Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

On accelerating the implementation of the construction of green mines

F: | Au:佚名 | DA:2023-11-28 | 508 Br: | 🔊 点击朗读正文 ❚❚ | Share:

To promote the whole area green mine construction

The "Implementation Opinions" put forward three specific goals and tasks. First, transform the image: basically form a new pattern of green mine construction. All newly built mines meet the requirements of green mine construction; Speed up the transformation and upgrading of production mines, and gradually meet the standards; We will build more than 50 demonstration zones for green mining development. The second is to change the mode: explore new ways to change the mode of mining development. We will continue to balance the transformation of the growth model with steady growth, and create new models of industrial development and new ways of economic growth that conserve and recycle resources. Third, promote reform: establish a new mechanism for green mining development. Adhere to the mutual promotion of green transformation and management reform, research and establish a national provincial and county level joint venture, business owners, third-party evaluation, social supervision of green mine construction work system.

The person in charge said that through the formulation of local green mine construction standards, the formation of national industrial green mine standards, and the gradual introduction of national mandatory standards, the three steps to improve the development of green mine leading standards.

Green mine construction is the "point", the implementation subject is the mining enterprise, the green mining development demonstration area is the "face", the implementation subject is the local government. Select cities or counties with remarkable achievements in green mine construction, take green mining development demonstration zones as platforms for mineral resource management system reform and innovation, give full play to the government's guiding role, promote technological innovation, management innovation and institutional innovation, and focus on continuous and overall promotion of green mine construction in the whole region.

Innovate mechanisms to clarify the boundaries of government, market and society

According to the person in charge, green mine construction is a systematic project involving multiple stakeholders. Under the new situation and new requirements, the green mine construction work should further clarify the boundaries of government, market and society, and focus on building a new mechanism for green mine construction that is guided by government, dominated by enterprises, leading by standards, providing policy support, innovating mechanisms, strengthening supervision, implementing responsibilities and stimulating vitality.

-- Implementing the government's responsibility to guide, promote and supervise services. A four-level linkage, the center of gravity sinking, the implementation of responsibility. The six central departments mainly provide guidance and policy basis; Provincial land and resources and other relevant departments should effectively shoulder the work responsibilities, formulate work plans, strengthen organizational leadership, and comprehensively promote the construction of green mines; The city and county departments are responsible for the specific organization and implementation, and strengthen supervision and management. Second, it is necessary to formulate standards, clarify policies, formulate work plans for promoting the region, and refine and form operational policies and measures. Third, we must strengthen supervision, optimize services, and establish a regulatory mechanism for social supervision, government spot checks, reward for trustworthiness, and punishment for dishonesty.

-- Implementing the main responsibility of mining enterprises. First, we must take the initiative to carry out construction. All mining enterprises should adapt to local conditions, boldly explore and vigorously promote the innovation of technological system, industrial model and operation mode, and walk out a new path of mining development that is technically feasible, economically reasonable, quality and efficient. Two to be honest and trustworthy, strict self-discipline. We must adopt the concept of green development and increase internal driving force. For those who meet the green mine standards, a "red list" will be established, incorporated into the enterprise credit information system, and enjoy the corresponding incentive policies. Third, accept supervision and respond proactively. A grievance-response mechanism for major environmental, health, safety and social risk incidents should be established to respond promptly to the demands of the public, communities and other stakeholders.

-- Giving full play to the promoting role of trade associations. First, the China Mining Federation and various industry associations are invited to continue to play a good role as a bridge between the government and enterprises, do a good job in the publicity and promotion of the Implementation Opinions, unite the majority of mining enterprises, and expand the green consensus. The second is to give play to the role of intellectual support and experts, participate in the research and development of group standards and industry standards, and do a good job in the promotion of green technology, technology and equipment. The third is to do a good job in the selection of excellent green mines and strengthen the summary and exchange of advanced experience.

-- Innovating the selection mechanism. Green mine construction is not a new approval item, nor shall it adopt the traditional way of evaluation and identification. The new mechanism of mine self-evaluation, third-party evaluation, list management, standard storage and automatic enjoyment of relevant policies should be adopted to promote the work.

At the same time, it is necessary to formulate assessment methods for green mine construction according to local conditions, strengthen assessment of the implementation of main objectives, indicators, key tasks, major policies, etc., and incorporate the assessment results into the performance evaluation system to ensure that all tasks are implemented in practice.

In coordination with departments, we will clarify incentive policies from the four aspects of land use, mining, finance and finance

The person in charge pointed out that the six departments jointly issued the "Implementation Opinions", and came up with "real gold and silver" incentive policies and measures from the four aspects of land use, mining, finance and finance.

-- Implementing policies to support mineral resources. From the regulation of total mining quotas, mining rights investment and transfer, priority will be given to supporting the construction of green mines and green mining development demonstration zones in accordance with the law.

-- Ensuring land for green mine construction. First, plan and guarantee. In the adjustment and improvement of the overall plan for land use, the project land required for green mine construction should be included in the planning and overall arrangement, and the annual plan for land use should give priority to ensuring the reasonable demand for new construction land for the construction, renovation and expansion of green mines. The second is to reduce land costs. For mining land, after going through the procedures for construction land according to law, it can be transferred, leased or leased first and then granted by agreement; According to the production cycle and mining life of the mine, within the maximum legal period of transfer, the land-use right transfer period can be flexibly selected and flexible transfer can be implemented. The third is to support green mining enterprises in timely reclamation and revitalization of existing industrial and mining land, and be linked to new construction land. The construction of green mining development demonstration zones will be coordinated with the reclamation and utilization of abandoned industrial and mining land, the restoration and restoration of mining geological environment, the control of soil pollution in mining areas, and the improvement of land, and relevant pilot and support policies will be applied. Under the premise of meeting the planning and ecological requirements, the cultivated land increased by the reclamation of abandoned industrial and mining land left over from history is allowed to be used for the balance of cultivated land occupation and compensation. The fourth is to mine according to law caused land damage and irreparable, according to the relevant provisions, after field investigation and special report review, into the annual change survey, involving arable land, according to the actual reduction of arable land, but not break through the local control number, involving basic farmland to make up.

-- Increasing fiscal and tax policy support. When the Ministry of Finance and the Ministry of Land and Resources arrange funds for geological and mineral investigation and evaluation, they will give appropriate preference to eligible projects in the green mining development demonstration zone. While making good use of the central funds, local governments can make overall arrangements for geology and mineral resources, mine ecological environment management, heavy metal pollution prevention and control, land reclamation and other funds, and give priority to supporting qualified projects in the green mining development demonstration zone. Actively coordinate local financial funds, establish a reward system, and reward outstanding green mining enterprises.

-- Innovating green financial support policies. First, banking financial institutions are encouraged to develop credit products with green mining characteristics, and increase financial support for environmental restoration and management, heavy metal pollution prevention and control, and resource recycling. The second is to encourage financial institutions to actively do a good job of financial services and financing support for green mining enterprises. The third is to encourage provincial governments to establish a green mine project database and strengthen support for green credit. The green mine information will be incorporated into the enterprise credit information system as an important reference for banks to handle credit business and other financial institutions. Fourth, support government guarantee institutions to explore the establishment of a structured green mining guarantee fund. Encourage social capital to set up various green mining industry funds. The fifth is to promote qualified green mining enterprises in the domestic small and medium-sized board, GEM and main board listing, as well as to the "new third board" and regional equity market listing financing.


  • CTI-Cryogenics 8116071G001 Enhanced On-Board 8F Cryopump
  • ETEL LMD10-050-3QA-223A Linear Motor
  • Etel DSO-SER211-000 Servo Card Power Add-On
  • ETEL LMG05-050-3QA-213A Linear Motor
  • Etel DSO-SER211-000 Power Add-On Board
  • ETEL EU-LGP-0-0-0000-00 Motion Control Card
  • ETEL EA-P2M-400-15/40A-0100-00 AccurET Servo Drive
  • ETEL DSA2P1540A Digital Servo Amplifier
  • ETEL DSC2P131-111-000 Drive Board
  • ETEL DSC2P131-111D-000A Servo Drive
  • Etel SA-IL 03-208 Linear Motor Section 208mm
  • ETEL EA-P2M-300-4/7.5A-0000-01 AccurET Position Controller
  • ETEL DSO-SER211-000 Power Board
  • ETEL DSC2P131-111F-000A Servo Amplifier
  • ETEL DSA1P6242B Digital Servo Amplifier
  • ETEL DSC2P131-111B-000B Regulator
  • ETEL DSA2P1540A Digital Servo Amplifier
  • ETEL EA-P2M-048-2.5/5A-0100-01 Drive
  • ETEL SA-LE 03-208 Linear Motor
  • ETEL DSO-PWS111B-000C Power Supply Module
  • ETEL DSA2S211ZA-018A Digital Servo Amplifier
  • ETEL DSA2P1643A Digital Servo Amplifier
  • ETEL DSC2P141-111-000 Linear Servo Amplifier
  • ETEL DSO-PWR111C-000A Power Supply Module
  • ETEL DSCDP132-111E-000A Dual Position Controller
  • ETEL DSCDM332-111C-000C Overload Protection Controller
  • ETEL EA-S0M-300-40/80A-0000-00 AccurET Modular Power Supply
  • ETEL DSO-PWR112C-000B Power Supply Module
  • Etel DSCDM343-111C-000B Position Controller
  • ETEL DSO-PWR111C-000B Power Supply Module
  • ETEL LMP07-100-3TAS-229 Linear Motor Primary Part
  • ETEL DSCDP324-322G-000A Servo Amplifier
  • ETEL DSDP324-322F-000C Dual Motor Driver
  • ETEL DSCDM341-111-000 PCB Board
  • ETEL SA-IL 03-208 Linear Motor
  • ETEL DSB2S234-111E-000H Digital Servo Amplifier
  • ETEL DSB2P131-111E-000B Digital Servo Amplifier
  • ETEL DSCDP121-111B-000A Speed Controller
  • ETEL DSCDM342-111-000 Servo Amplifier
  • ETEL IWM040-0256-00A Ironcore Linear Motor Magnetic Way
  • ETEL DSO-PWS111C-000B Power Supply Module
  • Etel TMB0140-100-3RBS-S82 Direct Drive Torque Motor
  • ETEL LMG05-030-3QA-A11A Ironcore Linear Motor
  • ETEL DSMAX212-121C-000C Digital Servo Amplifier
  • ETEL DSA2P174ZA-033 Digital Servo Amplifier
  • Etel TMB0140-150-3RBS-S82-ER Direct Drive Torque Motor
  • ETEL DSCDP334-322-000 Position Controller
  • ETEL DSCDP334-322G-000A Position Controller
  • ETEL DSCDM342-111-000 Servo Amplifier
  • ETEL IWM060-0064-00 Ironcore Linear Motor Magnetic Way
  • ETEL LMG05-070-3QA-A14A Ironcore Linear Motor
  • ETEL EA-P2M-400-05/10A-0000-01 Accuret Position Controller
  • ETEL RTMB0140-070-AQN-02 Direct Drive Motor
  • ETEL DSCDM343-111C-000B Position Controller
  • ETEL LMB10-030-3QA-A00A Linear Motor
  • ETEL MWA050-0128-20B Linear Motor Magnet
  • ETEL DSA2P1642A Digital Servo Amplifier
  • ETEL DSCDP121-111D-000A Position Controller
  • Heidenhain 2330P-01A Wafer Stage Chuck with ETEL 591151-01-00-A
  • ETEL 3LM-23C LMG Linear Motor 568160-01
  • ETEL DSC2P121-111D-000A Digital Servo Amplifier
  • ETEL MWA030-0512-00B/398 Linear Motor Magnetic Way
  • ETEL DSC2P131-111B-000D Servo Drive
  • ETEL DSB2S134-111E-000H Digital Servo Amplifier
  • ETEL TMB0140-050-3UBS-S82 Torque Motor Stator
  • ETEL TMB0530-150-3VHN-E82 Torque Motor
  • ETEL DSCDP324-322F-000C AC Servo Amplifier
  • ETEL LMG05-030-3QA-A11A Ironcore Linear Motor
  • ETEL DSB2P123-111E-000H Digital Servo Amplifier
  • ETEL DSC2P131-111F-000A Digital Servo Amplifier
  • ETEL LMG10-050-3QA-A11 Ironcore Linear Motor
  • ETEL EA-P2M-400-10/20A-0000-01 Accuret Position Controller
  • ETEL DSB2S144-111E-000H Digital Servo Amplifier
  • ETEL PMWA050-016-00A Motor
  • ETEL DSCDM341-111-000 PCB Board
  • ETEL TMB0140-030-3RAS-S82-EL Direct Drive Motor
  • ETEL DSCDP330-322G-001 Motor Driver
  • ETEL TLMD05-050-0010-ANN-24A Linear Motor
  • ETEL EA-P2M-400-10/20A-0000-01 Accuret Modular Position Controller (T256144)
  • ETEL LMC11-050-3TA-220A Linear Motor Module
  • ETEL IWM060-0256-00 Ironless Linear Motor Magnetic Way (Magnet Track)
  • Rolls-Royce R02TCN-E0L3-00 Remote Controller Features
  • Etel SA-IL 03-208 Linear Motor Section
  • ETEL ILM03-060-3RA-A00 Ironless Linear Servo Motor
  • ETEL DSCDP321-121-000 Dual Position Controller Board
  • Etel DSCDP121-111F-000A Dual Axis Servo Drive
  • Etel EA-S0M-400-40/80A-0000-00 AccurET Modular Power Supply
  • Etel TMB+0291-150-RO-00000-0A0 Rotor
  • ETEL DSCDP131-111F-000A Position Controller
  • ETEL DSC2P154-421F-000A Servo Drive
  • ETEL DSO-SER211-000 Add-On Power Board for Servo Amplifier
  • ETEL 613712-05 4-Axis Control Assembly
  • ETEL P2M-300-07/15A Accuret Position Controller
  • ETEL LMP07-100-3TAS-229 Motor Ruler Primary Part
  • ETEL 569866-03 ASME-RTMA014 Motor
  • ETEL DSCDP131-111-000 Dual Position Controller
  • ETEL DSB2S134-211E-000H Digital Servo Amplifier
  • ETEL DSCDP121-111F-000A DSC Dual Controller
  • ETEL DSC2P154-421E-000A Servo Drive
  • ETEL DSCDP121-111C-000A Regulator – Stable Power Control
  • ETEL DSC2P131-111B-000D Driver Board
  • ETEL ILM03-060-3RA-A00 Linear Motor
  • ETEL EA-S0M-300-40/80A-0090-00 Power Supply Module
  • Etel DSCDP131-111-000 Position Controller
  • ETEL DSC2P121-111E-001A Digital Servo Amplifier
  • ETEL DSB2P101-121E-009H Position Controller
  • ETEL IWM040-0128-00 Ironcore Linear Motor Magnetic Way
  • ETEL AccurET EA-S0M-400-40/80A-0000-00 Modular Power Supply
  • ETEL LMC11-050-3TA-S10C Motion Controller
  • ETEL LMC11-050-3TA-250A Controller Module
  • ETEL DSB2P101-121E-009H Digital Servo Amplifier Position Controller
  • ETEL AccurET Modular 400 Position Controller
  • ETEL DSA2 Digital Servo Amplifier
  • ETEL DSC2P154-421-000 Servo Drive
  • ETEL DSO-PWS121-003 Power Supply Module
  • ETEL 0348M-070-02D-004 Linear Encoder
  • ETEL DSC2P131-111-000 Linear Servo Amplifier – 10Arms/30Arms
  • ETEL DSC2P131-121-000 Digital Servo Amplifier
  • ETEL DSB2P131-111E-000H Digital Servo Amplifier
  • ETEL DSO-PWS111-000 Power Supply Module
  • ETEL LMC11-050-3TA-S41C Linear Motor Module – High Thrust Density
  • ETEL EA-P2M-300-07/15A Drive Specs
  • ETEL DSO-RAC200A-011D Dual Position Controller Rack
  • ETEL Short-Stroke Actuator ID809786-03
  • ETEL DSCDM332-111-000 Servo Controller Specs
  • ETEL DSCDL332-131-000A Position Controller
  • ETEL LMP07-100-3TAS-229 Linear Motor
  • ETEL LMA11-120-3ZA-359C Linear Motor