Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Oil and gas pipeline protection Regulations

来源: | 作者:佚名 | 发布时间 :2023-12-14 | 471 次浏览: | Share:

Article 1 These Regulations are formulated for the purpose of ensuring the safe operation of petroleum (including crude oil and refined oil, the same below) and natural gas (including coal bed methane, the same below) pipelines and their affiliated facilities, and maintaining public safety.

Article 2 These Regulations shall apply to the protection of pipelines transporting oil and natural gas and their ancillary facilities (hereinafter referred to as pipeline facilities) within the territory of the People's Republic of China.

These Regulations shall not apply to the protection of urban pipe networks transporting petroleum and natural gas and the internal pipe networks of petrochemical enterprises.

Article 3 The term "pipeline facilities" as mentioned in these Regulations includes:

(1) Pipelines for transporting oil or natural gas;

(2) Pipeline anti-corrosion protection facilities, including cathodic protection station, cathodic protection test pile, anode ground bed and stray current drainage station;

(3) Pipeline hydraulic protection structures, seismic facilities, pipe levees, pipe Bridges and special culverts and tunnels for pipelines;

(4) pressure station, heating station, metering station, oil collection (gas) station, gas transmission station, gas distribution station, treatment yard (station), pigging station, all kinds of valve chambers (Wells) and emptying facilities, oil depot, loading and unloading rack and unloading yard;

(5) Pipeline marking, marking and crossing public (railway) road leak detection device.

Article 4 Pipeline facilities are important infrastructure facilities and are protected by law. No unit or individual may seize, destroy, steal or loot them.

All units and individuals have the obligation to protect pipeline facilities and the oil and natural gas transported by pipelines. Any unit or individual shall have the right to stop and report to the relevant departments any act of encroaching, destroying, stealing or robbing pipeline facilities, oil and natural gas transported through pipelines or any other act endangering the safety of pipeline facilities.

Article 5 The administrative department of economy and trade under The State Council shall be responsible for the supervision and administration of the protection of pipeline facilities throughout the country; The departments designated by the local people's governments at or above the county level shall be responsible for the supervision and administration of the protection of pipeline facilities within their respective administrative areas.

Article 6 The local people's governments at all levels along the pipeline facilities shall conduct publicity and education on the safety protection of pipeline facilities among the masses along the pipeline facilities, and be responsible for coordinating the settlement of the temporary land use, employment and other matters related to the inspection, maintenance and emergency repair of pipeline facilities.

Article 7 The local people's governments at all levels along the pipeline facilities shall strengthen the organization and leadership of the protection of pipeline facilities, take effective measures to ensure the safety of pipeline facilities, and promptly organize the relevant departments to stop and investigate and punish the encroachment, destruction, theft, looting of pipeline facilities and the oil and natural gas transported through pipelines as well as other acts endangering the safety of pipeline facilities within their respective administrative areas.

The local people's governments at all levels along the pipeline facilities, the relevant departments and their personnel shall not shelter or connive at any act of occupying, damaging, stealing or robbing the pipeline facilities, the oil and natural gas transported by the pipeline or any other act endangering the safety of the pipeline facilities. No one shall obstruct or interfere with the investigation and punishment of acts of encroachment, destruction, theft, or looting of pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities according to law.

Article 8 The public security organs at all levels along the pipeline facilities shall be responsible for investigating and handling according to law the cases of damaging, stealing, robbing pipeline facilities and the oil and natural gas transported through pipelines, as well as other cases endangering the safety of pipeline facilities.

Article 9 The relevant departments of the State and pipeline enterprises shall award units and individuals that have made outstanding contributions to the safety of pipeline facilities.

Chapter II Protection of pipeline facilities

Article 10 Pipeline enterprises shall be responsible for the safe operation of their pipeline facilities and perform the following obligations:

(A) in strict accordance with the national pipeline facilities construction quality standards design, construction and acceptance;

(2) Apply anti-corrosion insulation layer to the pipeline, and add cathodic protection devices;

(3) After the completion of the pipeline, permanent signs shall be set up, and protective measures shall be taken and signs shall be set up for local pipelines that are vulnerable to vehicle collision and damage by humans and animals;

(D) strictly implement the pipeline transport technical operating rules and safety rules and regulations;

(5) Regular inspection of pipeline facilities, timely maintenance;

(6) Cooperate with the local people's government to carry out publicity and education on the safety protection of pipeline facilities to the masses along the pipeline facilities;

(7) Cooperate with public security organs to ensure the safety and security of pipeline facilities.

