Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Bonfiglioli BN63A2 Motor
    ❤ Add to collection
  • Bonfiglioli BN63A2 Motor

    ABB、GE、FANUC、Allen-Bradley、FOXBORO、Honeywell,KUKA、YOKOGAWA、YOKOGAWA、KOLLMORGEN、METSO、Motorola、NI、OEMAX、RELIANCE、Vibro-Meter、Rolls-Royce、MOOG、B&R、Woodward、Yaskawa、XYCOM、Emerson、HIMA、Bently、PROSOFT、TRICONEX、KEBA、Lenze、Alstom、CTI、DCSSystem accessories, robot system accessories, large servo system spare parts.
    Mr.FSN
    chnfcsXM@163.com
    +86-153-9626-8993
    Selection, installation, operation, maintenance, troubleshooting, safety
    Petrochemical/Chemical,Power industry,Metallurgical industry,Municipal/Environmental Protection,Oil and gas industry,Robot system accessories,automobile manufacturing,3C Electronics,Machining
    • ¥15429.00
      ¥17754.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:1.700KG
    • Quantity:
    • (Inventory: 64)
Description

Bonfiglioli BN 63 A 2 Three-Phase Motor

The Bonfiglioli BN 63 A 2 three phase motor is a compact electric motor built on the frame 63 design with a two pole configuration. The two pole design produces a relatively high speed, making the motor suitable for applications that require fast rotation in a small package. The BN series is a well established range of Bonfiglioli asynchronous motors used in industrial drive systems. The exact electrical ratings are determined by the nameplate and the specific build configuration.

Product Overview

The BN 63 A 2 motor is intended for low power industrial applications where a compact frame and reliable operation are important. The frame 63 size is small and suits machines with limited mounting space. The two pole configuration produces a nominal speed close to the synchronous speed of a two pole machine, which is higher than the speed of four pole and six pole motors. This characteristic is useful in applications such as small pumps, fans, and high speed auxiliary drives.

The motor can be used as a standalone drive or combined with a gearbox to achieve a lower output speed and higher torque. When combined with a reducer, the motor flange and shaft must match the gearbox input interface. The BN 63 A 2 is designed for standard industrial mounting and electrical connection. Proper selection requires matching the motor to the load, supply, environment, and control method.

Construction and Design

The motor housing supports the stator, rotor, bearings, and shaft. The stator windings are insulated for industrial operation. The rotor is mounted on a shaft that is supported by bearings selected for the expected loads. The shaft extension is machined to accept pulleys, couplings, or other driven components. The fan and fan cover provide cooling airflow over the housing during operation.

The terminal box provides a safe connection point for the electrical supply. Connections should be made according to the connection diagram and local regulations. The mounting arrangement allows the motor to be secured to a machine frame or base. Proper mounting ensures alignment with the driven equipment and helps control vibration. Seals and bearing covers protect internal components from dust and moisture in normal industrial environments.

Performance Characteristics

The performance of the BN 63 A 2 motor depends on its electrical design and the connected load. Motor speed is primarily determined by the supply frequency and the number of poles. The two pole design provides a higher speed than four pole or six pole motors of the same frame size. Torque is produced by the interaction between the stator field and the rotor current. The motor should be operated within its rated voltage, frequency, and duty cycle to maintain stable thermal performance.

Starting current and starting torque should be considered when selecting protective devices and control equipment. The motor should be protected against overload, phase loss, and abnormal supply conditions. Efficiency and thermal behavior are important in continuous operation. Adequate ventilation around the motor helps maintain stable temperatures. When variable speed operation is required, the motor and drive should be selected together to ensure compatibility.

Applications

The Bonfiglioli BN 63 A 2 motor is suitable for small machines, pumps, fans, conveyors, packaging equipment, and auxiliary drives. Its compact frame 63 design makes it useful in equipment where space is limited. The two pole configuration provides a high speed for applications that require fast rotation. The motor can be paired with a gearbox when lower output speed or higher torque is needed.

The operating environment should be considered when applying the motor. Dust, moisture, chemicals, and high ambient temperatures can affect insulation, bearings, and cooling. In such conditions, additional protection or a different motor configuration may be required. The motor should be installed where it can be inspected and maintained. Correct alignment with the driven equipment helps reduce vibration and bearing load.


Installation Guidelines

Installation should begin with a check of the nameplate data and a visual inspection of the motor. The motor should be mounted on a rigid base that can withstand the torque reaction. The shaft should be aligned with the driven equipment to avoid excessive radial and axial loads. Couplings should be fitted according to the manufacturer recommendations and checked for alignment. Mounting bolts should be tightened to the recommended torque.

Electrical connections should be made by qualified personnel following local regulations. The supply voltage and frequency must match the motor rating. The direction of rotation should be verified before connecting the load. Proper grounding is essential for safe operation. After installation, a short run without load helps confirm that the motor operates smoothly and without abnormal noise or vibration.

Maintenance Recommendations

Regular maintenance helps ensure reliable motor operation. The cooling fan and fan cover should be kept clean to maintain airflow. Bearing noise and vibration should be monitored. The motor insulation resistance can be measured periodically to detect deterioration. Electrical connections should be checked for tightness and signs of overheating. Any abnormal noise, smell, or temperature rise should be investigated promptly.

In environments with dust or moisture, additional protection measures may be needed. The motor should be kept clean and dry. Maintenance records help identify trends and support planned servicing. Following a consistent maintenance schedule reduces the risk of unexpected downtime and extends the operating life of the motor. When the motor is part of a geared drive, the gearbox maintenance schedule should also be followed.

Selection Considerations

When selecting the BN 63 A 2 motor, engineers should confirm the supply voltage, frequency, phase, rated power, speed, frame size, mounting, and enclosure requirements. The motor must provide enough torque for the load under starting and running conditions. The duty cycle and ambient temperature affect thermal capacity. Protective devices should be selected to match the motor and load characteristics.

The motor interface must match the driven equipment or gearbox. Shaft dimensions, flange dimensions, and mounting holes should be checked. For variable speed applications, the motor should be compatible with the selected drive. Correct selection and installation help ensure dependable performance, stable thermal behavior, and long service life.

Conclusion

The Bonfiglioli BN 63 A 2 three phase motor offers a compact frame 63 design with a two pole configuration for high speed industrial drives. Its construction supports reliable operation in small machines, pumps, fans, and auxiliary equipment. With proper installation and maintenance, the motor provides stable performance and long service life.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Foxboro E69F Converter
  • Foxboro DCS Compact200 series RH916RB (16 slot horizontal bottom plate)
  • Reliability Electric PSC7000 Control Card Troubleshooting and Maintenance
  • Eaton MTL F809F Plus DTM Operating Instructions
  • Motorola ACE3600 RTU Troubleshooting Guide
  • MOOG D136-003-001 on-site deployment and troubleshooting
  • Troubleshooting and Maintenance of Micro Panel GF1-10 Touchscreen
  • Neles NDX Intelligent Valve Positioner Troubleshooting and Debugging
  • Jamesbury VPVL Mod D Maintenance and Troubleshooting
  • Jamesbury VPVL Pneumatic actuator selection and maintenance guide
  • GMW IPP 144-40 GS Thermal Printer Troubleshooting Guide
  • Meggitt C327845 Gas Shutoff Valve Troubleshooting and Replacement Guide
  • Meggitt C422685 Gas Solenoid Valve Troubleshooting Guide
  • LTI ServoOne Servo Troubleshooting Guide
  • Jenaer Antriebstechnik ECOVARIO Servo Troubleshooting Guide
  • Honeywell TDC3000X Troubleshooting Guide
  • Honeywell NOTIFIER NFS2-3030 Troubleshooting Guide
  • Troubleshooting of Honeywell FC series safety barriers
  • Honeywell XL1404 Troubleshooting Guide
  • Honeywell TDC 3000 Troubleshooting and Module Replacement Guide
  • HIMA X-DI 64 01 Safety Module
  • Hirschmann MICE MS20/MS30 Switch Integration and Troubleshooting
  • EXOR ePAD05/ePAD06 button screen replacement and troubleshooting
  • EXOR eVO58-TST/TNT Compact HMI Human Machine Panel
  • Esd VME-PCM-CADDY/2 Carrier Board Integration and Troubleshooting Guide
  • Elmo Gold Tuba Servo Drive Integration and Troubleshooting Guide
  • Eaton COM-MPB1-TP/MPB2-TP communication module
  • DeltaTau PMAC2 PCI Ultralite Programmable Multi Axis Motion Controller
  • DATA PATTERNS DP-VME-5114 Dual PMC Carrier Board Integration and Troubleshooting
  • CMZ SVM1608 Intelligent Servo Driver
  • SUMITOMO T2100Z steel turning selection and troubleshooting
  • SUMITOMO PSZ Turn Quick Change System Selection and Troubleshooting
  • SUMITOMO EGU chip breaker selection and troubleshooting
  • SUMITOMO GND slotting tool holder selection and troubleshooting
  • SUMITOMO AC8000P steel turning selection and troubleshooting
  • SUMITOMO AC6000M Stainless Steel Turning Guide
  • SUMITOMO ELECTRIC AC5000S Heat Resistant Alloy Turning Guide
  • SUMITOMO ELECTRIC AC4000K Cast Iron Turning Selection Guide
  • SUMITOMO ELECTRIC AC1135U Small Parts Turning Application Guide
  • SUMITOMO ELECTRIC AC1030U Precision Machining Selection and Practice for Small Parts
  • CCS 6900G/P pressure switch
  • BENDER WR Transformer Selection
  • BENDER RCMA475LY Residual Current Monitoring
  • BENDER IRDH575 Insulation Monitoring
  • BENDER IRDH265 Insulation Monitoring and Debugging
  • Bender RCMA475LY residual current monitor debugging
  • Beckwith Electric M-3425A Generator Protection Relay Debugging Guide
  • Automated MEX816U Expander Troubleshooting Guide
  • ASEM HT2150 Industrial Tablet Selection and Troubleshooting
  • Troubleshooting and practical application of Advantest U3771/3772 microwave spectrum analyzer
  • Advantest R6144 Programmable DC Voltage/Current Source (Calibration Source) Calibration and Maintenance
  • Aerotech UNIDEX 100/U100i single axis motion controller
  • Aerotech Ndrive MP Ultra Compact PWM Digital Servo Driver
  • Aerotech Ndrive HPe 10/20/30 High Performance PWM Digital Servo Drive
  • Aerotech Ndrive HLe maintenance replacement
  • Aerotech Ndrive CP maintenance replacement
  • Aerotech Ndrive Linear Drive Selection
  • Aerotech NDrive HL linear drive maintenance replacement
  • Aerotech NDrive HP 10/20/30 Maintenance and Replacement
  • Aerotech NDrive CP10 Servo Drive Guide
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting