Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Amazon Air cargo expansion has been forced to slow

来源: | 作者:佚名 | 发布时间 :2023-12-15 | 299 次浏览: | 🔊 Click to read aloud ❚❚ | Share:

This year, Amazon fell from the most searched shopping site last year to the fourth place in the Black Friday and Cyber Monday sales. But its "Prime" member delivery speed is still indisputable. This can only be attributed to its increased air cargo capacity. Amazon's shipping and fulfillment costs have grown faster than revenue over the past five years, according to Cargo Facts Consulting.

At present, Amazon Air continues to add flights, but the growth rate has slowed from 30% in 2021 to about 5% in the first half of 2022. Is Amazon's air cargo layout caught in the vortex of its "speed is of the essence" philosophy? Will you expand your strength in the future? Or will it be sold to third parties like Amazon Cloud Services? For now, at least, it's not going anywhere.

Amazon Air was born out of the company's experience in 2013 when "poor" deliveries from its delivery partners damaged its business and reputation. After that, Amazon wants to get rid of the shackles of shipping partners, control its own destiny, and better serve customers. Through sheer strength, and perhaps some luck, Amazon hasn't faced the crisis of not being able to deliver on Christmas since 2013.

By Christmas 2013, Amazon was almost entirely dependent on FedEx and UPS to deliver most of its packages across the United States. And the delivery enterprise ground transportation problems caused by Amazon can not timely delivery of goods to consumers. This painful lesson forced Amazon to spend the next year to build its own network of distribution centers and optimize truck delivery routes.

Amazon also faced a crisis in the 2014 Christmas season. Amazon, which had been preparing to promote its flagship Kindle and ship it in time for Christmas, found it was running out of inventory to ship within driving distance of its Seattle headquarters. Amazon turned to UPS to fly more Kindles to New York. But with the holiday shopping season in full swing, carriers can't deploy more planes. Amazon's promise of fast delivery has been severely challenged. Although Dave Clark, Amazon's head of global operations, urgently requested the deployment of cargo planes to ensure delivery and escaped the "disaster", in order to smooth the next year, Amazon had to find another way out, that is to build its own air cargo network.

The philosophy of Amazon's founders at the time was to emphasize that "speed is of the essence" and that some irrefutable decisions do not need to be deeply researched. However, the network is not easy to build. In addition to the huge cost, there is also the need to meet government compliance requirements on safety and working conditions.

Amazon has built its own large-scale Air cargo service network "Amazon Air" in a few years, greatly reducing its dependence on the above two major delivery companies. Currently, Amazon owns 11 aircraft and leases about 100 aircraft operated by seven airlines, flying more than 200 cargo flights a day from more than 70 airports around the world. Last year, Amazon spent $1.5 billion to build an air hub at Cincinnati/Northern Kentucky International Airport (CVG) to provide delivery closer to consumers.

However, the "infatuation with aviation" strategy also makes Amazon some "quick success", its employees complained about this, saying that "air transportation costs are high, emissions are large, and sometimes goods transported by air can be efficiently delivered by cheaper ground transportation."

Amazon's air network is in full swing. In 2015, Bezos called a meeting of top and middle managers to discuss whether the airline network would be owned or outsourced. In the end, he decided to leave the mission to other airlines in order to reduce a number of safety and compliance issues.

Amazon followed the example of DHL Express. DHL outsources its air operations in the United States to a number of smaller air cargo companies, which manage the aircraft, staff and maintenance and safety issues. In 2016, Amazon signed a long-term agreement to lease 40 freighters from two medium-haul carriers, Air Transport Services Group and Atlas Air. Later, these cargo planes were printed with the Amazon logo "Prime Air" and flew over the United States.

Amazon has always been accompanied by "noise" in the development layout of the aviation network. With better predictive planning and inventory management, Amazon doesn't need so many planes, and especially doesn't need so many hubs. Former Amazon employees revealed that UPS saved millions of dollars by better connecting to the ground network rather than buying more planes. "Amazon wants to cover the entire United States and beyond."