Article 11 When an accident occurs in pipeline facilities, pipeline enterprises shall promptly organize emergency repair, and no unit or individual may obstruct or hinder the emergency repair work by any means.

Article 12 The oil leaked or discharged from pipelines shall be recovered and disposed of by the pipeline enterprises, and no unit or individual may take it as his own.

Article 13 Pipeline enterprises shall enjoy the right to the use of the land requisitioned according to law, and no unit or individual may illegally occupy it. Local farmers, after obtaining the consent of the pipeline enterprise, may plant shallow root crops within the scope of land requisition, but the pipeline enterprise shall not compensate for the loss of crops caused in the process of pipeline inspection, maintenance and emergency repair.

Article 14 A pipeline enterprise may, as required, assign full-time line guards or employ part-time line guards.

Article 15 Any unit or individual is prohibited from engaging in the following activities that endanger the safety of pipeline facilities:

(1) Moving, removing or damaging pipeline facilities, as well as signs and marks set up to protect the safety of pipeline facilities;

(2) Collecting soil, digging ponds, repairing canals, building aquaculture farms, discharging corrosive substances, piling up bulk materials, quarrying stones, building houses, greenhouses, livestock sheds, constructing other buildings and structures, or planting deep-rooted plants within 5 meters on each side of the Central Line of the pipeline;

(3) Blasting, excavating mountains and constructing large buildings and structures on both sides of the Central Line of the pipeline or within a range of 50 meters outside the site of the pipeline facilities;

(4) Driving motor vehicles on the inspection road above the buried pipeline facilities or walking on the ground pipeline facilities or overhead pipeline facilities;

(5) Other acts endangering the safety of pipeline facilities.

Article 16 Where blasting is carried out within the range of 50 meters to 500 meters on both sides of the center line of the pipeline, the consent of the pipeline enterprise shall be obtained in advance, and the blasting can only be carried out after taking safety protection measures.

Article 17 For pipeline facilities crossing a river, the scope of safety protection shall be determined by the pipeline enterprises and the management units of river courses and waterway in accordance with the relevant provisions of the State, and signs shall be set up.

Within the scope of safety protection determined in accordance with the preceding paragraph, except for dredging operations for flood control and navigation of waterway under the condition of ensuring the safety of pipeline facilities, piers shall not be built, anchoring, dragging, dredging, dredging, frying fish, carrying out underwater blasting or other underwater operations that may endanger the safety of pipeline facilities.

Chapter three deals with the encounter relationship between pipeline facilities and other construction projects

Article 18 A pipeline enterprise shall submit the relevant information of the pipeline facilities it has built and the plans or plans for the construction, alteration (expansion) of pipeline facilities to the local planning authorities; The local planning authorities shall incorporate the new construction, modification (expansion) of pipeline facilities into the local overall planning.

Where the relevant information, plans or plans prescribed in the preceding paragraph need to be submitted to other relevant local competent authorities in accordance with laws and administrative regulations, pipeline enterprises shall submit them according to law.

Article 19 When pipeline enterprises carry out pipeline facilities maintenance operations and construction protection projects, the relevant units and individuals in the areas through which the pipeline passes shall give necessary assistance. If the above operations cause losses to the legitimate rights and interests of the relevant units or individuals, the pipeline enterprises shall compensate according to law.

Article 20 The protection problems of pipeline facilities arising from the encounter between the construction project to be constructed or modified (expanded) and the existing pipeline facilities shall be solved through consultation between the construction project unit to be constructed or modified (expanded) and the pipeline enterprise. If a construction project to be constructed or modified (expanded) needs to reroute, relocate or increase the protection facilities of pipeline facilities, the expenses required shall be borne by the construction project unit to be constructed or modified (expanded).

Article 21 When formulating flood control measures and building DAMS, water conservancy departments shall pay attention to the safety of pipeline facilities; When it is necessary to discharge flood in the area through which the pipeline facilities pass, the amount and time of discharge shall be notified to the pipeline enterprise in a timely manner.

Article 22 The construction of pipeline facilities across (through) river courses, river banks and waterways, and the construction of pipeline protection facilities in river courses must conform to the national flood control standards and navigation standards.

Article 23 When any unit carries out the following construction within the scope of safety protection of pipeline facilities, it shall notify the pipeline enterprise in advance and take corresponding protective measures:

(1) Constructing, upgrading (expanding) constructing railways, highways, Bridges, rivers and canals, and overhead power lines;

(2) laying underground electrical (optical) cables;

(3) Setting up safety or lightning arrester grounding body.

Chapter IV Legal liability

Article 24 Whoever moves, dismantles or damages pipeline facilities in violation of the provisions of these Regulations, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections, and may impose a fine of not more than 10,000 yuan on individuals and not more than 100,000 yuan on units; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 25 Whoever, in violation of the provisions of these Regulations, damages pipeline facilities or steals or robs oil or natural gas transported through pipelines, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the public security organ shall confiscate the illegal gains and, if the illegal gains are more than 10,000 yuan, impose a fine of not less than two times but not more than five times the illegal gains; If there are no illegal gains or the illegal gains are less than 10,000 yuan, a fine of not more than 20,000 yuan shall be imposed; Whoever violates the provisions on the administration of public security shall be punished for the administration of public security according to law.

Article 26 Whoever, in violation of the provisions of these Regulations, explodes, excavates hills or constructs large buildings or structures on both sides of the Central Line of the pipeline or within a range of 50 meters outside the area of the pipeline facility, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections and impose a fine of not less than 10,000 yuan but not more than 100,000 yuan; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 27 Whoever, in violation of the provisions of these Regulations, builds, changes (expands) the construction of railways, highways, Bridges, rivers, overhead power lines, buries underground electric (optical) cables, sets up safety or lightning protection grounding bodies within the scope of safety protection of pipeline facilities, fails to notify the pipeline enterprises in advance and takes corresponding protective measures, shall be ordered to make corrections by the department designated by the local people's government at or above the county level. A fine of not less than 10,000 yuan but not more than 50,000 yuan.

Article 28 Whoever, in violation of the provisions of these Regulations, obstructs or hinders the normal inspection, maintenance or rush repair of pipeline facilities by pipeline enterprises shall be ordered by the department designated by the local people's government at or above the county level to make corrections, and may be fined not more than 2,000 yuan for individuals and not more than 50,000 yuan for units; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 29 Whoever, in violation of the provisions of these Regulations, draws soil, digs ponds, repairs canals, builds aquaculture farms, discharges corrosive substances, piles up bulk materials, quarries stones, builds houses, greenhouses, builds livestock sheds, constructs other buildings or structures, or plants with deep roots within a radius of 5 meters on each side of the Central Line of a pipeline, shall be ordered to make corrections by the department designated by the local people's government at or above the county level. Individuals may be fined up to 2,000 yuan, and units may be fined up to 50,000 yuan.

Article 30 If any of the acts listed in Articles 24 to 29 of these Regulations causes damage or damage to pipeline facilities, in addition to administrative penalties or criminal penalties according to law, it shall also bear the liability for compensation according to law.

Article 31 Where a pipeline enterprise, in violation of the provisions of these Regulations, fails to perform the obligations of safe operation of pipeline facilities, thereby causing damage to pipeline facilities and constituting a crime, it shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections and impose a fine of not less than 20,000 yuan but not more than 100,000 yuan.

Article 32 Where employees of pipeline enterprises collude with others to destroy or steal pipeline facilities and oil or natural gas transported through pipelines, if the case constitutes a crime, they shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, a heavier punishment shall be given in accordance with the provisions of Article 25 of these Regulations.

Article 33 Where local people's governments or relevant departments fail to perform their duties for the protection of pipeline facilities, resulting in the encroachment, destruction, theft or looting of pipeline facilities and the oil and natural gas transported through pipelines, as well as other activities endangering the safety of pipeline facilities in their own areas, which cannot be stopped for a long time and cause serious consequences, the persons in charge and other persons directly responsible shall, in accordance with the seriousness of the circumstances, To give administrative sanctions of demerit demerit, demotion or dismissal according to law; If the case constitutes a crime, criminal responsibility shall be investigated according to law.

Article 34 If a functionary of a state organ commits any of the following acts, which constitutes a crime, he shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, administrative sanctions of demotion, removal or even dismissal from public office shall be imposed according to law:

(1) concealing or conniving at encroachment, destruction, theft or robbery of pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities;

(2) providing information to the parties concerned who occupy, destroy, steal or loot pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities, and helping them to evade investigation and punishment;

(3) obstructing or interfering with relevant departments' investigation and punishment of encroaching, destroying, stealing or robbing pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities according to law.


  • FOXBORO P0926KK PLC system functional module
  • FOXBORO P0924AW wireless pressure transmitter
  • FOXBORO P0916NK differential pressure transmission cable
  • FOXBORO P0916JQ PLC module
  • FOXBORO P0916JP I/A series control module
  • FOXBORO P0916GG Digital Input Module
  • FOXBORO P0916DV I/A series digital input module
  • FOXBORO P0916DC Terminal Cable
  • FOXBORO P0916DB I/A series PLC module
  • FOXBORO P0914ZM recognition module
  • FOXBORO P0902YU control module
  • FOXBORO P0901XT Process Control Unit
  • FOXBORO P0800DV fieldbus extension cable
  • FOXBORO P0800DG Standard Communication Protocol Module
  • FOXBORO P0800DB Universal I/O Module
  • FOXBORO P0800DA Industrial Control Module
  • FOXBORO P0800CE control module
  • FOXBORO P0700TT Embedded System
  • FOXBORO P0500WX Control System Module
  • FOXBORO P0500RY Terminal Cable Assembly
  • FOXBORO P0500RU control module
  • FOXBORO P0500RG Terminal Cable
  • FOXBORO P0400ZG Node Bus NBI Interface Module
  • FOXBORO P0400GH fieldbus power module
  • FOXBORO FBM207B Voltage Monitoring/Contact Induction Input Module
  • FOXBORO FBM205 Input/Output Interface Module
  • FOXBORO FBM18 Industrial Controller Module
  • FOXBORO FBM12 Input/Output Module
  • FOXBORO FBM10 Modular Control System
  • FOXBORO FBM07 Analog/Digital Interface Module
  • FOXBORO FBM05 redundant analog input module
  • FOXBORO FBM02 thermocouple/MV input module
  • FOXBORO FBI10E fieldbus isolator
  • FOXBORO DNBT P0971WV Dual Node Bus Module
  • FOXBORO CP30 Control Processor
  • FOXBORO CM902WX Communication Processor
  • FOXBORO AD202MW Analog Output Module
  • FOXBORO 14A-FR Configuration and Process Integration Module
  • FOXOBORO 130K-N4-LLPF Controller
  • FUJI FVR004G5B-2 Variable Frequency Drive
  • FUJI FVR008E7S-2 High Efficiency Industrial Inverter
  • FUJI FVR008E7S-2UX AC driver module
  • FUJI RPXD2150-1T Voltage Regulator
  • FUJI NP1PU-048E Programmable Logic Control Module
  • FUJI NP1S-22 power module
  • FUJI NP1AYH4I-MR PLC module/rack
  • FUJI NP1BS-06/08 Programmable Controller
  • FUJI NP1X3206-A Digital Input Module
  • FUJI NP1Y16R-08 Digital Output Module
  • FUJI NP1Y32T09P1 high-speed output module
  • FUJI NP1BS-08 Base Plate​
  • FUJI A50L-2001-0232 power module
  • FUJI A50L-001-0266 # N Programmable Logic Control Module
  • GE GALIL DMC9940 Advanced Motion Controller
  • GE DMC-9940 Industrial Motion Control Card
  • GE IS200AEADH4A 109W3660P001 Input Terminal Board
  • GE IC660HHM501 Portable Genius I/O Diagnostic Display
  • GE VMIVME 4140-000 Analog Output Board
  • GE VMIVME 2540-300 Intelligent Counter
  • GE F650NFLF2G5HIP6E repeater
  • GE QPJ-SBR-201 Circuit Breaker Module
  • GE IC200CHS022E Compact I/O Carrier Module
  • GE IC695PSD140A Input Power Module
  • GE IC695CHS016-CA Backboard
  • GE IC800SS1228R02-CE Motor Controller
  • GE IS215WEMAH1A Input/Output Communication Terminal Board
  • GE CK12BE300 24-28V AC/DC Contactor
  • GE CK11CE300 contactor
  • GE DS3800NB1F1B1A Control Module
  • GE VMIVME2540 Intelligent Counter
  • GE 369B1859G0022 High Performance Turbine Control Module
  • GE VME7865RC V7865-23003 350-930007865-230003 M AC contactor
  • GE SR489-P5-H1-A20 Protection Relay
  • GE IS200AEPGG1AAA Drive Control Module
  • GE IS215UCCCM04A Compact PCI Controller Board
  • GE VME7768-320000 Single Board Computer
  • GE SR489-P5-LO-A1 Generator Protection Relay
  • GE IS215WETAH1BB IS200WETAH1AGC Input/Output Interface Module
  • GE D20 EME210BASE-T Ethernet Module
  • GE IS200EXHSG3REC high-speed synchronous input module
  • GE IS200ECTBG1ADE exciter contact terminal board
  • GE VPROH2B IS215VPROH2BC turbine protection board
  • GE F650BFBF2G0HIE feeder protection relay
  • GE SLN042 IC086SLN042-A port unmanaged switch
  • GE SR489-P1-HI-A20-E Generator Management Relay
  • GE IS400JPDHG1ABB IS410JPDHG1A track module
  • GE IS410STAIS2A IS400STAIS2AED Industrial Control Module
  • GE IS410STCIS2A IS400STCIS2AFF Industrial Control Module
  • GE DS200DCFBG2BNC DS200DCFBG1BNC DC Feedback Board
  • GE VME5565 VMIVME-5565-11000 332-015565-110000 P Reflective Memory
  • GE VMIVME-7807 VMIVMME-01787-414001 350-00010078007-414001 D module
  • GE IS220PDOAH1A 336A4940CSP2 Discrete Output Module
  • GE VMIVME-4150 Analog Output Module
  • GE WESDAC D20 PS Industrial Power Module
  • GE 369B1860G0031 servo drive module
  • GE 369B1859G0021 Input/Output Module
  • GE 208D9845P0008 Motor Management Relay
  • GE IS420UCSCH1A-F.V0.1-A Independent Turbine Controller
  • GE D20EME10BASE-T 820-0474 Ethernet Interface Module
  • GE DS200DCFBG2BNC MRP445970 DC Feedback Board
  • GE IC800SSI228RD2-EE servo motor controller
  • GE IS200JPDMG1ACC S1AT005 Digital Input/Output (I/O) Module
  • GE IS200TSVCH1AED servo input/output terminal board
  • GE IS200TTURH1CCC S1DF00Z Terminal Turbine Plate
  • GE IS200TSVCH1ADC S1CX01H servo input-output board
  • GE IS200TRPGH1BDD S1C5029 Trip Solenoid Valve Control Board
  • GE IS220YAICS1A L Analog Input/Output Module
  • GE UCSC H1 IS420UCSCH1A-F-VO.1-A Controller Module
  • GE UCSC H1 IS420UCSCH1A-B Communication Processing Module
  • GE IC697VDD100 Digital Input Module
  • GE V7768-320000 3509301007768-320000A0 Controller Module
  • GE IS410TRLYS1B Relay Output Module
  • GE IS415UCVGH1A V7666-111000 VME Control Card
  • GE IC800SSI216RD2-CE servo motor controller
  • GE VMIVME-5565-010000 332-01565-010000P Reflective Memory
  • GE IC695ALG508-AA Analog Input Module
  • GE IC660EPM100J Power Monitoring and Control Module
  • GE RS-FS-9001 362A1052P004 Redundant Fan System Module
  • GE IS220UCSAH1AK independent processor module
  • GE 369-HI-0-M-0-0-0-E Motor Management Relay
  • GE CIFX50-C0 interface board
  • GE SR469-P5-H-A20-T Motor Management Relay
  • GE WES5120 2340-21005 power module
  • GE WES5120 2340-21003 Control Module
  • GE D20MIC10BASE-T 820-0756 Ethernet Module
  • GE WES13-3 5167-001-0210 Mechanical Relay Output Module
  • GE WES13-3 2508-21001 Control Board Module
  • GE D20ME 526-2005-216943 Input/Output Module