Bonfiglioli 300/300M series gearboxes: installation, maintenance, and troubleshooting

In heavy industry transmission systems, the installation quality and maintenance level of gearboxes directly determine the operational reliability and service life of the equipment. The Bonfiglioli 300/300M series modular planetary gearboxes are widely used in mining, port, metallurgy and other fields due to their high power density and flexible configuration. However, even the highest quality equipment can still lead to early failure if installed improperly or maintained improperly. This article is based on Bonfiglioli's official "Installation, Operation, and Maintenance Manual for 300/300M Series", providing on-site engineers with full process technical guidance from unboxing inspection to daily maintenance, with a focus on special operating requirements in ATEX explosion-proof environments.


Open box inspection and safe handling

1. Arrival inspection

After receiving the goods, first check whether the shipping list matches the order information, and inspect the gearbox for any transportation damage. If any discrepancies or damages are found, the Bonfiglioli distributor should be contacted immediately. Packaging materials must be disposed of in accordance with local environmental regulations.

2. Lifting and handling

The weight and external dimensions of the gearbox may make manual handling impractical, and appropriate mechanical lifting equipment must be used.

Selection of lifting points: The manual provides detailed lifting diagrams for different series and configurations. For gearboxes that have already been assembled with motors, it is strictly prohibited to use the eyebolts on the motor housing for lifting unless explicitly marked as allowed.

Maximum tilt angle: During the lifting process, the swing of the load in any direction shall not exceed 15 °. If the angle exceeds this, the lifting device should be stopped and readjusted.

Requirements for lifting equipment: Use certified lifting eye bolts, shackles, steel cables, slings, etc., and their rated load must be greater than the weight of the lifted object (see product catalog for weight data).


Installation specifications and key processes

1. Preparation before installation

Confirm that the nameplate data is consistent with the order, including the mounting position. Changing the mounting position without authorization will invalidate ATEX certification.

The installation base must have sufficient rigidity and flatness (flatness error ≤ 0.2mm/100mm during foot base installation).

All mating surfaces should be cleaned and coated with anti micro corrosion protective paste (such as Kl ü berpaste 46 MR 401 or equivalent).

2. Flange installation

Flange installation is the most common configuration. There are clear regulations on the strength grade and tightening torque of installation bolts (see Table 2 in the manual), for example, M10 × 8 bolts are used for the 300 machine base, and the tightening torque is 85 Nm (12.9 level). Torque wrenches must be used to tighten in the prescribed cross sequence, and cannot be estimated based on experience.

3. Shaft mounted installation (shrink disk)

For the hollow shaft installation method using a shrink disc, the installation quality directly affects the torque transmission capacity and disassembly convenience:

Cleaning and lubrication: Clean and degrease the holes inside the gearbox and the outer surface of the customer shaft. The outer surface of the shrink disc can be lightly lubricated, but the use of molybdenum disulfide or other lubricating grease is strictly prohibited to avoid reducing the friction coefficient and affecting the torque transmission performance.

Installation steps (size 300-313): First, pre tighten 3 bolts in triangular order (position 1-5-9), insert the gearbox into the shaft, and then tighten them in a circular manner until all bolts reach the specified torque.

Installation steps (size 314-325): First, tighten 4 bolts in a cross pattern with 50% torque, then tighten the other 4 bolts in a cross pattern with 100% torque, and finally tighten all bolts continuously until there is no looseness.

Disassembly Tip: If disassembly is difficult, you can use the oil pressure injection hole (1/8 "or 1/4" BSP) on the gearbox to inject pressurized oil to assist in disassembly.

4. Replacement of transport plugs and installation of breathable plugs

The gearbox is equipped with a closed transport plug when it leaves the factory. Before formal operation, it must be replaced with the breathable plug that comes with the box, otherwise the internal pressure will increase during operation, which will cause damage to the oil seal and oil leakage.


Special requirements for ATEX explosion-proof environment

For gearboxes designated for use in potentially explosive environments, the following requirements must be strictly followed:

Only synthetic lubricants (PAG or PAO) are allowed, mineral oils are not suitable.

Surface temperature monitoring: The nameplate of ATEX certified models indicates the highest surface temperature (135 ° C for T4 level and 135 ° C for 2D level). During operation, the surface temperature of the casing must be regularly measured (especially at the connection between the motor and gearbox and the least ventilated area), and must not exceed the allowable value.

Dust environment cleaning: Gearboxes installed in zones 21/22 must develop and implement regular cleaning plans to prevent dust accumulation exceeding 5mm.

Oil level check: ATEX gearboxes installed vertically are usually equipped with expansion chambers and dedicated oil level check rods. During inspection, the inspection rod should be placed at the edge of the threaded hole to ensure that the oil level is not lower than 3mm below the overflow port.

Motor installation: Only motors with ATEX rating equal to or higher than the gearbox can be installed, and the compliance of the entire machine after installation is the responsibility of the final assembler.

Lubrication management

1. Lubricating oil selection

Choose the appropriate type and viscosity of lubricating oil based on work schedule and environmental temperature:

Industrial applications: Mineral oil (EP additive), PAO synthetic oil, or PAG synthetic oil can be selected. Specific recommended brands can be found in the manual charts (Shell, Mobil, Total, etc.).

Mobile machinery: Select according to SAE grade (80W/90, 85W/140) and API GL5 grade.

2. Oil filling

The gearbox does not contain lubricating oil when it leaves the factory (unless specifically specified at the time of ordering). Users need to add the corresponding amount of oil according to the installation position on the nameplate and the table in Annex 2 of the manual. The oil level is based on the mark on the oil level plug, and the data in the table is for reference only.

3. Oil change cycle

The oil change interval depends on the type of oil and operating temperature:

Average oil temperature mineral oil PAO synthetic oil PAG synthetic oil

< 65°C 8,000 h 25,000 h 25,000 h

65-80°C 4,000 h 15,000 h 15,000 h

80-95 ° C 2000 h (within 1 year) 12500 h 12500 h

Attention: It is not recommended to operate continuously within the oil temperature range of 80-95 ° C. Oil temperature exceeding 95 ° C is considered a fault state.


Long Term Stock

For gearboxes with an expected storage period exceeding 6 months (up to 2 years), Bonfiglioli offers specialized long-term storage options:

Packaging method: The gearbox is sealed in a VpCI (vapor phase anti rust) bag, and the outside is a BBOX cardboard box or wooden box. The four walls of the box are marked with "OPEN ONLY BEFORE THE INSTALLATION".

Rust proof fluid: Add anti-corrosion protective fluid inside the gearbox instead of standard lubricating oil.

Compatibility:

SLM option: Rust inhibitor is compatible with all mineral oils and PAO synthetic oils.

SLP option: Rust inhibitor is compatible with all PAG synthetic oils.

Pre operation processing:

If the working oil is compatible with the rust inhibitor: simply add the working oil to the specified level and replace the vent plug.

If not compatible: first drain the rust inhibitor, add 20% oil for "cleaning operation", and then add new working oil after draining.

Extended storage period: After 2 years of storage, it needs to be inspected by Bonfiglioli service center before it can be stored for another 24 months.


Installation of hydraulic motor and hydraulic brake

1. Installation of hydraulic motor

There are two sealing methods between the motor installation flange and the gearbox: O-ring sealing or motor built-in sealing.

Clean the positioning stopper and mating surface before installation, apply lubricating grease, install the motor, and tighten the flange bolts (not lower than grade 8.8).

Drain Port: If a leaking oil pipe is connected, the pressure at the shaft seal is equal to the pressure of the leaking pipeline; If closed, the shaft seal pressure is the average of the inlet and outlet pressures. When multiple motors are connected in series, a leaking oil pipe must be connected.

2. Hydraulic brake

The minimum release pressure of the brake is shown in Table 8 of the manual (e.g. about 10 bar for type 4 brake and about 20 bar for type 6 brake), and the maximum pressure does not exceed 320 bar.

The static braking torque (Mbs) is at its maximum value and may decrease slightly under dynamic conditions. The actual value fluctuates between -5% and+15% of the rated value.


Common faults and troubleshooting

Possible causes and solutions for the fault phenomenon

Bearing temperature too high, oil level too low, oil aging, bearing damage, oil replenishment, oil change, contact authorized maintenance

Operating temperature too high, oil level too high, oil aging, impurities in oil. Check oil level, change oil, change oil

Abnormal operation noise, gear damage, excessive axial clearance of bearings, bearing wear, overload, impurities in oil. Contact authorized maintenance, correct load to rated value, oil change

Abnormal noise at the installation site. Loose or worn installation bolts. Tighten and replace bolts according to torque

Oil leakage, high oil level, seal failure, gasket aging. Check the oil level and contact authorized maintenance

The gearbox does not rotate or has difficulty operating. If the oil viscosity is too high, the oil level is too high, the gear is overloaded, or the gear is damaged, replace the recommended oil, check the oil level, redesign the transmission, and contact authorized maintenance


Maintenance plan and safety precautions

1. Regular inspection items

Every 24 hours: Check the oil pressure (if there is a hydraulic circuit), noise, and vibration levels.

Every 720 hours: Check for external seal leaks, oil level, and oil filter contamination indicators.

Every 2000-4000 hours: Check the torque of all fastening bolts, wear of coupling elastic components, and re lubrication of Drywell seals.

Every time the oil is changed: check the alignment status between the gearbox and the coupling equipment.

2. Safety Warning

Before all maintenance work, the power must be cut off and ensure that it is not accidentally powered on, while taking measures to prevent the suspended load from accidentally moving.

When maintaining in potentially explosive environments, it is also necessary to eliminate residual gases or dust in the environment.

Original spare parts must be used during maintenance. Non original parts not only void the warranty, but may also endanger equipment safety.

The disassembled threaded connection must be reapplied with Loctite 510 or equivalent product.

When replacing the seal, a small amount of fluorocarbon grease (such as Fluorocarbon gel 880 ITP) should be applied to the sealing lip.

  • Lauer PCS807 Profibus-DP Module PX 807.101.5BM – Fieldbus Adapter
  • Lauer PCS090 Topline Operator Panel PG 090.206.D – Compact HMI Terminal
  • Lauer PCS095 Branson Label Operator Panel PG 095.507.A – HMI Terminal
  • Lauer PCS009 Topline Micro Operating Terminal PG 009.204.1 – Mini HMI
  • LAUER AVTCE210.2 – Industrial Vision and Control Terminal
  • LAUER LCA 245 Text Display SU 245.100.1
  • LAUER PCS807 Profibus DP Module 807.101.5BM
  • Lauer PSC090 Topline Mini Operator Interface Panel – Compact HMI
  • Lauer EPC X 550 TC Embedded Industrial PC with Touch Panel
  • LAUER SYSTEME PCS-900 Operator Panel – Advanced HMI Workstation
  • Lauer PCS095.P PCS Plus Profibus DP Operator Interface – Control Panel
  • Systeme Lauer LCA 180 Text Monitor LD 180.004.1 – Industrial Text Display Terminal
  • LAUER PCS950C – High-Performance Process Control Station
  • LAUER SYSTEME LCA142 – Compact Industrial Controller and Logic Unit
  • LAUER SYSTEME PCS-810-1 – Industrial Panel PC and Control Terminal
  • ASML Right Field Detector 874-0084-002 – Light Intensity Measurement Module
  • ASML IPCB SEM-I-319 Interface Board 4022.636.58181 – VME I/O Module
  • ASML Temperature Sensor Assembly PT1000 4022.481.27732
  • ASML PCB FEI PHILIPS FIDT BD 4022.192.71178
  • ASML IR1-NIR Module 4022.639.86644 – Infrared Near-Infrared Sensor Unit
  • ASML Interface PCB 4022.192.72303
  • SVG Silicon Valley Group 99-54149-01 HMDS Refill Canister for ASML 90S DUV
  • ASML SVG 121-142F Controller Low-Spin Motor Developer
  • ASML 879-0054-002 PROTEUS 150SST Flow Switch
  • ASML 4022.654.97871 LM 4C LPSA Power Supply
  • ASML 28320 PCB Assy OCTU/UC 4022.192.9463
  • ASML 900470 System Interface Card 137285
  • ASML 130-127 PCB Artic
  • ASML 4022.471.76592 PCB-I-E-1391=9G24
  • ASML 4022.430.12256 PCB-I-E-1463=ZA09
  • ASML 879-0262-002 Shutter
  • ASML 4022.654.97872 LM 4C LPSA Power Supply
  • ASML SMC Pneumatic Valve Manifold Assy 4022.472.5315
  • Premium NP-0606 Power Supply 26V/6A for ASML 4022.476.01341
  • ASML PCB Card 4022.428.1023 PAS 5000/2500
  • ASML LISAF 3P Power Supply 4022.634.44801
  • ASML Red/635 Solid State Laser Module 635nm ELEC-I-1050
  • ASML SEM-I-1512 Controller Module 4022.639.02772
  • ASML Chuck QML/MSXLOD 879-0362-002 – Electrostatic Wafer Chuck Assembly
  • ASML SEM-I-737 Interface Module 4022.486.04121.HLN
  • ASML RH-PU-Mk3 Parker Power Unit 4022.631.24391
  • ASML Processor PCB Board PAS 5000/2500 7122.714.1800
  • ASML 4022.455.1103 Rotator Beam OR BS Assy
  • ASML Servo Test Box Frameless Monoset U20L0203
  • ASML 4022.428.1804 Processor PCB Board PAS 5000/2500
  • ASML 12456 Motion Control Board 4022.436.6467
  • ASML 37155 CCD Camera with Lens 4022.456.12463
  • ASML 4022.654.97873 LM 4C LPSA Power Supply
  • ASML 4022.635.04286 MF LS Purging Supply Assy
  • ASML 4022.636.53513 WH PA Interface Box Assy
  • ASML C2913 Cymer Lens 750A 4022.454.48131
  • ASML 4022.472.42622 IR2-FIR Solid State Laser Module
  • ASML 4022.437.20602 Green Laser Head & Controller
  • ASML 4022.651.46362 End Effector & RH Robot Gripper
  • BRONKHORST ASL-100F ASML 4022.666.71411 Mass Flow Controller
  • ASML 4022.471.88172 PAAC 450/20 PRODRIVE
  • ASML ATLAS Vacuum Regulator 4022.481.81953
  • ASML 4022.230.0438 PCB Card for PAS 5000/2500
  • ASML 4022.430.0109 Reticle Table Control PCB
  • ASML 4022.436.2451 Procesador Sello Arriba/Abajo PCB
  • ASML IIB Base 2 PCB Set 4022.436.8304 4022.436.8601
  • ASML 4022.472.62895 Power Supply Interface Module
  • ASML 4022.436.45028 PID Board
  • ASML 4022.671.23212 TCMA Thin Client Module MK2
  • ASML 0021-06148 TAB Clamp Ring Endura 5500 PVD
  • ASML 4022.192.9103 Interface PCB
  • ASML 4022.436.5298 Stepper Barcode Reader
  • ASML SVG 879-0794-001 Micrascan Axiom Assembly
  • ASML 54-125495A02 PC Compact Industrial ASMA003
  • ASML 4022.430.0098 PCB Card PAS 5000/2500
  • ASML 7122.714.1200.5 Processor PCB Board PAS 5000/2500
  • ASML 4022.428.14901 PAS 5000/2500 PCB Card
  • ASML Kay Neum F2 Valve Block PAS 2500 5000
  • ASML 4022.436.2451 Processor Stamp PCB PAS 5000 2500
  • ASML 4022.640.52821 IXL XP Module
  • ASML 859-8184-002 Viewing Power Select Panel
  • OZ OPTICS 4022.656.10963 Laser Module
  • ASML 851-0618-003 Stepper Library Brake
  • GF+ U1000 V2 ASML Ultrasonic Flowmeter 4022.669.98971
  • ASML 4022.636.73571 Zero Sensor Laser Box
  • ASML EO084D Shutter Socket PCB Card
  • PANalytical 402233010044 MPPC Power Supply Driver Unit
  • ASML 4022.631.26719 Load Port Module SEM-I-1310
  • ASML 4022.637.22711 Pneumatic Assembly
  • ASML 851-8942-001 Encoder Buffer PCB
  • ASML 859-0927-007 Lamp Power Compensation PCB Card
  • ASML 4022.639.86643 CDA IR1-NIR Solid State Laser 780nm
  • SVG ASML 28-43015-01 S90 Track CP Module
  • ASML 4022.471.75263 PCB Assembly
  • ASML 4022.637.22711 SEM-I-398 Controller Module
  • ASML 4022.651.32601 Control Module
  • ASML 4022.474.2568.1 Wafer Table Cleaning Stone
  • ASML 8764535001 Servo Test Box Frameless
  • ASML 4022.125.1083 Blade Drive PCB for PAS 5000/2500
  • ASML 4022.631.15821 VAT Mirror Assembly AI-2 193nm
  • ASML 16-006335D01 Motion Interlock PWB Assembly
  • ASML 851-0618-003 Stepper Library Brake
  • ASML 4022.454.8555 Stepper Barcode Reader
  • ASML 4022.664.25702 SEM-I-311 Controller Module Set
  • SVG Lithography ASML 859-0501-003 F Assembly
  • ASML 4022.486.71154 Control Module
  • ASML 4022.422.4644 Stamp Up Down PCB for PAS 2500/5000
  • ASML 4022.430.0524 PCB Card PAS 5000 2500
  • ASML 4022.430.0479 Shutter Encoder Line Driver PCB
  • ASML 4022.472.86252 Pneumatic Manifold Assembly
  • ASML 4022.470.5116.2 Zerosensor Laser Assembly
  • ASML 4022.437.07471 Power Control Module
  • ASML 4022.436.6467 Motion Control Board MSR AB53
  • ASML 4022.481.27732 Temperature Sensor JUMO RTD
  • ASML 4022.472.42622 850nm Laser Module IR2-FIR
  • ASML 4022.630.2404 Monochrome Assembly
  • ASML 4022.436.80012 JDS Uniphase Laser 1135P-3348
  • ASML 4022.471.87587 Circuit Board Module
  • ASML 8790366 Air Puck Bearing Assembly
  • ASML 4022.471.8629 SVG Chassis Board Module
  • ASML 4022.656.54263 Flow Module ASL-007F
  • ASML 4022.431.04341 Lens Assembly PAS 5000 2500
  • ASML 4022.430.0336 Processor PCB Board SCPM PAS 5000
  • ASML 600114483401 Semiconductor Component
  • ASML 4022.436.4502 PCB PID Board Module
  • ASML TWINSCAN EXE 5000C LEGO Set Employee Edition
  • ASML 4022.455.09864 F11H SEM-I-1576 Module
  • ASML 4022.455.09864 SEM-I-1575 Controller Module Set
  • ASML SERV.454.71153 Beam Steering Laser BSM Mirror
  • ASML 4022.472.97505 ProDrive PCB Board with XP Modules
  • ASML 4022.436.6467 AT-700S PCB Circuit Board
  • ASML 4022.437.11214 Green Laser Module Control Module
  • ASML 4022.436.8226 PTI Base Board PCB Assembly