Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Many mines and mining areas in China have achieved remarkable results in the treatment of the past "scars on the earth" into green mountains

F: | Au:佚名 | DA:2023-12-21 | 701 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

The parallel exploitation of mineral resources and ecological restoration and management of mining areas is an inevitable requirement of the concept of "ecological priority and green development". Under the guidance of the concept of green development and relying on the spirit of hard work and scientific management, many mines and mining areas in our country are repairing one piece after another of the "scars on the earth", so that the former waste water and mountains have become green mountains.

Recently, Inner Mongolia Erdos City Yijin Horo Banner Wulan Mulun town Tianjiao green energy 500,000 kw coal mining subsidence area ecological governance photovoltaic power generation demonstration project connected to the grid. The implementation of this project provides a new reference for the development of new energy industry, the construction of green mines and the comprehensive development of ecological restoration and management in coal mining subsidence areas in the Yellow River basin.

The parallel exploitation of mineral resources and ecological restoration and management of mining areas is an inevitable requirement of the concept of "ecological priority and green development". Science and Technology Daily reporters visited many places in China and found that the management of mining areas in these areas has achieved remarkable results, and the highlights of ecological restoration are frequent. With the unswerving concept of green development, the spirit of hard work and scientific governance, we are repairing one piece after another "scars on the earth", and the barren mountains of waste water in the past are turning into green mountains.

Work hard, dig out the black and leave the green

In Habahe County, Alatai region, Xinjiang, Ashele Copper Co., Ltd. planted 270,000 trees of various types for the Ashele mining area covered with green clothing, the reporter learned here that since the construction of the mining area began in 2002, the annual spring and autumn tree-planting activities have never been interrupted, this persistence, making the mining area green rate reached 70% today. At the same time, the mining area has also implemented the tailings water utilization project, the domestic sewage purification and pumping, for production water and mining area greening irrigation, to achieve zero discharge of production and domestic wastewater, mine environmental protection management has reached the leading level in China.

Located in Inner Mongolia, the national energy Group Shendong Coal Group Company (hereinafter referred to as Shendong Group) is the only modern energy enterprise in China that delivers 200 million tons of high-quality coal to the country every year. The person in charge of the company introduced: "The 36 years of the establishment of the enterprise is not only the 36 years of building a safe, efficient and modern smart coal base, but also the 36 years of building a green coal base for soil and water conservation, environmental protection and land reclamation; Practice has proved that with firm will and hard work, the ecological environment can be fundamentally improved, and a barren mine can become a green treasure house."

In fact, more than 30 years ago, Shendong Group, while exploiting resources, has already rooted the concept of environmental protection and ecological restoration into the development of enterprises. According to the memories of many old employees of Shendong Group, at that time, we started from the mobile sand area around the mining area, and used the combination of grid sand fixation and irrigation cultivation to fix and control sand. Since 1994, Shendong Group has taken a combination of engineering measures and biological measures to carry out comprehensive soil and water conservation management in small watersheds around the mining area, and the first battle was launched in the Red stone Circle, which was the most serious soil erosion at that time. The workers put up tents on the mountain, slept in the open, and launched a "decisive battle" with the sand area, laying the foundation for today's beautiful "Red stone Circle" in the deep forest.

Wu Jiazheng, an employee of Shendong Group who has 30 years of experience in mining area greening, said: "At that time, the mining area needed a lot of seedlings for afforestation, the supply force around the mining area was insufficient, and the cost of outsourcing was too high, so the group finally decided to grow seedlings by itself." Hard work pays off, in a few years, the group's nursery has cultivated more than 2 million saplings for the mining area. Until today, the nursery is still cultivating seedlings for Shendong Group, which has made a significant contribution to the environmental protection cause of the mining area.

Today, from "a tree" to "a forest", it embodies the firm will of several generations of "Shendong people". The vegetation coverage rate of the mining area of Shendong Group has increased from 3%-11% at the beginning of development to 64% at present, and the ecological control area of the mining area has reached 384 square kilometers.

