Load, foundation load, and installation method
Supplementary load: maximum 2 kg on the arm, maximum 1 kg on the rotating column/connecting rod. Flange load: KR 10 R1100-3 for operation F(a) 245 N、F(r) 223 N、M(k) 38 Nm、M(g) 23 Nm, Emergency stop F (a) 695 N, F (r) 655 N, M (k) 96 Nm, M (g) 55 Nm; KR 13 R900-3 runs 284/265/29/23, emergency stop 843/851/91/53; KR 16 R1100-3 runs 361/366/32/33, emergency stop 814/985/102/75. Basic load: KR 10 R1100-3 floor Fv normal 925 N、max 1964 N,Fh 460/1987 N,Mk 489/1917 Nm,Mr 275/530 Nm; Ceiling Fv 1120/1988 N, Fh 633/1984 N, Mk 485/1942 Nm, Mr 277/530 Nm; Wall Fv 1111/2501 N, Fh 450/1549 N, Mk 638/2064 Nm, Mr 252/544 Nm. KR 16 R1100-3 floor Fv 1485/2593 N, Fh 773/1901 N, Mk 869/2126 Nm, Mr 421/1259 Nm; Ceiling Fv 1563/2414 N, Fh 654/2485 N, Mk 812/3064 Nm, Mr 427/1255 Nm; Wall Fv 1705/2329 N, Fh 624/1708 N, Mk 1113/2439 Nm, Mr 384/1264 Nm. The maximum load is used for foundation design and must be followed.
Fault Handling Checklist
Emergency stop, power off, padlock, and power check first.
Check the alarm: motor, brake RDC、 Data cables and safety circuits.
Mechanical inspection: oil level, oil leakage, toothed belt, lubrication, base bolts.
Check parameters: load, center of gravity, inertia, installation angle, program magnification.
After replacement: Mastering, T1 testing, stop distance retest.
Record: Fault time, frequency, axle number, temperature, load, maintenance content.
The reliability of KUKA KR AGILUS-3 ultra is based on standardized maintenance. By controlling the six stages of stopping distance, base bolts, toothed belts, gear oil, lubricating grease, and zero point calibration, most on-site faults can be detected in advance. For engineers, the true idea of "replacing discontinued modules" is not to wait until they break before replacing them, but to use verifiable parameters and standard steps to turn every maintenance into a traceable quality record.