Some analysts say that when fedex and UPS are faced with a huge volume of business, the response is "existing facilities can not handle so many packages," while Amazon's attitude is always shocking, "renting places near the airport to immediately meet the transportation task." Amazon's management of air freight is not familiar, causing dissatisfaction among many employees, especially the crew. In 2016, Amazon employees saw the real situation of the flight team at the airport. In order to meet Amazon's pursuit of timeliness, the company often requires temporary changes in flight routes, resulting in some pilots having to rest in the cockpit.

In 2017, the head of Amazon's aviation division was replaced by Sarah Rhoads. She was previously in charge of Amazon's distribution centre operations in the UK and Europe and was seen as lacking knowledge of the air cargo sector. Amazon ushered in another wave of airline network expansion and development to further improve operational efficiency.

The expansion allowed Amazon to open six regional hubs between 2019 and 2021, flying more than 200 flights a day in the United States. More hiring followed. This development situation has been confronted with the novel coronavirus epidemic that has lasted for about three years, which has brought a huge burden to Amazon.

The high efficiency requirements of Amazon's airline network, even the minute-precise scheduling management, make it difficult for the crew, and the boundaries between Amazon and the pilot's responsibilities are increasingly blurred. Amazon's meticulous calculation of costs even requires airlines to provide certain fuel consumption information, change established routes to save costs, etc., which makes the partner airlines and their flight personnel feel stressed and unsafe.

Amazon Air's expansion has also drawn complaints from affected communities and residents. In 2019, Amazon launched the "Scythia" project in a mountain area of Florida to increase the number of aircraft at the local airport, aiming to provide local jobs and promote economic development while improving transportation capacity. This has also been approved by the relevant safety and environmental protection authorities. Since then, there will be 22 Amazon flights a day. In 2021, when Amazon announced it would increase its fleet here to 44 aircraft by 2027, residents of the communities involved objected strongly at hearings, saying it would affect their quality of life. Although Amazon has the right to expand capacity here under the terms of its original airport lease, the expansion plans are still pending.

Amazon has faced many similar obstacles. In 2021, the port authorities of New York and New Jersey negotiated to allow Amazon to lease an air cargo facility at Newark Liberty International Airport, but months of opposition protests followed. Local environmental groups, labor groups and politicians say the project could eliminate some union jobs and pollute the surrounding minority communities. Amazon and local port authorities shut down the project.

According to Wired, Amazon is currently optimizing its operations to ensure a sustainable and efficient web. This includes calculating the load rate of the aircraft, taking into account the weight, volume, route, staffing, supporting facilities and other supplies of the package.

For air capacity that is not fully loaded, Amazon said it would mimic the model of Amazon Web Services and sell excess capacity. However, attracting customers is not smooth sailing. Apart from the shipping contract signed by Amazon and the United States Postal Service in 2017, customers are few and far between.

Faced with slow revenue growth and economic uncertainty, Amazon CEO Andy Jassy, who took over last year, appears to have slowed expansion. The company has decided to suspend, close or delay plans to open more than 80 facilities in the United States. The company has fired Dave Clark, the executive in charge of building a massive logistics facility. Recently, Amazon has also embarked on a mass firing spree.

As for the airline business, while Amazon Air continues to add flights, its growth rate has slowed from 30 percent in 2021 to around 5 percent in the first half of 2022, according to Cargo Facts Consulting. Amazon's investment in the aviation sector continues. In October, Amazon announced a partnership with Hawaiian Airlines, which will operate Airbus A330 aircraft on Amazon's behalf. At the same time, several former Amazon employees have told the media that the company has been discussing for years the possibility of buying one of the outsourced airlines and starting its own airline, preferably by hiring non-union pilots.


