Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Key points of compliance in completion and operation of mine projects

来源: | 作者:佚名 | 发布时间 :2023-11-27 | 708 次浏览: | 🔊 Click to read aloud ❚❚ | Share:

Key points of compliance in completion and operation of mine projects

After the completion of a mine project, it is necessary to perform special acceptance, completion acceptance and other procedures, and obtain a safety production license before it can be put into production. Focus should be paid to the following compliance obligations:

1. Complete environmental acceptance

After the completion of a mine project, the construction unit shall, in accordance with the standards and procedures prescribed by laws and regulations, check and accept the supporting environmental protection facilities and prepare an acceptance report. In the process of acceptance of environmental protection facilities, construction units shall truthfully examine, monitor and record the construction and commissioning of environmental protection facilities of construction projects. Except in cases where confidentiality is required according to state regulations, the construction unit shall disclose the acceptance report to the public according to law.

2. Complete the acceptance of soil and water conservation facilities

The construction unit shall, before the completion and acceptance of a mine project, organize a third-party institution to prepare an acceptance report on soil and water conservation facilities. Where the conclusion of the acceptance report of water and soil conservation facilities is that the conditions for acceptance are met, the production and construction units shall organize the completion acceptance inspection of water and soil conservation facilities and form a written acceptance inspection and appraisal of water and soil conservation facilities. Production and construction units shall, after passing the acceptance inspection of water and soil conservation facilities, promptly publicize the materials for acceptance inspection of water and soil conservation facilities on their official websites or other websites known to the public, and submit the materials for acceptance inspection of water and soil conservation facilities to the competent administrative department.

3. Complete acceptance of water intake project and obtain water intake license

Where a mine project water intake project or facility is completed and has been in trial operation for 30 days, the construction unit shall submit relevant materials to the water intake examination and approval authority and apply for a water intake license. The examination and approval authority for water intake shall, within 20 days after receiving the materials, conduct on-site verification of the water intake project or facility and issue opinions on acceptance. For those that pass the acceptance inspection, a water drawing license shall be issued.

4. Complete the acceptance of safety facilities

The construction unit completes all the construction contents in accordance with the approved safety facility design, and if it meets the conditions for completion acceptance, it shall organize the completion acceptance of the safety facilities of the construction project. If the construction unit implements multi-level management, its superior unit with independent legal personality (or company headquarters) can also be responsible for organizing inspection and acceptance. The safety supervision department shall supervise and verify the completion and acceptance activities and acceptance results of mine projects.

5. Complete the acceptance of occupational disease prevention facilities

Before the inspection and acceptance of the occupational-disease-prevention facilities, the construction unit shall work out the inspection and acceptance plan and submit a written report to the work safety supervision and administration department. The principal person in charge of the construction unit or its designated person in charge shall organize occupational health professionals to review the evaluation report on the control effect of occupational disease hazards, check and accept the occupational-disease-prevention facilities, and form review opinions and acceptance opinions. The construction unit shall make a written report on the acceptance process of the occupational-disease-prevention facilities for future reference. The construction project with serious occupational-disease-prevention hazards shall submit a written report to the work safety supervision and administration department.

6. The coal mine project shall carry out joint trial operation

After the completion of a coal mine project, joint trial operation shall be carried out before the completion and acceptance. The project construction unit shall prepare a joint trial operation plan and report it to the provincial coal industry administrative department for the record. After the completion of the joint test run, the construction unit shall prepare a joint test run report.

7. Coal mine projects shall implement capacity replacement requirements

The State Council and the National Development and Reform Commission have stipulated that since 2016, the new coal production capacity reduction and replacement policy has been implemented, and the new coal mine projects have to implement the reduction and replacement, and the coal mine projects need to provide the capacity replacement plan before the application for approval, and the project approval authority will review and approve the capacity replacement plan according to the requirements. In order to promote the acceleration of the construction of advanced capacity coal mines, the state will review and confirm the capacity replacement plan of coal mine projects in 2022, and adjust it from the project approval to the completion acceptance.

  • OMRON C200PC-ISA02-DRM-E SYSMAC Board PLC with Floppy & Operator Panel
  • OMRON 3G3SV-BB007-E 0.75kW Inverter
  • OMRON CP1H-X40DT-D Compact PLC
  • OMRON CS1W-AD081-V1 Analog Input Module
  • OMRON C60K-CDR-C K-Type CPU PLC
  • YASKAWA SGMPH-08A1A41 750W Servo Motor with Gearbox
  • YASKAWA SGMPH-04AAA61D-OY 200V 400W Servo Motor
  • OMRON CJ1W-DA041 Analog Output Module
  • OMRON C60H-C5DR-DE-V1 SYSMAC CPU PLC
  • OMRON 3G3MV-P10CDT3-E RS422/485 Inverter PLC Board
  • OMRON C200PC-ISA02-DRM-E SYSMAC Board PLC
  • Omron CQM1H-MAB42 Analog I/O Board
  • Omron C200PC-ISA02-DRM-E SYSMAC Board
  • Oriental Motor ARD-C CM10-1 Stepping Driver
  • EVA 915.85.003 Embedded CPU Module
  • Omron C60H-C1DR-DE-V1 PLC CPU
  • TE.CO TFX 4G10 Industrial Power Cable
  • Siemens 6SL3120-2TE15-0AA4 Motor Module
  • Emerson SolaHD SDN10-24-100P Power Supply
  • PARKER HPD2S5N/K005 Servo Drive
  • Danfoss VLT 3008 Variable Speed Drive
  • Saia Burgess Controls PCD4.H31 PLC CPU
  • OMRON C200HW-PRT21 Profibus DP Slave Unit
  • OMRON TJ1-ML04 Trajexia Motion Controller
  • Schneider Electric Pre-Wired PLC Control Box
  • Allen Bradley 1336-L8E AC Drive
  • Siemens 6ES7123-1GB60-0AB0 PLC Module
  • Automation Direct D3-08B-1 PLC Chassis 8 Slot
  • OMRON 3G3XV-A2007 VFD 0.75kW 220V
  • STOBER F102SG0230MO20 Gear Drive Technology
  • Saia PCD4.H32 PCD4 Series PLC
  • Omron NSJ12-TS01B-G5D NSJ Terminal
  • Biticino MA250 T7314A Megatiker Circuit Breaker
  • Omron ZX-LDA41 ZX-LD300L Laser Sensor
  • Siemens 6ES7511-1AK02-0AB0 CPU 1511-1 PN
  • Saia Burgess Controls SBC PCD PLC Module
  • Siemens 6ES5 244-3AA21 S5 Temperature Module
  • Omron NSJ5-SQ01-DRM NSJ Controller
  • Omron NT15S-SF121B-E Programmable Terminal
  • Yaskawa CIMR-F7Z4045 45kW VFD AC Drive
  • AB 1494U-D100 Smart Motor Controller
  • Omron NA5-7W001B-V1 Touch Screen HMI
  • Fanuc A16B-1000-0400/01A CNC Control Board
  • Omron CV2000-CPU01-EV1 PLC CPU Unit
  • Eaton XV-102-B4-35TQRF-10-PLC Touch Panel
  • Siemens 6FX1121-3BB01 SINUMERIK Board
  • SCE M68-2000 2 Axis CNC Servo Controller
  • Omron R88M-K20030T-BS2 AC Servo Motor
  • Omron G3NH-4150B Solid State Relay
  • BITICINO MA250 T7313A Megatiker PLC Disconnector
  • IFM 2MSTR AS-i PROFIBUS DP Gateway
  • Danfoss VLT 3022 175H1238 Variable Speed Drive
  • PASABAN MTC-3052 FAST I/O Module
  • Allen Bradley 1746-A7 SLC 500 Chassis
  • Mitsubishi NF1600-SEW MCCB
  • Schneider LTMR100EBD Motor Management Controller
  • Yokogawa AIP121-S3 Analog Input Module
  • Siemens 6ES7135-4LB02-0AB0 ET200S AO Module
  • Motor Power SKA DDR 148-240 Torque Motor
  • OMRON CS1H-CPU63-EV1 PLC CPU Unit
  • ABB UFC921A101 Main Control Board
  • ABB UFC921A Main Control Unit
  • ABB UFC911B108 Drive Main Control Unit
  • ABB UFC911B106 Drive Main Control Unit
  • ABB UFC911B101 Drive Main Control Unit
  • ABB UFC765AE102 Drive Control Interface Board
  • ABB UFC762AE101 I/O and Communication Extension Board
  • ABB UFC760BE41 I/O and Communication Extension Board
  • ABB UFC760BE145 I/O and Communication Extension Module
  • ABB UFC721BE101 Fieldbus Communication Adapter Module
  • ABB UFC721AE101 3BHB002916R0101 Network Interface
  • ABB UFC718AE101 HIEE300936R0101 Communication Module
  • ABB UDC920BE01 3BHE034863R0001 Communication Module
  • GE IS420UCSCH1A-F-VO.1-A Controller Module
  • GE UCSC H1 IS420UCSCH1A Controller Station Card
  • ABB UCD240A101 3BHE022287R0101 Process Controller
  • ABB UCD224A103 Process I/O Module
  • ABB UCD224A102 Analog Input Module
  • WOODWARD 9907-838 Load Sharing Module
  • B&R X20CP1485-1 Industrial PC CPU Module
  • ELAU MC-4/11/22/400 4-Axis Servo Drive
  • ELAU C600/10/1/1/1/00 Configurable Safety Relay
  • BENTLY 60R/SIM01 Proximitor Power Supply
  • BENTLY 60R/PPM01 Protection Processing Module
  • BENTLY 60R/PNL01 Operator Control Panel
  • BENTLY 60R/PIM01 Panel Interface Module
  • BENTLY 60R/INP07 Isolated DC Input Module
  • BENTLY 60R/INP01 4-Channel Analog Input Module
  • BENTLY 60R/CMM01 Communication Multiplexer Module
  • BENTLY 60R/CHA02 System Chassis Rack Enclosure
  • BENTLY 60R/CGW01 Condition Monitoring Gateway
  • Pacific Scientific P70360-SDN Servo Motor
  • HONEYWELL 05701-A-0284 Signal Conditioner
  • YOKOGAWA NFCP501-W05 Pressure Transmitter
  • ABB CI541V1 3BSE0146666R1 Control Interface
  • ABB DSTC176 57310001-KT Terminal Base Unit
  • ABB DSDP170K02 3BSE019925R1 Analog Input Module
  • ABB DSBC173 57310001-KH Terminal Base Unit
  • ABB DSAI130K01 5730-030-UC Thermocouple Input
  • ABB DSRF182 57310255-AL Relay Output Module
  • ABB SC520 3BSE003816R1 Compact PLC
  • ABB DSDP140A 57160001-ACT Analog Input Module
  • ABB DSAI130 57120001-P Analog Input Module
  • ABB SCYC55830 3AFE58063282 MCCB
  • Fireye 95DSS3-1CEX UV Flame Scanner
  • ABB DSDP170 57160001-ADF Analog Input Module
  • ABB CI532 3BSC140120R1 Communication Interface
  • ABB DSAO120A 3BSE018293R1 Analog Output Module
  • ABB CI869K01 3BSE049110R1 Ethernet Interface
  • ABB CI522A 3BSE018460R1 PROFIBUS DP Master
  • GUTOR OP6257 Rectifier Control Unit
  • Meggitt C327845-11 Gas Shutoff Valve
  • ABB SACO64D4 4-Pole Digital Annunciator Unit
  • ABB CI522AK04 3BSE018451R1 PROFIBUS DP Module
  • ABB DSAI130DK01 3BSE020828R1 Temperature Input Module
  • ABB CI546 3BSE012610R1 PROFIBUS DP Master Module
  • ABB SC510 3BSE003832R1 Compact PLC Controller
  • ABB CI540 3BSE001077R1 PROFIBUS DP Slave Module
  • ABB CI532V03 3BSE003828R1 AF 100 PROFIBUS DP Master
  • ABB DSBC172 57310256-EL Digital Input Terminal Base
  • Rexroth VT2000-5X Frequency Converter AC Drive
  • GE MAVS01L1AB0751D-140393N Soft Starter
  • ABB REF615 HBFDACADNAA1BCN1XE Relay
  • ABB SACO16D1 1-Pole Digital Annunciator Unit
  • ABB UNITROL 1000 3BHE014557R0003 Static Excitation System
  • Woodward 8273-1011 Electro-Hydraulic Actuator
  • Eaton MC2-442-57CQB-1-2A Molded Case Circuit Breaker
  • Siemens 3AY1715-6L VS30029P VS30041 Auxiliary Contact Block