Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Gas, electricity, drainage, heating and other supporting infrastructure has become the focus of the transformation

来源: | 作者:佚名 | 发布时间 :2023-12-26 | 644 次浏览: | Share:

Out of sight

-- Investigate potential security risks in supporting infrastructure, and map out the gaps in people's livelihood facilities

The "old" and "old" of the old community are not only reflected in the specific age of the building, but also hidden in many "invisible places".

"The installation of elevators, hardening of the road, these are 'visible places', and' invisible places' should also become the focus of the transformation." When it comes to the transformation of old residential areas, Chen Jun, a resident of an old residential area in Haidian District, Beijing, said so. The community where Chen Jun lives was built in the early 1980s. Due to the age of the building, the supporting facilities of the community have problems such as aging drainage facilities, low heating temperature, and slow optical fiber network speed. Taking drainage facilities as an example, the upper and lower water pipes in the building are made of cast iron, which is aged and rusted seriously, and there are water leakage and other phenomena. "Every time the water supply is restored after the water is stopped, the water is brown-red and mixed with gravel, and it takes a long time to restore the clarity." The corrosion of the pipes has affected the water quality. My family does not burn tap water to drink or cook with." Chen Jun said.

For the gap in people's livelihood facilities, the residents of the old community also have a strong desire to transform.

"The building door is five steps higher than the ground, but there is no barrier-free facilities, which is particularly inconvenient for elderly people in wheelchairs and crutches." There are many old people and children in the community, and there is a lack of nursing care facilities." Wang Shuzhen, who is over 80 years old and lives in a residential area built in the 1990s in Chaoyang District, Beijing, now has a problem: "We are a ladder of two households, some owners simply occupy the public space outside the elevator, partition, storage of debris, feeling very unsafe, but the property has no law enforcement power, and now it has become a 'big trouble' problem." Wang Shuzhen said.

These "invisible" and "difficult to see" places contain not only the basic transformation content such as municipal supporting facilities, but also the improvement content to meet the needs of residents' convenience in life, and the improvement content of rich public services, which is the focus of the next stage of the transformation of old residential areas.

The notice requires the investigation of gas, electricity, drainage, heating and other supporting infrastructure, as well as public space and other possible security risks; Find out the gap in facilities such as elderly care, childcare, parking, convenience, and charging piles. On this basis, the above facilities will be prioritized as a key content.

Ren Xingzhou, a researcher at the Research Institute of Market Economy of the Development Research Center of The State Council, told this reporter that the renovation of relevant facilities in the old community is a systematic project including the early project approval, mid-term construction, and late management and maintenance, and the early planning is in place and the residents are well explained and guided, which is an important prerequisite for the transformation. In the process of specific implementation, we must also adhere to local conditions, classified policies, and strive to achieve one policy in one place and one policy in one community. "Finding out the situation, identifying the shortcomings, and first striving for practical results in the transformation process will greatly improve the sense of gain and happiness of residents in the old community." Ren Xingzhou said.

Build, update, and manage well

-- Strengthen the supervision during and after the event, implement professional property management, and improve the long-term management mechanism

Making up the short board of supporting facilities in old residential areas is a complex and meticulous project involving a wide range of areas.

"We hope to change the cast iron pipe into PVC (polyvinyl chloride), but this is really a big project, to change the whole series, need someone to organize coordination, unified action." Of course, it also requires a lot of money." Chen Jun told reporters that in order to solve the problem of aging drainage facilities, the strength of individual owners and property companies is far from enough, and multiple subjects need to form a joint force in all aspects in order to achieve "both symptoms and root causes."

Wang Shuzhen said that when the facilities are built, they should also be managed, which requires improving the service management capabilities of the community, property and related departments. "There is not only a lack of parking Spaces in our community, but also disorderly management. Some have no households at all, while others have many. Over time, many residents lack trust in facility managers."

The transformation of supporting facilities requires compacting the responsible body. The "Notice" emphasizes that the social responsibility and safety responsibility of professional business units must be implemented first, and safety inspections and facility maintenance must be done. In terms of improving the long-term management mechanism, cities (counties) at all levels should fulfill the main responsibility of safety management, and relevant departments should carry out safety supervision and inspection according to their duties. In addition, it is necessary to establish a new community management mechanism with extensive participation, consultation, coordination and interaction between residents' committees, industry committees, and property companies, promote the modernization of community grass-roots governance systems and governance capabilities, and jointly maintain the transformation results.

Overall planning and coordination in the transformation process is also very important. "The management facilities of each unit are often 'Kowloon water control' and lack of coordination. Digging pipes today, repairing Wells tomorrow, moving optical cables the day after tomorrow... Digging and filling, and then stopping the water from time to time, have brought a lot of inconvenience to the lives of residents." Chen Jun said. To this end, the "Notice" in the engineering quality and safety supervision of the project industry in charge of units, construction units, survey and design units, construction units, supervision units are put forward corresponding requirements, and clearly strengthen the overall coordination of project construction, optimize the spatial layout and construction timing, to avoid repeated excavation.

In addition, some old residential areas do not have property management due to historical reasons, and the property rights of supporting facilities are unclear, which has become an obstacle to the maintenance and updating of supporting facilities in the medium and long term. The "Notice" clearly states that after the renovation of the old urban residential areas, the qualified residential areas will choose professional property service companies to take over through market-oriented methods; Guide the transfer of the property rights of relevant supporting facilities to professional business units in accordance with legal procedures, which will be responsible for follow-up maintenance and management.

Raise funds through multiple channels

-- coordinating local financial resources; Encourage the participation of financial institutions; Guide residents to contribute to participate

Many residents and the staff of franchised units and property management enterprises said in an interview that the transformation of supporting facilities and people's livelihood facilities as the difficulty of the transformation of old residential areas, "the difficulty is difficult in the funds."

Ren Xingzhou believes that the key to solving the problem of "where does the money come from?" is to innovate the investment and financing mechanism and promote the co-construction and co-reform of multiple entities. At the same time, it is necessary to focus on the sustainability of the transformation, promote the continuous flow of funds, and avoid the process of raising funds into a "one-off sale".

Clarifying a variety of funding sources is a highlight of the Notice.

On the one hand, the "Notice" emphasizes that the investment in the central budget is all used for the construction of supporting facilities for the renovation of old urban communities; All localities should coordinate local financial resources, focusing on the elimination of various types of safety hazards in old urban communities, improving drainage and waterlogging prevention capabilities, improving nursing care facilities, building parking lots and convenient facilities for the elderly and other supporting facilities in old urban communities. At the same time, professional business units should implement the responsibility of investment, and prioritize the renovation funds for supporting facilities in old residential areas.

On the other hand, the Circular pointed out that the important role of development and policy financial support should be given full play; Encourage financial institutions to participate in the investment of urban renewal funds set up by local governments such as the renovation of old residential areas; For the elderly care, parking, etc., there is a certain profit transformation content, encourage social capital professional contract, single or multiple; In accordance with the principle of who benefits and who contributes, residents are actively guided to contribute to participate in the renovation.

"Who benefits, who invests, these six words are difficult to implement." In 2013, the property posted a notice in the lift indicating that the lift was outdated and in urgent need of major repair or replacement. The notice is still up there, but no one is paying!" Wang Shuzhen said, "We these old residents are willing to pay, and the maintenance fund this pool should also be renewed." In addition, there are many billboards in the community, and the public income generated should also be used for the maintenance of facilities.

In order to implement the principle of "who benefits, who invests", the "Notice" gives specific methods: When guiding residents to contribute to participate in the transformation, direct investment can be taken, the use of residential special maintenance funds (replacement, renewal), and the transfer of public benefits to the community. At the same time, establish and improve the housing special maintenance funds collection, use and renewal system; Coordinate the owners' common income such as the operating income of public facilities, and ensure the needs of subsequent custody funds.

Ren Xingzhou explained that considering the characteristics of the old community itself, the funds for the renovation of supporting facilities need to be raised through multiple channels. This is neither the financial "all-in", nor the owners completely "out of their own pockets", but through the central finance, local finance, residents, social capital and other parties to participate in the joint construction and common reform.

Experts said that the focus of the transformation of different communities is different, and the problem of "who pays" should adhere to specific problem specific analysis: basic transformation should be provided by financial support at all levels; The improvement and upgrading should be apportioned by residents to fulfill the investment responsibility, and social capital can also be introduced through the market mechanism for the renovation of facilities with a certain profit. Among them, it is crucial to guide residents to reach consensus and form a consensus, and obtain the "maximum common divisor" of the public interest of the building and even the community.


  • GE Hydran M2-X Transformer Condition Monitoring Device
  • FOXBORO P0916VL control module
  • FOXBORO P0916VC High Performance Terminal Cable
  • FOXBORO P0916WG system module
  • FOXBORO P0972ZQ interface channel isolation 8-input module
  • FOXBORO P0973BU high-frequency fiber optic jumper
  • FOXBORO P0926MX Splasher Confluencer
  • FOXBORO P0961S connector module
  • FOXBORO P0903NU system module
  • FOXBORO CM902WM control module
  • FOXBORO P0972VA ATS Processor Module
  • FOXBORO P0916Js digital input terminal module
  • FOXBORO PO961BC/CP40B control module
  • FOXBORO PO916JS Input/Output Module
  • FOXBORO PO911SM Compact Monitoring Module
  • FOXBORO P0972PP-NCNI Network Interface Module
  • FOXBORO P0971XU Control System Module
  • FOXBORO P0971DP Controller
  • FOXBORO P0970VB control module
  • FOXBORO P0970BP (internal) cable assembly
  • FOXBORO P0961EF-CP30B High Performance Digital Output Module
  • FOXBORO P0961CA fiber optic LAN module
  • FOXBORO P0926TM Modular I/O PLC Module
  • FOXBORO P0916BX series control system input/output module
  • FOXBORO P0916AG Compression Period Component
  • FOXBORO P0916AC I/A series module
  • FOXBORO P0912CB I/O Terminal Module
  • FOXBORO P0911VJ high-precision control module
  • FOXBORO P0911QC-C 8-channel isolated output module
  • FOXBORO P0911QB-C High Performance Industrial Module
  • FOXBORO P0903ZP Embedded System Debugging Module
  • FOXBORO P0903ZN control module
  • FOXBORO P0903ZL High Frequency Industrial Module
  • FOXBORO P0903ZE I/A series fieldbus isolation module
  • FOXBORO P0903NW Industrial Control Module
  • FOXBORO P0903NQ control module
  • FOXBORO P0903AA Industrial Control Module
  • FOXBORO FBM205 cable
  • FOXOBORO P0960HA I/A series gateway processor
  • FOXBORO P0926TP high-performance control module
  • FOXBORO P0926KL control module
  • FOXBORO P0926KK PLC system functional module
  • FOXBORO P0924AW wireless pressure transmitter
  • FOXBORO P0916NK differential pressure transmission cable
  • FOXBORO P0916JQ PLC module
  • FOXBORO P0916JP I/A series control module
  • FOXBORO P0916GG Digital Input Module
  • FOXBORO P0916DV I/A series digital input module
  • FOXBORO P0916DC Terminal Cable
  • FOXBORO P0916DB I/A series PLC module
  • FOXBORO P0914ZM recognition module
  • FOXBORO P0902YU control module
