Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Protect mine geological environment and promote mine sustainable development

F: | Au:佚名 | DA:2024-01-11 | 811 Br: | 🔊 点击朗读正文 ❚❚ | Share:

It is urgent to strengthen the legislation and formulate special provisions to solve the increasingly severe geological environment problems of mines in reality

Reporter: What are the considerations behind the Regulations?

Wang Shouzhi: The problems caused by mining activities in China, such as cave-in, groundwater drainage, and destruction of geological landform landscape, have seriously jeopardized the normal production and life of people in mining areas, and restricted the sustainable development of local economy and society. According to statistics, among the country's 113,108 mines, the goaf area is about 1.349 million hectares, accounting for 26% of the mining area; The land area occupied or destroyed by mining activities is 2.383 million hectares, accounting for 47% of the mining area; A total of 12,366 secondary geological disasters caused by mining caused direct economic losses of 16.63 billion yuan, casualties of about 4,250 people, facing a very severe geological environment situation.

The reasons for these problems mainly come from three aspects. First, the lack of special legislation on mine geological environment protection is only scattered in some provisions of relevant laws and regulations, and the lack of independent, unified and targeted laws, regulations or regulations to regulate it. Scattered regulations lead to the practice of pertinence and operation is not strong, the mine geological environment protection can not be relied on.

Secondly, mining development generally exists the phenomenon of "heavy development, light protection". Due to the lack of effective supervision means, responsibility system and special legislative norms, the owners of mining rights only attach importance to the exploitation of resources, and generally lack the awareness of protecting the geological environment of mines. The protection of mine geological environment is not taken as an important content in the design scheme of mineral resources exploitation. The management authorities have not taken the protection and restoration of the geological environment of mines as an important requirement for the owners of mining rights, resulting in great pressure on the protection of the geological environment of mines.

Third, the special funds for mine geological environment protection and restoration are insufficient. At present, the enterprise basically has no funds dedicated to protecting and restoring the mine geological environment, and the environmental cost generated by mining mineral resources has not been included in the production cost of the enterprise, resulting in the destruction of the mine geological environment, the enterprise has no special funds for governance.

The Notice of The State Council on Comprehensively Rectifying and standardizing the Order of Mineral Resources Development proposed to "Explore the establishment of a compensation system for the restoration of the ecological environment in Mines", and the Guiding Opinions of the Ministry of Finance, the Ministry of Land and Resources and the State Environmental Protection Administration on Gradually Establishing a Responsibility Mechanism for environmental Governance and ecological Restoration in Mines proposed that "enterprises should open deposit accounts in banks designated by local financial departments. And use the funds according to regulations." Therefore, it is urgent to strengthen the legislation and formulate special provisions to solve the increasingly severe geological environment problems of mines in reality.

Reporter: How to define the scope of application of the Provisions?

Wang Shouzhi: The definition of this scope is a difficult point in the formulation process. In view of the particularity of mine geological environment protection work and the specificity of the causes of mine geological environment problems, after repeated research, we have determined that its scope of application is: the prevention, treatment and restoration of mining ground collapse, ground cracks, collapses, landslides, aquifer damage, and topographical landscape damage caused by mineral resources exploration and mining activities. At the same time, considering that in the process of practical operation, the restoration and management of mine geological environment may involve the management of "three wastes" and land reclamation, in order to avoid cross-functional problems, "three wastes" management and land reclamation are excluded from the scope of application. Thus, it is clearly stipulated that the exploitation of mineral resources involves land reclamation, in accordance with the relevant laws and regulations of the State land reclamation implementation.

Mining geological environment protection, adhere to the principle of prevention first, prevention combined, who develops who protects, who destroys who governance, who invests who benefits

Reporter: What provisions are made on the responsibility, rights and benefits of protecting the geological environment of mines?

Wang Shouzhi: It can be summarized in 26 words, that is, prevention is the first, prevention and control is combined, who develops who protects, who destroys who governs, who invests who benefits. To be specific, the main means of prevention is planning. The administrative departments of land and resources at all levels shall be responsible for the investigation and evaluation of the geological environment of mines in their respective administrative areas, and formulate the geological environment protection plan of mines accordingly. The planning for geological environment protection of mines shall conform to the planning for mineral resources and be coordinated with the overall planning for land use and the planning for prevention and control of geological disasters.

