Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • CLC-2P 4L PLC Lubrication Pump System
    ❤ Add to collection
  • CLC-2P 4L PLC Lubrication Pump System

    ABB、GE、FANUC、Allen-Bradley、FOXBORO、Honeywell,KUKA、YOKOGAWA、YOKOGAWA、KOLLMORGEN、METSO、Motorola、NI、OEMAX、RELIANCE、Vibro-Meter、Rolls-Royce、MOOG、B&R、Woodward、Yaskawa、XYCOM、Emerson、HIMA、Bently、PROSOFT、TRICONEX、KEBA、Lenze、Alstom、CTI、DCSSystem accessories, robot system accessories, large servo system spare parts.
    Mr.FSN
    chnfcsXM@163.com
    +86-153-9626-8993
    Selection, installation, operation, maintenance, troubleshooting, safety
    Petrochemical/Chemical,Power industry,Metallurgical industry,Municipal/Environmental Protection,Oil and gas industry,Robot system accessories,automobile manufacturing,3C Electronics,Machining
    • ¥42634.00
      ¥44367.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:15.640KG
    • Quantity:
    • (Inventory: 5437)
Description
<span style="font-size: 20px; font-family: arial;">CLC-2P 4L PLC Lubrication Pump System</span>

CLC-2P (4L) PLC Controlled Electric Lubricating Oil Pump System

The CLC-2P (4L) is a PLC-controlled electric lubricating oil pump designed for centralized lubrication systems in industrial machinery. This unit integrates a 4-liter lubricant reservoir with an electric pump and control interface, providing automated lubrication delivery to multiple points within a machine or production line. The system is suitable for applications requiring precise, repeatable lubrication cycles for bearings, guides, chains, gears, and other moving components.

System Architecture and Control Interface

The CLC-2P lubrication system is designed to interface directly with PLC controllers through discrete I/O or serial communication, allowing integration into existing machine control architectures. The pump operation can be triggered by timer-based cycles, machine cycle counts, temperature sensors, or other process variables monitored by the PLC. When the PLC outputs a start signal, the pump energizes and delivers lubricant to the distribution network. The control voltage is configurable to match the PLC output specifications. An integrated pressure switch provides feedback to the PLC when the system reaches operating pressure, enabling closed-loop monitoring of lubrication delivery.


Reservoir and Pump Specifications

The 4-liter lubricant reservoir capacity supports extended operation between refills, reducing maintenance frequency in continuous production environments. The reservoir is constructed from materials compatible with standard industrial lubricants including mineral oils, synthetic oils, and greases. A fill port with integrated strainer prevents contamination during refilling, while a sight glass or level indicator allows visual confirmation of lubricant level. An optional low-level switch can be connected to the PLC to generate an alert when lubricant supply is running low, triggering a refill warning before the system runs dry.

Delivery Performance and Distribution

The electric pump generates sufficient pressure to deliver lubricant through distribution tubing to multiple lubrication points. Discharge pressure is regulated by an internal relief valve or monitored by the PLC via a pressure transducer. The flow rate is matched to the requirements of typical centralized lubrication systems used in machinery applications. The pump can be configured for either single-line or dual-line distribution depending on the lubrication system architecture. The system supports progressive distributors or injectors for dividing the lubricant flow among individual points with consistent volume per cycle. Output ports are sized to accept standard lubrication tubing fittings.

Installation and System Integration

The CLC-2P unit is designed for panel or frame mounting within the machine enclosure. The compact footprint minimizes interference with other machine components while keeping the lubrication system accessible for maintenance. Power and control connections are made via pre-wired leads or terminal blocks, allowing direct connection to the PLC output modules and the facility power supply. The pump motor operates on standard industrial voltages, with wiring diagrams provided for integration into the machine electrical system. Mounting holes are provided for secure attachment to machine frames or control cabinet backplanes.

Applications in Industrial Machinery

The CLC-2P lubrication pump is used in applications requiring automated, PLC-controlled lubrication of multiple points. Typical machinery includes CNC machine tools requiring controlled lubrication of guideways and ballscrews, presses and stamping equipment, packaging machinery with multiple rotary and linear bearings, conveying systems, printing presses, and metal forming equipment. The PLC interface allows the lubrication cycle to be synchronized with machine operation, delivering lubricant only when the machine is running and adjusting frequency based on production rates.

Maintenance and Operation

Regular maintenance includes checking the lubricant level and refilling the reservoir as needed, inspecting hoses and fittings for leaks, and cleaning the reservoir strainer. The pump can be serviced by removing access panels or the complete pump assembly from the reservoir. The control interface includes status indicators showing pump operation and alarm conditions, facilitating troubleshooting without specialized tools. The system supports typical lubricant types such as ISO VG 32, 46, 68, and 100 hydraulic oils, gear oils, and way lubricants suitable for the application.

Conclusion

The CLC-2P (4L) electric lubricating oil pump provides a PLC-controlled solution for centralized lubrication in industrial machinery. With a 4-liter reservoir, electrical control interface, and pump capable of reaching multiple lubrication points, this system automates lubrication delivery, reducing manual maintenance and improving machine reliability.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Edwards CTI Kryogenics On Board 8F Enhanced Cryopump Explanation
  • ADLINK PCI-9112 Multi functional Data Acquisition Card
  • ADLINK PCI-8102 Two Axis Pulse Motion Control Card
  • ADLINK PCI-9812/10 high-speed synchronous acquisition card
  • ADLINK PCI-7200 High Speed Digital I/O Card
  • ADLINK MXE-1000 series fanless industrial computer
  • ADLINK IMB-T10 Mini ITX Embedded Motherboard
  • ADLINK HSL-DO32-M-N/P distributed I/O module
  • ADLINK DAQ-2500 Series Multi Channel Analog Output Card
  • ADLINK DAQ-2200 Series Data Acquisition Card
  • ADLINK ETX-AT-N270 Embedded Module
  • ADLINK ACL-7225B Relay Isolation Input Card Guide
  • ADLINK DAQ-2000 Synchronous Sampling and Acquisition Card Selection Guide
  • ADLINK NuPRO-E330 Industrial Motherboard Selection and Deployment
  • ADLINK ACL-8112 Data Acquisition Card Configuration and Programming
  • ADLINK USB-2405 Dynamic Signal Acquisition Module Deployment Guide
  • ADLINK PXIS-3320 PXI chassis installation troubleshooting
  • ADLINK PCIe-GIE72/74 Image Acquisition Card Deployment Guide
  • ADLINK PCIe-7856/7853 Sports I/O Controller Card Guide
  • ADLINK PCI-6308 Isolation Output Card Programming and Installation
  • ADLINK PCI-7432 installation and configuration troubleshooting
  • adlink nupro-e72 التحكم الصناعي اللوحة
  • ADLINK NuPRO-E72 Industrial Control Motherboard
  • ADLINK MXE-5400 Industrial Control Computer
  • ADLINK M-322 Industrial Motherboard Configuration and Deployment Guide
  • ADLINK IMB-M43H Industrial Motherboard Configuration and 6th/7th Generation Core Deployment Guide
  • ADLINK IMB-M42H Industrial Motherboard Deployment and BIOS Optimization Guide
  • ADLINK i915GV-INA motherboard configuration and ISA compatibility tuning guide
  • ADLINK ETX-NR667 Core2 Duo Module Selection and Deployment
  • ADLINK ETX-BT Module Configuration and PATA to SATA Upgrade Guide
  • ADLINK CM1-BT1 Extreme Environment Deployment and Configuration
  • ADLINK cPCI-8217 VGA/LCD Module Configuration and Troubleshooting
  • ADLINK AmITX-SL-G Mini ITX Motherboard Deployment and SEMA Guide
  • ADLINK AmITX-AL-I Embedded Motherboard Deployment and SEMA Management Guide
  • ADLINK NuPRO-E315 PICMG 1.3 Industrial Motherboard Deployment Guide
  • ADLINK NuPRO-842 Pentium 4 Industrial Motherboard Deployment and Debugging Guide
  • ADLINK NuPRO-900A Dual Xeon ePCI-X Motherboard Deployment Guide
  • ADLINK cPCI-6910 Dual Core Xeon Single Board Computer Deployment Guide
  • ADLINK cPCI-6860A Dual Xeon Single Board Computer Deployment Guide
  • ADLINK CPCI-8168 Eight Axis Motion Control Card Deployment and HSL Integration Guide
  • ADLINK NuPRO-E340 Industrial Motherboard Debugging and BIOS Optimization Guide
  • ADLINK NuPRO-A40H Industrial Single Board Computer Hardware Deployment and BIOS Calibration Guide
  • ADLINK NuPRO-852 LGA775 Industrial Control Motherboard Maintenance Guide
  • ADLINK NuPRO-841 Industrial Motherboard Maintenance and Troubleshooting
  • ADLINK NuPRO-590 Series Socket7 Industrial Control Motherboard Maintenance Guide
  • Deployment and Troubleshooting of ADLINK MXE-5500 Series Industrial Control Computer
  • ADLINK MXE-200 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK cPCI-6770 Series CompactPCI Motherboard Maintenance Guide
  • ADLINK NuPRO-A301 Industrial Motherboard Troubleshooting Manual
  • ADLINK NuPRO-965 SHB Debugging and Maintenance Complete Manual
  • ADLINK NuPRO-935A Industrial Motherboard Debugging and Maintenance Guide
  • ADLINK NuPRO-865 Single Board Computer Hardware Troubleshooting Guide
  • ADLINK NuPRO-840 P4 Industrial SBC Architecture Maintenance
  • ADLINK NuPRO-770 Full length SBC Configuration and Maintenance
  • ADLINK NuPRO-595 Industrial Half length SBC Motherboard Configuration and Maintenance Guide
  • ADLINK cPCI-6840 Series Single Board Computer Installation, Configuration, and Maintenance Guide
