Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Yokogawa PSBCMNBN Bus Continuation Module ProSafe-PLC
    ❤ Add to collection
  • Yokogawa PSBCMNBN Bus Continuation Module ProSafe-PLC

    ABB、GE、FANUC、Allen-Bradley、FOXBORO、Honeywell,KUKA、YOKOGAWA、YOKOGAWA、KOLLMORGEN、METSO、Motorola、NI、OEMAX、RELIANCE、Vibro-Meter、Rolls-Royce、MOOG、B&R、Woodward、Yaskawa、XYCOM、Emerson、HIMA、Bently、PROSOFT、TRICONEX、KEBA、Lenze、Alstom、CTI、DCSSystem accessories, robot system accessories, large servo system spare parts.
    Mr.FSN
    chnfcsXM@163.com
    +86-153-9626-8993
    Selection, installation, operation, maintenance, troubleshooting, safety
    Petrochemical/Chemical,Power industry,Metallurgical industry,Municipal/Environmental Protection,Oil and gas industry,Robot system accessories,automobile manufacturing,3C Electronics,Machining
    • ¥33623.00
      ¥35327.00
      ¥33623.00
      ¥33623.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:15.200KG
    • Quantity:
    • (Inventory: 5404)
Description
<span style="font-size: 18px; font-family: arial;">Yokogawa PSBCMNBN Bus Continuation Module ProSafe-PLC</span>

Yokogawa PSBCMNBN Bus Continuation Module for ProSafe‑PLC

The Yokogawa PSBCMNBN is a bus continuation module designed for the ProSafe‑PLC safety instrumented system. This module is a critical component in extending the safety bus between the ProSafe‑PLC safety CPU and distributed safety I/O modules. It enables the construction of larger safety systems by allowing the safety bus to travel between different racks or cabinets while maintaining the required safety integrity. The PSBCMNBN ensures that communication between the safety controller and remote I/O remains deterministic and fault‑tolerant, which is essential for applications requiring SIL3 (IEC 61508) compliance. Yokogawa’s ProSafe‑PLC is a TÜV‑certified safety logic solver used in the process industries, including oil & gas, chemical, power generation, and refining. The bus continuation module is typically installed between I/O bus interface modules to maintain electrical continuity across distances.

Technical Specifications

The PSBCMNBN operates as part of the ProSafe‑PLC safety bus system. It supports the proprietary Yokogawa safety bus protocol designed for SIL3 applications. The module provides electrical isolation and signal conditioning to allow the bus to span longer distances or to connect multiple rack segments. Power supply: 24 V DC (typically from the rack’s power supply). Current consumption is approximately 0.1 A. The module is housed in a standard ProSafe‑PLC module format, compatible with the safety I/O rack. Dimensions follow the ProSafe‑PLC form factor (approx. 130 mm × 25 mm × 140 mm). Operating temperature range: -20°C to +60°C. Storage: -30°C to +80°C. Humidity: 5-95% non‑condensing. Protection rating: IP20. The module includes diagnostic LEDs for bus status and power. It is certified for use in safety systems up to SIL3 per IEC 61508 and IEC 61511.

Key Features

  • Bus continuation module for Yokogawa ProSafe‑PLC safety systems

  • Extends the safety communication bus between racks or cabinets

  • Maintains SIL3 integrity for safety‑critical applications

  • Electrical isolation between bus segments for noise immunity

  • Plug‑and‑play installation in ProSafe‑PLC I/O rack

  • Diagnostic LEDs for bus status and module health

  • Hot‑swap capability (with appropriate system configuration)

  • Compatible with ProSafe‑PLC safety CPU and I/O modules


Function in ProSafe‑PLC System

The ProSafe‑PLC system consists of a safety CPU (e.g., PSBCPU) mounted in a rack, along with safety I/O modules (digital input, output, analog input). The safety bus connects these modules within a rack and allows expansion to additional racks via bus continuation modules. When the physical distance between racks exceeds the maximum allowed direct bus length, or when racks are in separate cabinets, the PSBCMNBN module is inserted at the end of one rack and the beginning of the next rack, with a cable connecting them. The module regenerates the bus signals, providing electrical isolation and preventing signal degradation. This allows the system to be expanded from a single rack to multiple racks without sacrificing safety performance. The module also provides diagnostic feedback to the safety CPU to ensure bus integrity.

Installation and Configuration

The PSBCMNBN is mounted in a standard ProSafe‑PLC I/O rack slot. It is typically placed at the rightmost slot of the first rack (or at the end of the bus segment), with the continuation cable connected to the next rack’s bus continuation module. The module does not require specific addressing or software configuration; it is automatically recognized by the safety CPU as a bus extender. Installation requires the rack to be powered off unless the system supports hot‑swap (check system documentation). The continuation cable must be of the specified type and length (maximum typically 10 meters for copper, longer with optical converters). After installation, the safety CPU will perform bus diagnostics; any fault is indicated by the module’s status LED.

Applications

The PSBCMNBN is used in large safety instrumented systems where I/O points are distributed across multiple physical locations. Example applications include: emergency shutdown systems for oil & gas platforms (where I/O is spread across multiple cabinets), burner management systems in power plants (remote I/O for burner valves), chemical reactors with I/O in separate control rooms, and high‑integrity process safety systems requiring SIL3 certification. The module ensures that the safety bus reaches all remote I/O modules without reducing the safety level. It is also used when retrofitting additional I/O racks to an existing ProSafe‑PLC system.

Maintenance and Diagnostics

The PSBCMNBN has minimal maintenance requirements. The front panel includes LEDs: PWR (green) indicates power present; BUS (green) indicates bus communication active; ERR (red) indicates a bus fault (open circuit, short circuit, or terminator missing). If the ERR LED lights, check the continuation cable and terminations. The module has no field‑replaceable parts. Replacement is simple: remove the old module and insert a new one, ensuring the bus cable is reconnected. System diagnostics can be performed using Yokogawa’s ProSafe‑PLC engineering software, which reports bus continuity status and any module faults. The module is designed for continuous operation and has a long MTBF (mean time between failures) typical of industrial safety equipment.

Environmental and Compliance

The PSBCMNBN is certified by TÜV for use in safety systems up to SIL3 (IEC 61508, IEC 61511). It also meets CE, UL, and ATEX requirements for non‑incendive installations. Operating temperature: -20°C to +60°C. Storage: -30°C to +80°C. Humidity: 5-95% non‑condensing. The module is rated IP20 and must be installed in a protected cabinet. It is RoHS compliant and suitable for use in Class I, Division 2 hazardous areas (with proper cabinet).

Conclusion

The Yokogawa PSBCMNBN bus continuation module is an essential component for expanding ProSafe‑PLC safety systems beyond a single rack. Its ability to extend the safety bus while maintaining SIL3 integrity makes it ideal for large, distributed safety instrumented applications in the process industries. The module’s simple installation, diagnostic LEDs, and robust design ensure reliable operation even in demanding environments.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • OMRON NX502 CPU Unit Hardware Installation and Maintenance Guide
  • OMRON NX102 Hardware Installation Guide
  • OMRON C200HX/HG/HE PLC Troubleshooting
  • Yamatake SDC35/36 Controller Application Guide
  • MITSUBISHI ELECTRIC GT25 Human Computer Interface Application Guide
  • Eurotherm Mini8 Controller Integration Guide
  • KEYENCE GC-1000 Safety Controller Manual
  • SICK RLY3-EMSS300 Safety Relay Manual
  • Troubleshooting of Siemens SIRIUS 3SK2 Safety Relay
  • Nordson DAGE4000 Bond Tensile Tester
  • HMS Anybus Communicator Gateway Replacement and Troubleshooting Guide
  • Allen Bradley 800T/H 30mm Button Troubleshooting and Replacement Guide
  • Schneider Modicon M340 Strict Environment Deployment and Troubleshooting Guide
  • Kepco BOP 1000M Troubleshooting Application
  • Siemens SIPROTEC 5 Replacement and Upgrade Guide
  • Banner XS/SC26 Security Controller Debugging and Troubleshooting
  • Allen Bradley MicroLogix 1500 Installation and Debugging
  • EOCR-PMZ (panel embedded) and EOCR-PFZ (embedded) motor comprehensive protector
  • Microchip PIC16F182X Low Power Design
  • FANUC α iS servo HRV calibration practice
  • Mitsubishi Electric GT23 Series HMI Maintenance Guide
  • Mitsubishi GT27 HMI Application Guide
  • Siemens SIMATIC ET 200M Selection
  • Lenze 8200 Vector Selection
  • Troubleshooting of Siemens MASTER DRIVES VC
  • FANUC I/O Unit A Maintenance Manual
  • Allen Bradley PLC-5 Classic Controller Complete Guide
  • Maintenance of M&C SP2006-H/DIL Sampling Probe
  • Pro face connection to Mitsubishi DIASYS Netmation
  • OMRON SYSMAC C-series/CVM1/CV series analog I/O units
  • LTI ServoOne Replacement and Troubleshooting
  • OMRON C-series AD/DA module configuration
  • Siemens 840C 611D Module Replacement Guide
  • Diagnosis and maintenance of ABB ACS550 frequency converter fault codes
  • OMRON NX1P2 Hardware Debugging Guide
  • Fuji FRENIC Mini inverter troubleshooting
  • Braided Forissier Braided Copper Strip Selection Guide
  • Mecc Alte MC200 Controller Engineering Debugging and Troubleshooting
  • Schneider Square D 9036/9037/9038 Electromechanical Liquid Level Controller
  • Pilz PSS 4000 distributed safety control
  • Schneider TeSys GV5/GV6 Motor Circuit Breaker Operation and Protection Guide
  • Eaton Freedom NEMA Contactor Starter Complete Guide
  • OMRON D4SL-N/D4SL-NSK10-LK Safety Door Switch Comprehensive Guide
  • NI CompactRIO Embedded System
  • Emerson Ovation I/O Module Troubleshooting and Replacement Practical Guide
  • MITSUBISHI A-series PLC Troubleshooting Replacement
  • Automation Direct DL06 D0-06DD1 Replacement Guide
  • IFM CR2530 Intelligent Controller Guide
  • OMRON FH/FHV series visual sensor controller
  • Pilz PDP67 F4 code troubleshooting
  • Panasonic FP-X PLC Replacement and Troubleshooting
  • OMRON CK3W-AX Multi axis Control Selection
  • Debugging and maintenance of EPSON RC90/RC90-B controller
  • Nthytronic Group iRTUe I/O Expansion Module
  • Schneider ATV320 Inverter Installation and Debugging Guide
  • Eaton SPB Drawdown Switch Maintenance Guide
  • GFS EVO-SP dual fuel retrofit complete solution
  • OMRON CJ2 CPU Troubleshooting and Maintenance
  • Complete Guide to Lenze ECS Servo System
  • GE EX2100e Excitation System Complete Guide
  • OMRON G3PW Power Controller: Parameter Setting and Troubleshooting Guide
  • Key Points for Selection and Deployment of MITSUBISHI FX3GE PLC
  • Beckhoff EP23xx EtherCAT Box Selection Troubleshooting
  • MITSUBISHI MDS-B servo troubleshooting
  • TOYO valve pressure and temperature selection
  • SIEMENS SIMODRIVE 611 HR/HRS Replacement and Advanced Positioning Techniques
  • SIEMENS SINUMERIK 840C 611-D Startup and Troubleshooting Guide
  • FANUC Series 0i-F Maintenance and Troubleshooting
  • Troubleshooting Schneider Modicon TM3 Bus Expansion
  • Troubleshooting of R&S EPL1000
  • Baum ü llerb b maXX 5000 Safety Configuration and Troubleshooting Guide
  • Huichuan AM600 Motion Controller Malfunction and Replacement Guide
  • Allen Bradley Ultra3000 Servo Motor Replacement Guide
  • NEC NL8060BC26-17 LCD Module Maintenance and Replacement
  • ABB Pluto Safety PLC Maintenance and Troubleshooting
  • OMRON NE1A Safety Controller Troubleshooting and Replacement
  • Allen Bradley 2711P series PanelView Plus human-machine interface terminal
  • NI cFP-22xx on-site integration and troubleshooting
  • KEYENCE XG-8000 Line Scan Visual Debugging Guide
  • OMRON G9SX Security Unit Configuration and Troubleshooting
  • OMRON CPM1A Maintenance and Troubleshooting
  • ABB ACH550 Inverter Maintenance
  • IDEC MicroSmart FC6A Replacement Guide
  • Gefran GILOGIK II Distributed I/O System
  • GE VersaMax Nano/Micro Replacement Guide
  • Nastyaer GIV50-11 limit switch
  • Rockwell Trusted TMR Processor
  • TIANMA NL8060BC21-11KG Industrial LCD
  • CapXon UJ series aluminum electrolytic capacitors
  • FLVOTEK MV10H DC/DC power supply
  • SIEMENS QBE3000/3100 differential pressure
  • Huichuan H3U series PLC high-performance motion control selection and troubleshooting guide
  • Phoenix Contact ILC 1X1 Field Troubleshooting and Engineering Application Guide
  • Allen Bradley Lifeline 4 Cable Switch Field Installation and Troubleshooting Complete Guide
  • Gardner DELCOS 3100 Controller Field Troubleshooting and Maintenance Guide
  • Mitsubishi GOT2000 Utility Troubleshooting and System Maintenance Complete Guide
  • Ohmite EBW Current Sensing
  • Mitsubishi A1S61PN Power Module: Complete Guide to On site Troubleshooting and System Maintenance
  • Complete Guide to On site Maintenance and Troubleshooting of Honeywell TN3801 Electro Motive Liquid Level
  • ABB PSTX/PSR Soft Starter Field Troubleshooting and Maintenance Guide
  • GE Hydran 201Ti Troubleshooting Practice
  • ABB NextMove ESB-2 Debugging and Replacement
  • CAREL PGD Handheld Operator Configuration Replacement
  • Clinical Guidelines for Hiossen EK Implant System
  • Eaton 9PX UPS maintenance and replacement
  • Airlec RYP Precision Pressure Reducing Valve Selection and Maintenance
  • Schneider Modicon M258 Selection and Upgrade
  • KEYENCE XG-8000/7000 adds new features
  • Alfa Laval EPC 50 Upgrades EPC 70 Separators
  • Nidec Unidrive M700 Troubleshooting
  • Mitsubishi A171SCPU Maintenance and Troubleshooting
  • YASKAWA DX200 Feature Pack Complete Guide
  • CKD AxTools servo debugging software (EboDEX)
  • IUSA Copper Tube System Installation and Troubleshooting Guide
  • TAIYO LX Series Generator Common Troubleshooting and Maintenance Guide
  • Automation Direct DL06 PLC Common Troubleshooting and Maintenance Guide
  • Kepco BOP Bipolar Power Supply Troubleshooting and Maintenance Guide
  • Pilz PNOZmulti Safety Controller Troubleshooting and Maintenance Guide
  • HMS Airbus X-gateway troubleshooting
  • Nidec Unidrive SP troubleshooting
  • GE SPEEDTRONIC Mark VI troubleshooting
  • LK-TECH MGv2 Servo Motor System Complete Guide
  • Zebra EPL2 Complete Guide
  • Gold Whistle Servo Drive Complete Guide
  • MITSUBISHI ELECTRIC FR-D700 Inverter Complete Guide
  • Edwards EST-3 Life Safety System
  • ABB ACS380 Inverter Complete Guide
  • MITSUBISHI ELECTRIC MELSEC iQ-R/Q/L Complete Guide