Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS200VPROH2B Printed circuit board
    ❤ Add to collection
  • GE IS200VPROH2B Printed circuit board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS200VPROH2B Printed circuit board

    • ¥19860.56
      ¥19520.23
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:3.020KG
    • Quantity:
    • (Inventory: 19)
Description

GE IS200VPROH2B Printed circuit board


GE IS200VPROH2B Printed circuit board

Part Number IS200VPROH2B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI/VIe Function Module Availability In StockIS200VPROH2B is a turbine protection board developed by GE. It is a part of Mark VI control system. The Emergency Turbine Protection (VPRO) system, along with its associated terminal boards (TPRO and TREG), serves as an independent emergency overspeed protection mechanism for turbine systems. This system operates independently of the main turbine control system and is designed to ensure safety in the event of critical emergencies. 

 SYSTEM COMPONENTS VPRO Board: The board, located in the Protection Module, is the central component responsible for providing emergency trip functionality. It operates with triple redundancy to enhance reliability and features an Ethernet connection for IONet communications with the control modules. Terminal Boards (TPRO and TREG): The TPRO and TREG terminal boards facilitate the connection between the board and the trip solenoids. TPRO serves as the interface between VPRO and TREG, while TREG provides the positive side of the 125 V dc power to the solenoids. 

TRPG, another terminal board, provides the negative side. SYSTEM FUNCTIONALITY Emergency Trip Function: Primarily responsible for overseeing the emergency trip function. It can control up to three trip solenoids connected between the TREG and TRPG terminal boards. Trip Solenoid Control: TREG supplies the positive side of the 125 V dc power to the trip solenoids, while TRPG provides the negative side. Both TREG and TRPG are equipped to trip the turbine independently if necessary. Relay Control: Controls a total of 12 relays on the TREG board, nine of which are organized into three groups of three. 

These relays are utilized to vote inputs controlling the trip solenoids, ensuring redundancy and reliability in critical emergency scenarios. MPU CHARACTERISTICS Output Resistance and Inductance: The MPU's output resistance is measured at 200 ohm, accompanied by an inductance of 85 mH. These parameters determine the impedance of the MPU's output circuitry. Output Voltage and Load: The MPU generates an output voltage of 150 V peak-to-peak (p-p) when connected to a load of 60 Kohm at the TPRO terminal block. Despite this voltage, the energy output is insufficient to produce a spark. Maximum Short Circuit Current: In the event of a short circuit, the MPU can deliver a maximum current of approximately 100 mA. This current limit ensures the protection of the system components in case of a fault. Normal Mode Load: To mitigate voltage fluctuations and ensure stability, the system applies a normal mode load of up to 400 ohm to the input signal. This load helps in reducing the voltage level at the terminals, thereby maintaining safe operating conditions. 

 HARDWARE VERIFICATION PROCEDURE Operate K25P Relay: Force the output signal Sync Perm found under VTUR card points to operate the K25P relay. Verify the functionality of the K25P relay by probing TTUR screws 3 and 4. Note: The application code has direct control over this relay. Operate K25 Relay: Simulate generator voltage on TTUR screws 17 and 18. Operate the K25 relay by forcing the TTUR card point output signals Sync Bypass1 to 1 and Sync Bypass0 to 0. Verify the functionality of the K25 relay by probing screws 4 and 5 on TTUR. Operate K25A Relay: Simulate generator voltage on TPRO screws 1 and 2. Operate the K25A relay by forcing TPRO card point output signals SynCK Bypass to 1 and SynCk_Perm to 1. Note: The bus voltage must be zero (dead bus) for this test to be functional. Verify the functionality of the K25A relay by probing screws 5 and 6 on TTUR.

Main Functions

Power system monitoring and control:

The power interface board can be used for power system monitoring and control equipment to ensure the safe, stable and reliable operation of the power system.

Power plant automation:

In the power plant, it can be used to connect and manage the power supply of the mastering system and monitoring equipment to improve the automation level of the power plant.

Power transformer and distribution:

Applicable to substations and distribution stations, it is used to govern the power supply of transformers, circuit breakers and other equipments to ensure the high efficiency of power transmission and distribution.

Industrial Process Mastering:

In manufacturing and chemical workshops, this power interface board can be used for power management of automation systems, inner and control equipment to enhance productivity and safety.

Building Automation:

It can be used in building automation system, power supply to lighting, air conditioning, security equipment, etc., to achieve intelligent management of building equipment.

Railway flag signal system:

In the railway system, it is used in the power management of railway flag signal equipment and control system to ensure the stable operation of railway signal system.

Smart Grid:

In the smart grid, the power interface board can be used to connect and manage the digital power equipment and promote the intelligent development of the power grid.

Traffic Flag Signal System:

In the traffic flag signal system of routes and intersections, it is used to supply power to the flag master and equipment to ensure the normal display of traffic signals.

Aerospace:

In aviation and aerospace, the power interface board can be used in the control system of aircraft and spacecraft to provide stable and reliable power support.

It is suitable for land initiatives, oilfield equipment and other categories, providing power support for various land engineering equipment.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide
  • Bonfiglioli Vectron CM-232/485 Modbus Communication Configuration Guide
  • Bonfiglioli BMS series servo reduction motor selection and integration guide
  • Bonfiglioli ACTION 210/410 Inverter Debugging and Fault Diagnosis Complete Guide
  • Honeywell Enhanced Micro TDC 3000X System Redundancy Architecture and Maintenance Guide
  • Selection and Configuration of Bonfiglioli Active Series Inverter
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli HDP/HDO Series Heavy duty Gearboxes
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli 300/300M Series Gearboxes
  • Bonfiglioli 300M planetary gearbox selection and thermal verification guide
  • Bonfiglioli 3/H series heavy-duty gearbox selection and verification guide
  • Bonfiglioli KRG/KCG/KSD Hydraulic Coupling Selection and Integration Guide