Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Three-year action plan for improving the quality and efficiency of sewage treatment

来源: | 作者:佚名 | 发布时间 :2023-12-20 | 393 次浏览: | Share:


In order to further improve the quality of the water environment, speed up the shortcomings of domestic sewage treatment, and promote domestic sewage treatment at a high level, according to the relevant requirements of the national, provincial and municipal governments on in-depth fighting against pollution prevention and control, improving the quality and efficiency of sewage treatment, etc., Around the goals and tasks of the Mobilization Order of the General River Chief of Suzhou on carrying out the Action of "Eliminating the inferior and fighting for the Superior" to comprehensively eliminate the inferior V water bodies (No. 1 of 2021), combined with the actual situation of our city, the municipal government decided to implement the three-year action plan for improving the quality and efficiency of sewage treatment.

1. Guiding ideology

 Adhere to the problem orientation, goal orientation and result orientation, focus on strengthening the weaknesses, strength and efficiency, focus on comprehensively improving the quality of the water environment, promote the quality and efficiency of sewage treatment with high quality, and gradually realize the goal of clear river water and green bank, smooth and shallow bottom, add the background color for the water city Suzhou, and constantly enhance the people's sense of gain and happiness.

Ii. Main objectives

From 2021 to 2023, we will carry out in-depth actions to improve the quality and efficiency of sewage treatment, promote the integrated management of rivers and lakes in the plant network, and build a coordinated sewage treatment system. With the goal of "full coverage, full collection, full transportation, and full treatment", a new pattern of sewage treatment with "source control in place, plant network connection supporting, pipe network maintenance fine, sewage treatment quality, and sludge disposal safety" is built. We will basically eliminate sewage outfall and sewage pipe network blank areas in urban built-up areas, establish a sewage treatment system with matching capacity, and create a model area for improving sewage treatment quality and efficiency. Efforts should be made to improve the urban water environment, completely eliminate substandard Class V water bodies in urban built-up areas, and create a number of high-quality clean water waterways. The comprehensive level of sewage treatment and water environment treatment is in the forefront of the province and the country.

3. Key tasks

Improve the sewage collection and treatment capacity, crack the bottleneck; We will promote the construction of quality and efficiency improvement zones and eliminate weak links. Improve the quality of urban water environment, build clean water quality river, improve people's livelihood experience; Strengthen the quality and efficiency of construction, maintenance and management, and ensure long-term treatment. Implementation of precision, high-level promotion of sewage treatment work, more than 75% of the urban built-up areas and Jiangnan water town ancient town area, more than 65% of the township built-up areas into the "sewage treatment quality and efficiency up to standard area", completed 627, 1227.68 square kilometers, priority implementation of key areas, sensitive areas of the standard construction.

(a) implementation of sewage collection and treatment capacity improvement projects.

1. Improve the comprehensive sewage treatment capacity. Focusing on the improvement of treatment capacity, on the basis of the full assessment of the current situation, in accordance with the requirements of unified planning and unified construction, optimize the layout of sewage treatment facilities, moderately advance the construction of sewage treatment facilities, and newly renovated and expanded 13 sewage treatment plants, adding 340,000 tons/day of sewage treatment capacity. To further improve the efficiency of the transmission network, the concentrations of CODcr and BOD5 in the inlet water of urban and township sewage plants are greater than 280, 110 mg/l, 230 mg/L and 85 mg/L, respectively. For urban sewage plants whose inlet concentration is not up to standard, a "one plant, one policy" system is implemented. Sewage treatment plants close to residential areas and environmentally sensitive areas have been fully deodorized, and the construction of high-standard environmentally friendly sewage treatment plants has been encouraged.

2. Improve the coverage of sewage networks. Focus on the improvement of collection capacity, with the focus on the urban (town) suburb junction, urban villages, old streets, township industrial concentration areas and main traffic roads along the sewage network blank areas and empty points list. Further optimize the layout of the sewage pipe network in urban built-up areas, expand the coverage, weave the collection pipe network, build the main network of 394 kilometers, basically eliminate the blank area of the pipe network, and enhance the sewage collection and transportation capacity. We will strengthen the diversion of rain and pollution in temporary and acute terminal interception areas, and strive to promote the diversion of rain and pollution with higher standards in combination with the renovation of old residential areas and the improvement of inferior Class V water bodies. Strengthen the testing and repair of sewage pipe networks, and by the end of 2022, basically complete the testing of drainage pipe networks in urban built-up areas, complete the construction of drainage pipe network geographic information system (GIS), and organize the implementation of pipe network renovation and repair in planned areas, so as to effectively improve the efficiency of sewage collection.