  • FOXBORO P0901XT Process Control Unit
  • FOXBORO P0800DV fieldbus extension cable
  • FOXBORO P0800DG Standard Communication Protocol Module
  • FOXBORO P0800DB Universal I/O Module
  • FOXBORO P0800DA Industrial Control Module
  • FOXBORO P0800CE control module
  • FOXBORO P0700TT Embedded System
  • FOXBORO P0500WX Control System Module
  • FOXBORO P0500RY Terminal Cable Assembly
  • FOXBORO P0500RU control module
  • FOXBORO P0500RG Terminal Cable
  • FOXBORO P0400ZG Node Bus NBI Interface Module
  • FOXBORO P0400GH fieldbus power module
  • FOXBORO FBM207B Voltage Monitoring/Contact Induction Input Module
  • FOXBORO FBM205 Input/Output Interface Module
  • FOXBORO FBM18 Industrial Controller Module
  • FOXBORO FBM12 Input/Output Module
  • FOXBORO FBM10 Modular Control System
  • FOXBORO FBM07 Analog/Digital Interface Module
  • FOXBORO FBM05 redundant analog input module
  • FOXBORO FBM02 thermocouple/MV input module
  • FOXBORO FBI10E fieldbus isolator
  • FOXBORO DNBT P0971WV Dual Node Bus Module
  • FOXBORO CP30 Control Processor
  • FOXBORO CM902WX Communication Processor
  • FOXBORO AD202MW Analog Output Module
  • FOXBORO 14A-FR Configuration and Process Integration Module
  • FOXOBORO 130K-N4-LLPF Controller
  • FUJI FVR004G5B-2 Variable Frequency Drive
  • FUJI FVR008E7S-2 High Efficiency Industrial Inverter
  • FUJI FVR008E7S-2UX AC driver module
  • FUJI RPXD2150-1T Voltage Regulator
  • FUJI NP1PU-048E Programmable Logic Control Module
  • FUJI NP1S-22 power module
  • FUJI NP1AYH4I-MR PLC module/rack
  • FUJI NP1BS-06/08 Programmable Controller
  • FUJI NP1X3206-A Digital Input Module
  • FUJI NP1Y16R-08 Digital Output Module
  • FUJI NP1Y32T09P1 high-speed output module
  • FUJI NP1BS-08 Base Plate​
  • FUJI A50L-2001-0232 power module
  • FUJI A50L-001-0266 # N Programmable Logic Control Module
  • GE GALIL DMC9940 Advanced Motion Controller
  • GE DMC-9940 Industrial Motion Control Card
  • GE IS200AEADH4A 109W3660P001 Input Terminal Board
  • GE IC660HHM501 Portable Genius I/O Diagnostic Display
  • GE VMIVME 4140-000 Analog Output Board
  • GE VMIVME 2540-300 Intelligent Counter
  • GE F650NFLF2G5HIP6E repeater
  • GE QPJ-SBR-201 Circuit Breaker Module
  • GE IC200CHS022E Compact I/O Carrier Module
  • GE IC695PSD140A Input Power Module
  • GE IC695CHS016-CA Backboard
  • GE IC800SS1228R02-CE Motor Controller
  • GE IS215WEMAH1A Input/Output Communication Terminal Board
  • GE CK12BE300 24-28V AC/DC Contactor
  • GE CK11CE300 contactor
  • GE DS3800NB1F1B1A Control Module
  • GE VMIVME2540 Intelligent Counter
  • GE 369B1859G0022 High Performance Turbine Control Module
  • GE VME7865RC V7865-23003 350-930007865-230003 M AC contactor
  • GE SR489-P5-H1-A20 Protection Relay
  • GE IS200AEPGG1AAA Drive Control Module
  • GE IS215UCCCM04A Compact PCI Controller Board
  • GE VME7768-320000 Single Board Computer
  • GE SR489-P5-LO-A1 Generator Protection Relay
  • GE IS215WETAH1BB IS200WETAH1AGC Input/Output Interface Module
  • GE D20 EME210BASE-T Ethernet Module
  • GE IS200EXHSG3REC high-speed synchronous input module
  • GE IS200ECTBG1ADE exciter contact terminal board
  • GE VPROH2B IS215VPROH2BC turbine protection board
  • GE F650BFBF2G0HIE feeder protection relay
  • GE SLN042 IC086SLN042-A port unmanaged switch
  • GE SR489-P1-HI-A20-E Generator Management Relay
  • GE IS400JPDHG1ABB IS410JPDHG1A track module
  • GE IS410STAIS2A IS400STAIS2AED Industrial Control Module