Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"New infrastructure" and traditional infrastructure need to work together

F: | Au:佚名 | DA:2023-12-26 | 866 Br: | 🔊 点击朗读正文 ❚❚ | Share:

At the same time, it is also urgent to accelerate the investment and construction of "new infrastructure" projects. At the same time, the impact of the epidemic has generated new consumption and demand, and led to the rapid development of emerging Internet business forms in industries such as Internet medical care, live education, online office, and public services supported by infrastructure such as fiber broadband, 4G/5G, data centers, and cloud computing. It is urgent to increase the supply of new infrastructure to meet the new demand in this regard in a timely manner. Achieve accurate matching between supply and demand. In this response to the epidemic, China has exposed obvious shortcomings in the major epidemic prevention and control system and public health emergency management system, and accelerating the "new infrastructure" will also help strengthen the construction of relevant capacities.

On the other hand, to meet the requirements of high-quality development, "new infrastructure" and traditional infrastructure need to work together.

China has entered a stage of high-quality development, and to promote high-quality economic development, we must balance the relationship between "new infrastructure" and traditional infrastructure. At this stage, China's traditional infrastructure networks such as transportation, logistics, energy, water conservancy, and municipal services still have many shortcomings and deficiencies. There are still problems such as unbalanced development and inadequate supply of infrastructure between regions, between urban and rural areas, between cities, between different consumer groups, and between various links of "construction, management, maintenance and transportation". There is still much room for improvement in the overall quality, overall efficiency and service level of infrastructure, and construction, upgrading and upgrading need to be accelerated. The "new infrastructure" can greatly improve the quality and efficiency of traditional infrastructure, promote the vigorous development of intelligent transportation, smart grid, smart logistics, smart water conservancy, smart city, etc., and it is associated with intelligent manufacturing, Internet of things, Internet of vehicles, intelligent driving, unmanned distribution and other huge emerging industrial clusters. And 5G terminal consumption, network education, telemedicine, network entertainment and other emerging consumption with great potential. Therefore, accelerating the "new infrastructure" is conducive to transforming and upgrading traditional industries, cultivating and expanding emerging industries, and promoting economic transformation and upgrading and high-quality development.

Coordinate the development of "new infrastructure" and traditional infrastructure of the realistic path

In accelerating the "new infrastructure" while upgrading traditional infrastructure, to achieve high-quality infrastructure development, it is necessary to coordinate the "new infrastructure" and traditional infrastructure, play a good policy "combination", coordinate the establishment of efficient coordination, guarantee strong policy support system, and promote the integrated development of "new infrastructure" and traditional infrastructure. We will accelerate the formation of an infrastructure supply system that can respond in a timely manner and accurately match the needs of different structures or scenarios, and has strong adaptability and rapid adjustment capabilities.

One is to plan the top-level design of "new infrastructure" and traditional infrastructure in a timely manner. At present, China has prepared medium - and long-term network layout plans or industry development plans for traditional infrastructure construction fields such as transportation, logistics, energy, water conservancy, and communications, and has established mature planning evaluation and dynamic adjustment mechanisms. However, for "new infrastructure", its development trend, construction ideas and development priorities are still in the research and exploration stage, and lack of necessary strategic consideration. At present, efforts should be made to strengthen the top-level design of the "new infrastructure", and major special planning studies such as the spatial layout, target ideas, and development priorities of the "new infrastructure" should be launched as soon as possible. At the same time, do a good job of planning and guiding the "new infrastructure" and traditional infrastructure, with the goal of accelerating the high-quality development of infrastructure, and strengthen the overall connection between the "new infrastructure" and the top-level design of traditional infrastructure.

The second is to coordinate the timing and focus of "new infrastructure" and traditional infrastructure. Accelerating the progress of "new infrastructure" projects does not mean weakening traditional infrastructure, which will still play an important role in the national economic system for a long period of time. It is necessary to see that under the premise of financial resources, resources and environment constraints, the two must jointly share the annual investment scale and resource and environmental capacity. Therefore, whether at present or in the long run, it is very important to coordinate the construction timing, focus and resource allocation of "new infrastructure" and traditional infrastructure projects. All localities should give full consideration to the requirements of the situation, prominent problems and strategic support needs of economic and social development in different periods, take into account the short board areas and construction priorities of the infrastructure system, stock upgrading and incremental innovation, as well as the allocation capacity of land, capital, manpower and other resource elements, and rationally arrange the timing of project construction.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series