3. Strengthen the standardization of sewage pumping stations. Focus on the improvement of transfer capacity, and promote the standardized construction and intelligent operation of sewage pumping stations (Wells) in accordance with the requirements of "advanced technology, safety and reliability, unified standards, and economic and reasonable". The construction of new sewage pumping stations with high standards, the current sewage pumping stations through investigation and evaluation, classification and implementation of capacity improvement or upgrading, 152 new or upgraded sewage pumping stations. Unify the selection and configuration standards of key equipment and facilities of sewage pumping stations, implement dual-circuit power supply transformation or equip standby power facilities, improve basic functions, enhance versatility and interoperability, add water quality and water quantity monitoring facilities at key node pumping stations, coordinate the promotion of water supply and drainage zoning metering, strengthen water balance analysis, and help sewage collection.

4. Strengthen the emergency response capacity of the sewage system. Focusing on the improvement of the toughness of the system, fully considering the impact on the operation of the sewage treatment plant caused by fluctuations in the amount of water coming into the plant, extreme low temperature, single tank maintenance, sewage pipe network and treatment system accident emergency, actively promote the construction of inter-plant and inter-regional interconnection pipelines in the sewage collection section, break administrative barriers, strengthen the overall planning of the interconnection pipeline system at the city level, and actively explore regional collaboration. Construction of 82.3 kilometers of sewage interconnection network. Strengthen the engineering and management measures for sewage collection, treatment and other facilities to effectively cope with overload, extremely low temperature, power loss, construction accidents, meteorological disasters and other factors, improve operation scheduling plans and emergency plans, strictly prohibit reduced operation, do relevant training, exercise, assessment, supervision and evaluation, and improve anti-risk ability.

5. Strengthen the standardized treatment and disposal of sludge. Focusing on the safe disposal of sludge, coordinating the construction of comprehensive utilization or permanent treatment and disposal facilities for sludge and municipal waste in sewage treatment plants, rationally arranging and constructing pipeline network drainage sludge disposal facilities, building 7 new and upgraded facilities, increasing the treatment and disposal capacity of 320 tons/day, and gradually improving the mutual guarantee system for sludge treatment and disposal in the municipal area. A traceable supervision system for the whole process of sludge transport, treatment and disposal has been established, GPS dynamic tracking instruments have been installed on all sludge transport vehicles and vessels, and the whole process and all-round supervision of sludge transport have been implemented online.

6. Improve the effectiveness of rural domestic sewage treatment. Focusing on the comprehensive treatment of agricultural pollution, promoting the extension of urban sewage treatment facilities and services to the countryside, the villages close to the municipal sewage network in principle adopt the takeover method, and carry out sewage treatment for 862 untreated natural villages, and strive to achieve 100% of the city's rural domestic sewage treatment rate. Evaluate the existing facilities, upgrade degraded and backward facilities, independent facilities of Taihu Lake and Yangcheng Lake first and second level protection areas, key national and provincial examination sections of villages, can not meet the effluent water quality requirements, priority to take over the transformation and upgrading. Implement unified operation and maintenance at the county and district levels, strengthen long-term management, improve the level of information supervision, strengthen daily assessment and supervision, and ensure the normal operation of facilities and discharge of water up to standard.

(2) Implementing the construction project of areas where the quality and efficiency of sewage treatment meet the standards.

Seven. Eliminate sewage direct discharge and mixing outlet. Further find out the drainage of farmers' markets, small restaurants, night stalls, farmers' music, barber shops, baths, auto repair and car washing, laundry, small clinics and other "small scattered" drainage households and construction sites, waste transfer stations, water quality, pretreatment facilities and take-over, establish a list of problems and a list of tasks, timely remediation, and according to the requirements of the classification of drainage permits or sewage acceptance procedures. In urban built-up areas, we will carry out inspections of non-rain outfalls, drainage outfalls into rivers, drainage outfalls in hidden culverts, and intercepting pipes along rivers, scientifically eliminate the miscombination of rain and sewage pipes and direct sewage outfalls, effectively control the overflow pollution of combined drainage systems during rainy days, and eliminate sewage from entering river headwaters.

