Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Green construction project

来源: | 作者:佚名 | 发布时间 :2023-11-24 | 167 次浏览: | Share:

1. Green construction project

The draft for comments proposes to formulate and improve the evaluation system of chemical parks that meet the requirements of green development, cultivate a number of green parks, give play to the role of demonstration and typical leadership, and promote the green development of chemical parks to a new level. Resolutely win the battle of pollution control, carry out in-depth circular transformation of the chemical park, realize the recycling of industrial links in the park, efficient resource utilization, centralized pollution control, and do a good job in the scientific treatment and disposal of the "three wastes" in the park. To study and formulate the responsible care construction plan of chemical industry park, and promote the practice of responsible care in chemical industry park. By 2025, 50 "green chemical parks" will be created, more than 100 key chemical parks will fully commit to practicing responsible care, and key petrochemical bases and chemical parks will become ecological and beautiful industrial clusters with "blue sky, clear water and green grass".

Yang Songfeng said that it is necessary to adhere to green and low-carbon development. Support the green technology innovation of enterprises in the park, promote cleaner production, improve resource utilization efficiency, realize the transformation from decentralized governance of enterprises to centralized governance of the park, promote the development of circular economy in the park, improve the degree of industrial correlation and recycling, actively carry out the integrated transformation of the park, and realize the circular connection between enterprises and industries. We will improve the management of resources, energy and other materials and the management of the environment, promote the formation of links between the production system and the household system, promote the overall conservation and recycling of resources, and improve the utilization rate of resources.

Qiu Guoqiang suggested that the responsible care of the park should be included in the important work scope of the development of the chemical park, further deepen the implementation of responsible care, further strengthen the interaction between the park and the public, gain the trust of the public, and form a community of interests.

Liu Yanwei, former chief engineer of the Petrochemical Planning Institute, said that the state now puts forward five development concepts as planning principles to practice the concept of green development. From the perspective of the park, in terms of project introduction, the park is now very strong awareness, requiring high project quality and input-output intensity to meet the requirements. In addition to these rigid requirements, there are green development indicators, which are mainly reflected in three aspects. First, the green access threshold should be scientifically evaluated by relevant experts, and the park will provide preferential conditions for those who meet the entry threshold requirements of green indicators; Second, to use clean energy, from the perspective of future development, to increase the proportion of renewable energy and renewable electricity in the park's energy consumption, can encourage the use of nuclear renewable resources; The third is to adopt low-carbon technologies and reserve technologies in advance for future low-carbon technological barriers.

2. Intelligent construction project

According to the draft for comments, research on the adaptation of new technologies and park management needs, with big data as the core, through system planning, information leadership, reform and innovation, vigorously promote the deep integration and iterative evolution of big data technology and park modernization, accelerate the interconnection and open sharing of park information systems and public data, and build a "shareable" and "traceable" smart supervision system. To realize the whole life cycle supervision of hazardous chemicals, build an emergency rescue system with fast response and efficient decision-making, and effectively improve the management level and management efficiency of the park. By 2025, 50 pilot demonstration units of "smart chemical parks" will be built, 30% of key chemical parks at the provincial level and above will carry out the creation of smart chemical parks, and key petrochemical bases and chemical parks will achieve controllable major safety risks, monitoring, early warning, and prevention and control of key hazard sources and risk points.

Yang Songfeng said that intelligent and digital development should be accelerated, modern technologies such as cloud computing and big data Internet of things should be adopted to speed up the construction of petrochemical industry platforms, build intelligent park management platforms, establish park related databases, industrial production system simulation and decision support systems, achieve information sharing, improve infrastructure support capabilities, and improve the construction plan of smart parks.

"Information construction has two roles: on the one hand, improve management efficiency, achieve quality change, power change, efficiency change; The other is to raise the level of supervision in the park."  The draft for comments has not yet been reflected in the construction of the early warning system for key hazardous chemical production enterprises in the chemical industry, and the Ministry of Emergency Management has been promoting the monitoring content of the risk early warning system of the chemical park in the integrated platform to connect with the risk early warning system of the enterprise.

Wu Xun, deputy director of Yangzhou Huazhi Office, believes that the smart construction of chemical parks should establish digital transformation, and in addition to smart park management, smart factories and smart workshops should be built, as well as the whole-process automation transformation currently being implemented in the chemical industry. He said that the smart park is not only the management of the park level, but also the classification and management of the whole ecology of the park.

Su Dong believes that in terms of intelligent construction, comprehensive utilization of resources should be encouraged, such as energy utilization, efficient power generation projects and power supply projects, to give some regional power grids preferential treatment, and encourage the development of new energy application fields in addition to raw materials and products.

3. Standardized construction projects

The draft for comments proposes to complete the top-level design of the chemical park standard system and orderly promote the preparation of the urgently needed standards in the chemical park. The establishment of a set of chemical industry park as the main body, the association organization to promote, technical support units, industry experts, universities and research institutions and other extensive participation in the standardization work mechanism. According to the multi-stage promotion of group standards, industry standards and national standards as the main form, actively promote the construction of chemical park standards system. By 2025, the number of management and construction standards for chemical parks will reach 50, providing strong support for management standardization and standardization.

Yang Songfeng believes that the construction of the standard evaluation system of chemical parks can play a good guiding role in the improvement of the construction norms of chemical parks, and also provide a basis for the supervision and evaluation work of relevant departments. At present, some provinces and cities have carried out the identification work of chemical parks or introduced the identification management measures for chemical parks. The standardization of chemical industry parks has been further strengthened.

Cao Yinshan, director of Sulige Economic Development Zone in Ordos, Inner Mongolia, suggested that for the coal chemical industry, the construction of coal chemical bases and the construction of coal chemical parks, the development of unified subdivision standardization construction guidance norms and evaluation system norms at the national level. The coal chemical industry is in the initial stage of development and evolving to the mature stage. It is necessary to formulate norms and guidance from the national level.

Wu Zhipeng, deputy director of the Green petrochemical Industry Promotion Bureau of the Tianjin Economic and Technological Development Area, said that the lack of safety standards for the construction of chemical enterprises is currently a national problem, especially the lack of equipment supervision standards during the construction of enterprise projects, which should be put forward in the draft for comments.

High-quality development demonstration projects

The draft for comments proposes that, based on the development experience of domestic and foreign industrial bases and professional parks, the establishment of "high-quality development Guidance Opinions for Chemical Parks" supporting and guaranteeing the high-quality development of the park, focusing on innovation, and timely carrying out the creation of "high-quality development demonstration projects for chemical parks". By 2025, 50 high-quality development demonstration projects of chemical parks will be cultivated, including 20 "high-quality development demonstration chemical parks" with high development quality, excellent management level, good industrial coordination and strong innovation ability; 30 "High-quality development demonstration projects in Chemical parks" with advanced technology and significant benefits.

"The Fifth Plenary Session of the 19th Central Committee of the Communist Party of China on the formulation of the 14th Five-Year Plan for National Economic and Social Development and 2035 vision Goals" clearly proposed to enhance the modernization of the industrial chain and supply chain, including the petrochemical industry, including the park to implement this requirement, vigorously develop new chemical materials, and accelerate the realization of high-end, differentiated and refined development of the industry. Move up the value chain and accelerate the transformation and upgrading of the petrochemical industry." Yang Songfeng said.

He believes that the development of chemical parks should benchmark world-class parks and develop the following aspects at the same time: First, to ensure the safety of the petrochemical park, safety is the bottom line, without safety development everything will be zero, further improve the understanding of the importance of safety work, fully implement the main responsibility of safety production, strengthen safety production management according to law, regularly organize safety inspections, implement monitoring of major hazards according to law, and eliminate hidden dangers in a timely manner; The second is to improve the infrastructure configuration project and improve the public service capacity; The third is to improve the construction of emergency system and the formulation of emergency plans to reduce the risk of accidents; Fourth, improve the emergency team, improve material reserves, regularly carry out emergency drills, and enhance the ability to prevent the expansion of accidents.

Zhang Wenming proposed that on the basis of green development and circular development, the park should consider highlighting the coupling development in the upstream and downstream connection, and enhance the coupling between the chemical park and other industries, such as the coupling of chemical industry and building materials, and the coupling of chemical industry and steel.

Kong Qingcheng, deputy director of the Shandong Provincial Department of Industry and Information Technology, suggested adding another public facilities upgrading project to the five major projects. He believes that the park is a carrier, and public facilities are very important, including basic roads, heating, sewage treatment, the construction of fire stations, parking lots, and car washes should be planned, and some are not necessarily placed in the park, but serve the park.


  • GE HYDRAN 201Ti Single Channel Gas Monitoring Transmitter
  • GE Hydran M2-X Transformer Online Monitoring Equipment
  • GE Hydran M2 Transformer Monitoring System
  • Kollmorgen Seidel 65WKS-CE310/6PB - Servo Drive Control
  • Kollmorgen U9M4T - Servodisc DC Motor, With Harmonic Drive Transmission
  • KOLLMORGEN TT-2952-1010-B - INLAND BRUSH SERVO MOTOR WITH TACH
  • ONE VF-RA2474N-5/10/12/15 - Servo Drive Power Cable
  • Kollmorgen S30601-NA - Servostar 346 + EtherCat
  • Kollmorgen HDIL100P1 - Direct Drive Linear Hall Effect Assembly
  • Kollmorgen TT-4239-1010-AA - DC Servo Motor 875 RPM
  • PMI Kollmorgen 00-00907-999 - ServoDisc DC Motor 0.5" Diameter Shaft
  • INLAND KOLLMORGEN TT-2952-1010-B - MOTOR (USES RESOLVER)
  • KOLLMORGEN CTI-187-2 - BRUSHLESS MOTOR DANAHER MOTION
  • Kollmorgen 12-0857 - Lead Screw Electric Cylinder without Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • kollmorgen 6sm, 10m - Cable
  • KOLLMORGEN ME2-207-C-94-250 - GOLDLINE SERVOMOTOR-ENCODER COMMUTATED
  • Kollmorgen MT308A1-R1C1 - GoldLine Motor
  • Kollmorgen 73 & 54 cm Travel - Ironless Linear Motors on THK Rail
  • Kollmorgen AKM53H-ACCNR-00 - Servo Motor
  • Kollmorgen PA5000 - Power Supply
  • KOLLMORGEN D082M-12-1310 - GOLDLINE DDR DIRECT DRIVE ROTARY MOTOR 230Vrms 300 RPM
  • Kollmorgen RBEH-01210-A14 - Brushless Motor, Heidenhain D-83301
  • KOLLMORGEN Servotronix PRD-CC18551H-11 - Servo Board
  • Kollmorgen DH083M-13-1310 - Ho Direct Drive Rotary. Max Speed: 400/500 RPM
  • KOLLMORGEN BMHR-4.8XX - INLAND MOTOR
  • Kollmorgen Seidel 84421 - Motor Cable 20 Metre 6SM 27/37 AKM DBL Engines
  • Kollmorgen AKD1207-NBCC-0000 - Drive
  • HP Indigo / Kollmorgen VLM32H-ALNR-00 - Motor
  • SUPERIOR ELECTRIC / KOLLMORGEN GM05009005 - POWERSTAT 50 AMP VARIAC w/ PMI MOTOR
  • Kollmorgen CM12A1-015-033-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • Kollmorgen U9M2 - DC Motor
  • Kollmorgen AKM11C-ANMN2-00 - 3-Phase PM Servo Motor 110W
  • Kollmorgen 60-023168-000 - MOTOR GEARBOX ASSEMBLY SERVODISC DC NO REAR SHAFT
  • Kollmorgen AS10300 - servo drive servo star Cincinnati
  • Kollmorgen AKM23D-EFC2C-00 - Servo Motor AKD Drive
  • KOLLMORGEN E33HRFB-LNK-NS-01 - STEPPER MOTOR 2.7AMP 251W 1500RPM 170V
  • Kollmorgen AKM21G-ENM2DB00 - Servomotor
  • KOLLMORGEN SERVO STAR 620-AS - 230-480V 20A Servo Drive
  • Kollmorgen CFE0A1-002-006-00 - Encoder Cable 6.00m
  • KOLLMORGEN AKM21C-ANM2DBOO - PM SERVOMOTOR
  • Kollmorgen 03200-2G205A - ServoStar Servo Drive
  • Kollmorgen CR10251 - SERVOSTAR CD AC Servo Driver
  • Kollmorgen VF-DA0474N-03-0 - 10 Ft Feedback Cable
  • KOLLMORGEN AKM21S-ANMNR-03 - Servo Motor
  • Danaher Motion Kollmorgen S403AM-SE - Servostar 443M-S Servo Drive
  • Kollmorgen Seidel digifas 7204 - Servo Amplifier Digital
  • Kollmorgen Industrial Drive B-406-B-A1-B3 - Goldline Brushless Servomotor
  • Danaher Motion S20630-CNS - Servo Kollmorgen S200 Series
  • KOLLMORGEN B-206-A-31-B3 - GOLDLINE BRUSHLESS PM SERVO MOTOR 1400RPM
  • Kollmorgen Seidel SR6-6SMx7 - 4m Cable
  • Cincinnati Milacron Kollmorgen Vickers PSR4/5-250-7500 - Power Supply
  • Kollmorgen AKM 13C-ANCNR-00 - Gripper Handling with Neugart PLE 40 gears
  • Kollmorgen SERVOSTAR 403 A-P - 3a servo drive
  • KOLLMORGEN S6M4H - INDEXER ASSY SERVO MOTOR
  • SERVOMOTOR KOLLMORGEN SEIDEL 6SM 57M-3.000-G-09 - Servo Motor
  • Kollmorgen VP-507BEAN-03 - Valueline AKD 10 Ft Power Cable
  • KOLLMORGEN 28454 - SERVO DRIVE, SERVOSTAR 300 SERVOSTAR 310
  • KOLLMORGEN TT-4205-4017-C - INDUSTRIAL DRIVE DC MOTOR
  • Kollmorgen T150551 - Servostar 343 Control Drive
  • Kollmorgen ICD05030A1C1 - Platinum DDL Direct Drive Linear Motor w/ 30" Rail Way
  • Kollmorgen SERVOSTAR 303 S30361-SE - Servo Drive
  • Kollmorgen 00-00907-002 - ServoDisc DC Motor Varian Semiconductor 3500054
  • Kollmorgen CM12A1-025-005-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • KOLLMORGEN MOTION TECH IL18100A3TRC1 - BRUSHLESS LINEAR MOTOR PLATINUM DDL
  • Kollmorgen SERVOSTAR 406 M-C - Servo Drive FW: 7.36
  • Kollmorgen IC11030A1P1103 - platinum direct drive linear motor
  • W&T 10/100BaseT - Com Server Highspeed 3×RS232/RS422/RS485
  • Kollmorgen S30361-NA - drive brand
  • Kollmorgen Industrial Drives PSR3-208/50-01-003 - Power Supply
  • Kollmorgen RBE-03011-A00 - Brushless Frameless Servo Motor, OD: 5-5/64"/129mm
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Kollmorgen IC44030A2P1 - LINEAR DRIVE MOTOR
  • KOLLMORGEN AKM22E-ANS2R-02 - servo motor + Micron X-TRUE 60
  • Kollmorgen 18442-01B - Pendant (E2)
  • Kollmorgen AKD-P00306-NBEC-0069 - Drive
  • Kollmorgen AKM53H-ACCNR-00 - Servomoteur
  • Kollmorgen AKD-P01207-NACN-0056 - Servo Drive
  • Kollmorgen SERVOSTAR 403a-c - Servo Drive
  • Kollmorgen B-204-B-39-016 - Servo Motor
  • Giddings & Lewis Dahaner Motion Kollmorgen M.1017.3140 R3 - Output Module
  • Kollmorgen KNSG300 - Emergency Light Unit
  • KOLLMORGEN 62-0050 Model T31V-EM-C0 - Servo Motor Shaft Size 3/8" Dia 1-1/4" Long
  • Kollmorgen S30601-NA-ARM9 - SERVOSTAR346 Controller w/o Fan As Is
  • Kollmorgen PMI Motors 00-00903-010 - ServoDisc DC Motor Type U9M4H 1/2" shafts
  • Kollmorgen PMI Motion U12M4 - Servo Disc DC Motor Universal Instruments 11467000
  • Kollmorgen AKM53H-accnr-00 - Servo Motor
  • DANAGER MOTION / KOLLMORGEN ACD4805-W4 - (70A ) Vehicle / Motor Controller
  • Kollmorgen s60300 - SERVOSTAR 603 3 x 230-480v 2kva
  • KOLLMORGEN B-404-C-21 - GOLDLINE BRUSHLESS P.M. SERVOMOTOR
  • Kollmorgen T-5144-A - GE Aviation 739034-01 Direct Drive DC Torque Motor
  • KOLLMORGEN M.1302.8761 - CABLE, POWER
  • Kollmorgen CE03250 - Servostar Servo Drive
  • Kollmorgen K-342 - dual axis automatic autocollimator
  • Kollmorgen TT-4500-1010-B - Inland Motor
  • Kollmorgen S20260-Srs - Synqnets200 Series Servo Drive Forparts
  • Kollmorgen PRDRHP720SND-65 - drive CR06703-R
  • KOLLMORGEN S70362-NANANA - driver
  • Kollmorgen CR06260-000000 - SERVOSTAR CD AC Servo Driver
  • KollMorgen akd-m00306-mcec-D000 - Multi-Axis Master Programmable Drive AKD PDMM
  • KOLLMORGEN S61000 - SERVOSTAR 610 3X230-480V 10A
  • Kollmorgen AKD-P00306-NBCC-0000 - AKD Servo Drive
  • KOLLMORGEN CP306250 - SERVOSTAR SP Servo Drive
  • Kollmorgen MPK411 - controller
  • Kollmorgen S64001 - SERVOSTAR 640, factory-certified
  • Kollmorgen Servotronix Prdr0087006Z-00 - Lvd Servo Drive
  • Kollmorgen AKD-P00306-NAAN-0000 - Servo Drive Controller, 1.2KVA, 240Vac, 3 Phase
  • Kollmorgen MCSS08-3232-001 - MCSS06-3224-001 ServoStar Drives (AS-IS)
  • Kollmorgen CR06250-2D063A - drive
  • YASKAWA SGDP-04APA - SERVOPACK SERVO DRIVE
  • Kollmorgen s62001 - servostar 620-as 14kva 20a ip2o 3x 230-480v
  • Kollmorgen Seidel S60100 - Servostar 601 Servo Drive
  • KOLLMORGEN CR06703-R - HP SERVOSTAR CD CONTROLLER
  • kollmorgen Prdr0052200z-05 - graco inter Servo Component
  • KOLLMORGEN S403AM-SE - drive SERVOSTAR 443M-S
  • YASKAWA SGDP-01APA - SERVOPACK SERVO DRIVE
  • Kollmorgen CE06200-1H348H - SERVOSTAR CD Servo Driver
  • Kollmorgen S71262-NANANA - S700 Servo Amplifier 208Y/120V 480Y/277V
  • Kollmorgen S70302-NANANA-NA - S700 Servo Driver
  • KOLLMORGEN S61401-560 - ATS-SERVOSTAR 614-AS Servo Drive
  • KOLLMORGEN Industrial Drives BDS4A-103J-0001/102A21P - Servo Controller
  • Kollmorgen S71202-NANANA-NA-024 - S700 Servo Driver
  • KOLLMORGEN S70302-NANANA - driver
  • Kollmorgen CR06250 - SERVOSTAR Servo Drive
  • Kollmorgen CE03550 - drive
  • Kollmorgen S71202-NANANA - S700 Servo Driver