  • ABB DSAI130DK01 3BSE020828R1 Analog Input Module
  • Parker 466966-0001-3820 Industrial Component Data
  • PARKER ZETA6104 Microstepping System
  • PARKER COMPAX 2500S/F3 Servo Drive Manual Details
  • PARKER CX-DH Indexer Drive Technical Specifications
  • PARKER 6K8 Motion Controller Features and Specifications
  • PARKER EVM32-BASE I/O Module Base Technical Specification
  • ABB Pb PN-112718 Digital Input Module
  • Pb PN-45734 PN-73899 Industrial Automation Module
  • Control Techniques Pb PN-40856 Industrial Control Module
  • Pb PN-104412 4002910956 Industrial Control Module
  • Siemens Pb PN-41513 Industrial Ethernet Module
  • Pelco PA30-0065-00-A1 PTZ Decoder Module
  • Pentek FILTER 3F11 800000919 Pleated Filter Cartridge
  • Pepperl+Fuchs RSD-TI-EX8 Temperature Input Module
  • PERITEK AC7-00712-1113 Industrial Interface Module
  • PFEIFFER EVR116 Vacuum Control Module
  • Pepperl+Fuchs RSD-CI-EX8 Hazardous Area Interface Module
  • PEPPERL+FUCHS 2108HAT Intrinsic Safety Barrier Module
  • Philips 958481320201 PROC+ Processing Unit
  • Philips 958481321300 PSB Power Supply Board
  • Philips 958481321220 PD208 Power Module
  • PHILIPS 958481321200 PD216 Control Module
  • PHILIPS 958481320201 PROC PLUS Control Module
  • Philips 958481320400 PIF Interface Module
  • Philips 958481320100 LCB Control Board
  • PHILIPS 958481223220 Industrial Control Module
  • PHILIPS 958481223223 Industrial Control Module
  • PHILIPS 958481321300 Industrial Control Module
  • PHILIPS SCM040 Digital Output Synchronization Module
  • PHILIPS DSI020 Data Storage Interface Module
  • PHILIPS OPM010 Optoelectronic Control Module
  • PHILIPS VBM010 Industrial Automation Module
  • PHILIPS VBM030 Turbine Supervisory Instrumentation
  • PHILIPS PR1613 Industrial Control Module
  • PHOENIX PATG1/23 1013847 Ground Terminal Block
  • Phoenix Contact IB ST 24 AI 4/SF Analog Input
  • Phoenix Contact OPC5315-004-AB Industrial PC
  • Phoenix Contact UMK-SE11.25-1 Side Element
  • PHOENIX 2961192 Relay Module
  • PHOENIX IB ST ZF 24 AI 4/SF Analog Input Module
  • Phoenix Contact PLC-BSC-24DC/21 Relay Base
  • Phoenix Contact UK6N Feed-Through Terminal Block
  • Phoenix Contact UK4-T Disconnect Terminal Block
  • Phoenix UK3N Screw Terminal Block
  • Phoenix QUINT-PS-100-240AC/10 Power Supply
  • Phoenix QUINT PS-100-240AC/24DC/10 Power Supply
  • Phoenix UT 6-HE SI Surge Protection Terminal Block
  • Phoenix UT 4-MTD Feed-through Terminal Block
  • Phoenix UT 4-HE SI Surge Protection Terminal Block
  • Phoenix IBS 24BK-I/O-T Bus Coupler
  • Phoenix Contact HDFK4 High-Current Terminal Block
  • PHOENIX ST-SI-UK4 Fuse Terminal Block
  • PHOENIX FLMC10BASE-T/FO G850 Fiber Media Converter
  • PHOENIX CONTACT QUINT-PS-100-240AC/24DC/40 Power Supply
  • PHOENIX CONTACT QUINT-DIODE/40 Redundancy Module
  • Phoenix Contact 2884208 Wireless I/O MUX
  • Photonetics 3646 HE 1540 Tunable Laser Source
  • PI C-663.12 Mercury Multi-Axis Step Motor Controller
  • PI C-663.10 Mercury Step Motor Controller
  • Pillar CB6687-2L Industrial Communication Board
  • Pilz DE-106712 A.F.051.5/01 Safety Module
  • Pilz 680003 Safety Relay Module Set