8. Renovate balcony and unit internal drainage. Further investigate the mismixing of rainwater and sewage pipe networks in residential communities, commercial complexes, public buildings and units and the take-over of total drains, find out the whereabouts of rainwater and sewage, identify problems, implement responsibilities, and implement internal rainwater and sewage diversion transformation. Implement balcony sewage collection and treatment, set up independent sewage collection pipes on the balcony of the new community, and take rain and sewage diversion transformation or interception measures for the balcony sewage of the old community. Strengthen the acceptance and treatment of domestic sewage discharged from the first floor or underground garage, rectify the irregular connection of old residential areas, and study and implement the control mechanism to prevent residents from connecting the sewage riser to the stormwater pipe network.

9. Standardize drainage in industrial enterprises. We will accelerate the separate treatment of industrial wastewater and domestic sewage, and gradually build supporting facilities for the centralized treatment of industrial wastewater in industrial parks. Conduct a comprehensive investigation and evaluation of industrial enterprises whose waste water is connected to the municipal sewage network. If it is determined after evaluation that it cannot be connected to the sewage treatment plant, the directly discharged waste water and tail water that are treated by themselves according to regulations shall not be connected to the municipal sewage network, and the connected industrial enterprises shall be withdrawn within a time limit; If access is allowed, access shall be achieved after preprocessing. Strengthen the monitoring of water quality and quantity of water in the management enterprises, urge the enterprises to set up inspection Wells at the connection points of municipal pipelines, install online monitoring systems and flow control facilities. We will carry out the transformation of rain and pollution diversion in industrial parks and industrial enterprises, and eliminate the problems of direct sewage discharge and mismixing of rain and pollution.

(3) Implementing urban water environment improvement projects.

10. Eliminate inferior Class V water bodies. Implement the requirements of the "Eliminate the inferior and compete for the superior" action of the General River Chief Order in 2021, further investigate the water bodies in urban built-up areas, and further understand the pollution status and sources of the 170 inferior Class V water bodies that have been investigated, strengthen source control and pollution prevention in accordance with the standards of full coverage of the pipe network, full collection of sewage and full treatment of sewage, and prioritize the construction of associated drainage areas to meet the standards. It will be basically completed by the end of 2021.

11. Strengthen the use of ecological tail water. Make full use of high-pressure corridors, high-speed corridors, branch rivers and broken rivers after ecological transformation, etc., promote the construction of tailwater ecological wetlands according to local conditions, and improve the safety of tailwater. The use of river channel to transform functional wetlands, strengthen the site selection demonstration, to ensure the safety of flood control and drainage. Make full use of the tail water of high-quality ecological wetlands as ecological water replenishment for river channels to realize the utilization of tail water resources, and add 10 tail water ecological wetlands.

12. Create clean water boutique river. In each region, select an area or river with good basic conditions, build a drainage area with high standards, build a zero-direct discharge model area or zero-direct discharge river, supplement ecological restoration measures, introduce high-quality tailwater from sewage plants or carry out supplementary water source pretreatment, and optimize the riverbank environment to form a high-quality river with clear water, green bank and beautiful scenery. Improve the visibility of sewage treatment and the public's sense of gain, and transform the results of sewage treatment into high-quality environmental public goods.

(4) Implementing construction management quality and efficiency improvement projects.

13. Improve the quality control of facilities. We will carry out high-quality construction of sewage treatment plants, pipe networks, pumping stations, wetlands, and sludge treatment and disposal facilities, standardize bidding and bidding management, improve the quality of engineering investigation and design, and strictly control the quality of materials and construction. Encourage the establishment of a list of qualified suppliers of pipes and equipment, optimize pipe quality sampling measures, strengthen the inspection and acceptance of hidden works, strictly carry out the closed water test and CCTV inspection before pipeline acceptance, build a traceable and accountable quality control system for construction projects, and comprehensively improve the quality of drainage facilities construction.