Hard work and hard work, digging out the black, leaving the green, has become an iron concept of modern mining development.

Keep trying, want to green also want to develop

In recent years, with the continuous improvement and innovation of the concept of green development, China's new attempts, new explorations and new experiences in mining area restoration and mine ecological management are endless.

On September 15, the "Muli Mining area ecological environment comprehensive treatment project (Section 1) Grass restoration Project" (hereinafter referred to as Muli Mining area restoration Project) undertaken by the China Coal Geology Administration (hereinafter referred to as the China Coal Geology Administration) passed the provincial inspection and acceptance of Qinghai Province.

Zhang Jiabao, academician of the Chinese Academy of Engineering and researcher of the Nanjing Institute of Soil Science of the Chinese Academy of Sciences, said in an interview with the media: "The ecological restoration of Muli mining area is the first demonstration project of large-scale mine management in China at present in the plateau, high cold and high altitude area. There is no successful experience and mature model at home and abroad for reference, which has strong exploration and experimental significance. It is not only an exploration in China, but also an exploration in the world." The quest proved to be a complete success.

The inspection group believes that the quality of the green restoration project in Muli mining area is good, especially the key indicators of the number of seedlings, coverage and plant height are better than the acceptance standard, and the seedling growth is good, and the expected results have been achieved.

According to the relevant person in charge of the General Bureau of Coal Geology, the ecological management project of the mining area follows the concept of "integrated management of mountains, rivers, forests, fields, lakes and grasses", and achieved the goal of "two years to see the green image" one year in advance, creating new achievements in the ecological environment management of plateau and cold areas and accumulating new experience.

Mining area management should be green, but also development. In the Inner Mongolia Ordos Tianjiao green energy 500 thousand kilowatts of coal mining subsidence area ecological control photovoltaic power generation demonstration project site, the reporter saw that 20,000 acres of contiguous photovoltaic panels endless, spectacular.

Unlike other projects, this PV project is a PV + industry developed after high-standard ecological restoration in the coal mining subsidence area. With the launch of the project, while contributing 900 million KWH of clean electricity to the country every year, this coal mining subsidence area will be completely transformed into a smart photovoltaic garden complex.

The reporter was informed that the project in 42,000 mu of coal mining subsidence area land on the basis of high standard ecological restoration, the photovoltaic module is arranged above the ground with a bracket, the lower layer is used for agriculture and forestry planting, aquaculture, the upper layer is used for solar power generation, play the forest light complementary, agricultural light complementary, fishing light complementary, dual-use characteristics. And supporting the development of agricultural tourism, special fruits and vegetables and other tourism industries.

Ding Xiangfei, head of the project site, said: "With the concept of green development, this project has created a new development direction for ecological restoration and governance, achieved the integrated development of the first, second and third industries, and also carried out a pilot exploration for the future green energy replacement."

Technology blessing, a "navigation" for ecological restoration

In recent years, new technologies such as big data, artificial intelligence, automation and robots have brought new opportunities and paths for mining production and ecological restoration in mining areas.

According to the "Ecological Restoration Work Plan of Abandoned Open-pit Mines Based on Mining Big Data and Remote Sensing Information" of the Ministry of Natural Resources in 2019, it is necessary to use big data to comprehensively rectify the ecological and environmental damage problems of abandoned open-pit mines (including mining sites) along the Yangtze River main stream and main tributaries. By the end of 2020, the treatment of abandoned open-pit mines within 10 kilometers of each bank of the main stream of the Yangtze River and its main tributaries has been completed. Facts are gradually verifying the subversion and reshaping of the resource governance system, including mine ecological restoration, by big data, artificial intelligence and other technologies.

The open pit mine in Inner Mongolia Jalainur is a typical representative of northern mining area. After hundreds of years of exploitation, the land in the mine is barren and degraded, and the area of soil and water loss has increased continuously. Today, the century-old mine is tree-lined and completely covered with native grasses.

"The ecological restoration of Jalainur open pit mine is a typical case in which we use modern technical means to repair and control the mining area. The mine ecological big data platform uses advanced technologies such as cloud computing, big data, Internet of Things and remote sensing to guide the fine restoration of the mine. It provides whole-life cycle process management for exploration, planning and design, geological disaster control, ecological restoration project implementation and conservation." He Yong, head of mining business of Inner Mongolia Mengcao Ecological Environment (Group) Co., LTD. (hereinafter referred to as Mengcao Group).

On the page of Mengcao Group's ecological big data platform, the basic situation of mines in the country is clear at a glance. Through the data platform, you can query the distribution information of more than 60,000 mines in the country. Click on the point to view the longitude and latitude location of the current mine, the district and county to which it belongs, the type of mineral, the type of soil, meteorological information and the information of suitable vegetation.

He Yong said that the ecological environment restoration of mines has the characteristics of comprehensiveness, complexity, professionalism and innovation. At present, there are more than 20 kinds of mine geological disasters in the northern region, including geomorphic landscape damage, underground aquifer damage, land resource occupation and destruction, etc. To complete a comprehensive mine restoration project requires multidisciplinary knowledge and technical support such as geotechnical engineering, geology, biology, soil science and soil and water conservation.

Facts have proved that China's big data platform has been able to provide relatively complete solutions covering planning and design, product technology research and development, plant matching, engineering construction of systematic mine restoration and environmental governance, so that mine restoration is no longer difficult.


  • Rexroth CFL01.1-R3 Sercos III Interface Module
  • Rexroth CKK-110-NN-1 Linear Axis with MSK040C
  • Bosch Rexroth 047018-104401 Controller Card
  • Rexroth MDSD1K-2X/4 Solenoid Driver Module
  • Rexroth DKC02.3-012-3-MGP-01VRS Servo Drive
  • Rexroth HCS01.1E-W0006 Compact Servo Drive
  • Rexroth NAM1.2-08 Line Former R911246505
  • Rexroth VPB40 Industrial PC Control Cabinet
  • Rexroth FWA-ECODR3-SGP-03-MS Firmware Module
  • Rexroth HEDE10-31 Pressure Switch R901425475
  • Rexroth HM 17-11/315-C/V0/0 Pressure Sensor
  • Rexroth VFC 3610-2K20-3P4-MNA-7P Inverter 2.2kW
  • Rexroth MSK040C-0600-NN-M1-UG1-NNNN Right Angle Geared Motor
  • Rexroth DKC02.3-012-3-MGP-01VRS EcoDrive Cs
  • Bosch Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth HCS02.1E-W0012-A-03-NNNN Power Section
  • Rexroth DBDS 20 P18/400V Pressure Relief Valve
  • Rexroth 3460565500 Pneumatic EP Converter Regulator
  • Rexroth VT-SWA-1-12/DFEE Angle Sensor R900913641
  • Rexroth 0-608-830-250 Interface Module SM24V
  • Rexroth MHD071B-035-NP0-UN8 Servo Motor 12Nm 1000rpm
  • Rexroth MKD025B-144-KG0-KN R911263737 Servo Motor
  • Rexroth KCU02.2N-ET-ET*-025-NN-N-NN-NW Control Unit
  • Rexroth MV-VPB40*3-RB001VPB R911337529 Valve Terminal
  • Bosch Rexroth AS 2/R-2200 Drive Module 3842998041
  • Rexroth HMS01.1N-W0036 Power Section
  • Rexroth CKK-145-NN1 Compact Linear Module
  • Rexroth MS2N04-C0BTN-BSDK0-NNNNN-NN Geared Servo Motor
  • Rexroth HCS02.1E-W0028-A-03-NNNN Power Section
  • Rexroth MS2N04-D0BQN-CMSG0-NNNNN-NN Servo Motor
  • Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth MKD041B-144-KP1-KN Servo Motor R911262307
  • Rexroth ESA075G Handheld Nutrunner 0608841033
  • Rexroth MSK070D-0450-NN-M1-UP1-NSNN Motor
  • Rexroth CKK-145-NNG1 Linear Kit with HCS02 Drive
  • Rexroth MSK060C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth MKD090B-047-KP1-KS Servo Motor
  • Rexroth MLS140S-3A-0450-NNN Linear Motor
  • Rexroth VPB40.3 Industrial PC R911338689 CB1
  • Rexroth HCS02.1E-W0012 Servo Drive R911313871
  • Rexroth R151349014 R151145672 Ball Screw Assembly
  • Bosch Rexroth CKK-110-NN-1 Compact Module
  • Rexroth MSK060B-0300-NN-M1-UG1-NNNN Servo Motor
  • Rexroth Indramat TBM 1.2-40-W1-024 Servo Bleeder
  • Rexroth MSK040B-0600-NN-M1-UG1-NNNN Servo Motor
  • Rexroth MLS200S-3A-0450-NNN R911299213 Linear Motor
  • Rexroth SB356 Tool Tightening Controller Rack
  • Rexroth MSK050C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth Indramat DKC11.3-040-7-FW Eco Drive
  • Rexroth VT2000 Proportional Amplifier
  • Rexroth VT1118-10 Analog Module
  • Rexroth MSK060C-0600-NN-M1-UP1-NSNN Motor
  • Rexroth MSK060C-0300-NN-S1-UG0-NNNN Motor
  • Rexroth R911173937 IndraControl XM AI1
  • Rexroth R412018225 AES-D-BC-ECAT Module
  • Rexroth CDB02.1B R911338542 Controller Card
  • Rexroth VT-HNC100-2-30/P-I-00/000 Module
  • Bosch Rexroth CSB02.1B R911372549 Control
  • Bosch Rexroth R185321310 Runner Block
  • Rexroth VPB40.3 Industrial PC R911338689
  • Rexroth HNK01.1A-A075-E0106-A-500 Drive Controller
  • Rexroth CSH02.1B-CC-EC-ET-S4-NN-NN-FW Controller
  • Rexroth CSB01.1C-PB-ENS-NNN Control Unit
  • Rexroth MKD041B-144-KP0-KN Permanent Magnet Motor
  • Rexroth SE-B2.020.030-14.000 Servo Motor
  • Rexroth MSK060C-0600-NN-M1-UG0-NNNN Servo Motor
  • Rexroth HCS01.1E-W0018-A-03-B Drive Controller
