Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Green construction project

F: | Au:佚名 | DA:2023-11-24 | 515 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

1. Green construction project

The draft for comments proposes to formulate and improve the evaluation system of chemical parks that meet the requirements of green development, cultivate a number of green parks, give play to the role of demonstration and typical leadership, and promote the green development of chemical parks to a new level. Resolutely win the battle of pollution control, carry out in-depth circular transformation of the chemical park, realize the recycling of industrial links in the park, efficient resource utilization, centralized pollution control, and do a good job in the scientific treatment and disposal of the "three wastes" in the park. To study and formulate the responsible care construction plan of chemical industry park, and promote the practice of responsible care in chemical industry park. By 2025, 50 "green chemical parks" will be created, more than 100 key chemical parks will fully commit to practicing responsible care, and key petrochemical bases and chemical parks will become ecological and beautiful industrial clusters with "blue sky, clear water and green grass".

Yang Songfeng said that it is necessary to adhere to green and low-carbon development. Support the green technology innovation of enterprises in the park, promote cleaner production, improve resource utilization efficiency, realize the transformation from decentralized governance of enterprises to centralized governance of the park, promote the development of circular economy in the park, improve the degree of industrial correlation and recycling, actively carry out the integrated transformation of the park, and realize the circular connection between enterprises and industries. We will improve the management of resources, energy and other materials and the management of the environment, promote the formation of links between the production system and the household system, promote the overall conservation and recycling of resources, and improve the utilization rate of resources.

Qiu Guoqiang suggested that the responsible care of the park should be included in the important work scope of the development of the chemical park, further deepen the implementation of responsible care, further strengthen the interaction between the park and the public, gain the trust of the public, and form a community of interests.

Liu Yanwei, former chief engineer of the Petrochemical Planning Institute, said that the state now puts forward five development concepts as planning principles to practice the concept of green development. From the perspective of the park, in terms of project introduction, the park is now very strong awareness, requiring high project quality and input-output intensity to meet the requirements. In addition to these rigid requirements, there are green development indicators, which are mainly reflected in three aspects. First, the green access threshold should be scientifically evaluated by relevant experts, and the park will provide preferential conditions for those who meet the entry threshold requirements of green indicators; Second, to use clean energy, from the perspective of future development, to increase the proportion of renewable energy and renewable electricity in the park's energy consumption, can encourage the use of nuclear renewable resources; The third is to adopt low-carbon technologies and reserve technologies in advance for future low-carbon technological barriers.

2. Intelligent construction project

According to the draft for comments, research on the adaptation of new technologies and park management needs, with big data as the core, through system planning, information leadership, reform and innovation, vigorously promote the deep integration and iterative evolution of big data technology and park modernization, accelerate the interconnection and open sharing of park information systems and public data, and build a "shareable" and "traceable" smart supervision system. To realize the whole life cycle supervision of hazardous chemicals, build an emergency rescue system with fast response and efficient decision-making, and effectively improve the management level and management efficiency of the park. By 2025, 50 pilot demonstration units of "smart chemical parks" will be built, 30% of key chemical parks at the provincial level and above will carry out the creation of smart chemical parks, and key petrochemical bases and chemical parks will achieve controllable major safety risks, monitoring, early warning, and prevention and control of key hazard sources and risk points.

Yang Songfeng said that intelligent and digital development should be accelerated, modern technologies such as cloud computing and big data Internet of things should be adopted to speed up the construction of petrochemical industry platforms, build intelligent park management platforms, establish park related databases, industrial production system simulation and decision support systems, achieve information sharing, improve infrastructure support capabilities, and improve the construction plan of smart parks.

"Information construction has two roles: on the one hand, improve management efficiency, achieve quality change, power change, efficiency change; The other is to raise the level of supervision in the park."  The draft for comments has not yet been reflected in the construction of the early warning system for key hazardous chemical production enterprises in the chemical industry, and the Ministry of Emergency Management has been promoting the monitoring content of the risk early warning system of the chemical park in the integrated platform to connect with the risk early warning system of the enterprise.

Wu Xun, deputy director of Yangzhou Huazhi Office, believes that the smart construction of chemical parks should establish digital transformation, and in addition to smart park management, smart factories and smart workshops should be built, as well as the whole-process automation transformation currently being implemented in the chemical industry. He said that the smart park is not only the management of the park level, but also the classification and management of the whole ecology of the park.

Su Dong believes that in terms of intelligent construction, comprehensive utilization of resources should be encouraged, such as energy utilization, efficient power generation projects and power supply projects, to give some regional power grids preferential treatment, and encourage the development of new energy application fields in addition to raw materials and products.

3. Standardized construction projects

The draft for comments proposes to complete the top-level design of the chemical park standard system and orderly promote the preparation of the urgently needed standards in the chemical park. The establishment of a set of chemical industry park as the main body, the association organization to promote, technical support units, industry experts, universities and research institutions and other extensive participation in the standardization work mechanism. According to the multi-stage promotion of group standards, industry standards and national standards as the main form, actively promote the construction of chemical park standards system. By 2025, the number of management and construction standards for chemical parks will reach 50, providing strong support for management standardization and standardization.

Yang Songfeng believes that the construction of the standard evaluation system of chemical parks can play a good guiding role in the improvement of the construction norms of chemical parks, and also provide a basis for the supervision and evaluation work of relevant departments. At present, some provinces and cities have carried out the identification work of chemical parks or introduced the identification management measures for chemical parks. The standardization of chemical industry parks has been further strengthened.

Cao Yinshan, director of Sulige Economic Development Zone in Ordos, Inner Mongolia, suggested that for the coal chemical industry, the construction of coal chemical bases and the construction of coal chemical parks, the development of unified subdivision standardization construction guidance norms and evaluation system norms at the national level. The coal chemical industry is in the initial stage of development and evolving to the mature stage. It is necessary to formulate norms and guidance from the national level.

Wu Zhipeng, deputy director of the Green petrochemical Industry Promotion Bureau of the Tianjin Economic and Technological Development Area, said that the lack of safety standards for the construction of chemical enterprises is currently a national problem, especially the lack of equipment supervision standards during the construction of enterprise projects, which should be put forward in the draft for comments.

High-quality development demonstration projects

The draft for comments proposes that, based on the development experience of domestic and foreign industrial bases and professional parks, the establishment of "high-quality development Guidance Opinions for Chemical Parks" supporting and guaranteeing the high-quality development of the park, focusing on innovation, and timely carrying out the creation of "high-quality development demonstration projects for chemical parks". By 2025, 50 high-quality development demonstration projects of chemical parks will be cultivated, including 20 "high-quality development demonstration chemical parks" with high development quality, excellent management level, good industrial coordination and strong innovation ability; 30 "High-quality development demonstration projects in Chemical parks" with advanced technology and significant benefits.

"The Fifth Plenary Session of the 19th Central Committee of the Communist Party of China on the formulation of the 14th Five-Year Plan for National Economic and Social Development and 2035 vision Goals" clearly proposed to enhance the modernization of the industrial chain and supply chain, including the petrochemical industry, including the park to implement this requirement, vigorously develop new chemical materials, and accelerate the realization of high-end, differentiated and refined development of the industry. Move up the value chain and accelerate the transformation and upgrading of the petrochemical industry." Yang Songfeng said.

He believes that the development of chemical parks should benchmark world-class parks and develop the following aspects at the same time: First, to ensure the safety of the petrochemical park, safety is the bottom line, without safety development everything will be zero, further improve the understanding of the importance of safety work, fully implement the main responsibility of safety production, strengthen safety production management according to law, regularly organize safety inspections, implement monitoring of major hazards according to law, and eliminate hidden dangers in a timely manner; The second is to improve the infrastructure configuration project and improve the public service capacity; The third is to improve the construction of emergency system and the formulation of emergency plans to reduce the risk of accidents; Fourth, improve the emergency team, improve material reserves, regularly carry out emergency drills, and enhance the ability to prevent the expansion of accidents.

Zhang Wenming proposed that on the basis of green development and circular development, the park should consider highlighting the coupling development in the upstream and downstream connection, and enhance the coupling between the chemical park and other industries, such as the coupling of chemical industry and building materials, and the coupling of chemical industry and steel.

Kong Qingcheng, deputy director of the Shandong Provincial Department of Industry and Information Technology, suggested adding another public facilities upgrading project to the five major projects. He believes that the park is a carrier, and public facilities are very important, including basic roads, heating, sewage treatment, the construction of fire stations, parking lots, and car washes should be planned, and some are not necessarily placed in the park, but serve the park.


  • Rexroth CFL01.1-R3 Sercos III Interface Module
  • Rexroth CKK-110-NN-1 Linear Axis with MSK040C
  • Bosch Rexroth 047018-104401 Controller Card
  • Rexroth MDSD1K-2X/4 Solenoid Driver Module
  • Rexroth DKC02.3-012-3-MGP-01VRS Servo Drive
  • Rexroth HCS01.1E-W0006 Compact Servo Drive
  • Rexroth NAM1.2-08 Line Former R911246505
  • Rexroth VPB40 Industrial PC Control Cabinet
  • Rexroth FWA-ECODR3-SGP-03-MS Firmware Module
  • Rexroth HEDE10-31 Pressure Switch R901425475
  • Rexroth HM 17-11/315-C/V0/0 Pressure Sensor
  • Rexroth VFC 3610-2K20-3P4-MNA-7P Inverter 2.2kW
  • Rexroth MSK040C-0600-NN-M1-UG1-NNNN Right Angle Geared Motor
  • Rexroth DKC02.3-012-3-MGP-01VRS EcoDrive Cs
  • Bosch Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth HCS02.1E-W0012-A-03-NNNN Power Section
  • Rexroth DBDS 20 P18/400V Pressure Relief Valve
  • Rexroth 3460565500 Pneumatic EP Converter Regulator
  • Rexroth VT-SWA-1-12/DFEE Angle Sensor R900913641
  • Rexroth 0-608-830-250 Interface Module SM24V
  • Rexroth MHD071B-035-NP0-UN8 Servo Motor 12Nm 1000rpm
  • Rexroth MKD025B-144-KG0-KN R911263737 Servo Motor
  • Rexroth KCU02.2N-ET-ET*-025-NN-N-NN-NW Control Unit
  • Rexroth MV-VPB40*3-RB001VPB R911337529 Valve Terminal
  • Bosch Rexroth AS 2/R-2200 Drive Module 3842998041
  • Rexroth HMS01.1N-W0036 Power Section
  • Rexroth CKK-145-NN1 Compact Linear Module
  • Rexroth MS2N04-C0BTN-BSDK0-NNNNN-NN Geared Servo Motor
  • Rexroth HCS02.1E-W0028-A-03-NNNN Power Section
  • Rexroth MS2N04-D0BQN-CMSG0-NNNNN-NN Servo Motor
  • Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth MKD041B-144-KP1-KN Servo Motor R911262307
  • Rexroth ESA075G Handheld Nutrunner 0608841033
  • Rexroth MSK070D-0450-NN-M1-UP1-NSNN Motor
  • Rexroth CKK-145-NNG1 Linear Kit with HCS02 Drive
  • Rexroth MSK060C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth MKD090B-047-KP1-KS Servo Motor
  • Rexroth MLS140S-3A-0450-NNN Linear Motor
  • Rexroth VPB40.3 Industrial PC R911338689 CB1
  • Rexroth HCS02.1E-W0012 Servo Drive R911313871
  • Rexroth R151349014 R151145672 Ball Screw Assembly
  • Bosch Rexroth CKK-110-NN-1 Compact Module
  • Rexroth MSK060B-0300-NN-M1-UG1-NNNN Servo Motor
  • Rexroth Indramat TBM 1.2-40-W1-024 Servo Bleeder
  • Rexroth MSK040B-0600-NN-M1-UG1-NNNN Servo Motor
  • Rexroth MLS200S-3A-0450-NNN R911299213 Linear Motor
  • Rexroth SB356 Tool Tightening Controller Rack
  • Rexroth MSK050C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth Indramat DKC11.3-040-7-FW Eco Drive
  • Rexroth VT2000 Proportional Amplifier
  • Rexroth VT1118-10 Analog Module
  • Rexroth MSK060C-0600-NN-M1-UP1-NSNN Motor
  • Rexroth MSK060C-0300-NN-S1-UG0-NNNN Motor
  • Rexroth R911173937 IndraControl XM AI1
  • Rexroth R412018225 AES-D-BC-ECAT Module
  • Rexroth CDB02.1B R911338542 Controller Card
  • Rexroth VT-HNC100-2-30/P-I-00/000 Module
  • Bosch Rexroth CSB02.1B R911372549 Control
  • Bosch Rexroth R185321310 Runner Block
  • Rexroth VPB40.3 Industrial PC R911338689
  • Rexroth HNK01.1A-A075-E0106-A-500 Drive Controller
  • Rexroth CSH02.1B-CC-EC-ET-S4-NN-NN-FW Controller
  • Rexroth CSB01.1C-PB-ENS-NNN Control Unit
  • Rexroth MKD041B-144-KP0-KN Permanent Magnet Motor
  • Rexroth SE-B2.020.030-14.000 Servo Motor
  • Rexroth MSK060C-0600-NN-M1-UG0-NNNN Servo Motor
  • Rexroth HCS01.1E-W0018-A-03-B Drive Controller
  • Rexroth 3 842 547 996 IE3 Geared Motor
  • Rexroth CSH01.1C-NN-ENS R911309709 Control Section
  • Rexroth R151349013 Ball Screw Nut
  • Mannesmann Rexroth VT3006-36 Analog Amplifier Card
  • Bosch Rexroth R900086160 PGF1 Gear Pump
  • Bosch Rexroth R911173263 VDP15.3 Touch Display
  • Bosch Rexroth PPC-R22.1 RJ522 Industrial Controller
  • Bosch Rexroth MSK060C-0300-NN-S1-UG0-NNNN Servo Motor
  • Bosch Rexroth R911325068 NYS04.1 Controller
  • Bosch Rexroth R911335439 CSH01.1C Control Unit
  • Bosch Rexroth R917010287 BODAS RC10 Controller
  • Bosch Rexroth R911329791 CSH01.1C Drive Controller
  • Bosch Rexroth R182432310 Runner Block Guide
  • Bosch Rexroth VT-VSPA2-1-11 Amplifier Card R900021909
  • Bosch Rexroth MKD090B-047-KG1-KN Servo Motor
  • Bosch Rexroth LTU350 Servo Amplifier 0608750108
  • Bosch Rexroth 5610102050 Pneumatic Vacuum Regulator
  • Bosch Rexroth VT5041-23/3-OV PLC Control Board
  • Bosch Rexroth VT3015 S10/E Servo Amplifier Board
  • Bosch Rexroth MSK070D-0300-NN-M2-UG1 Servo Motor
  • Bosch Rexroth 3DREP6C-21 Valve R900955887
  • Bosch Rexroth R151244013 Ball Screw Bearing Unit
  • Bosch Rexroth MSM031C-0300 Servomotor R911325140
  • Bosch Rexroth EMD-B16.1-DC024N Box R911291681
  • Bosch Rexroth MKD071B-061-GP0-KN Servo Motor
  • Bosch Rexroth MSK030C-0900-NN-M1-UG1 Servo Motor
  • Bosch Rexroth EcoDrive DKC01.3-004-3-MGP-01 Servo Controller (299772)
  • Bosch Rexroth DKC02.3-040-7 EcoDrive Controller
  • Bosch Rexroth CLC-D02.3 CLC Motion Control Board
  • Bosch Rexroth HDS05.2-W300N Drive R911190019
  • Bosch Rexroth DKCXX.3-100-7 Servo Drive Unit
  • Bosch Rexroth CSE02.1A-S3-EC Control Unit R911339030
  • Bosch Rexroth MSK040C-0600-NN-S1-UP0 Servo Motor
  • Bosch Rexroth VT3013 S36 R5 Circuit Board Card
  • Bosch Rexroth VT3000-36A Amplifier Card R90020298
  • Bosch Rexroth VPB40.3 IndraControl Module R911374113
  • Bosch Rexroth HCS02.1E-W0054-A-03-NNNN Converter with R911332574 Control Unit
  • Bosch Rexroth MHD071B-061-PG1-UN Servo Motor
  • Bosch Rexroth A2F5/60W-B3-S Piston Motor R909418904
  • Bosch Rexroth HCS01.1E-W0018-A-03-B-ET-EC-NN-NN-NN-FW IndraDrive Cs Converter
  • Bosch Rexroth 4WRPEH 6 C4B40P-2X/G24K0/A1M Proportional Directional Valve (0 811 404 647)
  • Bosch Rexroth R911405975 ctrlX OS PLC Controller
  • Bosch Rexroth CSB02.1B-ET-EC-NN-S4-NN-NN-FW Servo Control Card R911338543
  • Rexroth MSK050B-0300-NN-M1-UG0-NNN Servo Motor
  • Rexroth IndraControl VEPXX.5-ATOM Set R911374889 Panel
  • Rexroth 1070089906-GC1 1070089907-201 Board
  • Rexroth CSB01.1C-SE-ENS-EN2-NN-S-NN-FW Control Unit
  • Rexroth MKD071B-024-KG3-KN Servo Motor
  • Rexroth Indramat DKC02.3-040-7-FW Controller
  • Rexroth HCS02.1E-W0028-A-03-NNNN Servo Module
  • Rexroth HMD01.1N-W0036-A-07-NNNN Drive Module
  • Rexroth MSK050C-0600-NN-M1-UG0-NNN Servo Motor
  • Rexroth DKC02.3-040-7-FW Servo Controller
  • Bosch Rexroth VT-5014S30-R1 Amplifier Card
  • Bosch Rexroth MSK040C-0600-NN-M1-UG1 Servo Motor
  • Bosch Rexroth MKD071B-061-GG0-KN Servo Motor
  • Bosch Rexroth VT5012-S45-R1 Amplifier Card
  • Bosch Rexroth SHL03.1-NNN-S-NNN Encoder Module
  • Bosch Rexroth EFC3600-0K75 Frequency Converter
  • Bosch Rexroth VFC3610-1K50-3P4-MNA-7P-NNNNN-NNNN 1.5kW Frequency Inverter
  • Bosch Rexroth EFC5610-2K20-3P4-MDA-7P-NNNNN-L1NN 2.2kW Frequency Converter