14. Improve facility maintenance and management efficiency. The drainage GIS system should be improved, and the information of pipe network inspection, detection, repair, and maintenance should be input into the GIS system in a timely manner, so as to give full play to the role of the GIS system in management and protection. Establish a regular testing mechanism, carry out a structural inspection of the sewage network every 5 to 10 years, carry out a functional inspection every 1 to 2 years, and repair the problems found in the test as planned. Low water level operation of sewage pipe network and integrated operation of "plant station network and river" to reduce sewage overflow and extravasation. Formulate maintenance standards for municipal pipe networks, residential areas, unit courtyards, and agricultural pollution facilities, promote standardized and standardized maintenance, improve the level of mechanized maintenance, and establish a sound maintenance quality assessment mechanism.

Fifteen. Improve drainage information management. Promote the pilot construction of intelligent drainage in Suzhou, strengthen the integration with Suzhou City Information Model (CIM), and realize resource sharing. Construct drainage perception system, improve drainage perception network, and build online monitoring system and joint control system covering plant and station network river and agricultural pollution facilities. Improve the intelligent drainage application system, integrate information technology with business workflow, strengthen online supervision of drainage system water quantity, water quality and operation status, carry out online inspection and assessment, and improve work efficiency. Explore the application of monitoring and early warning, intelligent analysis, centralized scheduling, etc., form an intelligent integrated platform, realize the integration of plant, station, network and river scheduling, urban drainage and waterlogging early warning and scheduling, and improve the level of intelligent management and scheduling.

Fourth, safeguard measures

1. Strengthening organizational leadership and coordinating work. The municipal and district people's governments are responsible for the implementation of the three-year action to improve the quality and efficiency of sewage treatment, and should strengthen policy cohesion and work coordination to promote the implementation of the program. The office of the Leading Group at all levels to promote the quality of urban and rural domestic sewage treatment has included the three-year action to improve the quality and efficiency of sewage treatment as an important part of its work. Strengthen territorial responsibilities, implement grid tasks, work block management, all localities should formulate annual task plans, give full play to the production of river chiefs, and steadily promote the quality and efficiency of sewage treatment.

2. Rationalize the management system and oversight mechanism. In order to meet the requirements of high-quality development, intensive use of resources, abandoning the concept of heavy construction and light management, heavy factory and light pipe network, promote the reform of drainage management system in the city, thoroughly solve the problems of complicated management bodies, different standards, multi-management and unmanned management of sewage pipe network, and build a drainage management system with clear responsibilities, clear boundaries, strict supervision and efficient operation. We will focus on planning and leading coordination, promote the supervision of the whole process of construction and management operation, give full play to the effectiveness of departmental coordination and joint law enforcement, improve the level of urban and rural domestic sewage treatment, and form a unified, efficient, scientific and standardized management mechanism with strong implementation.

3. Strengthen funding and policy support. The total investment is 13.344 billion yuan. We will strengthen financial support and guarantee, establish an investment and financing mechanism that is guided by the government, promoted by the market and involving the public, and actively expand financing channels. Actively strive for national and provincial funding support for key sewage treatment and water environment improvement projects. In accordance with the normal operating costs of sewage treatment and sludge treatment and disposal facilities and the principle of reasonable profit, high quality and high price, reasonable adjustment of sewage treatment fee standards, improve the sewage treatment plant, pipe network (pumping station) and tail water wetland operation service fee allocation methods, fully ensure the stable operation of facilities. Coordinate the use of sewage treatment fees and financial subsidies to pay for operation services, and improve the performance of fund use.

