Self tuning tool: automatically identifies initial gain and generator time constant
Real time monitoring: monitoring up to 6 parameters simultaneously
Step/Time Response Tool: Manually Adjust Gain
Frequency response analysis: frequency scanning or white noise tool
Data recording: trend recording and event data capture
Logical View: Provides graphical Diagram View and compact Execution View for interconnecting logical blocks
BESTspace: Custom workspace layout that can be saved and reused
BESTCOMSPro is compatible with ccTools of ECS2200 and is a direct upgrade path for the latter users.
6. Upgrading and Transformation Strategies and Engineering Applications
6.1 Front End Retrofit Kit
For customers who are still using large excitation systems but whose original control parts have been phased out or are no longer supported by OEM, the DECS-2100 front-end retrofit kit is the best choice. Its core advantages lie in:
Less time: Customized panel chassis components, perfectly adapted to existing control cabinets, significantly reducing installation time
Lower risk: avoid long-term unplanned downtime caused by the original factory's cessation of support; Basler provides long-term product support and upgrade paths
Lower cost: Reuse power components with longer service life (rectifier bridge, demagnetization circuit, etc.), only update the control part
6.2 Overview of Module Level Upgrade Paths
The entire series of DECS-2100 modules are designed with the principle of "transformation friendly":
New module replaces key compatibility features of objects
ECM-2 ECS2200 three board group dedicated retrofit board with minimal wiring changes
BCM-2 ECS22100 BCM/DECS-400 IFM of the same size and wiring position
AIOM-2 ECS2200 AIOM DIP switch selects compatibility mode
DIOM-2 ECS2200 DIOM DIP switch selects compatibility mode
IT-2 ECS2200 IT has the same size and wiring, no software changes required
FGD-2 ECS2200 FGD with the same installation hole spacing (4/6 holes) and the same wiring
DXCB-2 ECS2200 DXCB with the same position and wiring, no additional configuration required
IDP-1201 IDP-1200/PanelMate with the same mounting hole position, minor wiring adjustments
6.3 Shallow Depth and Compact Solutions
For space constrained applications, the DECS-2100 offers a shallow depth solution with a depth of only 36 inches (using a compact rectifier bridge or SSE-N series rectifier bridge). The standard power drawer system has a depth of 60 inches and requires rear maintenance access.
7. Troubleshooting and maintenance recommendations
7.1 Common problem troubleshooting ideas
Communication failure: Check the fiber link connections (F1-F3 main channel, F4-F6 redundant channel) and confirm that the fiber connections between ECM-2 and each module are correct
Trigger pulse abnormality: Check the connection between the gate (G) and cathode (K) of BCM-2, and confirm that the bridge selection switch is set correctly
Analog reading deviation: Check if the V/I mode switch setting of AIOM-2 matches the actual signal type
DIOM input not recognized: Confirm if the internal switch is set to the correct voltage range (24 Vdc or 125 Vdc/120 Vac)
FGD-2 no output: Check if the Enable input is connected to a valid AC voltage and confirm if the Active Status LED is lit
DXCB-2 does not operate: Check the trigger signal voltage level (24 or 125 Vdc) and confirm that the control power supply 125 Vdc is normal
7.2 Maintenance Suggestions
Regularly check the fan operation status of the power drawer (redundant fan design)
Regularly check the LED indicator status of BCM-2 and confirm that the SCR conductivity monitoring is normal
Regularly check the range DIP switch settings of IT-2 to ensure they match the actual sensing signal
Regularly check the grounding leakage current reading of FGD-2 and promptly detect the trend of insulation degradation
Using BESTCOMSPro's Sequence of Events (SOE) and Alarm History for event tracing