Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Bonfiglioli W 110U 100 Gearbox
    ❤ Add to collection
  • Bonfiglioli W 110U 100 Gearbox

    ABB、GE、FANUC、Allen-Bradley、FOXBORO、Honeywell,KUKA、YOKOGAWA、YOKOGAWA、KOLLMORGEN、METSO、Motorola、NI、OEMAX、RELIANCE、Vibro-Meter、Rolls-Royce、MOOG、B&R、Woodward、Yaskawa、XYCOM、Emerson、HIMA、Bently、PROSOFT、TRICONEX、KEBA、Lenze、Alstom、CTI、DCSSystem accessories, robot system accessories, large servo system spare parts.
    Mr.FSN
    chnfcsXM@163.com
    +86-153-9626-8993
    Selection, installation, operation, maintenance, troubleshooting, safety
    Petrochemical/Chemical,Power industry,Metallurgical industry,Municipal/Environmental Protection,Oil and gas industry,Robot system accessories,automobile manufacturing,3C Electronics,Machining
    • ¥15662.00
      ¥16638.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:1.530KG
    • Quantity:
    • (Inventory: 74)
Description
Bonfiglioli W 110U 100 Gearbox

Bonfiglioli W 110U 100 P80 B5 B3 Gearbox

Product Overview

The Bonfiglioli W 110U 100 P80 B5 B3 is an industrial worm gearbox intended for speed reduction and torque transmission. The references 2G32013641 and KG3201360 help confirm the specific unit during planning, replacement, and service. The P80 B5 B3 designation identifies motor interface and mounting details that must be matched to the driven machine. The gearbox should be selected according to output torque, input speed, duty cycle, mounting position, and environment.

The unit can be used in conveyors, packaging equipment, material handling, and general industrial machinery. Correct installation and maintenance support reliable operation. The gearbox forms part of a complete drive train that includes the motor, coupling, control, and driven machine. Installation should follow technical documentation so that alignment, lubrication, and sealing performance are maintained.

Construction and Mechanical Design

The worm gearbox contains a housing, worm shaft, worm wheel, bearings, and sealing elements. The worm and wheel arrangement provides speed reduction and torque increase in a compact layout. The housing supports the bearing arrangement and protects internal parts from contamination. Seals retain lubricant and reduce the entry of dust and moisture. The mounting interface and motor flange must match the machine and motor.

Installation requires a clean and rigid mounting surface. The gearbox should seat without distortion. Fasteners must be tightened to the specified torque and checked after initial operation. Shaft connections should be aligned carefully. Couplings, pulleys, and other transmission elements must be fitted with suitable tools and without impact. Excessive overhung load or belt tension can affect bearing life.

Mounting and Interface Planning

The B5 and B3 references indicate mounting arrangements that must be confirmed for the installation. The motor flange, shaft, and pilot must match the gearbox input. Incorrect adaptation can cause vibration, misalignment, or damage. The motor should be fitted without force. Coupling and clamping elements should be tightened according to instructions. The output shaft connection must suit the driven equipment.

The surrounding structure should provide access for lubrication checks, inspection, and maintenance. Guards should protect rotating parts without restricting cooling. The installation should consider thermal expansion and vibration. Alignment should be checked after the machine is fully assembled and again after initial operation, because settlement or thermal changes can affect the drive train.

Installation and Commissioning

Before installation, the gearbox should be inspected for damage and the identification details should be checked. The shaft and mounting surfaces should be clean. Alignment with the motor and driven machine should be verified. Fasteners should be tightened to the specified torque. The installation should provide access for maintenance. The surrounding structure should be rigid enough to support the drive train.

Commissioning should begin with a low load run where possible. Rotation direction, noise, vibration, leakage, and temperature should be checked. Fasteners should be rechecked after initial operation. The lubricant level should be confirmed according to the mounting position. If the gearbox is controlled by an inverter, acceleration and deceleration ramps should be set to avoid mechanical shock.

Lubrication and Thermal Conditions

Lubrication reduces friction and wear and helps remove heat from the gear mesh and bearings. The specified lubricant type and quantity must be used. The mounting position determines the correct oil level and plug arrangement. Fill, level, and drain points should remain accessible. Before commissioning, the lubricant level should be checked. If the gearbox is stored for a long period, preservation and lubricant condition should be reviewed before operation.

Operating temperature should remain within the intended range. The housing should have adequate air flow. In enclosed spaces, heat from the motor and other equipment must be considered. Excessive temperature can indicate overload, incorrect lubricant, or inadequate cooling. Leakage should be corrected because low lubricant level can damage gears and bearings.


Operation and Monitoring

During operation, the gearbox should run smoothly within the designed speed and torque range. Operators should monitor noise, vibration, temperature, and leakage. A change in running sound can indicate wear or lubrication problems. Vibration can result from coupling issues, loose fasteners, or bearing damage. Leakage can lead to insufficient lubrication and should be corrected promptly. The exterior should be kept clean.

Load changes can affect gearbox life. Increased throughput, higher torque, frequent reversing, or shock loading should be reviewed against the original selection. The gearbox should not be operated beyond its rated conditions. If the machine process changes, the drive train should be checked. Protective devices should remain active, and fault causes should be corrected before restarting.

Protection and Reliability

Reliability depends on correct mounting, suitable lubrication, and protection from contamination. Seals should be inspected for damage. Breathing devices, where fitted, should be kept clean. The gearbox should not be exposed to water, dust, or corrosive substances beyond its intended protection level. Excessive vibration and misalignment should be corrected rather than ignored. Fasteners should be checked periodically.