4. Intensify law enforcement, oversight and assessment. The departments of ecological environment, water affairs and urban management shall, in accordance with their respective duties, strengthen law enforcement and crackdown on the direct discharge and diversion of sewage; All functional departments regularly carry out joint inspections and joint law enforcement, and grid personnel should strengthen the inspection of drainage and report problems in time. Strengthen the management of drainage permits, improve the supervision before, during and after the event, and increase the law enforcement and investigation of illegal drainage behaviors such as exceeding the standard and exceeding the permitted amount into the sewage network. Urban domestic sewage treatment management standards have been formulated, and third-party certification has been promoted. Strengthen daily inspection, carry out classified assessment, and strictly assess the operation of sewage treatment, pipe network operation and rural domestic sewage treatment facilities, pay according to quality, reward the best and punish the poor. We will innovate regulatory methods, strengthen the construction of professional regulatory teams, and cultivate and make good use of third-party regulatory forces.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell MU-TD0D13 - 51304650-100 / MU-TDOD13 Digital Output FTA SS Relay Rev. H
  • Honeywell STD810-A1HC4AS-1-A-AD0-11S-A-00A0-00-0000 - NSMP
  • Honeywell PI000-05076 - "target, M2000 sputtering, 59.5Ti/.5CU, 4.460X11.64X13.050, "
  • Honeywell 51401286-100 - / 51401286100 (NEW NO BOX)
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx)
  • Honeywell CC-PDIL01 - 1PCS PKS DI 24V IOM 51405040-175() /PL3
  • Honeywell TK-PRS021 - 51404305-375 NSNP
  • Honeywell STR93D-21C-1K0AFCAA21A0-A1,CC,F8,FC,FF,MB,TG,W2,3H-XXXX - NSMP
  • Honeywell 9437310 - Measurex - - MxOpen UAP (Unitec Applications Processor)
  • Honeywell 51305552-100 - / 51305552100 (USED TESTED CLEANED)
  • Honeywell 97350 - Target /BP Assy .25 IN TI 5N AMAT Endura Applied Materials New
  • Honeywell 51305508-200 - / 51305508200 (NEW NO BOX)
  • Honeywell U2-1018S-PF - Brand New Expedited Shipping
  • Honeywell 2MLR-AC22 - "Masterlogic-200 ,2MLR-DBSF,2MLF-AD4S Rack Modules"
  • Honeywell 2075252-D2 - Enraf PCB XPU1 + Display Mount 2558 584-1
  • Honeywell MC-PAIL02 - 51304481-150 Low Level Analog Input Module FW: K
  • Honeywell 51304493-200 - PM Modem Card Rev.K
  • Honeywell C7012F1052 - Flame Detector Expedited Shipping UPS Express GQ
  • Honeywell WA800 - Radar Antenna MI-585353 w/ May 2024 Inspected 8130
  • Honeywell W7704D-1016 - / W7704D1016 (NEW IN BOX)
  • Honeywell VE4100B3000 - Brand NEW gas solenoid valve one year warranty
  • Honeywell MIDAS-M - MMC-A2U20000 Detector #H254CC YD
  • Honeywell C-AA201 - 30734772-002 Auxiliary Alarm With Relay Board PWB
  • Honeywell 51401598-200 - Time-Sync Communication Daughter Card
  • Honeywell MCT202 - Communicator Brand New Fast Shipping via DHL
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell VE4100B3000 - NEW gas solenoid valve one year warranty
  • Honeywell AZ960 - 7024900-90 Air Data Computer
  • Honeywell FC-RUSIO-3224 - Programmable Logic Controller Module
  • Honeywell SM200 - Servo Drive 4006719-921 w/ October 2023 Inspected 8130
  • Honeywell V5013C1019U - New 1PC V5013C1019/U 1 year warranty
  • Honeywell MU-PPIX02 - Pulse Input Module 51304386-100
  • Honeywell CC-TAON01 - 1PCS Module 51308371-175 Brand new
  • Honeywell U2-1018S-PF - New Flame Detector DHL
  • Honeywell TC-IAH161 - 1PC PLC Module TCIAH161 Via DHL or FedEX
  • Honeywell SPS5713 - 51199930-100 (AS PICTURED) NSMP
  • Honeywell TK-CCR014 - REDUNDANT NETINTERFACE NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell DR45AT-1000-00-011-0-000000-0 - 120/240VAC NSMP
  • Honeywell XNX-UTAI-RNNNN - Universal Transmitter New DHL
  • Honeywell 82408449-001 - Yamatake- IBCD Card PCB
  • Honeywell K2LCN-8 - Via DHL or FedEx
  • Honeywell FC-PSU-UNI2450U - V2.1 Power Supply Module
  • Honeywell CD815 - Control Display Unit 7022360-902 Removed Working
  • Honeywell MCB3-A3C1REZ-020 - 0 to 100 PPM LCD Display Multi-Gas Detector
  • Honeywell HP600 - High Power Amplifier 7516250-60050 Removed Working
  • Honeywell C7061F2001 - 1PC New replace C7012F1052 flame detector Fast Shipping
  • Honeywell 620-0025RC - 1pcs Brand New Fast Fast Shipping
  • Honeywell ED-600 - 7003403-901 Electric Display with Mods (Cracked Face)
  • Honeywell 3075388-2 - ", TRANSDUCER PN "
  • Honeywell EN-2018-5607 - Smartline HART Communication Assy
  • Honeywell EX52710100036 - / MTU EXHAUST TURBOCHARGER
  • Honeywell Q7055A-1007 - / Q7055A1007 (USED TESTED CLEANED)
  • Honeywell 51304190-200 - E Jumper Card 51304189 Rev A
  • Honeywell TK-PRR021 - 1PC New PLC Module in box 1 year warranty#XR
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping
  • Honeywell 05704-A-0145 - / 05704A0145 (NEW NO BOX)
  • Honeywell C7012F1052 - New UV Flame Detector Free Expedited Shipping
  • Honeywell MC-PAIL02 - 51304481-150 Low Level Analog Input Module Rev: E
  • Honeywell 80363969-150 - / 80363969150 (NEW IN BOX)
  • Honeywell 8694700 - USED MEASUREX COP PROCESSOR
  • Honeywell 900C70-0360-00 - 5VDC NSMP
  • Honeywell 51401392-100 - ",51403422-150,51304485-100 Module Rack 24VDC"
  • Honeywell CC-PDOB01 - / CCPDOB01 (NEW IN BOX)
  • Honeywell SPS5785 - NEW 1PCS 51198651-100 replace 51198947-100 HPM POWER SUPPLY
  • Honeywell 965-1210-020 - "EGPWS Computer w/ GPS MK VIII, P/N: , HONEYWELL"
  • Honeywell VE4100B3000 - NEW gas solenoid valve one year warranty
  • Honeywell PW6K1R2 - 13PCS Brand New Expedited Shipping
  • Honeywell TSQUALWDX-07821 - "Sputtering Target 59Al/1Cu 7.830x11.640x13.050"" New"
  • Honeywell 900C70-0360-00 - 900 CONTROL STATION Touch Screen
  • Honeywell 620-0036 - / 6200036 (NEW IN BOX)
  • Honeywell DR45AT-1100-00-001-0-00000E-0 - 120/240VAC UNMP
  • Honeywell LG1093AA24 - NEW ULTRAVIOLET FLAME SENSOR 261A1812P012
  • Honeywell TC-IAH161 - ANALOG INPUT TCIAH161 NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell TK-PRS021 - F/W G 24VDC 1.6A NSNP
  • Honeywell G3I-D22C - Programmable Logic Controller 12-24Vdc 5-11Ma
  • Honeywell TK-PRS021 - / TKPRS021 (NEW NO BOX)
  • Honeywell VM3A - "Thor - 30.7cm (12.1in) - 1024 x 768 Pixel - LED - Capacitive"
  • Honeywell MCL1326 - HOUSING ASSY P/N (HONEYWELL) NE COND # 11383 (4)
  • Honeywell 50126003-001 - Smartline Integrally Mounted Basic Indicator Rev A
  • Honeywell 053669-01 - "USED MEASUREX PC BOARD REV. A, 05366901"
  • Honeywell 620-0025RC - 1pcs Brand New Fast Shipping FedEx or DHL
  • Honeywell FC-RUSIO-3224 - 1pc Brand New Programmable Logic Controller Module
  • Honeywell 7000836-916 - Display Unit Attitude Reference Indicator Agusta A109E #AR
  • Honeywell STF724-E1HS4A-H1F-A-AHC-11C-B-01A0-F1-000 - ST 700 Pression Transmett
  • Honeywell PGM-7340 - ppbRAE 3000+ VOC Gas detector
  • Honeywell MCT202 - Communicator Fast Shipping
  • Honeywell QPP-0002 - Security Manager 24vdc Processor
  • Honeywell 8C-PCNT02 - New C300 Controller In Box DHL
  • Honeywell 1616-350-01A - Iridium FlightDeck Tranceiver P/N
  • Honeywell V5013C1019U - New V5013C1019/U 1 year warranty