  • Rexroth 3 842 547 996 IE3 Geared Motor
  • Rexroth CSH01.1C-NN-ENS R911309709 Control Section
  • Rexroth R151349013 Ball Screw Nut
  • Mannesmann Rexroth VT3006-36 Analog Amplifier Card
  • Bosch Rexroth R900086160 PGF1 Gear Pump
  • Bosch Rexroth R911173263 VDP15.3 Touch Display
  • Bosch Rexroth PPC-R22.1 RJ522 Industrial Controller
  • Bosch Rexroth MSK060C-0300-NN-S1-UG0-NNNN Servo Motor
  • Bosch Rexroth R911325068 NYS04.1 Controller
  • Bosch Rexroth R911335439 CSH01.1C Control Unit
  • Bosch Rexroth R917010287 BODAS RC10 Controller
  • Bosch Rexroth R911329791 CSH01.1C Drive Controller
  • Bosch Rexroth R182432310 Runner Block Guide
  • Bosch Rexroth VT-VSPA2-1-11 Amplifier Card R900021909
  • Bosch Rexroth MKD090B-047-KG1-KN Servo Motor
  • Bosch Rexroth LTU350 Servo Amplifier 0608750108
  • Bosch Rexroth 5610102050 Pneumatic Vacuum Regulator
  • Bosch Rexroth VT5041-23/3-OV PLC Control Board
  • Bosch Rexroth VT3015 S10/E Servo Amplifier Board
  • Bosch Rexroth MSK070D-0300-NN-M2-UG1 Servo Motor
  • Bosch Rexroth 3DREP6C-21 Valve R900955887
  • Bosch Rexroth R151244013 Ball Screw Bearing Unit
  • Bosch Rexroth MSM031C-0300 Servomotor R911325140
  • Bosch Rexroth EMD-B16.1-DC024N Box R911291681
  • Bosch Rexroth MKD071B-061-GP0-KN Servo Motor
  • Bosch Rexroth MSK030C-0900-NN-M1-UG1 Servo Motor
  • Bosch Rexroth EcoDrive DKC01.3-004-3-MGP-01 Servo Controller (299772)
  • Bosch Rexroth DKC02.3-040-7 EcoDrive Controller
  • Bosch Rexroth CLC-D02.3 CLC Motion Control Board
  • Bosch Rexroth HDS05.2-W300N Drive R911190019
  • Bosch Rexroth DKCXX.3-100-7 Servo Drive Unit
  • Bosch Rexroth CSE02.1A-S3-EC Control Unit R911339030
  • Bosch Rexroth MSK040C-0600-NN-S1-UP0 Servo Motor
  • Bosch Rexroth VT3013 S36 R5 Circuit Board Card
  • Bosch Rexroth VT3000-36A Amplifier Card R90020298
  • Bosch Rexroth VPB40.3 IndraControl Module R911374113
  • Bosch Rexroth HCS02.1E-W0054-A-03-NNNN Converter with R911332574 Control Unit
  • Bosch Rexroth MHD071B-061-PG1-UN Servo Motor
  • Bosch Rexroth A2F5/60W-B3-S Piston Motor R909418904
  • Bosch Rexroth HCS01.1E-W0018-A-03-B-ET-EC-NN-NN-NN-FW IndraDrive Cs Converter
  • Bosch Rexroth 4WRPEH 6 C4B40P-2X/G24K0/A1M Proportional Directional Valve (0 811 404 647)
  • Bosch Rexroth R911405975 ctrlX OS PLC Controller
  • Bosch Rexroth CSB02.1B-ET-EC-NN-S4-NN-NN-FW Servo Control Card R911338543
  • Rexroth MSK050B-0300-NN-M1-UG0-NNN Servo Motor
  • Rexroth IndraControl VEPXX.5-ATOM Set R911374889 Panel
  • Rexroth 1070089906-GC1 1070089907-201 Board
  • Rexroth CSB01.1C-SE-ENS-EN2-NN-S-NN-FW Control Unit
  • Rexroth MKD071B-024-KG3-KN Servo Motor
  • Rexroth Indramat DKC02.3-040-7-FW Controller
  • Rexroth HCS02.1E-W0028-A-03-NNNN Servo Module
  • Rexroth HMD01.1N-W0036-A-07-NNNN Drive Module
  • Rexroth MSK050C-0600-NN-M1-UG0-NNN Servo Motor
  • Rexroth DKC02.3-040-7-FW Servo Controller
  • Bosch Rexroth VT-5014S30-R1 Amplifier Card
  • Bosch Rexroth MSK040C-0600-NN-M1-UG1 Servo Motor
  • Bosch Rexroth MKD071B-061-GG0-KN Servo Motor
  • Bosch Rexroth VT5012-S45-R1 Amplifier Card
  • Bosch Rexroth SHL03.1-NNN-S-NNN Encoder Module
  • Bosch Rexroth EFC3600-0K75 Frequency Converter
  • Bosch Rexroth VFC3610-1K50-3P4-MNA-7P-NNNNN-NNNN 1.5kW Frequency Inverter
  • Bosch Rexroth EFC5610-2K20-3P4-MDA-7P-NNNNN-L1NN 2.2kW Frequency Converter