Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Key points of compliance in completion and operation of mine projects

来源: | 作者:佚名 | 发布时间 :2023-11-27 | 305 次浏览: | Share:

Key points of compliance in completion and operation of mine projects

After the completion of a mine project, it is necessary to perform special acceptance, completion acceptance and other procedures, and obtain a safety production license before it can be put into production. Focus should be paid to the following compliance obligations:

1. Complete environmental acceptance

After the completion of a mine project, the construction unit shall, in accordance with the standards and procedures prescribed by laws and regulations, check and accept the supporting environmental protection facilities and prepare an acceptance report. In the process of acceptance of environmental protection facilities, construction units shall truthfully examine, monitor and record the construction and commissioning of environmental protection facilities of construction projects. Except in cases where confidentiality is required according to state regulations, the construction unit shall disclose the acceptance report to the public according to law.

2. Complete the acceptance of soil and water conservation facilities

The construction unit shall, before the completion and acceptance of a mine project, organize a third-party institution to prepare an acceptance report on soil and water conservation facilities. Where the conclusion of the acceptance report of water and soil conservation facilities is that the conditions for acceptance are met, the production and construction units shall organize the completion acceptance inspection of water and soil conservation facilities and form a written acceptance inspection and appraisal of water and soil conservation facilities. Production and construction units shall, after passing the acceptance inspection of water and soil conservation facilities, promptly publicize the materials for acceptance inspection of water and soil conservation facilities on their official websites or other websites known to the public, and submit the materials for acceptance inspection of water and soil conservation facilities to the competent administrative department.

3. Complete acceptance of water intake project and obtain water intake license

Where a mine project water intake project or facility is completed and has been in trial operation for 30 days, the construction unit shall submit relevant materials to the water intake examination and approval authority and apply for a water intake license. The examination and approval authority for water intake shall, within 20 days after receiving the materials, conduct on-site verification of the water intake project or facility and issue opinions on acceptance. For those that pass the acceptance inspection, a water drawing license shall be issued.

4. Complete the acceptance of safety facilities

The construction unit completes all the construction contents in accordance with the approved safety facility design, and if it meets the conditions for completion acceptance, it shall organize the completion acceptance of the safety facilities of the construction project. If the construction unit implements multi-level management, its superior unit with independent legal personality (or company headquarters) can also be responsible for organizing inspection and acceptance. The safety supervision department shall supervise and verify the completion and acceptance activities and acceptance results of mine projects.

5. Complete the acceptance of occupational disease prevention facilities

Before the inspection and acceptance of the occupational-disease-prevention facilities, the construction unit shall work out the inspection and acceptance plan and submit a written report to the work safety supervision and administration department. The principal person in charge of the construction unit or its designated person in charge shall organize occupational health professionals to review the evaluation report on the control effect of occupational disease hazards, check and accept the occupational-disease-prevention facilities, and form review opinions and acceptance opinions. The construction unit shall make a written report on the acceptance process of the occupational-disease-prevention facilities for future reference. The construction project with serious occupational-disease-prevention hazards shall submit a written report to the work safety supervision and administration department.

6. The coal mine project shall carry out joint trial operation

After the completion of a coal mine project, joint trial operation shall be carried out before the completion and acceptance. The project construction unit shall prepare a joint trial operation plan and report it to the provincial coal industry administrative department for the record. After the completion of the joint test run, the construction unit shall prepare a joint test run report.

7. Coal mine projects shall implement capacity replacement requirements

The State Council and the National Development and Reform Commission have stipulated that since 2016, the new coal production capacity reduction and replacement policy has been implemented, and the new coal mine projects have to implement the reduction and replacement, and the coal mine projects need to provide the capacity replacement plan before the application for approval, and the project approval authority will review and approve the capacity replacement plan according to the requirements. In order to promote the acceleration of the construction of advanced capacity coal mines, the state will review and confirm the capacity replacement plan of coal mine projects in 2022, and adjust it from the project approval to the completion acceptance.

8. Complete the project completion acceptance

Where a mine project has been completed in accordance with the approved construction scale, standards, investment and contents, meets the design and production requirements, and environmental protection facilities, soil and water conservation facilities, safety facilities, etc. have been completed in accordance with the requirements and passed the special acceptance inspection, meeting the acceptance conditions, the construction unit shall organize the completion acceptance inspection. After the mine project has passed the acceptance check, the construction unit shall submit the opinions on the completion acceptance check, the rectification report of the enterprise on the completion of the completion acceptance check, the notice of the completion acceptance check (the appraisal letter) and other materials to the competent administrative authority.

9. Obtain safety production license

China implements a safety production licensing system for mining enterprises. Before a mine project is put into operation, it shall apply to the relevant administrative authority for issuing a safety production license. Mining enterprises that have not obtained safety production licenses shall not engage in production activities. It should be noted that coal mine projects and non-coal mine projects should handle safety production permits in accordance with the Measures for the Implementation of Safety Production Licenses for Coal mine Enterprises and the Measures for the Implementation of Safety Production Licenses for non-coal mine Enterprises, respectively.

Some suggestions on compliance management of mining project construction in mining enterprises

In order to effectively prevent and control compliance risks in the construction of mining projects, mining enterprises should focus on the content of sorting out compliance obligations, identifying compliance risks, coping with compliance risks, formulating special guidelines for compliance management, and improving the compliance operation mechanism, etc., and carry out compliance management of mining project construction professionally and accurately, so as to help mine projects enter the production stage at an early date.

(1) Comprehensively sorting out compliance obligations around the regulatory requirements of mine project construction

The first is to systematically sort out the laws, regulations, rules and normative documents in the field of mining project construction, on the basis of doing a good job of combing the laws and policies at the central level, it should also strengthen the combing of local regulations, rules and normative documents in the location of mining rights, and make full reference to the service guidelines issued by government departments.

The second is to sort out and classify the compliance obligations involved in the construction of mine projects in combination with factors such as the timing of construction of mine projects, types of compliance obligations, administrative approval procedures, and form a systematic, complete and practical list of compliance obligations.

The third is to pay timely attention to the progress of the reform of the construction management of mine projects, pay attention to the revision of relevant laws and regulations, policy changes and regulatory developments, and regularly update the list of compliance obligations.

(2) Focusing on the whole process of mine project construction, systematically identifying compliance risks

First, mining enterprises should adopt various methods such as interview research, data reference and case analysis to comprehensively and systematically identify compliance risks according to the specific compliance requirements involved in various administrative approval links in the process of project approval, construction approval and completion acceptance, so as to ensure that risk identification covers the whole process of mine project construction.

Second, the legal basis, form of expression, risk examples and consequences of violations of each compliance risk in the construction process of a mine project are listed in detail, and classified and sorted according to the construction process of a mine project to form a systematic, comprehensive and intuitive compliance risk database.

Third, according to the progress of mine project construction, combined with changes in external laws, regulations and policies, timely revise and update the compliance risk database.

(3) Taking into account risk prevention and project promotion, and responding to compliance risks at different levels

First, in view of the compliance risks in the process of mining project construction, mining enterprises should carry out risk analysis and evaluation on the possibility of occurrence of compliance risks, the degree of risk impact and the degree of corporate control, and form a risk assessment report.

Second, according to the red line of disruptive risks, compliance defects that need to be focused on, general compliance defects and other different situations, compliance risks are divided into high, medium and low levels, and the priority of compliance risk prevention is distinguished. On this basis, a targeted response plan should be formulated, effective measures should be taken to eliminate risks or control risks within an acceptable range, and compliance management can take into account the needs of mine project promotion and compliance supervision.

(2) Formulate special compliance guidelines according to the actual needs of project compliance management

Mining enterprises should focus on the key issues and important links in the project construction management, and formulate special guidelines for compliance management as the action guide for the compliance management of mine project construction. Specific guidelines should focus on the following areas:

First, it is necessary to systematically and comprehensively sort out the mining project construction management process according to the project construction timing and the relationship between the approval items, and clarify the handling requirements and procedures of the administrative approval items in each specific link, so that the relevant departments and personnel of mining enterprises can fully grasp the key points of compliance management in the construction of mining projects.

The second is to clarify the compliance points that should be paid attention to and the compliance responsibilities that need to be performed among various departments and management entities at different levels of mining enterprises; At the same time, strengthen the internal coordination and cooperation of the enterprise to improve the efficiency of compliance work.

The third is to focus on the specific business links of mining project construction, embed risk control measures in a targeted way, embed compliance requirements in the whole process of project implementation, and ensure that compliance management measures and means are effective.

(3) Establish and improve the compliance operation mechanism based on the normal management of project compliance

The first is to establish a compliance review mechanism, and regard compliance review as a necessary procedure involving the formulation of rules and regulations, decision-making of major matters, and signing of important contracts in the construction and management of mine projects.

The second is to establish a rectification mechanism for violations, in view of the problems exposed in the legal compliance review, plug management loopholes by improving rules and regulations and optimizing business processes, and improve the compliance management level of mine project construction.

Third, establish a regular compliance training mechanism. On the one hand, it is necessary to carry out compliance business training for relevant departments and personnel within the enterprise in combination with compliance requirements, work processes, typical cases and difficult problems in the construction of mining projects. On the other hand, it is necessary to pay attention to industry benchmarking, learn the experience and practice of mining project construction compliance management of advanced enterprises in the industry through benchmarking, and timely improve and enhance their own project construction compliance management.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell VITO - Enraf Lt Interface 762 Up 762 Aga / Z
  • Honeywell QPP-0001 - FC-QPP-0001 Module
  • Honeywell TC-PRS021 - / TCPRS021 (USED TESTED CLEANED)
  • Honeywell 51403698-100 - / 51403698100 (USED TESTED CLEANED)
  • Honeywell XCL8010A - 24V NSMP
  • Honeywell 91884 - "Target, 15.620 X 12.846 X 0.250"" BTL, 07-613, 5N TI, 118305"
  • Honeywell 51403776-100 - / 51403776100 (USED TESTED CLEANED)
  • Honeywell LG1093AC01 - UV Flame Sensor/Detector
  • Honeywell CC-PCNT02 - Controller Module Expedited Shipping CCPCNT02 Spot Goods Zy
  • Honeywell FFSB14ER10KS2 - / FFSB14ER10KS2 (NEW IN BOX)
  • Honeywell RF600 - Radio Frequency Unit 7516240-60060 Removed Working
  • Honeywell 51196881-100 - NEW UPGRADE KIT EC W/ODEP 51196881100
  • Honeywell CC-IP0101 - 51410056-175 Brand New Expedited Shipping
  • Honeywell AL300 - Alt Preselect Command Controller 7002412-904 w/ August 2011 Repaired 8130
  • Honeywell 094377-00 - / 09437700 (USED TESTED CLEANED)
  • Honeywell IRTP271 - Tata Printed Circuit Board Rev.0 DPCB21010003
  • Honeywell TVMUGR-888880-020-52-3-030-0U000G-000 - MULTITREND GR GRAPHIC RECORDER
  • Honeywell RM850 - Radio Management Unit 7012100-811 w/ December 2017 Repaired 8130
  • Honeywell PGM-7360 - Gas Detector
  • Honeywell WU660 - Radar RTA 7021450-601 w/ April 2024 Overhauled 8130
  • Honeywell 9243201 - / 9243201 (NEW NO BOX)
  • Honeywell AZ850 - Micro Air Data Computer 7014700-601 Removed Working
  • Honeywell DCP550 - Yamatake- Digital Programmable Controller Temperature
  • Honeywell FF-SEDGE6G2-1M-C - / FFSEDGE6G21MC (USED TESTED CLEANED)
  • Honeywell FC-RUSIO-3224 - Brand New Expedited Shipping Via DHL
  • Honeywell RM850 - Radio Management Unit 7012100-801 w/ March 2021 Tested 8130
  • Honeywell HIMA-6E-B - Large System Controller Via DHL or FedEx
  • Honeywell RM855 - Radio Management Unit 7013270-973 w/ April 2024 Modified 8130
  • Honeywell MP-DNCF02-200 - REV B Upper & Lower / 51305072-300 51305072-200 REV L.
  • Honeywell 80360206-001 - / 80360206001 (USED TESTED CLEANED)
  • Honeywell DE132-0-A-BB-0-Z-1-0C-EE0-00 - Chart Recorder
  • Honeywell 51403519-160 - NSNP
  • Honeywell 627-1002RC - / 6271002RC (USED TESTED CLEANED)
  • Honeywell 51400997-100 - / 51400997100 (USED TESTED CLEANED)
  • Honeywell J-AOM10 - Yamatake- /J-A0M10 Analog Output Module 24Vdc 480Ma Hw/Fw Rev: C
  • Honeywell AZ800 - Digital Air Data Computer 7000700-953 w/ July 2016 Repaired EASA Form 1
  • Honeywell FC-RUSIO-3224 - Brand New
  • Honeywell BZ-2RW82272-A2 - Micro Switch 1a 125vac
  • Honeywell FC-RUSIO-3224 - 1PC Brand New
  • Honeywell 10268S-1-020-201-0-2-03100-000-00 - Electric Actuator 121va 120v-ac
  • Honeywell 14CE102-1RS - Limit Switch IP65
  • Honeywell FC-PSU-UNI2450U - Brand New Fast Shipping FedEx or DHL
  • Honeywell 696658-1 - SUPPORT ASSY. NS 11764 (3)
  • Honeywell TK-PRR021 - ONE New 51309288-475 DC
  • Honeywell PSU-UNI2450 - (AS PICTURED) NUPI
  • Honeywell 80360146-011 - / 80360146011 (USED TESTED CLEANED)
  • Honeywell EGWPM - MODULE Assembly 7028419-1904 Inspected/Tested Jun. 2021
  • Honeywell DE131-0-A-0B-0-Z-1-0B,0C-EE0-000 - "Chart Recorder"
  • Honeywell 51454493-126 - / 51454493126 (NEW IN BOX)
  • Honeywell 965-1186-003 - "MK VI, GPWS Computer, EASA FORM ONE/FAA 8130 Guaranteed"
  • Honeywell 51401996-100 - / 51401996100 (USED TESTED CLEANED)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118222"
  • Honeywell SPS5785 - 1pc 51198651-100 Power Supply Brand New Fast shipping
  • Honeywell FX-USI-0002 Security Manager System Module 5Vdc
  • Honeywell SPS5785 - 51198651-100 power supply
  • Honeywell HIMA-6E-B - Large System Controller Fast Shipping
  • Honeywell 51301882-100 - RTD MUX Terminal Board
  • Honeywell 51198821-100 - 1PC new module PLC One year warranty free Shipping#XR
  • Honeywell EAMR - 51401996-100 E CARD card
  • Honeywell 51305734-100 - / 51305734100 (USED TESTED CLEANED)
  • Honeywell 50065674 - Basic Display PWA Assembly HNWG50049911-001
  • Honeywell TSENCOBTM-07889 - "15.620X12.913X0.125 MPS-5-002/M TARGET, 109953"
  • Honeywell 86220000 - / 086220000 (USED TESTED CLEANED)
  • Honeywell CC-IP0101 - C300 system card Brand new fedex or DHL
  • Honeywell WU880 - Radar Antenna 7021450-801 w/ May 2024 Repaired 8130
  • Honeywell CC-IP0101 - ONE Profibus DP Gateway Module NEW
  • Honeywell 397124-2-4 - Gulfstream Valve New Overhauled
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping DHL or FedEX
  • Honeywell RCZ850 - Integrated Communication Unit 7510100-731 w/ March 2024 Tested 8130
  • Honeywell STS103-001-00006-12-1137 - NSNP
  • Honeywell AL300 - Altitude Preselect Command Ctlr 7002412-906 w/ March 2024 Overhauled 8130
  • Honeywell 2119020-8000 - Series 1 N1 Digital Electronic Engine Control
  • Honeywell 51198685-100 - Power Module Brand New Shipping FedEx or DHL
  • Honeywell 620-0073C - / 6200073C (NEW IN BOX)
  • Honeywell GTS-3PA-B - "Timer 0-60 Sec, 220v 50/60 Hz"
  • Honeywell IVA81D - TCAS Vertical Speed Indicator 066-01171-2804 w/ January 2020 Tested 8130
  • Honeywell 51403299-200 - / 51403299200 (NEW NO BOX)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118221"
  • Honeywell AT860 - Loop Sense Antenna 7510300-901 w/ May 2024 Tested 8130
  • Honeywell XL2000B3A - 1PCS USED /
  • Honeywell CC-PCNT02 - C300 Controller Module
  • Honeywell ASDX015D44R - SenSym Pressure Sensor Micro Switch 0-15 psi 8 pin DIP
  • Honeywell 900CS15-00 - Touch Panel NEW SHIP DHL OR EMS 1 Year Warranty cl
  • Honeywell FC-SCNT01 - S300 Control Module 51454926-176 Security Control - 400mA
  • Honeywell DC1010CR-301000-E - Digital Temperature Controller 85-265VAC
  • Honeywell TK-PRR021 - redundancy module 51309288-475
  • Honeywell K4LCN - 51402755-100 Motherboard SS 51201795-400
  • Honeywell XL2000B3A - plc new FREE EXPEDITED SHIPPING
  • Honeywell FC-SCNT02 - 51460114-176 S300 Controller Module 78-4
  • Honeywell BVS - 99ATEX2259X 03ATEXG016X Tester new