  • Pilz 301140 PNOZ X3 Safety Relay
  • Pilz P1U-1NB Safety Relay
  • Pioneer PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3326B-6-1-2-E Power Supply
  • Pioneer Magnetics HYRSP-1500-56 Power Supply
  • Pioneer Magnetics PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3328BP-6 Power Supply
  • Potter & Brumfield SDAS-01-7Y2S1024 Relay
  • Powec PMP10.48 SIC High-Efficiency Rectifier
  • Powerbox PU200-31C Industrial DC-DC Converter
  • PIONEER MAGNETICS PM3398BP-6-1-3-E Power Supply Module
  • PIONEER MAGNETICS PM1253AL-6-3-Z03 Power Supply Module
  • Powerex PD411811 Rectifier Diode Module
  • Power-One MAP55-1024 AC-DC Power Supply
  • ProSoft MVI56-MDA4 ControlLogix Multi-Protocol
  • POLYSPED PRD2-200 Industrial Drive Module
  • P-OPEN P-OPEN-P4-150 PAC-OP150 Operator Panel
  • ABB Processor 958481321210 350211080320 Rugged CPU
  • ABB Processor 958481320201 350211080460 Safety CPU
  • ABB Processor 958481321200 350211080320 CPU Module
  • ABB Processor 958481321220 350211080320 CPU Module
  • ABB Processor 958481320100 350211080090 CPU Module
  • Pro-Face PL5901-T42-24V HMI Touch Panel
  • PROFIBUS PB3-VME-1-E V1.2.2 Interface Card
  • PROMESS 850040060P Force Displacement Monitor
  • PROSOFT AN-X2-AB-DHRIO DH+ and Remote I/O Gateway
  • PROSOFT RLX2-IFH24E Industrial Wireless Radio Module
  • PROSOFT 5202-DFNT-MCM4 DF1 to EtherNet/IP Gateway
  • PROSOFT PLX35-NB2 EtherNet/IP to Modbus TCP Gateway
  • ProSoft 5201-MNET-MCM-WEB Modbus TCP/Serial Gateway
  • ProSoft 5304-MBP-PDPMV1 Modbus Plus to PROFIBUS DP Master
  • ProSoft 5302-MBP-MCM4 Modbus Plus to Modbus Master/Slave
  • ProSoft 5301-MBP-DH485 Modbus Plus to DH485 Gateway
  • ProSoft 6104-WA-PDPM Wireless PROFIBUS DP Master
  • ProSoft MVI56-LTQ ControlLogix Limitorque Master
  • Prosoft 5304-MBP-PDPM PROFIBUS Master Module
  • Prosoft 1452-25M Relay Output Module
  • Prosoft MVI56-MNETR Modbus TCP/IP Module
  • Prosoft MVI69L-MBS Modbus Serial Module
  • Prosoft PLX32-EIP-SIE Ethernet Gateway
  • Prosoft MVI56-PDPS PROFIBUS DP Slave Module
  • Prosoft PMF1327205 Gateway Module
  • Prosoft PMF1216D61 FOUNDATION Fieldbus Module
  • PROSOFT MVI56-GSC Generic Serial Communication Module
  • PROSOFT 5601-RIO-MCM Remote I/O Communication Module
  • PROSOFT 1454-9F Communication Interface Module
  • PROTECH SYSTEMS PBI-6SA Industrial Single Board Computer
  • PRSTECH DMP10.24-20 DIN-Rail Power Supply
  • PRT PSA300R-81 Industrial Power Supply Module
  • PULS SLA8.100 AS-Interface Power Supply
  • QSI QTERM-K65 Industrial Operator Interface
  • R-2528Z R-2528Z Industrial Specialized Component
  • Radisys SBC486DX66 Single Board Computer
  • Radisys EPC-5 with EXM-13 Embedded System
  • Radisys EPC-16 Embedded Computer
  • Ramix PMC676TX PMC Ethernet Adapter
  • Ramix PMC008A PMC-to-VME Adapter
  • Ramix PMC237C-008EMI PMC Carrier
  • Ramix PMC661J PMC Carrier Board
  • Renata CR2450N Lithium Battery
  • Renault Circuit CU-8593-IND.A Control Module
  • Reotron 567LH-DP24 Voltage Regulator
  • RIFA IC693PWR321U GE Fanuc Series 90-30 Power Supply
  • RKC REX-B871NN-CS1B Intelligent Controller
  • RKC B871-RCU Digital Temperature Control Unit