Overload protection should be coordinated with the machine design. Jam conditions, blocked loads, and sudden torque peaks can stress the worm gear set and bearings. Mechanical overload protection, torque limits, or current protection should be set according to the drive train. Service work should be performed by qualified personnel. Opening the gearbox without proper instructions can affect sealing and bearing adjustment.

Maintenance and Service

Maintenance should include periodic inspection of lubricant, seals, fasteners, and housing condition. The interval depends on operating hours, load, temperature, and environment. In dusty or humid locations, inspections should be more frequent. Lubricant changes, if required, should use the specified type and quantity. Contamination should be avoided during filling. Used lubricant should be handled according to local regulations.

Before service, the machine must be isolated and secured against rotation. The gearbox should be allowed to cool where necessary. Replacement of seals or bearings requires proper tools and clean conditions. After service, alignment and lubricant level should be checked. The unit should be run briefly and inspected before return to full duty. Service records help identify repeated issues.

Integration and Selection Summary

The W 110U 100 P80 B5 B3 gearbox can be integrated into industrial machines that require compact right angle speed reduction and torque transmission. The final application determines protection, mounting position, and maintenance access. The gearbox should be selected as part of the complete drive train, including motor, coupling, control, and driven machine.

Selection should confirm the model W 110U 100, P80 B5 B3 configuration, references 2G32013641 and KG3201360, ratio, shaft arrangement, torque capacity, mounting position, and lubrication requirements. The designer should verify compatibility with the motor and driven machine. Documentation should be reviewed before installation.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • GMW IPP 144-40 GS Thermal Printer Troubleshooting Guide
  • Meggitt C327845 Gas Shutoff Valve Troubleshooting and Replacement Guide
  • Meggitt C422685 Gas Solenoid Valve Troubleshooting Guide
  • LTI ServoOne Servo Troubleshooting Guide
  • Jenaer Antriebstechnik ECOVARIO Servo Troubleshooting Guide
  • Honeywell TDC3000X Troubleshooting Guide
  • Honeywell NOTIFIER NFS2-3030 Troubleshooting Guide
  • Troubleshooting of Honeywell FC series safety barriers
  • Honeywell XL1404 Troubleshooting Guide
  • Honeywell TDC 3000 Troubleshooting and Module Replacement Guide
  • HIMA X-DI 64 01 Safety Module
  • Hirschmann MICE MS20/MS30 Switch Integration and Troubleshooting
  • EXOR ePAD05/ePAD06 button screen replacement and troubleshooting
  • EXOR eVO58-TST/TNT Compact HMI Human Machine Panel
  • Esd VME-PCM-CADDY/2 Carrier Board Integration and Troubleshooting Guide
  • Elmo Gold Tuba Servo Drive Integration and Troubleshooting Guide
  • Eaton COM-MPB1-TP/MPB2-TP communication module
  • DeltaTau PMAC2 PCI Ultralite Programmable Multi Axis Motion Controller
  • DATA PATTERNS DP-VME-5114 Dual PMC Carrier Board Integration and Troubleshooting
  • CMZ SVM1608 Intelligent Servo Driver
  • SUMITOMO T2100Z steel turning selection and troubleshooting
  • SUMITOMO PSZ Turn Quick Change System Selection and Troubleshooting
  • SUMITOMO EGU chip breaker selection and troubleshooting
  • SUMITOMO GND slotting tool holder selection and troubleshooting
  • SUMITOMO AC8000P steel turning selection and troubleshooting
  • SUMITOMO AC6000M Stainless Steel Turning Guide
  • SUMITOMO ELECTRIC AC5000S Heat Resistant Alloy Turning Guide
  • SUMITOMO ELECTRIC AC4000K Cast Iron Turning Selection Guide
  • SUMITOMO ELECTRIC AC1135U Small Parts Turning Application Guide
  • SUMITOMO ELECTRIC AC1030U Precision Machining Selection and Practice for Small Parts
  • CCS 6900G/P pressure switch
  • BENDER WR Transformer Selection
  • BENDER RCMA475LY Residual Current Monitoring
  • BENDER IRDH575 Insulation Monitoring
  • BENDER IRDH265 Insulation Monitoring and Debugging
  • Bender RCMA475LY residual current monitor debugging
  • Beckwith Electric M-3425A Generator Protection Relay Debugging Guide
  • Automated MEX816U Expander Troubleshooting Guide
  • ASEM HT2150 Industrial Tablet Selection and Troubleshooting
  • Troubleshooting and practical application of Advantest U3771/3772 microwave spectrum analyzer
  • Advantest R6144 Programmable DC Voltage/Current Source (Calibration Source) Calibration and Maintenance
  • Aerotech UNIDEX 100/U100i single axis motion controller
  • Aerotech Ndrive MP Ultra Compact PWM Digital Servo Driver
  • Aerotech Ndrive HPe 10/20/30 High Performance PWM Digital Servo Drive
  • Aerotech Ndrive HLe maintenance replacement
  • Aerotech Ndrive CP maintenance replacement
  • Aerotech Ndrive Linear Drive Selection
  • Aerotech NDrive HL linear drive maintenance replacement
  • Aerotech NDrive HP 10/20/30 Maintenance and Replacement
  • Aerotech NDrive CP10 Servo Drive Guide
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials