F: | Au:佚名 | DA:2023-11-17 | 1716 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

Mining method

According to the different stope management methods in the ore recovery process, the mining methods of non-coal mining mines can be divided into four categories:

(1) Open stope mining method is characterized by the fact that in the mining process, the goaf mainly relies on temporary or permanent residual pillars to support, and the goaf is always empty, which is generally used when the ore and surrounding rock are stable.

(2) The caving mining method is characterized by the planned use of the overlying rock layer of the caving ore body and the rocks of the upper and lower wall to fill the goaf with the ore extraction to control the ground pressure in the mining area. Generally, it is used under the condition that the surrounding rock of the ore body is unstable and the surface allows subsidence.

(3) The filling mining method is characterized by the support of the goaf by the filling material within the goaf during mining. This method can effectively maintain the gob, the stability of the surrounding rock is not high, but the production cost is high. It is mainly used for mining high ore value, sufficient filling materials, the surface does not allow subsidence and the geological conditions are particularly complex.

(4) The retention mining method is characterized by the temporary retention of part of the mined ore in the goaf during the mining process, so as to support the goaf with pillars and maintain sufficient mining space. Generally, the ore is stable, and is not easy to oxidize, bond and spontaneous combustion, and the surrounding rock of the ore body is moderately stable.

Current situation

1. Small scale of mine investment and low mining capacity

The main body of mine investment is not enough to understand the scale of stone mine investment, do not have the investment consciousness of scale mine, performance in the mine construction has no long-term plan, geological work blank, mining plan is not clear, mining methods are backward, mining equipment and lifting equipment is simple, the annual mining volume is only a few hundred cubic meters, at most thousands of cubic meters, mining production has no plan at all. Not to mention mass production.

There is no threshold limit on the scale of investment in the stone mining industry, resulting in the proliferation of small mines across the country. Small-scale mines are often in a major stone producing area in large numbers, scattered, large ore bodies are divided into small ore bodies, complete stone deposits are divided into seven and a half, mining riddled with holes, the destruction and waste of resources is very serious.

Due to the small area of mining activities (the smallest is several hundred square meters), adjacent mines affect each other, resulting in frequent conflicts between mining enterprises, casualties occur from time to time, increasing the difficulty of mining management.

2. Insufficient emphasis on technology

Prior to this, because there is no technical threshold for stone mines in China, the genetic types and geological structures of stone deposits are diverse, and the investment subjects of mining enterprises are mostly individual or private enterprises, unwilling to spend money on geological exploration and mining design, subjectively believing that stone mining is blasting stone, there is no higher technical content in it. The weight of science and technology in quarrying activities is despised, so that the actual problems encountered in the mining process are at a loss.

Although this kind of mine in the capital investment side is larger than the previous situation, but in the overall mining plan of the mine, the determination of mining force method, the rational purchase of mining equipment are lack of unified guiding ideology, lack of scientific basis.

There are many mines with an investment scale of more than 10 million yuan, or even tens of millions of investment. Due to unclear geological conditions, unclear occurrence and occurrence conditions of ore bodies, lack of reasonable economic and technical evaluation of mines, lack of mining design scheme, mine investment has great blindness and great risks. The determination of the first mining area, the layout of the mining face, stripping and slagging, transportation and stacking sites are not clearly designed, and the whole mining area is very disorderly. Due to the uncertainty of the first mining area, the mining production has great blindness, and even the thickness of the fracture zone and regolith is not clear. Once the mining progresses to the expected depth in the mind, the thought will be shaken, and even stop working in this mining face, and find another site to start over. A shot to change a place, always stay on the surface of the mining area, all the surface of the mining area have been mined again without finding a lot of further mining, wasting a lot of manpower, financial and material resources, as well as precious time. What is more terrible is that so much power has been invested, and there is no clear route, because the activities carried out in the front lack purpose, the corresponding data lack reference value, and can not produce great guiding significance for the future work.

  • National Instruments NI 9264 Output Module
  • National Instruments IC-3173 Controller
  • National Instruments NI 9234 Vibration Module
  • National Instruments SMB-2163 DIO Accessory
  • National Instruments PXIe-1062Q DSA System
  • National Instruments USB-6289 DAQ Device
  • National Instruments NI 9233 Vibration Module
  • National Instruments PXIe-5840 VST
  • National Instruments PXI-1033 and PXI-6132 System
  • National Instruments GPIB-USB-HS+ Controller
  • National Instruments NI 9231 Sound and Vibration Module
  • National Instruments cRIO-9074 CompactRIO Controller
  • National Instruments 782536-01 DAQ Module
  • National Instruments 779781-01 DAQ Module
  • National Instruments PXIe-8388 MXI Express Controller
  • National Instruments SCXI-1520 Strain Bridge Module
  • National Instruments PCIe-6320 Multifunction DAQ Card
  • National Instruments NI 9234 Sound and Vibration Module
  • National Instruments USB-4431 Sound and Vibration Device
  • National Instruments NI 9227 Current Input Module
  • National Instruments PXI-1033 PXI Chassis
  • National Instruments NI 9213 Thermocouple Module
  • National Instruments PXI-1042 PXI Chassis
  • National Instruments PXI-6229 DAQ Card
  • National Instruments cRIO-9075 Controller
  • National Instruments PCI-6033E DAQ Card
  • National Instruments PCIe-6363 DAQ Card
  • National Instruments cDAQ-9174 Chassis
  • National Instruments PXIe-8880 PXI Controller
  • National Instruments NI 9242 Analog Input Module
  • National Instruments USB-6221 BNC DAQ Device
  • National Instruments NI 9220 Analog Input Module
  • National Instruments cRIO-9068 CompactRIO Controller
  • National Instruments PXI-4130 Source Measure Unit
  • National Instruments USB-6251 Multifunction DAQ Device
  • National Instruments PXI-8106 Embedded Controller
  • National Instruments USB-6218 Multifunction DAQ Device
  • National Instruments PCIe-1473R Camera Link Frame Grabber
  • National Instruments PXIe-4341 DSA Module
  • National Instruments PXI-8102 Embedded Controller
  • National Instruments cDAQ-9178 Chassis
  • National Instruments USB-6210 DAQ Device
  • National Instruments USB-6212 DAQ Device
  • National Instruments NI 9485 Relay Output Module
  • National Instruments NI 9208 Current Input Module
  • National Instruments PXIe-4141 SMU
  • National Instruments PCI-6154 DAQ Card
  • National Instruments cRIO-9038 Controller
  • National Instruments PCI-6133 DAQ Card
  • National Instruments LabVIEW RIO Kit 501684G
  • National Instruments PXIe-6396 Embedded Controller
  • National Instruments USB-8502 CAN Interface Device
  • National Instruments NI 9264 Spring Terminal Output Module
  • National Instruments NI 9213 Thermocouple Input Module
  • National Instruments NI-9205 Analog Input Module
  • National Instruments NI 9264 Analog Output Module
  • National Instruments USB-6212 Multifunction I/O Module
  • National Instruments PXI-4071 FlexDMM Multimeter Module
  • National Instruments NI-9208 DSUB Current Input Module
  • National Instruments PXIe-6363 X Series I/O Module
  • National Instruments NI 6587 LVDS Digital I/O Module
  • National Instruments PCI-6225 Data Acquisition Card
  • National Instruments NI-9262 Analog Output Module
  • National Instruments NI 9235 Quarter Bridge Input Module
  • National Instruments PXIe-8301 Remote Control Module
  • National Instruments PXI-4071 FlexDMM Module
  • NI-9234 Sound and Vibration Input 779680-01
  • NI 9229 Isolated Analog Input Module
  • NI cDAQ-9178 USB CompactDAQ Chassis
  • National Instruments NI 9220 143613B-06L Analog Input Module
  • NI 9229 Analog Input Module
  • NI 9246 Analog Input Module
  • NI PXIe-1071 PXI Express Chassis
  • National Instruments 9225 780159-01 Analog Input Module
  • NI cDAQ-9171 USB CompactDAQ Chassis
  • NI PXIe-8840 Embedded PXI Controller
  • Bonfiglioli A202 UH35 FIA 39.6 Right Angle Reducer
  • Bonfiglioli BN 90 LA 4 Gearmotor 1.5kW i=14.1
  • Bonfiglioli BN71A4 Motor with C313PP71 Gearbox
  • Bonfiglioli MP 130 1 4 STD 114A CD Planetary Gear Head
  • Bonfiglioli LC155 1 10 STD Gearbox
  • Bonfiglioli Vectron ACU401-13 FA Inverter
  • Bonfiglioli AEC500-31A Solar Inverter
  • Bonfiglioli BN63B6 Geared Motor VF44P
  • Bonfiglioli Vectron ACT410-23 Inverter
  • Bonfiglioli FR FRIZ 11/90 Clutch
  • Bonfiglioli A/11.90 B3 Clutch Brake
  • Bonfiglioli 50.180.3000 Servo Motor
  • Bonfiglioli NFF 14 112 EE Clutch
  • Bonfiglioli BMD 65 Permanent Magnet Motor
  • Bonfiglioli MP 080 2 20 STD 73A1 CD Planetary Gearbox
  • Bonfiglioli VF/VF30/63 P1 1520 Gearbox
  • Bonfiglioli M3SA4 FD with X F202 H35 10.0 Gearbox
  • Bonfiglioli ACU401-19A Frequency Inverter 5.5kW
  • Lafert B6306P-02276 Servo Motor with Bonfiglioli A102
  • Bonfiglioli ACU401-09FA Frequency Inverter 1.1kW
  • ProMinent Sigma S1CBH12035 with Bonfiglioli BN56B4
  • Bonfiglioli TR 080 2 20 STD Planetary Gearbox
  • Bonfiglioli ACT400-040A Frequency Inverter 15kW
  • Bonfiglioli BE 132 MA 4 Electric Motor 7.5kW
  • Bonfiglioli W86 U30 P100 Gearbox
  • Bonfiglioli MP105 2 25 Planetary Gearbox
  • Bonfiglioli BE160L4 Motor 15 kW
  • BONFIGLIOLI TMP-105 2 25 15 19 40 70 90 Planetary Gearbox
  • Bonfiglioli Vectron ACU401-18 FA Inverter
  • BONFIGLIOLI BE80B4 Motor with A302 UH35 76.5 P80 VA Gearbox
  • Bonfiglioli Vectron VCB400-180 Inverter
  • Bonfiglioli P63B14B3 Motorization Encoder
  • Bonfiglioli Vectron ACT201-13FA Inverter
  • Bonfiglioli F202 H30 P90 Gearbox
  • Bonfiglioli BN71A4 C313 P P71 Gearmotor
  • Bonfiglioli ACT201-11FA Frequency Inverter
  • Bonfiglioli ACU410-21 3 FA Inverter 7.5kW
  • Bonfiglioli RA0 60/00 Gear Reducer i=182
  • Alpha VDS 063-MF1-10-141-BE Planetary Gear 20018280
  • Stöber FDR 71B/10 Gearmotor 0.37kW
  • Stöber DW0-2000-037-4 Gearbox 0.25kW
  • Bonfiglioli M3SA4 FD R with X F252 H35 16.6 Gearbox
  • Bonfiglioli BN90LA4 Adjustable Gear Motor 1.5kW
  • Alpha LP 090-MO1-5-111-000 Planetary Gearbox
  • Bonfiglioli 335 M3 C Planetary Gear Motor
  • Bonfiglioli TR060 2 18 STD 50C CD 14 S1 OR SB KE Gearbox
  • Bonfiglioli MP1GD3036L001 Gearbox
  • Bonfiglioli BN90LA4 Gear Motor 1.5 kW
  • Bonfiglioli A302 UH35 P90 Gearbox
  • Bonfiglioli ACU410-31A5 Inverter
  • BONFIGLIOLI BMD 118 14 4500 400 165 SS TC1 RES2 P1N S1N CUS JB00013358
  • Bonfiglioli A302 UH40 P90 Reducer