  • Foxboro 43AP Pneumatic Controller Technical Specifications and Selection Guide
  • ADLINK cPCI-3720: 3U CompactPCI Low Power Pentium III CPU Module
  • ADLINK NuPRO-E47: PICMG 1.3 13th Generation Core Industrial SHB
  • ADLINK NuPRO-E43: PICMG 1.3 Core 7th Generation Industrial SHB
  • ADLINK NuPRO-780 PICMG Bus Core CPU Card
  • ADLINK cPCI-6965 6U CompactPCI Core Dual Core Single Board Computer
  • ADLINK USB/LPCI/LPCIe-3488A GPIB Interface Card Selection and Application Guide
  • Rittal SK 3241.700 Blue e+Cabinet Fan Filter Unit
  • ADLINK CPCI-8168 8-Axis Motion Control Card and HSL Network Integration Solution
  • ADLINK PCIe-PXIe-8638 High Speed PXIe Bus Expansion Scheme
  • ADLINK PCIe GIE7x Poe+Frame Grabber Hardware and Power Management Detailed Explanation
  • ADLINK PCIe-7396 Digital I/O Card Deployment Guide
  • ADLINK PCI-8164 Advanced Motion Control Card Deployment Guide
  • ADLINK PCI-8154 Motion Control Card Deployment Guide
  • ADLINK PCI-8134 Motion Control Card Deployment Guide
  • ADLINK NuPRO-E42 Industrial Control Motherboard Deployment Guide
  • ADLINK MXC-6600 Embedded Platform Deployment Guide
  • ADLINK MXC-6000 Industrial Control Computer Deployment and Optimization Guide
  • ADLINK MXC-2300 Embedded System Deployment Guide
  • ADLINK MCM-204 Edge DAQ Deployment Configuration Guide
  • ADLINK MCM-100/102 Deployment Calibration Guide
  • Deployment and Performance Optimization of ADLINK MXC-6400 Industrial Control Computer
  • Selection and Deployment of ADLINK Matrix Series Industrial Control Computers
  • российские промышленные новые машины.Наш отдел дебютировал в 2026 году в России Международная промышленная ярмарка INNOPROM
  • Deeply cultivating the Eurasian industrial market, linking new industrial opportunities between China and Russia
  • Deployment and troubleshooting of ADLINK GIE64+PoE acquisition card
  • Honeywell UMS Security System Troubleshooting Guide
  • Honeywell Expert Series C I/O Troubleshooting Guide
  • ADLINK EOS-1200 Vision System Deployment and Troubleshooting
  • ADLINK DLAP-5200 series AI engine deployment and optimization
  • ADLINK DLAP-4000 Deployment and BIOS Optimization
  • ADLINK Matrix MXC-2000 Deployment and Troubleshooting
  • ADLINK DAQe-2000 series acquisition card calibration and synchronization
  • ADLINK cPCI-6520 Core i7 Processor Blade Engineering Application Guide
  • ADLINK CM1-86DX3 PC/104 Embedded Single Board Computer Engineering Application Guide
  • Honeywell DC1000 Series PID Temperature Controller Engineering Application Guide
  • ALSTOM MiCOM C264 Substation Controller Engineering Application Guide
  • EMERSON AMS 2140 Practical Guide for On site Dynamic Balance and Vibration Analysis
  • ADLINK NuPRO-E320 motherboard deployment and tuning guide
  • ADLINK NuPRO-800 Dual PIII Industrial SBC Maintenance and Upgrade Guide
  • ADLINK NuPRO-598 SBC Maintenance Practical Guide
  • ADLINK MXC-6300 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK Express-BASE7 Carrier Board Quick Deployment and Debugging Guide
  • ADLINK DLAP-211 Edge AI Platform Selection and Deployment Guide
  • ADLINK 7230 Series Isolation DIO Card Selection and Engineering Application Guide
  • ADLINK cPCI-6965 SBC Embedded Installation and BIOS Tuning Guide
  • ADLINK 7200 Series High Speed DIO Card Practical Guide
  • ADLINK DLAP Series Edge AI Acceleration Platform Selection and Deployment Practical Guide
  • DEIF TCM-2 thyristor control module: Wind power cut in control engineering guide
  • DEIF MVR-200 Medium Voltage Relay: Installation and Wiring Engineering Guide
  • DEIF MDR-2 Differential Relay: Engineering Guide for Generator Differential Protection
  • DEIF Delomatic 3 AOM: Engineering Guide for Analog Output Modules
  • DEIF AGI 400 Graphic Interface: Ship and Industrial HMI Solution
  • DEIF BRW-1 Marine Instruments: Installation and Calibration Guide for Offshore Bridge Indicators
  • DEIF AGC 200 Controller: Quick Deployment and Configuration Guide for Generator Sets
  • DEIF AGC-2 Controller: The Ultimate Guide to Automatic Control and Protection of Generator Sets
  • ABB SPA-ZC400 Gateway: REM54x Access to IEC 61850 Ultimate Engineering Guide
  • ABB REM 543/545 Terminal
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit