Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

What is a smart mine? What problem can be solved?

来源: | 作者:佚名 | 发布时间 :2023-11-17 | 691 次浏览: | Share:

Generally speaking, smart mines and traditional mines are like smart phones and feature phones. Feature phones can only be used for voice calls, while smart phones have a variety of software automatic management and high-speed communication functions. Traditional mines are stupid and rely on manual work; The smart mine is based on the premise and basis of digitization and informationization of the mine, active perception, automatic analysis and rapid processing of mine production, occupational health and safety, technical support and logistics support, etc., to build a smart mine, and finally realize the construction of a safe mine, an unmanned mine, an efficient mine and a clean mine. At present, China has more than 4,000 coal mines, mining geological conditions are poor, landslides, flooding, gas explosions and other accidents prone to large safety risks, low mining efficiency, high labor costs, pain points have long restricted the development of the coal industry. Therefore, how to improve the informatization and intelligent operation level of coal enterprises and fully build a safe, green, efficient and intelligent mine has become a highly concerned issue in the whole industry. The mission of the smart mine is derived from this. The development of smart phones comes from the traditional mobile phone industry, and the development of smart mines comes from the traditional mining industry. From wired phones to multi-functional smart phones, from 2G to 5G, smart phones have completely become an extension of people in contemporary society. Smart mine is also the development and application of various new technologies on the basis of existing mines, and the continuous development and improvement of new concepts to achieve mine intelligence. At present, the development prospects of smart mines are broad, and the "Guiding Opinions on Accelerating the Intelligent Development of Coal mines" issued by the eight Ministries and commissions of the State Council in March 2020 proposed that by 2035, all types of coal mines will basically achieve intelligence, build a multi-industry chain and multi-system integrated coal mine intelligent system, and build an intelligent coal mine intelligent system with intelligent perception, intelligent decision-making and automatic execution. At present, intelligent coal mining is still in the demonstration stage, suitable for better working conditions, with the improvement of the technical level, the next 10-20 years or will be widely used.

Although the smart mine is a new concept, but its development is based on the achievements of mine automation, information, digitization, the development process of China's smart mine can be roughly divided into the following stages: (1) mechanization stage. China from the introduction of fully mechanized mining equipment in the 1970s, the implementation of comprehensive mechanized mining in the 1980s, to the development of large-scale coal mine machinery and equipment, to achieve the localization of coal machinery and equipment, coal machinery and equipment manufacturing in the world's leading ranks. Coal machine mainly includes boring machine, shearer, scraper transport, hydraulic support and so on. By 2018, the mechanization level of coal mining in China had reached 78.5 percent, a significant increase from 32.3 percent in 1978. The total installed power of shearer reaches nearly 3000kW, the cutting power reaches 1150kW, the cutting height breaks through 8.8m, and the production capacity reaches 4500t/h, reaching the world's leading level. (2) Integrated automation stage. In the early 21st century, the integrated platform and the 3DGIS digital platform were applied, and high-speed network channels were formed, realizing primary data processing, primary system linkage, and comprehensive information release. With the continuous update of electrical automation technology, in the control of mechanical equipment, electro-hydraulic control technology continues to develop. Coal mining automation technology has been widely used in coal mining enterprises, which can not only improve the production efficiency of coal enterprises, but also reduce labor costs.

(3) Mine intelligent stage. BIM technology, big data technology, 5G, and cloud computing technology have been applied to achieve local closed-loop operation, multi-system linkage, professional decision-making, closed-loop operation system, remote diagnosis and maintenance, intelligent decision analysis, and system prediction and prediction. It is gradually developing from the intelligence of a single system to the intelligence of a multi-system, building an intelligent coal mine system with intelligent perception, intelligent decision-making and automatic execution, and initially forming a smart mine with spatial digitization, information integration, equipment interconnection, virtual-real integration and control network.

It can be seen that the development of smart mines from mechanization to automation, and then to the intelligence of the industry 4.0 era, more and more unmanned. The development of mining information construction in China today, although all kinds of subsystems have basically realized the network integration, but the massive data obtained by each system can not be effectively shared and integrated analysis, this mode of each system fighting for itself, makes "information island" in the mining industry is extremely prominent. In order to solve this problem, a large number of intelligent devices (chips, digital sensors, broadband communication capabilities) are needed to help the mine achieve a "qualitative breakthrough", and the new information infrastructure is particularly important.

In September 2021, jointly built by China Radio and Television, China Mobile and China Coal Shaanxi Yulin Energy and Chemical Industry, China Coal Science and Technology Intelligent Mining Co., LTD., China Coal Information Technology, ZTE, Shaanxi Daze Coal Mine project for the first time in China to achieve 5G 700MHz band coal field application to help achieve full coverage of 5G signals on the mine surface and underground. It lays the foundation for multi-scenario applications such as 4K video surveillance, 5GVoNR video call, underground automatic driving, and remote control of working face in 5G intelligent mine scenarios. The combination of 5G private network technology and multi-basic capabilities such as big data, AI image recognition and large video provided by ZTE played a particularly key role in this project. As the world's leading integrated communication solution provider and China's largest listed communication equipment company, ZTE is now not only a communications equipment manufacturer, but also a complete solution and service provider of digital transformation solutions. Zte has a combination of 5G private network technology and big data, AI image recognition, large video and other advantages, and there are not many enterprises in the world that have these advantages at the same time, and an excellent smart mining platform cannot be separated from the empowerment of these core technologies.

Since 2020, after two years of industry exploration of 5G enabled mining, ZTE believes that the value of the combination of ICT and mining applications has been verified with certainty, and established the mining Business Department at the end of December 2021 to specialize in the mining industry segment. The Mining Business Department, headed by Junshi Xie, executive vice president and Chief Operating Officer of ZTE, gathers the whole chain of personnel including industry experts, product research and development, marketing, engineering delivery, commercial procurement, etc., taking mining industry customers as the boundary, effectively connects the company's operating factors, breaks the original organizational framework, and quickly gathers resources. Open the marketing forward, pull back the program/product, is committed to creating a minimalist, high-speed and safe mining network, and build a smart mine with the interconnection of everything.

Up to now, ZTE has cooperated with more than 20 private networks and business partners. For example, during the World Telecommunication and Information Society Day 2022 conference recently, ZTE and Inner Mongolia Dazhong Mining Co., LTD. (referred to as "Dazhong Mining") signed a strategic cooperation framework agreement at the conference. And has implemented more than 70 projects in Shaanxi, Shanxi, Inner Mongolia, Henan, Anhui, Xinjiang, etc., and completed the boring machine remote control, intelligent fully mechanized mining, intelligent inspection, unmanned mining card, video splicing and other business applications, including mine and open pit mine remote control, intelligent fully mechanized mining, intelligent inspection, unmanned mining card, video splicing and other business applications. While carrying out cooperation in product research and development, ecological collaboration, and project solutions, 5G will be used to enable the needs of safe production, and gradually realize intelligent upgrades such as fewer and unmanned production, automatic transportation, automatic loading and unloading, automatic driving, and robot inspection. Jointly promote the application and practice of Internet, big data, artificial intelligence, 5G edge computing and other innovative technologies in the mining industry. This also basically includes the ten intelligent systems needed for smart mines: 5G+ intelligent coal mining system, 5G+ intelligent driving system, intelligent dispatching centralized control system, intelligent equipment early warning and remote consultation system, Internet of Things + intelligent storage system, intelligent traffic safety control system of auxiliary inclined shaft, 5G+ intelligent conveyor belt transportation system, unattended integrated coal sales control system, intelligent ventilation system, remote intelligent office system.

As a key part of the intelligent construction of Daze Coal Mine, the 5G 700MHz&2.6GHz Fusion communication system project of Daze Coal Mine mentioned above builds a three-level elastic computing power network system based on the new cloud network architecture to help the coal mine realize the network management and control of "5G, WiFi, IoT and industrial Ethernet ring network" in the well/underground. At the same time, relying on key technologies such as 5G super uplink, network slicer technology, and MOCN, the 5G customized network private network mode lays the foundation for multi-scenario applications such as 4K video surveillance, 5GVoNR video call, underground automatic driving, and remote control of the working face in 5G smart mine scenarios, and continues to help the digital transformation and upgrading of all elements of Daishue coal mine production. Strive to build a model of science and technology, innovation, integration, and green development, making ZTE a leader in the construction of 5G+ smart mines in the national coal industry.

For the future long-term development of the mining business department, Xie Junshi said: "As a new force of smart mining, ZTE will take root in the mining technology, with advanced ICT technology to promote the digital transformation of coal mines, facing the future, we are willing to work with industry ecological partners for the high-quality development of energy mining enterprises, to build a new digital ecology of the coal industry to provide strong support." In the increasingly large-scale 5G construction, ZTE will continue to deepen the development of key capabilities for digital transformation of the industry, create a comprehensive technology ecology and application ecology, lead the industrial digital transformation, and serve the construction of high-quality digital economy. In the future, ZTE will continue to be open, integrated and win-win attitude, join hands with a wider range of industry partners, explore the continuous extension of smart mines, green mines to beautiful mines, and explore a sustainable development, effective and replicable road suitable for mines.

  • REXRTOH VT-HNC100-1-22/W-08-C-0 Industrial Touch Monitor
  • Rexroth MSK060C-0600-NN-S1-UP1-NNNN IndraDyn S Servo Motor
  • REXRTOH VT3024 Industrial Monitor
  • Rexroth MHD041B-144-PG1-UN Synchronous Servo Motor
  • Rexroth VT-HNC100-1-23/W-08-S-0 Digital Axis Control
  • Rexroth VT-HNC100-1-23/M-08-P-0 Controller
  • REXRTOH VT-HNC100-1-22/W-08-0-0 | Hydraulic Valve Block Assembly
  • Rexroth 4WE6Y62/EG24N9K4 + HSZ10-26916-AA/G24N9K4M01 Assembly
  • Rexroth MHD095C-058-NG1-RN Hydraulic Motor
  • Rexroth 4WE6Y62/EG24N9K4 + HSZ10-26916-AA/G24N9K4M01 Assembly
  • Rexroth SYHNC100-NIB-2X/W-24-P-D-E23-A012 Controller
  • REXRTOH BTV04.2GN-FW | Bus Terminal Valve with PROFINET
  • Rexroth BGR DKC02.3-LK SCK02/01 ECODRIVE3 Control Assembly
  • Rexroth MKD025B-144-KG1-UN Servo Motor
  • REXRTOH R901325866+R900775346+R901273425A | Drive System Component Set
  • Rexroth CSH01.1C-SE-EN2-NNN-NNN-NN-S-XP-FW Drive Controller
  • REXRTOH DDS2.1W200-D | Digital Servo Drive
  • Rexroth VT3002-2X/48F Card Holder for Proportional Amplifiers
  • Rexroth VDP40.2BIN-G4-PS-NN Proportional Valve
  • REXRTOH MSK070D-0450-NN-M1-UP1-NSNN Servo Motor
  • Rexroth MSK070C-0150-NN-S1-UG0-NNNN IndraDyn S Servo Motor
  • Rexroth MSK050C-0600-NN-M1-UP1-NSNN Servo Motor
  • Rexroth MSK030C-0900-NN-M1-UP1-NSNN Servo Motor
  • Rexroth TV 3000HT PUMF Hydraulic Pump Module
  • REXRTOH R911259395 | Drive System Control Module
  • Rexroth VT-VSPA1-1-11 Proportional Amplifier Card
  • Rexroth VT3006S35R1 Proportional Valve Module
  • REXRTOH VT3006S34R5 Hydraulic Valve | Directional Control Valve
  • Rexroth VT3000S34-R5 Proportional Amplifier Card
  • Rexroth SL36 Servo Motor Controller
  • REXRTOH SE200 0608830123 | Inductive Proximity Sensor
  • Rexroth RAC 2.2-200-460-A00-W1 Main Spindle Drive Controller
  • Rexroth PSM01.1-FW Power Supply Module
  • REXRTOH PIC-6115 | Programmable Industrial Controller
  • Rexroth MDD112D-N030-N2M-130GA0 Digital AC Servo Motor
  • Rexroth HDS03.2-W075N Drive Controller Module
  • REXRTOH DKC03.3-040-7-FW Servo Drive | Digital Motion Controller
  • Rexroth DKC02.3-200-7-FW ECODRIVE3 Servo Drive Controller
  • Rexroth CSB01.1N-AN-ENS Control System Module
  • REXRTOH 0608830222 | Genuine Automation Component
  • Rexroth 0608830174 ErgoSpin Tightening System Control Module
  • Rexroth 0608820103 Industrial Hydraulic Control Component
  • REXRTOH 0608820069 Industrial Automation Component
  • Rexroth 0608800048 ErgoSpin Tightening System Control Module
  • Rexroth 0608801006 Industrial Hydraulic Control Component
  • REXRTOH SYHNC100-NIB-24-P-D-E23-A012 Encoder | Synchronous Serial Interface
  • Rexroth 0608720040 ErgoSpin Tightening System Control Module
  • REXRTOH SYHNC100-NIB-2X/W-24-P-D-E23-A012 Controller
  • ABB CP555 1SBP260179R1001 HMI Operator Terminal
  • HIMA K9212 Fan Assembly | Safety System Cooling Unit
  • WATLOW CLS208 Digital Temperature Controller
  • Watlow CLS2163C1-110200000-CLS204204-C10000AA-CLS208208-C10000AE Multi-Loop PID Controllers
  • WATLOW PPC-TB50 Power Controller
  • WATLOW PPC-TB50 30280-00 Temperature Controller
  • Watlow NLS300-CIM316 Communication Interface Module
  • WATLOW MLS300 Limit Controller
  • WATLOW CAS 16CLS/CAS Temperature Controller
  • Watlow CAS200 CLS216 16-Loop Thermal Controller Module
  • WATLOW CLS208 C10000CP Power Controller
  • WATLOW ANAFAZE LLS200212 CLS208 Temperature Control System
  • Watlow ANAFZE PPC-TB50 CLS208 Multi-Loop Controller
  • WATLOW ANAFZE 997D-11CC-JURG Power Controller
  • WATLOW ANAFAZE PPC-TB50 Temperature Controller
  • ABB SUE3000 1VCF750090R0804 High-Speed Transfer Device
  • ABB TET106 11355-0-6050000 Temperature Module
  • ABB PPD512 A10-15000 Power Panel Display
  • ABB PPD113B01 3BHE023784R1023 AC 800PEC Control Module
  • ABB PFEA113-65 Tension Controller 3BSE050092R65
  • ABB PFEA112-20 3BSE050091R20 Fieldbus Adapter Module
  • ABB PFEA111-65 3BSE050091R65 Tension Electronics PFEA111
  • ABB PFEA111-65 Tension Controller 3BSE050090R65
  • ABB PDD500A101 Operator Display Panel | Industrial HMI Interface
  • ABB KP2500 Process Control System Controller
  • ABB CP405 A0 Operator Panel 1SAP500405R0001
  • ABB AX411/50001 Digital Input Module
  • ABB 500TRM02 1MRB150011R1 Procontrol P13 Bus Terminal Module
  • ABB 500TTM02 Temperature Module 1MB150021R0116
  • ABB 500TRM02 1MRB150011R0001 Terminating Resistor Module
  • ABB 500SCM01 1MRE450004R1 Control Module
  • ABB 500SCM01 1MRB200059/C 1MRB150044R0001 Station Control Module
  • ABB 500SCM01 1MRB150004R00011MRB200059/C Control Module
  • ABB 500PSM03 1MRB 150038 R1 894-030375D 136-011100H Power System Module
  • ABB 500PSM03 1MRB150038 R1 894-030375D 136-011100H Power Supply Module
  • ABB 500PSM02 1MRB150015R1 AD-272.100.20-01 AZ:C Power Supply Module
  • ABB 500PB101 1MRB178009R00011MRB200064/C Power Supply Module
  • ABB 500MTM02 1MRK001967-AA 1HDF 930512 X010 Module
  • ABB 500MTM02 1MRB150020R1102 1HDF 930512 X010 Motor Module
  • ABB 500MTM02 1MRB150020R0712 Touch Module
  • ABB 500MBA02 1MRB150003R0003 1MRB200053/M Bus Coupling Module
  • ABB 500MBA01 1MRB150003R00021MRB200053/L Motor Control Module
  • ABB 500MBA02 1MRB150003R000/B Analog Output Module
  • ABB 500CSP04 HE401314/0002 1MRB150051R2 Control Processor Module
  • ABB 500CPU05 1MRB150081R1/E CPU Module
  • ABB 500CPU03 1HDF700003R5122 Central Processing Unit
  • ABB 500CMP04 HE401314/0001 1MRB150051R1 Central Processor Module
  • ABB 500CIM05 1MRB150077R1/B PROFIBUS DP Interface Module
  • ABB 500BI001 1MRB150005R0001 1MRB200060/E Binary Input Module
  • ABB 500BI001 1MRB150005R1/J Procontrol P13 Bus Interface Module
  • ABB 500BOM01 1MRB150023R0002 Binary Output Module
  • ABB 500BIM01 Binary Input Module
  • ABB 500BIM01 1MRB150024R0002 Binary Input Module
  • ABB 500AIM02 1MRB150022R001 Analog Input Module
  • ABB 500AIM02 1MRB150022 R0002 Analog Input Module
  • ABB 500AIM02 Analog Input Module
  • ABB 3BHE050077R0102 UNS0881b-PV2 Control Module
  • ABB 3BHE023784R1023 PP D113 B01-10-150000 Power Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F Protection and Control Module
  • ABB 1SVR011718R2500 CM-ENS Time Relay
  • REXRTOH VT-HNC100-2-30/P-I-00/G02 Digital Servo Drive
  • REXROTH SYHNC100-NIB-24-P Hydraulic Controller
  • REXROTH SYHNC100-NIB-2X/W-24-P-D-E23-A012 R900978416 Hydraulic System Digital Control
  • REXRTOH VT-HNC100-2-30/P-I-00/G02 Servo Drive
  • REXROTH SYHNC100-NIB-22A Hydraulic Controller
  • REXROTH SYHNC100-NIB-23/W-24-P-D-E23-A012 Digital Hydraulic Control Unit
  • REXRTOH SYHNC100-NIB-22A/W-24-P-D-E24-A012 Synchronous Servo Motor
  • REXROTH VT-MVTW-1-16/D Hydraulic Valve Amplifier
  • REXROTH VTS0234-47/AP025 Control Module
  • REXRTOH SYHNC100-NIB-23/W-24-P-D-E23-A012 Synchronous Motor
  • SIEMENS 6ES7952-0KH00-0AA0 SIMATIC S7 RAM Memory Card
  • SIEMENS 6ES7416-3XL00-0AB0 SIMATIC S7-400 CPU 416-3 PLC Module
  • SIEMENS 6ES7626-2DG04-0AE3 Industrial Automation Module
  • SIEMENS 6ES7414-3XJ04-0AB0 Central Processing Unit
  • SIEMENS 6ES7414-3XM05-0AB0 PLC CPU Module
  • SIEMENS 6ES7414-3XJ00-0AB0 CPU 414-3
  • SIEMENS 6ES7412-2XJ05-0AB0 SIMATIC S7-400 CPU 412-2 Central Processing Unit Module
  • SIEMENS 6ES7318-3EL00-0AB0 CPU 318 Controller
  • SIEMENS 6ES7193-1CL10-0XA0 Terminal Module
  • SIEMENS 6ES7193-0CB20-0XA0 ET 200S Base Unit