Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS200VPROH2B Printed circuit board
    ❤ Add to collection
  • GE IS200VPROH2B Printed circuit board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS200VPROH2B Printed circuit board

    • ¥19860.56
      ¥19520.23
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:3.020KG
    • Quantity:
    • (Inventory: 19)
Description

GE IS200VPROH2B Printed circuit board


GE IS200VPROH2B Printed circuit board

Part Number IS200VPROH2B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI/VIe Function Module Availability In StockIS200VPROH2B is a turbine protection board developed by GE. It is a part of Mark VI control system. The Emergency Turbine Protection (VPRO) system, along with its associated terminal boards (TPRO and TREG), serves as an independent emergency overspeed protection mechanism for turbine systems. This system operates independently of the main turbine control system and is designed to ensure safety in the event of critical emergencies. 

 SYSTEM COMPONENTS VPRO Board: The board, located in the Protection Module, is the central component responsible for providing emergency trip functionality. It operates with triple redundancy to enhance reliability and features an Ethernet connection for IONet communications with the control modules. Terminal Boards (TPRO and TREG): The TPRO and TREG terminal boards facilitate the connection between the board and the trip solenoids. TPRO serves as the interface between VPRO and TREG, while TREG provides the positive side of the 125 V dc power to the solenoids. 

TRPG, another terminal board, provides the negative side. SYSTEM FUNCTIONALITY Emergency Trip Function: Primarily responsible for overseeing the emergency trip function. It can control up to three trip solenoids connected between the TREG and TRPG terminal boards. Trip Solenoid Control: TREG supplies the positive side of the 125 V dc power to the trip solenoids, while TRPG provides the negative side. Both TREG and TRPG are equipped to trip the turbine independently if necessary. Relay Control: Controls a total of 12 relays on the TREG board, nine of which are organized into three groups of three. 

These relays are utilized to vote inputs controlling the trip solenoids, ensuring redundancy and reliability in critical emergency scenarios. MPU CHARACTERISTICS Output Resistance and Inductance: The MPU's output resistance is measured at 200 ohm, accompanied by an inductance of 85 mH. These parameters determine the impedance of the MPU's output circuitry. Output Voltage and Load: The MPU generates an output voltage of 150 V peak-to-peak (p-p) when connected to a load of 60 Kohm at the TPRO terminal block. Despite this voltage, the energy output is insufficient to produce a spark. Maximum Short Circuit Current: In the event of a short circuit, the MPU can deliver a maximum current of approximately 100 mA. This current limit ensures the protection of the system components in case of a fault. Normal Mode Load: To mitigate voltage fluctuations and ensure stability, the system applies a normal mode load of up to 400 ohm to the input signal. This load helps in reducing the voltage level at the terminals, thereby maintaining safe operating conditions. 

 HARDWARE VERIFICATION PROCEDURE Operate K25P Relay: Force the output signal Sync Perm found under VTUR card points to operate the K25P relay. Verify the functionality of the K25P relay by probing TTUR screws 3 and 4. Note: The application code has direct control over this relay. Operate K25 Relay: Simulate generator voltage on TTUR screws 17 and 18. Operate the K25 relay by forcing the TTUR card point output signals Sync Bypass1 to 1 and Sync Bypass0 to 0. Verify the functionality of the K25 relay by probing screws 4 and 5 on TTUR. Operate K25A Relay: Simulate generator voltage on TPRO screws 1 and 2. Operate the K25A relay by forcing TPRO card point output signals SynCK Bypass to 1 and SynCk_Perm to 1. Note: The bus voltage must be zero (dead bus) for this test to be functional. Verify the functionality of the K25A relay by probing screws 5 and 6 on TTUR.

Main Functions

Power system monitoring and control:

The power interface board can be used for power system monitoring and control equipment to ensure the safe, stable and reliable operation of the power system.

Power plant automation:

In the power plant, it can be used to connect and manage the power supply of the mastering system and monitoring equipment to improve the automation level of the power plant.

Power transformer and distribution:

Applicable to substations and distribution stations, it is used to govern the power supply of transformers, circuit breakers and other equipments to ensure the high efficiency of power transmission and distribution.

Industrial Process Mastering:

In manufacturing and chemical workshops, this power interface board can be used for power management of automation systems, inner and control equipment to enhance productivity and safety.

Building Automation:

It can be used in building automation system, power supply to lighting, air conditioning, security equipment, etc., to achieve intelligent management of building equipment.

Railway flag signal system:

In the railway system, it is used in the power management of railway flag signal equipment and control system to ensure the stable operation of railway signal system.

Smart Grid:

In the smart grid, the power interface board can be used to connect and manage the digital power equipment and promote the intelligent development of the power grid.

Traffic Flag Signal System:

In the traffic flag signal system of routes and intersections, it is used to supply power to the flag master and equipment to ensure the normal display of traffic signals.

Aerospace:

In aviation and aerospace, the power interface board can be used in the control system of aircraft and spacecraft to provide stable and reliable power support.

It is suitable for land initiatives, oilfield equipment and other categories, providing power support for various land engineering equipment.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • DEIF TCM-2 thyristor control module: Wind power cut in control engineering guide
  • DEIF MVR-200 Medium Voltage Relay: Installation and Wiring Engineering Guide
  • DEIF MDR-2 Differential Relay: Engineering Guide for Generator Differential Protection
  • DEIF Delomatic 3 AOM: Engineering Guide for Analog Output Modules
  • DEIF AGI 400 Graphic Interface: Ship and Industrial HMI Solution
  • DEIF BRW-1 Marine Instruments: Installation and Calibration Guide for Offshore Bridge Indicators
  • DEIF AGC 200 Controller: Quick Deployment and Configuration Guide for Generator Sets
  • DEIF AGC-2 Controller: The Ultimate Guide to Automatic Control and Protection of Generator Sets
  • ABB SPA-ZC400 Gateway: REM54x Access to IEC 61850 Ultimate Engineering Guide
  • ABB REM 543/545 Terminal
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit
  • Installation and I/O configuration of DEIF PPM-3 power management module
  • Beckwith M-3520 Interconnection Protection Relay
  • Beckwith M-3430 Generator Protection Relay
  • Beckwith M-2293B adapter panel replacement GE regulator guide
  • Selection and Networking of Beckwith M-2001C Digital Voltage Regulating Controller
  • Beckwith M-2001B Digital Voltage Regulating Controller
  • Beckwith M-0388/M-0389 Synchronous Inspection Relay Application Guide
  • Beckwith M-0193B Synchronizer Debugging and System Integration Guide
  • Beckwith M-0115A Parallel Balance Module Debugging Guide
  • Beckwith M-0067E On Load Voltage Regulating Controller Selection and Debugging Guide
  • Debugging and Fault Handling of Beckwith M-4272 Digital Busbar Conversion System
  • Beckwith M-3311A Transformer Protection Relay Debugging Guide
  • Beckwith M-3425A Generator Protection Relay Debugging Guide
  • Setting and troubleshooting of Basler BE1-27/59 voltage relay
  • Debugging and troubleshooting of Basler AVC63-12/AVC125-10 voltage regulator
  • Basler L301kc Line Array Camera Technology and Troubleshooting
  • Selection and Debugging of Basler CBS 212A Current Boosting System
  • Selection and commissioning of Basler BE3-25 synchronous inspection relay
  • Basler BE1-32R/32O/U Direction Power Relay Setting and Testing Guide
  • Basler PRS 250 Synchronous Relay Maintenance and Replacement Guide
  • Basler piA2400-17gc Industrial Camera Replacement and Optimization Guide
  • Basler BE1-11g Generator Protection System
  • Basler VR63-4C/UL Voltage Regulator
  • Basler BE1-DFPR feeder protection relay
  • Basler CBS 310/320 Current Boosting System
  • Basler UFOV 250A/260A protection module
  • Basler MVC104/MVC108/MVC232 manual voltage control device
  • Basler XR2002/XR2002F Regulator
  • Basler DECS-400 excitation system
  • Basler DGC-2020 Generator Set Controller: Integrated Control and Debugging Guide
  • Basler MVC-300 Manual Voltage Controller: Characteristics and Engineering Applications
  • Basler MVC Series Manual Voltage Controller: Application and Selection
  • Basler SSR Static Voltage Regulator: A Complete Guide to Debugging and Troubleshooting
  • Basler SR4A/SR8A Voltage Regulator: Detailed Debugging and Troubleshooting Explanation
  • Basler BE2000E Voltage Regulator: Replacement and Application Details
  • Basler DECS-2100 Excitation System: Modular Upgrade and Engineering Application
  • Basler BE1-851 Overcurrent Protection System: A Complete Guide to Professional Debugging and Troubleshooting
  • Basler APR 63-5 Voltage Regulator: Professional Debugging and Troubleshooting Guide for Industrial Generator Excitation Systems
  • Basler BE1-FLEX Protection System: A Complete Guide to Professional Installation, Configuration, and Troubleshooting
  • Debugging and Testing of Basler BE1-700 Relay
  • Basler BE1-87B busbar differential setting test
  • Basler BE1-40Q demagnetization relay setting test
  • Basler BE1-60 Voltage Balance Relay Setting Test
  • Basler BE1-47N Relay Field Setting and Testing Guide
  • Basler BE1-81O/U Frequency Relay: On site Debugging and Protection Configuration Guide
  • Basler BE1-11f Feedline Protection System Debugging and Troubleshooting Guide
  • Basler DECS-250 Excitation System: Installation, Configuration, and Troubleshooting Practice Guide
  • Basler DECS-100 Digital Excitation System Debugging Guide
  • Application Guide for Basler BE1-BPR Circuit Breaker Protection Relay
  • Basler BE1-50/51B-255 Replacement CO Relay Guide
  • Basler BE1-25 synchronous inspection relay principle and testing
  • Basler BE1-51 Time Overcurrent Relay Debugging Guide
  • Practical Guide to Basler DECS-300 Digital Excitation System
  • Mitsubishi FX Series PLC Data Communication Practical Manual
  • Selection of Hirschmann cSCALE S6/C8 Mobile Safety Controller
  • Hirschmann OZD Profi G12D repeater explosion-proof installation configuration
  • Hirschmann OCTOPUS OS20/24 Switch Installation Power Supply
  • Hirschmann RS20/30/40 Switch Selection and PoE Deployment
  • Hirschmann EAGLE One Firewall Installation and Configuration Guide
  • Hirschmann MACH102 Switch Installation and Power Supply Guide
  • Hirschmann MICE MS20/MS30 Installation and DIP Configuration
  • Hirschmann BOBCAT BRS Switch Installation and Power Supply Guide
  • Hirschmann RSB20 Switch Deployment and Redundant Configuration
  • Hirschmann RS20 Basic Switch Installation and Debugging Guide
  • BECKHOFF EP20xx/EP28xx Output Module Installation and Debugging Guide
  • BECKHOFF EL5102 Encoder Terminal Debugging and Troubleshooting
  • BECKHOFF CU8803 Launch Box Installation and Explosion proof Guide
  • BECKHOFF CU20xx/CU22xx Switch Installation and Troubleshooting
  • BECKHOFF AMP8000 Servo Drive Installation and Debugging Manual
  • BECKHOFF EL2911 Safety Feed Terminal Debugging Guide
  • BECKHOFF EL600x/EL602x Serial Port Module Debugging Manual
  • BECKHOFF CP6700 Panel PC Installation and Maintenance Manual
  • BECKHOFF CP70xx panel maintenance and troubleshooting
  • BECKHOFF CP29xx Panel Installation and Troubleshooting
  • Beckhoff C6650-0060 Industrial Control Computer Hardware Architecture and RAID Data Security
  • Beckhoff BK1120/BK1250 EtherCAT Coupling Debugging and KL Terminal Parameterization Complete Guide
  • Beckhoff CX20x0 Embedded Controller Hardware Maintenance and Troubleshooting Complete Manual
  • Beckhoff CP77xx Panel PC Hardware Maintenance and Troubleshooting Complete Guide
  • Beckhoff EL41xx Analog Output Terminal Deep Analysis: Parameter Configuration, Fault Diagnosis, and Firmware Compatibility Guide
  • Beckhoff C63xx industrial computer power supply and shutdown configuration
  • Beckhoff C6920 Industrial Control Computer Selection and Expansion Guide
  • Beckhoff CU8800 USB extender diagnostic guide
  • Beckhoff AX2000 Shutdown Braking and Debugging
  • Beckhoff AX8000 servo installation fuse selection
  • Beckhoff CP27xx Multi finger Touch PC Maintenance
  • Beckhoff CP69xx long-distance transmission and installation
  • Beckhoff CP60xx remote deployment and maintenance
  • Beckhoff CP72xx Installation and Maintenance Complete Manual
  • Beckhoff CP78xx Installation and Troubleshooting Guide
  • Beckhoff CP39xx Control Panel
  • Beckhoff CX8110 Embedded PC
  • Beckhoff CX50x0 series DIN rail embedded industrial PC
  • Beckhoff CP62xx panel PC
  • BECKHOFF C6030 Industrial Control Computer
  • UniOP ePAD32B/ePAD33B/ePAD33BT Industrial HMI
  • UniOP ePAD05/06 Human Computer Interface
  • UniOP ePAD03/04 Human Computer Interface
  • UniOP BKDR-46-0045 Human Machine Interface
  • UniOP BKDR-16 human-machine interface
  • Beckwith M-3425A Relay Guide
  • Basler DECS-200-2L excitation system
  • Basler DECS-250 Excitation System Debugging Guide
  • HA-800A Servo Drive Debugging Guide
  • JUMO dTRANS p35 Manual