Oil and gas pipeline protection Regulations

F: | Au:佚名 | DA:2023-12-14 | 693 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Article 1 These Regulations are formulated for the purpose of ensuring the safe operation of petroleum (including crude oil and refined oil, the same below) and natural gas (including coal bed methane, the same below) pipelines and their affiliated facilities, and maintaining public safety.

Article 2 These Regulations shall apply to the protection of pipelines transporting oil and natural gas and their ancillary facilities (hereinafter referred to as pipeline facilities) within the territory of the People's Republic of China.

These Regulations shall not apply to the protection of urban pipe networks transporting petroleum and natural gas and the internal pipe networks of petrochemical enterprises.

Article 3 The term "pipeline facilities" as mentioned in these Regulations includes:

(1) Pipelines for transporting oil or natural gas;

(2) Pipeline anti-corrosion protection facilities, including cathodic protection station, cathodic protection test pile, anode ground bed and stray current drainage station;

(3) Pipeline hydraulic protection structures, seismic facilities, pipe levees, pipe Bridges and special culverts and tunnels for pipelines;

(4) pressure station, heating station, metering station, oil collection (gas) station, gas transmission station, gas distribution station, treatment yard (station), pigging station, all kinds of valve chambers (Wells) and emptying facilities, oil depot, loading and unloading rack and unloading yard;

(5) Pipeline marking, marking and crossing public (railway) road leak detection device.

Article 4 Pipeline facilities are important infrastructure facilities and are protected by law. No unit or individual may seize, destroy, steal or loot them.

All units and individuals have the obligation to protect pipeline facilities and the oil and natural gas transported by pipelines. Any unit or individual shall have the right to stop and report to the relevant departments any act of encroaching, destroying, stealing or robbing pipeline facilities, oil and natural gas transported through pipelines or any other act endangering the safety of pipeline facilities.

Article 5 The administrative department of economy and trade under The State Council shall be responsible for the supervision and administration of the protection of pipeline facilities throughout the country; The departments designated by the local people's governments at or above the county level shall be responsible for the supervision and administration of the protection of pipeline facilities within their respective administrative areas.

Article 6 The local people's governments at all levels along the pipeline facilities shall conduct publicity and education on the safety protection of pipeline facilities among the masses along the pipeline facilities, and be responsible for coordinating the settlement of the temporary land use, employment and other matters related to the inspection, maintenance and emergency repair of pipeline facilities.

Article 7 The local people's governments at all levels along the pipeline facilities shall strengthen the organization and leadership of the protection of pipeline facilities, take effective measures to ensure the safety of pipeline facilities, and promptly organize the relevant departments to stop and investigate and punish the encroachment, destruction, theft, looting of pipeline facilities and the oil and natural gas transported through pipelines as well as other acts endangering the safety of pipeline facilities within their respective administrative areas.

The local people's governments at all levels along the pipeline facilities, the relevant departments and their personnel shall not shelter or connive at any act of occupying, damaging, stealing or robbing the pipeline facilities, the oil and natural gas transported by the pipeline or any other act endangering the safety of the pipeline facilities. No one shall obstruct or interfere with the investigation and punishment of acts of encroachment, destruction, theft, or looting of pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities according to law.

Article 8 The public security organs at all levels along the pipeline facilities shall be responsible for investigating and handling according to law the cases of damaging, stealing, robbing pipeline facilities and the oil and natural gas transported through pipelines, as well as other cases endangering the safety of pipeline facilities.

Article 9 The relevant departments of the State and pipeline enterprises shall award units and individuals that have made outstanding contributions to the safety of pipeline facilities.

Chapter II Protection of pipeline facilities

Article 10 Pipeline enterprises shall be responsible for the safe operation of their pipeline facilities and perform the following obligations:

(A) in strict accordance with the national pipeline facilities construction quality standards design, construction and acceptance;

(2) Apply anti-corrosion insulation layer to the pipeline, and add cathodic protection devices;

(3) After the completion of the pipeline, permanent signs shall be set up, and protective measures shall be taken and signs shall be set up for local pipelines that are vulnerable to vehicle collision and damage by humans and animals;

(D) strictly implement the pipeline transport technical operating rules and safety rules and regulations;

(5) Regular inspection of pipeline facilities, timely maintenance;

(6) Cooperate with the local people's government to carry out publicity and education on the safety protection of pipeline facilities to the masses along the pipeline facilities;

(7) Cooperate with public security organs to ensure the safety and security of pipeline facilities.

Article 11 When an accident occurs in pipeline facilities, pipeline enterprises shall promptly organize emergency repair, and no unit or individual may obstruct or hinder the emergency repair work by any means.

Article 12 The oil leaked or discharged from pipelines shall be recovered and disposed of by the pipeline enterprises, and no unit or individual may take it as his own.

Article 13 Pipeline enterprises shall enjoy the right to the use of the land requisitioned according to law, and no unit or individual may illegally occupy it. Local farmers, after obtaining the consent of the pipeline enterprise, may plant shallow root crops within the scope of land requisition, but the pipeline enterprise shall not compensate for the loss of crops caused in the process of pipeline inspection, maintenance and emergency repair.

Article 14 A pipeline enterprise may, as required, assign full-time line guards or employ part-time line guards.

Article 15 Any unit or individual is prohibited from engaging in the following activities that endanger the safety of pipeline facilities:

(1) Moving, removing or damaging pipeline facilities, as well as signs and marks set up to protect the safety of pipeline facilities;

(2) Collecting soil, digging ponds, repairing canals, building aquaculture farms, discharging corrosive substances, piling up bulk materials, quarrying stones, building houses, greenhouses, livestock sheds, constructing other buildings and structures, or planting deep-rooted plants within 5 meters on each side of the Central Line of the pipeline;

(3) Blasting, excavating mountains and constructing large buildings and structures on both sides of the Central Line of the pipeline or within a range of 50 meters outside the site of the pipeline facilities;

(4) Driving motor vehicles on the inspection road above the buried pipeline facilities or walking on the ground pipeline facilities or overhead pipeline facilities;

(5) Other acts endangering the safety of pipeline facilities.

Article 16 Where blasting is carried out within the range of 50 meters to 500 meters on both sides of the center line of the pipeline, the consent of the pipeline enterprise shall be obtained in advance, and the blasting can only be carried out after taking safety protection measures.

Article 17 For pipeline facilities crossing a river, the scope of safety protection shall be determined by the pipeline enterprises and the management units of river courses and waterway in accordance with the relevant provisions of the State, and signs shall be set up.

Within the scope of safety protection determined in accordance with the preceding paragraph, except for dredging operations for flood control and navigation of waterway under the condition of ensuring the safety of pipeline facilities, piers shall not be built, anchoring, dragging, dredging, dredging, frying fish, carrying out underwater blasting or other underwater operations that may endanger the safety of pipeline facilities.

Chapter three deals with the encounter relationship between pipeline facilities and other construction projects

Article 18 A pipeline enterprise shall submit the relevant information of the pipeline facilities it has built and the plans or plans for the construction, alteration (expansion) of pipeline facilities to the local planning authorities; The local planning authorities shall incorporate the new construction, modification (expansion) of pipeline facilities into the local overall planning.

Where the relevant information, plans or plans prescribed in the preceding paragraph need to be submitted to other relevant local competent authorities in accordance with laws and administrative regulations, pipeline enterprises shall submit them according to law.

Article 19 When pipeline enterprises carry out pipeline facilities maintenance operations and construction protection projects, the relevant units and individuals in the areas through which the pipeline passes shall give necessary assistance. If the above operations cause losses to the legitimate rights and interests of the relevant units or individuals, the pipeline enterprises shall compensate according to law.

Article 20 The protection problems of pipeline facilities arising from the encounter between the construction project to be constructed or modified (expanded) and the existing pipeline facilities shall be solved through consultation between the construction project unit to be constructed or modified (expanded) and the pipeline enterprise. If a construction project to be constructed or modified (expanded) needs to reroute, relocate or increase the protection facilities of pipeline facilities, the expenses required shall be borne by the construction project unit to be constructed or modified (expanded).

Article 21 When formulating flood control measures and building DAMS, water conservancy departments shall pay attention to the safety of pipeline facilities; When it is necessary to discharge flood in the area through which the pipeline facilities pass, the amount and time of discharge shall be notified to the pipeline enterprise in a timely manner.

Article 22 The construction of pipeline facilities across (through) river courses, river banks and waterways, and the construction of pipeline protection facilities in river courses must conform to the national flood control standards and navigation standards.

Article 23 When any unit carries out the following construction within the scope of safety protection of pipeline facilities, it shall notify the pipeline enterprise in advance and take corresponding protective measures:

(1) Constructing, upgrading (expanding) constructing railways, highways, Bridges, rivers and canals, and overhead power lines;

(2) laying underground electrical (optical) cables;

(3) Setting up safety or lightning arrester grounding body.

Chapter IV Legal liability

Article 24 Whoever moves, dismantles or damages pipeline facilities in violation of the provisions of these Regulations, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections, and may impose a fine of not more than 10,000 yuan on individuals and not more than 100,000 yuan on units; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 25 Whoever, in violation of the provisions of these Regulations, damages pipeline facilities or steals or robs oil or natural gas transported through pipelines, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the public security organ shall confiscate the illegal gains and, if the illegal gains are more than 10,000 yuan, impose a fine of not less than two times but not more than five times the illegal gains; If there are no illegal gains or the illegal gains are less than 10,000 yuan, a fine of not more than 20,000 yuan shall be imposed; Whoever violates the provisions on the administration of public security shall be punished for the administration of public security according to law.

Article 26 Whoever, in violation of the provisions of these Regulations, explodes, excavates hills or constructs large buildings or structures on both sides of the Central Line of the pipeline or within a range of 50 meters outside the area of the pipeline facility, if the case constitutes a crime, shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections and impose a fine of not less than 10,000 yuan but not more than 100,000 yuan; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 27 Whoever, in violation of the provisions of these Regulations, builds, changes (expands) the construction of railways, highways, Bridges, rivers, overhead power lines, buries underground electric (optical) cables, sets up safety or lightning protection grounding bodies within the scope of safety protection of pipeline facilities, fails to notify the pipeline enterprises in advance and takes corresponding protective measures, shall be ordered to make corrections by the department designated by the local people's government at or above the county level. A fine of not less than 10,000 yuan but not more than 50,000 yuan.

Article 28 Whoever, in violation of the provisions of these Regulations, obstructs or hinders the normal inspection, maintenance or rush repair of pipeline facilities by pipeline enterprises shall be ordered by the department designated by the local people's government at or above the county level to make corrections, and may be fined not more than 2,000 yuan for individuals and not more than 50,000 yuan for units; Whoever violates the provisions on the administration of public security shall be punished by the public security organ according to law.

Article 29 Whoever, in violation of the provisions of these Regulations, draws soil, digs ponds, repairs canals, builds aquaculture farms, discharges corrosive substances, piles up bulk materials, quarries stones, builds houses, greenhouses, builds livestock sheds, constructs other buildings or structures, or plants with deep roots within a radius of 5 meters on each side of the Central Line of a pipeline, shall be ordered to make corrections by the department designated by the local people's government at or above the county level. Individuals may be fined up to 2,000 yuan, and units may be fined up to 50,000 yuan.

Article 30 If any of the acts listed in Articles 24 to 29 of these Regulations causes damage or damage to pipeline facilities, in addition to administrative penalties or criminal penalties according to law, it shall also bear the liability for compensation according to law.

Article 31 Where a pipeline enterprise, in violation of the provisions of these Regulations, fails to perform the obligations of safe operation of pipeline facilities, thereby causing damage to pipeline facilities and constituting a crime, it shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, the department designated by the local people's government at or above the county level shall order it to make corrections and impose a fine of not less than 20,000 yuan but not more than 100,000 yuan.

Article 32 Where employees of pipeline enterprises collude with others to destroy or steal pipeline facilities and oil or natural gas transported through pipelines, if the case constitutes a crime, they shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, a heavier punishment shall be given in accordance with the provisions of Article 25 of these Regulations.

Article 33 Where local people's governments or relevant departments fail to perform their duties for the protection of pipeline facilities, resulting in the encroachment, destruction, theft or looting of pipeline facilities and the oil and natural gas transported through pipelines, as well as other activities endangering the safety of pipeline facilities in their own areas, which cannot be stopped for a long time and cause serious consequences, the persons in charge and other persons directly responsible shall, in accordance with the seriousness of the circumstances, To give administrative sanctions of demerit demerit, demotion or dismissal according to law; If the case constitutes a crime, criminal responsibility shall be investigated according to law.

Article 34 If a functionary of a state organ commits any of the following acts, which constitutes a crime, he shall be investigated for criminal responsibility according to law; If the case does not constitute a crime, administrative sanctions of demotion, removal or even dismissal from public office shall be imposed according to law:

(1) concealing or conniving at encroachment, destruction, theft or robbery of pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities;

(2) providing information to the parties concerned who occupy, destroy, steal or loot pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities, and helping them to evade investigation and punishment;

(3) obstructing or interfering with relevant departments' investigation and punishment of encroaching, destroying, stealing or robbing pipeline facilities, oil and natural gas transported through pipelines or other acts endangering the safety of pipeline facilities according to law.


  • Omron CJ1M-CPU13 V3.0 PLC CPU Module
  • Pe323 HSD PLC Module Industrial Controller
  • Pasaban MTC3001-DC Drive Control PLC Module
  • Mitsubishi R02CPU PLC Module MELSEC iQ-R
  • B&R X20DC2395 Digital Output Module 32 Ch
  • Hoffman A30N24ALP Enclosure with PLC Addons
  • Rieter PLC with RMC 24/5V 10 RMC188-1 RMC RIO-1
  • Allen-Bradley 1790D-TN4V0 CompactBlock LDX Base Block 4 AI
  • National Instruments NI 9242 Analog Input Module 4-Channel
  • ABB AO820 3BSE008546R1 Analog Output Module
  • Moeller XVC-101-C192K-K82 PLC
  • AB 440F-C4000P MatGuard Controller
  • AB 1692-ZRCLSS Protection Module
  • Schneider S48896 PLC Module
  • FANUC A02B-0303-C205 I/O Module
  • AB 1785-LT4 PLC-5/10 Processor
  • AB 1746-NO8V SLC 500 Analog Output
  • OMRON CQM1-TC001 Temperature Unit
  • OMRON R7M-A20030-S1 Servo Motor
  • Toshiba ST1500GXH24 IEGT Module
  • Infineon PEF22822F V2.2 IC ISDN Controller
  • Allen-Bradley 440R-D22S2 Guardmaster Safety Relay GSR
  • Allen-Bradley 1771-IJ PLC Encoder Counter Module TTL
  • Texa Industrie EGO16GT1B Wall Frame Air Conditioner PLC
  • Schleicher Master CPU UCH 2 High Speed PLC
  • Siemens 6FC5371-0AA10-0AA1 NCU 710.2 CNC Controller
  • Schneider TM221C40R Modicon M221 PLC 40 I/O
  • Mitsubishi FX3U-128MR/ES PLC Controller 128 I/O
  • Pepperl Fuchs KFD0-RSH-1.4S.PS2 Relay Module 24VDC
  • Schneider XBTGT2110 HMI Touch Panel 10.4 Inch
  • APPLIED MATERIALS 0100-03267 - CH FACILITY INTERFACE PRODUCER SE PCB ASSY
  • INFICON 921-250-G1 - FFS232 Fabguard Interface AMAT Endura
  • LEYBOLD 0730-01046 - TRUBOTRONIK CONV FREQ NT341 MC/MCT 208V CONTROLLER
  • APPLIED MATERIALS 0010-57168 - SENSOR BOX ASM 300MM 35013
  • APPLIED MATERIALS 0226-31128 - ASSY VERSION 4 SIGNAL LAMP PCB
  • SBS 0090-01220 - PCB CPU BOARD FOR 128-30000
  • AMAT - - ANODE BULK COPPER PELLETS FG01PLT
  • APPLIED MATERIALS 0041-26804 - SHUTTER DOOR DRIVE ASSY 0040-76764 32032
  • APPLIED MATERIALS 0040-75150 - FILLER CHAMBER 1 APF PRODUCER SE
  • AMAT 0190-33295 - GATE COMPL
  • Applied Materials 0010-09341 - Wafer lift precision 5000 AMAT
  • APPLIED MATERIALS 0190-32096 - VARIAN CONTROLLER ASSY E15006160 E11388030
  • AMAT 0090-00590 - ELECT ASSY 750W SERVO MOTOR
  • APPLIED MATERIALS 101294-01 - 550W Power Supply
  • APPLIED MATERIALS 0150-14869 - CABLE AMAT LOT OF 16
  • Applied Materials 0200-09830 - ESC Electrostatic Chuck Pedestal Ring
  • APPLIED MATERIALS 0021-89500 - BRKT SNSR UPPER FRAME HTF 16132
  • Applied Materials 0200-10555 - Quartz Baseplate with Baffle 0200-00715
  • APPLIED MATERIALS 0240-75851 - KIT 11.3" SOURCE INSTALL
  • Applied Materials 0040-22023 - Adapter 13" W/B Source
  • Applied Materials 0010-09416 - P5000 Etch Std 3 kW 13.56 MHz Match
  • AMAT - - System Electronics Interface Board assy
  • AMAT 0090-00836 - MOTOR ASSY ROTATION 300MM
  • APPLIED MATERIALS 0140-12304 - HARNESS ASSY MF REMOTE SIGNALS PRODUCE 13041
  • Applied Materials 9090-01168ITL - ESC Chuck Power Supply PX32J
  • APPLIED MATERIALS 0020-24099 - insulator
  • APPLIED MATERIALS 0190-09764 - ZERO FIRING VARIABLE TIME BASE SCR POWER
  • APPLIED MATERIALS 0190-29887 - VERITY FL2006 FLASH LAMP 1007454 32453
  • APPLIED MATERIALS 0010-09348 - ASSY UNIVERSAL THROTTLE VALVE
  • APPLIED MATERIALS 0190-61486 - PRE-ALIGNER
  • APPLIED MATERIALS 0100-20000 - PCB ASSY 64 CHANNEL MUX 34246
  • Applied Materials 0090-07393 - RF Filter unit
  • AMAT 0040-89462 - FLANGE 6 PORT 300MM TITAN CONTOUR
  • APPLIED MATERIALS 0021-01421 - CHAMBER UPPER A-COAT M-DPS 32824
  • Applied Materials 0242-37433 - EMPAK 200mm Cassette Handler Retrofit Kit
  • APPLIED MATERIALS 0190-49999 - LINEAR ACTUATOR ASSY 32429
  • APPLIED MATERIALS 0020-63694 - COVER 300MM TITAN CONTOUR
  • APPLIED MATERIALS 0150-11135 - P3 MULTIZONE CTRL UNIT REV 002 11362100 1917
  • APPLIED MATERIALS 0240-01698 - KIT BAFFLE CLEAN PORT ULTIMA HDP-CVD
  • APPLIED MATERIALS 0040-03799 - MOUNTING PLATE CR SWILL
  • Applied Materials 0190-23562 - Newport 40000 Servo Positioning Controller
  • APPLIED MATERIALS 0090-08798 - ASSY EPM OVERSAMPLE INPUT CONTROLLER 28223
  • APPLIED MATERIALS 0040-32052 - WELDMENT BELLOW CATHODE DPSGECO 19601
  • APPLIED MATERIALS 0190-35712 - ASSY P-CHUCK 200MM CIP 99 0010-38437 35695
  • APPLIED MATERIALS 0021-39748 - BLOCKER PERF SILANE NITRIDE550 14762
  • APPLIED MATERIALS 3870-02323 - NOR-CAL VALVE PNEU INLINE 1" NW25 VIT-SEAL 12790
  • APPLIED MATERIALS 01-81911-00 - 8100 N ION TC CONTROLLER
  • APPLIED MATERIALS 0010-19137 - DEGAS LIFT & MOTOR ASSY 38924
  • APPLIED MATERIALS 0010-09978 - LAMP MODULE ASSY
  • APPLIED MATERIALS 0190-02362 - PCB ASSY MAINFRAME INTLK 1 RELAYS 32352
  • AMAT 0010-07017 - PCB ASSEMBLY LOWER PNEUMATIC BD
  • APPLIED MATERIALS 0010-75226 - ASSY THROTTLE VALVE 200MM ETCH DOWN STREAM 38918
  • APPLIED MATERIALS 0010-70345 - 0042-01927 Component
  • APPLIED MATERIALS 0010-07586 - ASSY HUB RADIANCE CHAMBER 33456
  • Applied Materials 0020-33882 - R2 Standard Cathode Insulating Washer
  • AMAT - - Pneumatic Door Assembly Desica Cleaner
  • APPLIED MATERIALS 3250-00041 - CNTNR DEIONIZER TANK SST HI TEMP W/RESIN
  • APPLIED MATERIALS 0190-E1370 - TWIN DETECTOR ASSY 38070
  • APPLIED MATERIALS 0040-13306 - INSERT LOADLOCK SLITVLV CORROSION RESISTANCE 15053
  • AMAT 0090-00334 - ASSEMBLY THROTTLE ASSY VALVE U-PLUG DIR DR DX 0040-32323
  • APPLIED MATERIALS 0100-02922 - DUAL GAS DETECTOR PCB CARD 0090-05327
  • APPLIED MATERIALS 0190-86001 - SICONI-PRODUCER INTERLOCK MODULE REV 2
  • APPLIED MATERIALS 0050-86832 - LINE VAC EXH WITH LKG CHECK PORT CH-B FAC
  • APPLIED MATERIALS 0270-02314 - FIXTURE BLADE CALIBRATION 300MM REV003
  • APPLIED MATERIALS 0040-20257 - ASSY LIFT HOOP 8" WIDE BODY CHAMBER
  • Applied Materials 0190-29890 - POWER SUPPLY BI-POLAR ISOLATED OUTPUT
  • AMAT 0040-89462 - FLANGE 6 PORT 300MM TITAN CONTOUR
  • APPLIED MATERIALS 0190-49999 - LINEAR ACTUATOR ASSY 32429
  • Applied Materials 0090-07393 - RF Filter unit
  • AMAT - - System Electronics Interface Board assy
  • APPLIED MATERIALS 0020-21225 - WEIGHT RING 300MM TITAN PROFILER
  • Applied Materials 0010-10436 - AC Distribution Assy
  • APPLIED MATERIALS 0120-90582 - SOLENOID DRIVE VACUUM CONTROL DRIVE PCB
  • Applied Materials 0190-18128 - Magentron Head Eto Mircowave Ultima
  • Applied Materials 0020-13067 - 300mm Lower Shield SIP TA Centura
  • Applied Materials 0010-29958 - Mainframe with Tenta cPCI Interlock Back Plane
  • APPLIED MATERIALS 0020-05681 - SUPPORT RIGHT 26 SLOT CASSETTE ENP
  • Applied Materials 0010-13321 - P5000 8Robot Assembly
  • AMAT 0190-23897 - SPECIFICATION EXMP SYNCNET STAND ALON
  • MKS 1350-01121 - 627A-13267 CAP-MAN 20-TORR VCO BARATRON
  • Applied Materials 0190-24484 - Assy REF Reader LF80 Serial w/o Aux RS232 5781
  • AMAT 0021-99235 - DISK SHUTTER ENCOREII TAN CENTER PIN ENDURA 2 300MM PVD
  • APPLIED MATERIALS 0190-24854 - MKS REV1.8 G4 PLUS 4-PORT UPA 300MM REFL
  • APPLIED MATERIALS 0040-21178 - BELL JAR
  • Applied Materials 0200-10555 - Quartz Baseplate with Baffle 0200-00715
  • AMAT 0010-35456 - CATHODE ESC DUAL HEATED ZONE ASSY 1AEF 0010-35507
  • APPLIED MATERIALS 0242-45447 - GASLINE HEATER CONTROL UNIT VAS104350-0237
  • APPLIED MATERIALS 0041-56144 - HEATER PEDESTAL ASSEMBLY ENP FCVD EDGE
  • Applied Materials 0010-00557 - HEAT EXCHANGER 0010-00506
  • AMAT 0150-10663 - CABLE 50 FT REMOTE RF RG393 COAXIAL
  • APPLIED MATERIALS 0041-26804 - SHUTTER DOOR DRIVE ASSY 0040-76764 32032
  • APPLIED MATERIALS 0190-33452 - CONTROLLER ASSY EXMP SYNQNET T008-0007 34803
  • APPLIED MATERIALS 0190-63631 - MKS MASS FLOW VERIFIER REV 003 MFVA-33168
  • AMAT 0040-82292 - GIMBAL SUPPORT 300 MM PROFILER
  • Applied Materials 0040-33998 - MXP+ Etch Liner Wall
  • Applied Materials 0090-76211 - CENTURA IOX WITH DUAL SERIP
  • APPLIED MATERIALS 0190-E1370 - TWIN DETECTOR ASSY 38070
  • UniOP eTOP40C-0050 - Color Touch Screen HMI