6. Accelerate project reserve and construction
The provincial energy authorities should, in accordance with the clear direction and tasks of the "14th Five-Year Plan for Renewable Energy Development" and the minimum absorption responsibility weight of non-hydropower in 2022 in the province (autonomous regions and municipalities), determine the scale of guaranteed grid-connected projects in 2022, pay close attention to organizing the competitive allocation of guaranteed grid-connected projects, and organize the approval (filing) of a number of new wind power and photovoltaic power generation projects. Do a good job in project reserve, promote the timely construction of projects, and achieve continuous development.
Safeguard measures
The provincial energy authorities shall promptly announce the scale of guaranteed grid-connection, implement guaranteed grid-connection and market-oriented grid-connection projects, and timely prepare annual development and construction plans and promptly organize and implement them. It is necessary to optimize the business environment, standardize the order of development and construction, and shall not use supporting industries as the threshold of project development and construction. It is necessary to urge local governments to implement project construction conditions, promote the introduction of land, fiscal, tax and financial support policies, reduce the unreasonable burden of new energy development and construction, and mobilize the enthusiasm of various market players to invest. It is necessary to increase coordination with natural resources, forestry and grassland, ecological environment, housing construction and other departments to create favorable conditions for the development and construction of wind power and photovoltaic power generation projects.
Power grid enterprises should simplify the network connection process, facilitate the network connection procedures, promote the new energy cloud platform, achieve full coverage of the country, and serve the new power system with new energy as the main body. It is necessary to strengthen the construction of network connection projects, and ensure that the guaranteed grid connection and market-oriented grid connection projects included in the annual development and construction plan "can do all", and no additional conditions shall be attached. Together with the national new energy consumption monitoring and early warning center, it is necessary to timely announce the grid consumption situation and forecast analysis of provincial regions, and guide rational investment and orderly construction.
The power generation enterprise shall organize and carry out the project construction in a timely manner in accordance with the requirements of the approval (filing) documents for the projects included in the annual development and construction plan. We must strengthen project quality control to ensure construction safety and production safety. It is necessary to fill in the national renewable energy power generation project information management platform in time and update the project information on a monthly basis.
The National renewable energy Information Management Center shall collect project information and report it to the National Energy Administration on a monthly basis, and copy it to the provincial energy authorities and relevant agencies.
The National Energy Administration will strengthen the monitoring and evaluation of the implementation of the renewable energy power consumption responsibility weight, and guide and promote the development and construction of wind power and photovoltaic power generation. The dispatch agencies shall strengthen the supervision of the implementation of wind power and photovoltaic power generation planning, project competitive allocation, grid delivery project construction, project grid-connected consumption and other matters within the jurisdiction, and organize the comprehensive supervision of clean energy consumption as required to ensure the standardized and orderly development and construction of wind power and photovoltaic power generation.
email:1583694102@qq.com
wang@kongjiangauto.com