In order to promote the owners of mining rights to enhance the awareness of protecting the geological environment, the applicants for mining rights should prepare a plan for the protection and restoration of the mining geological environment when applying for a mining license. The mining right owner shall pay the deposit for the restoration of the mining geological environment in accordance with the mine geological environment protection and rehabilitation plan. If the mining area, mineral species or mining method is changed, the mining right owner shall pay the deposit for the restoration of the mining environment in accordance with the standard after the change. The owners of mining rights shall strictly implement the approved plans for the protection and treatment of the geological environment in mines. Where the mining of mineral resources causes damage to the geological environment of the mine, the owner of the mining right shall be responsible for restoring it, and fulfill the obligation of restoring the geological environment of the mine before the closure of the mine. If the mining right is transferred, the obligation shall be transferred simultaneously. After the restoration of the geological environment of mines, the state encourages the development of mining sites with ornamental value and scientific research value into mining parks. If the owner of the prospecting right does not apply for the mining right after the completion of the mineral resources exploration activities, he or she shall take corresponding measures to restore the mining right and eliminate potential safety hazards.

The administrative departments of land and resources at or above the county level shall be responsible for the supervision and inspection of the implementation of the obligation of rehabilitation and restoration by the mining rights holders, and shall establish a monitoring system for the geological environment of mines within their respective administrative areas and report it to them on a regular basis. The administrative departments of land and resources at or above the county level shall have the right to carry out on-site inspections on the implementation of the plans for the protection, treatment and restoration of the geological environment of mines and the monitoring of the geological environment of mines.

It should be said that the responsibility, rights and benefits are more clear and unified, which is more conducive to the protection of mine geological environment.


  • Alcatel WTM11AD 3DW03915DABA01 Optical Transponder Module
  • Alcatel-Lucent 1340FMPK Card Chip BA5IVY6BAA – Processor Module
  • Alcatel-Lucent 3HE06151ACAC01 Control Fabric Module
  • Alcatel-Lucent 9500-MPR 18GHz 1P-1 Protection ODU Radio 3DB20433BA AA04
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 18GHz Radio 3DB20433BAAA04
  • Alcatel-Lucent SM269 LMPQ04KAXX Circuit Pack – Interface Module
  • Alcatel OME25HP Filter Cartridge – 107494
  • Alcatel-Lucent ALU-BZ74 99BC-4 –48V Battery Cabinet
  • Alcatel-Lucent WWAA37 Optical Amplifier WMAPZNZAAB – CP Series
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC MPT-XP 3DB20476BAAA04 23GHZ
  • Alcatel Tyco Yukon ES760A Rectifier
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 23GHz 3DB23045HMAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 11GHz 3DB20548ACAA01 Microwave Radio
  • Alcatel Lucent 3DH03173AKAA Module
  • Alcatel-Lucent 76-0300-02 CSM-V2 PCB
  • Alcatel 9400 UX ODU Module 3CC06729ABAA
  • Alcatel-Lucent 408981363 Jigsaw A Band Block 24/-48V KS24624L58
  • Alcatel 3BA53095 PCB Card
  • Alcatel 2C7-1005-000 Bell Jar Holder Ring Teflon PC7-1005-000
  • Alcatel-Lucent ES640 PWDQAGKUAA 5ESS 48V DC Alarm Control Unit
  • Alcatel-Lucent 9500-MPR ODU 300 23GHz Microwave Radio MPT 3DB23045HM
  • Alcatel-Lucent KFA720 WMOTCMVLAB Optical System Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 15GHz Microwave Radio 3DB20373BAAB04
  • Alcatel-Lucent AKM70 S1-7 SMUX1 Sub-Multiplexer – T3PQWAEAAH
  • Alcatel-Lucent 107486490 DDM-2000 SONET DS3 Circuit Pack – BBG4B
  • Alcatel-Lucent SBEVM BNJ82 1:12 Module – AV950-01168
  • Alcatel-Lucent 938A Optical Loss Set – Test & Measurement Kit
  • Alcatel-Lucent MS1025-25O16-ED Fiber Optic Unit – 48VDC
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 1/1P Microwave Radio 3DB20473BA AA04
  • Alcatel-Lucent bCEM-U Control Module – 3BK28676ABAC01
  • Alcatel ASI20 Detector Control Module
  • Alcatel Lucent 130B S-1 PWPQ08B Power Unit
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20441BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20824AAAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20822AAAB02 Microwave Radio
  • Alcatel-Lucent 3AL92111AA 1P10GSO Interface Module
  • Alcatel 8220 CTT 450 Turbo Pump Controller 127821
  • Alcatel-Lucent 3AL78823AAAE 02 Module
  • Alcatel-Lucent 90-0413-01 Universal Card
  • Alcatel-Lucent BRMA 10Base-T/100Base-TX Connecting Box 3BA56170ACAB010842
  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio