Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Fanuc A16B-1200-0220 PC Memory Board F3
    ❤ Add to collection
  • Fanuc A16B-1200-0220 PC Memory Board F3

    ABB、GE、FANUC、Allen-Bradley、FOXBORO、Honeywell,KUKA、YOKOGAWA、YOKOGAWA、KOLLMORGEN、METSO、Motorola、NI、OEMAX、RELIANCE、Vibro-Meter、Rolls-Royce、MOOG、B&R、Woodward、Yaskawa、XYCOM、Emerson、HIMA、Bently、PROSOFT、TRICONEX、KEBA、Lenze、Alstom、CTI、DCSSystem accessories, robot system accessories, large servo system spare parts.
    Mr.FSN
    chnfcsXM@163.com
    +86-153-9626-8993
    Selection, installation, operation, maintenance, troubleshooting, safety
    Petrochemical/Chemical,Power industry,Metallurgical industry,Municipal/Environmental Protection,Oil and gas industry,Robot system accessories,automobile manufacturing,3C Electronics,Machining
    • ¥42623.00
      ¥45352.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:5.060KG
    • Quantity:
    • (Inventory: 3175)
Description
<span style="font-size: 18px; font-family: arial;">Fanuc A16B-1200-0220 PC Memory Board</span>

Fanuc A16B-1200-0220 PC Memory Board

The Fanuc A16B-1200-0220 is a PC memory board used in Fanuc F3 control CNCs (Series 15, 16, 18). It provides non‑volatile SRAM storage for part programs, tool offsets, parameters, and macros. The board is installed in the main CNC rack and communicates with the main CPU via the backplane bus. It is essential for expanding memory capacity beyond the base CPU.

Memory Specifications

  • Type: 1 MB SRAM (static RAM) organized as 1M x 8 bits.

  • Battery backup: Lithium battery (BR‑2/3A or CR2032) retains data for 5 years.

  • Access time: 100 ns.

  • Data retention during battery change: 1 hour (supercapacitor).


Board Layout

The board measures 150 mm x 100 mm, FR‑4 material, UL 94V‑0. Key components: four 256K x 8 SRAM chips (e.g., Sony CXK581000), a battery holder, a voltage supervisor (MAX691), and an address decoder PAL (16V8). A 3‑position DIP switch configures the memory address range (A0–A19).

Connectors

  • J1 (96‑pin DIN 41612): Backplane connector for address/data bus.

  • J2 (2‑pin header): External battery connection (optional).

  • J3 (4‑pin header): Diagnostic LED and write‑protect jumper.

LED Indicators

LED1 (green): Power OK. LED2 (yellow): Write enabled. LED3 (red): Battery low. A push‑button (SW1) allows manual battery test.

Compatibility

The A16B-1200-0220 is used in Fanuc Series 15‑B, 16‑B, 18‑B, and 21‑B CNC systems. It is also compatible with Fanuc Power Mate i series. It replaces earlier A16B-1200-0221 (same form factor). Not compatible with i‑series (16i) which use different memory boards.

Configuration

The board’s address range is set by DIP switches SW2 (4 bits). The CNC automatically recognizes the memory during power‑up if configured correctly. Write protection can be enabled via jumper JP1 to prevent accidental program modification.


Battery Replacement

Replace the battery every 4–5 years (Fanuc part A02B-0160‑K201 or standard CR2032). Remove power, open the cabinet, locate the battery on the board, and replace within 1 minute. After replacement, verify parameter checksum and reload if necessary.

Environmental

Operating temperature: 0 to 50°C; storage: -20 to 70°C. Humidity: 10% to 90% non-condensing. The board is conformally coated to prevent corrosion.

Typical Applications

Storing large part programs (e.g., 1000+ lines), tool life management data, and macro programs in CNC machining centers, lathes, and grinding machines.

Ordering and Documentation

Fanuc part number: A16B-1200-0220. Manual: Fanuc Series 15/16 Maintenance Manual (B-62545E).


Beckhoff CP2712-0000 
Beckhoff industrial computer C6920-1057-0030
Beckhoff CP3224-0020
EK9300 Beckhoff CPU Module
Beckhoff Cx5020-0122 Control Module
Beckhoff C6240-1052-0040 4-086-06-3073
Beckhoff AM8042-0EH1-0000
BECKHOFF CP7037-1037-0010 
EK9300 Beckhoff CPU Module 
BECKHOFF CP7037-1037-0010 
Beckhoff Nail Operating Terminal CP7032-1031-0010 
Beckhoff AX8206-0000 Dual-Axis Module
Beckhoff CX5110-0112-9020/000368201 
Beckhoff CP3919-0010 
BECKHOFF CP6503-0001-0050 
Beckhoff CP7037-1037-0010 Operator Interface Touchscreen
Beckhoff Servo Motor AM8061-0JH1-0000 
Beckhoff CP7201-1000-0000
Beckhoff CX5120-0115 /2GB Controller Module
Beckhoff CP7201-1000-0000 
Beckhoff CP7812-1056-0010 
Beckhoff Compact Servo Amplifier AX5112-0000-0200 servo drives AX5112 with AX5805
BECKHOFF CP7037-1037-0010 OPERATOR INTERFACE TOUCHSCREEN
BECKHOFF CX2020-0120 PLC module 
Beckhoff PLC module CX1020-0000
Beckhoff AM8052-0J21-0000
BECKHOFF BEIFU CX2020-0120 CX2100-0004 PLC Module
Beckhoff CB3050-0010 
Beckhoff Embedded-PC CX5010-1121
BECKHOFF Industrial Computer c6920-1057-0030
  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • ADLINK AmITX-SL-G Mini ITX Motherboard Deployment and SEMA Guide
  • ADLINK AmITX-AL-I Embedded Motherboard Deployment and SEMA Management Guide
  • ADLINK NuPRO-E315 PICMG 1.3 Industrial Motherboard Deployment Guide
  • ADLINK NuPRO-842 Pentium 4 Industrial Motherboard Deployment and Debugging Guide
  • ADLINK NuPRO-900A Dual Xeon ePCI-X Motherboard Deployment Guide
  • ADLINK cPCI-6910 Dual Core Xeon Single Board Computer Deployment Guide
  • ADLINK cPCI-6860A Dual Xeon Single Board Computer Deployment Guide
  • ADLINK CPCI-8168 Eight Axis Motion Control Card Deployment and HSL Integration Guide
  • ADLINK NuPRO-E340 Industrial Motherboard Debugging and BIOS Optimization Guide
  • ADLINK NuPRO-A40H Industrial Single Board Computer Hardware Deployment and BIOS Calibration Guide
  • ADLINK NuPRO-852 LGA775 Industrial Control Motherboard Maintenance Guide
  • ADLINK NuPRO-841 Industrial Motherboard Maintenance and Troubleshooting
  • ADLINK NuPRO-590 Series Socket7 Industrial Control Motherboard Maintenance Guide
  • Deployment and Troubleshooting of ADLINK MXE-5500 Series Industrial Control Computer
  • ADLINK MXE-200 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK cPCI-6770 Series CompactPCI Motherboard Maintenance Guide
  • ADLINK NuPRO-A301 Industrial Motherboard Troubleshooting Manual
  • ADLINK NuPRO-965 SHB Debugging and Maintenance Complete Manual
  • ADLINK NuPRO-935A Industrial Motherboard Debugging and Maintenance Guide
  • ADLINK NuPRO-865 Single Board Computer Hardware Troubleshooting Guide
  • ADLINK NuPRO-840 P4 Industrial SBC Architecture Maintenance
  • ADLINK NuPRO-770 Full length SBC Configuration and Maintenance
  • ADLINK NuPRO-595 Industrial Half length SBC Motherboard Configuration and Maintenance Guide
  • ADLINK cPCI-6840 Series Single Board Computer Installation, Configuration, and Maintenance Guide
  • Foxboro 43AP Pneumatic Controller Technical Specifications and Selection Guide
  • ADLINK cPCI-3720: 3U CompactPCI Low Power Pentium III CPU Module
  • ADLINK NuPRO-E47: PICMG 1.3 13th Generation Core Industrial SHB
  • ADLINK NuPRO-E43: PICMG 1.3 Core 7th Generation Industrial SHB
  • ADLINK NuPRO-780 PICMG Bus Core CPU Card
  • ADLINK cPCI-6965 6U CompactPCI Core Dual Core Single Board Computer
  • ADLINK USB/LPCI/LPCIe-3488A GPIB Interface Card Selection and Application Guide
  • Rittal SK 3241.700 Blue e+Cabinet Fan Filter Unit
  • ADLINK CPCI-8168 8-Axis Motion Control Card and HSL Network Integration Solution
  • ADLINK PCIe-PXIe-8638 High Speed PXIe Bus Expansion Scheme
  • ADLINK PCIe GIE7x Poe+Frame Grabber Hardware and Power Management Detailed Explanation
  • ADLINK PCIe-7396 Digital I/O Card Deployment Guide
  • ADLINK PCI-8164 Advanced Motion Control Card Deployment Guide
  • ADLINK PCI-8154 Motion Control Card Deployment Guide
  • ADLINK PCI-8134 Motion Control Card Deployment Guide
  • ADLINK NuPRO-E42 Industrial Control Motherboard Deployment Guide
  • ADLINK MXC-6600 Embedded Platform Deployment Guide
  • ADLINK MXC-6000 Industrial Control Computer Deployment and Optimization Guide
  • ADLINK MXC-2300 Embedded System Deployment Guide
  • ADLINK MCM-204 Edge DAQ Deployment Configuration Guide
  • ADLINK MCM-100/102 Deployment Calibration Guide
  • Deployment and Performance Optimization of ADLINK MXC-6400 Industrial Control Computer
  • Selection and Deployment of ADLINK Matrix Series Industrial Control Computers
  • российские промышленные новые машины.Наш отдел дебютировал в 2026 году в России Международная промышленная ярмарка INNOPROM
  • Deeply cultivating the Eurasian industrial market, linking new industrial opportunities between China and Russia
  • Deployment and troubleshooting of ADLINK GIE64+PoE acquisition card
  • Honeywell UMS Security System Troubleshooting Guide
  • Honeywell Expert Series C I/O Troubleshooting Guide
  • ADLINK EOS-1200 Vision System Deployment and Troubleshooting
  • ADLINK DLAP-5200 series AI engine deployment and optimization
  • ADLINK DLAP-4000 Deployment and BIOS Optimization
  • ADLINK Matrix MXC-2000 Deployment and Troubleshooting
  • ADLINK DAQe-2000 series acquisition card calibration and synchronization
  • ADLINK cPCI-6520 Core i7 Processor Blade Engineering Application Guide
  • ADLINK CM1-86DX3 PC/104 Embedded Single Board Computer Engineering Application Guide
  • Honeywell DC1000 Series PID Temperature Controller Engineering Application Guide
  • ALSTOM MiCOM C264 Substation Controller Engineering Application Guide
  • EMERSON AMS 2140 Practical Guide for On site Dynamic Balance and Vibration Analysis
  • ADLINK NuPRO-E320 motherboard deployment and tuning guide
  • ADLINK NuPRO-800 Dual PIII Industrial SBC Maintenance and Upgrade Guide
  • ADLINK NuPRO-598 SBC Maintenance Practical Guide
  • ADLINK MXC-6300 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK Express-BASE7 Carrier Board Quick Deployment and Debugging Guide
  • ADLINK DLAP-211 Edge AI Platform Selection and Deployment Guide
  • ADLINK 7230 Series Isolation DIO Card Selection and Engineering Application Guide
  • ADLINK cPCI-6965 SBC Embedded Installation and BIOS Tuning Guide
  • ADLINK 7200 Series High Speed DIO Card Practical Guide
  • ADLINK DLAP Series Edge AI Acceleration Platform Selection and Deployment Practical Guide
  • DEIF TCM-2 thyristor control module: Wind power cut in control engineering guide
  • DEIF MVR-200 Medium Voltage Relay: Installation and Wiring Engineering Guide
  • DEIF MDR-2 Differential Relay: Engineering Guide for Generator Differential Protection
  • DEIF Delomatic 3 AOM: Engineering Guide for Analog Output Modules
  • DEIF AGI 400 Graphic Interface: Ship and Industrial HMI Solution
  • DEIF BRW-1 Marine Instruments: Installation and Calibration Guide for Offshore Bridge Indicators
  • DEIF AGC 200 Controller: Quick Deployment and Configuration Guide for Generator Sets
  • DEIF AGC-2 Controller: The Ultimate Guide to Automatic Control and Protection of Generator Sets
  • ABB SPA-ZC400 Gateway: REM54x Access to IEC 61850 Ultimate Engineering Guide
  • ABB REM 543/545 Terminal
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit
  • Installation and I/O configuration of DEIF PPM-3 power management module
  • Beckwith M-3520 Interconnection Protection Relay
  • Beckwith M-3430 Generator Protection Relay
  • Beckwith M-2293B adapter panel replacement GE regulator guide
  • Selection and Networking of Beckwith M-2001C Digital Voltage Regulating Controller
  • Beckwith M-2001B Digital Voltage Regulating Controller
  • Beckwith M-0388/M-0389 Synchronous Inspection Relay Application Guide
  • Beckwith M-0193B Synchronizer Debugging and System Integration Guide
  • Beckwith M-0115A Parallel Balance Module Debugging Guide
  • Beckwith M-0067E On Load Voltage Regulating Controller Selection and Debugging Guide
  • Debugging and Fault Handling of Beckwith M-4272 Digital Busbar Conversion System
  • Beckwith M-3311A Transformer Protection Relay Debugging Guide
  • Beckwith M-3425A Generator Protection Relay Debugging Guide
  • Setting and troubleshooting of Basler BE1-27/59 voltage relay
  • Debugging and troubleshooting of Basler AVC63-12/AVC125-10 voltage regulator
  • Basler L301kc Line Array Camera Technology and Troubleshooting
  • Selection and Debugging of Basler CBS 212A Current Boosting System
  • Selection and commissioning of Basler BE3-25 synchronous inspection relay
  • Basler BE1-32R/32O/U Direction Power Relay Setting and Testing Guide
  • Basler PRS 250 Synchronous Relay Maintenance and Replacement Guide
  • Basler piA2400-17gc Industrial Camera Replacement and Optimization Guide
  • Basler BE1-11g Generator Protection System
  • Basler VR63-4C/UL Voltage Regulator
  • Basler BE1-DFPR feeder protection relay
  • Basler CBS 310/320 Current Boosting System
  • Basler UFOV 250A/260A protection module
  • Basler MVC104/MVC108/MVC232 manual voltage control device
  • Basler XR2002/XR2002F Regulator
  • Basler DECS-400 excitation system
  • Basler DGC-2020 Generator Set Controller: Integrated Control and Debugging Guide
  • Basler MVC-300 Manual Voltage Controller: Characteristics and Engineering Applications
  • Basler MVC Series Manual Voltage Controller: Application and Selection