Key points of compliance in completion and operation of mine projects

F: | Au:佚名 | DA:2023-11-27 | 877 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Key points of compliance in completion and operation of mine projects

After the completion of a mine project, it is necessary to perform special acceptance, completion acceptance and other procedures, and obtain a safety production license before it can be put into production. Focus should be paid to the following compliance obligations:

1. Complete environmental acceptance

After the completion of a mine project, the construction unit shall, in accordance with the standards and procedures prescribed by laws and regulations, check and accept the supporting environmental protection facilities and prepare an acceptance report. In the process of acceptance of environmental protection facilities, construction units shall truthfully examine, monitor and record the construction and commissioning of environmental protection facilities of construction projects. Except in cases where confidentiality is required according to state regulations, the construction unit shall disclose the acceptance report to the public according to law.

2. Complete the acceptance of soil and water conservation facilities

The construction unit shall, before the completion and acceptance of a mine project, organize a third-party institution to prepare an acceptance report on soil and water conservation facilities. Where the conclusion of the acceptance report of water and soil conservation facilities is that the conditions for acceptance are met, the production and construction units shall organize the completion acceptance inspection of water and soil conservation facilities and form a written acceptance inspection and appraisal of water and soil conservation facilities. Production and construction units shall, after passing the acceptance inspection of water and soil conservation facilities, promptly publicize the materials for acceptance inspection of water and soil conservation facilities on their official websites or other websites known to the public, and submit the materials for acceptance inspection of water and soil conservation facilities to the competent administrative department.

3. Complete acceptance of water intake project and obtain water intake license

Where a mine project water intake project or facility is completed and has been in trial operation for 30 days, the construction unit shall submit relevant materials to the water intake examination and approval authority and apply for a water intake license. The examination and approval authority for water intake shall, within 20 days after receiving the materials, conduct on-site verification of the water intake project or facility and issue opinions on acceptance. For those that pass the acceptance inspection, a water drawing license shall be issued.

4. Complete the acceptance of safety facilities

The construction unit completes all the construction contents in accordance with the approved safety facility design, and if it meets the conditions for completion acceptance, it shall organize the completion acceptance of the safety facilities of the construction project. If the construction unit implements multi-level management, its superior unit with independent legal personality (or company headquarters) can also be responsible for organizing inspection and acceptance. The safety supervision department shall supervise and verify the completion and acceptance activities and acceptance results of mine projects.

5. Complete the acceptance of occupational disease prevention facilities

Before the inspection and acceptance of the occupational-disease-prevention facilities, the construction unit shall work out the inspection and acceptance plan and submit a written report to the work safety supervision and administration department. The principal person in charge of the construction unit or its designated person in charge shall organize occupational health professionals to review the evaluation report on the control effect of occupational disease hazards, check and accept the occupational-disease-prevention facilities, and form review opinions and acceptance opinions. The construction unit shall make a written report on the acceptance process of the occupational-disease-prevention facilities for future reference. The construction project with serious occupational-disease-prevention hazards shall submit a written report to the work safety supervision and administration department.

6. The coal mine project shall carry out joint trial operation

After the completion of a coal mine project, joint trial operation shall be carried out before the completion and acceptance. The project construction unit shall prepare a joint trial operation plan and report it to the provincial coal industry administrative department for the record. After the completion of the joint test run, the construction unit shall prepare a joint test run report.

7. Coal mine projects shall implement capacity replacement requirements

The State Council and the National Development and Reform Commission have stipulated that since 2016, the new coal production capacity reduction and replacement policy has been implemented, and the new coal mine projects have to implement the reduction and replacement, and the coal mine projects need to provide the capacity replacement plan before the application for approval, and the project approval authority will review and approve the capacity replacement plan according to the requirements. In order to promote the acceleration of the construction of advanced capacity coal mines, the state will review and confirm the capacity replacement plan of coal mine projects in 2022, and adjust it from the project approval to the completion acceptance.

  • Sumitomo SHI Cyclo Drive F3CS-A25G-89 Reducer
  • Sumitomo KNR0827 Wiring Harness SH120-3 SH120A3
  • Sumitomo ULC100011-01 LNR Actuator Driver
  • LUBE GMN-10-200-CB2-7L Lubricator Grease Pump
  • Sumitomo SH65UJ Rubber Track
  • Sumitomo KHR69310 Excavator Monitor
  • Sumitomo FDT-2FS Fiber Identifier Power Meter
  • Sumitomo CNVMS-4085G-43 Ink Fountain Motor
  • Sumitomo GV9924023-38 Circuit Board
  • Sumitomo 407915-5510 4BG1TRA ECU Controller
  • Sumitomo Cyclo F71m/4 Induction Motor 0.37kW
  • Sumitomo ANFJ-K30-SV-9 Hydraulic Control Valve
  • Hitachi Sumitomo 4625051 Pilot Valve Joystick
  • Sumitomo Demag W4RAP 6 W7-04-30 Valve
  • Sumitomo RV F2CF-A35-119 Gearbox
  • Sumitomo SH120 Slew Ring JCB JS130
  • Sumitomo Truninger QT-42-20HS-A Gear Pump
  • Sumitomo D2X-00577/02 SLV Control Board
  • Sumitomo Type-36 ARC Fibre Fusion Splicer
  • Sumitomo WRX33000R125-300 Shell Milling Cutter
  • Sumitomo Fine Cyclo F4CS-C35-59 Gearbox
  • Sumitomo Demag 4WREE 10 W75-23 Flow Valve
  • Sumitomo RDK-408A3 MRI Cold Head 5445412
  • Sumitomo AF-500 AF502-1A5 Cold Head
  • Sumitomo TYPE-35SE Fiber Optic Fusion Splicer
  • Sumitomo SH60 Rubber Track
  • Sumitomo SXPL JA765811BE Controller Interface Display
  • Sumitomo RF4100R Shell Mill 6 Flute 1.25 inch Arbor 4 inch OD
  • Sumitomo SHI SA765621AX SA765587BC Control Module
  • Sumitomo P-022CD-1A Cold Head Drive Unit
  • Sumitomo NL6448AC33-18 JA762898AD Operator Panel
  • Sumitomo JA762870GC Populated Circuit Board
  • Sumitomo Type-37 SM MM Fusion Splicer
  • Steel Track Chain for Sumitomo SH75 Excavator
  • Sumitomo CNV-6095-6 Cyclo Drive
  • Sumitomo Fine Cyclo F4CS-C35-59 PB048860 GEB
  • Sumitomo TC-FXPA FB-2E Motor RNYM2-1520A-EP-B-60 Gearbox
  • Sumitomo Heavy Industries RDK-4XX MRI Cold Head
  • Sumitomo SA765523AX PMDRV PCB Card 7MBP50RA060
  • Sumitomo Drive 307H-25 119H2505 Speed Reducer
  • Sumitomo Eaton H-130AA2FXJ Orbit Motor
  • Sumitomo JA775810A3 Nozzle Heater 19-58 130W
  • Sumitomo ZNFM05 Gearbox
  • Sumitomo F1C-A25-119 Gearbox
  • Sumitomo Fusion Splicer Type 39BT
  • Sumitomo MC78 UMC78S000-01 Motion Controller
  • Sumitomo Cyclo 2 Speed Motor Brake Gearbox
  • Sumitomo Drive PA213763 RNYMS02-1320YC-40
  • Sumitomo JA450704A2 Cylinder Head
  • Sumitomo T39 Fusion Splicer
  • Sumitomo AF-500 Cold Head
  • Sumitomo 71C Fusion Splicer
  • Sumitomo RDK-408S Cryocooler Cold Head
  • Sumitomo L3 Coldhead
  • Sumitomo F2CS-A25-119 Gearhead
  • Sumitomo US60125-GA AC Servo Driver SS6000
  • Sumitomo Type 39 Fusion Splicer
  • Sumitomo ANFJ-K30-SV-9 Planetary Gearbox
  • Sumitomo Heavy Industries JA761557BC RSC86-I Control Board
  • Sumitomo SA765604AX SA765603BC SXEX Servo Control Board
  • Sumitomo SumiDrill WDX2250D3S150 Drill
  • Sumitomo Type-66M12 Mass Fusion Splicer
  • Sumitomo Heavy Industries JA761557AC RSC86-I Control Board
  • Sumitomo JA761015CC RSC86 Circuit Board
  • Sumitomo T-72M12 Mass Fusion Splicer
  • Sumitomo TYPE-72C-KIT Core Aligning Fusion Splicer
  • Sumitomo CI-10/600-ADSD1-2 Power Supply
  • Sumitomo HF5202-3A7 Electronic Module
  • Sumitomo JA761015EC RSC86 Servo Control Board
  • Sumitomo TYPE-39 DCM Micro Core Fusion Splicer
  • Sumitomo JA761070HC AP-M Circuit Board
  • Sumitomo TYPE-400S T-400S Fusion Splicer Kit
  • Sumitomo TYPE-201E-VS Quantum Fusion Splicer
  • Sumitomo MC78IO Drive Power Module
  • Sumitomo 3-Phase Motor Gearbox 4kW 241RPM
  • CASE KRC10510 Hydraulic Swing Motor Sumitomo
  • Sumitomo HF4302-011 HF-430 Inverter Drive 11kW
  • Sumitomo SA765654BC SXIO-B Control Board
  • Sumitomo SDPH-018CHB PWM Amplifier Module
  • Sumitomo JA761070JC AP-M Circuit Board
  • Sumitomo HV960LC Local Control Board
  • Sumitomo T-71C+ Fusion Splicer Camera Y Focus Error
  • Sumitomo CH-210 Cold Head Cryo Cooler
  • Sumitomo Type-71C+ DCM Fusion Splicer
  • Sumitomo Type-65M12 Ribbon Fiber Fusion Splicer
  • Sumitomo T-502S Elite Fusion Splicer
  • Sumitomo T-72C+ Fusion Splicer
  • Sumitomo JA767632AC Circuit Board
  • Sumitomo Type-72C+ Core Alignment Fusion Splicer
  • Sumitomo CP5003 101AGG01 Sequencer I/F Board
  • Sumitomo T-37SE Fibre Fusion Splicer
  • Sumitomo Type-71C-KIT-PLUS Fusion Splicer
  • Sumitomo Type-72C HD Fusion Splicer
  • Sumitomo Type-72C+ Fusion Splicer FC-6+
  • Sumitomo Type-65M12 Ribbon Fusion Splicer
  • Sumitomo Type-72C+ Fusion Splicer
  • Sumitomo Type-39 DCM Fusion Splicer
  • Sumitomo Z1C Core Alignment Fusion Splicer
  • Sumitomo Type-71C DCM Fusion Splicer
  • Sumitomo T-72M12 Ribbon Fusion Splicer
  • ABB SACO 64D4 Digital Annunciator Unit 64-Channel Alarm System
  • EMERSON FloBoss S600+ P154 PRV Board 7381540 Prover Module
  • EMERSON FloBoss S600+ P155 PSU Board 7161550 Power Supply
  • EMERSON FloBoss S600+ P153 Front Panel 7181530 Display Keypad
  • EMERSON FloBoss S600+ P148 Dual Pulse Mezzanine 7181483 Module
  • EMERSON FloBoss S600+ P144 I/O Board 7281440 Analog Digital Module
  • EMERSON FloBoss S600+ P152 CPU Board 7381520 Main Processor
  • EMERSON FloBoss S600+ Base Unit 8176003 Flow Computer Chassis
  • Lauer PCS100FZ XX1.1031.SHX PLC HMI Operator Panel
  • Lauer Weber PCS095.S PG 195.203.3 Operator Panel HMI
  • Lauer Pcs Light PG 080.308.E Operator Panel HMI Console
  • Lauer Pcs Light PG 080.308.E Operator Panel HMI
  • Lauer PCS590p Pg 59X.000.0 PROFIBUS-DP HMI Panel
  • Lauer PCS095.1 095.408.A Operator Panel HMI
  • Lauer PCS009.m 109.203.1 Operator Panel PCS009
  • Lauer Pcs Light PG 080.308.F PLC HMI Operator Panel
  • Lauer Pcs 095.s 195.203.3 Operator Panel – Industrial HMI
  • Lauer LCA 200 (200-V02093) Starline Mini Operator Terminal – Compact HMI
  • Lauer PCS 110FZ Operating Screen – Compact Industrial Display
  • Lauer LCA200 022/581 Operator Terminal – Industrial HMI Panel
  • Lauer AST-150A Front Cover with Touch – Replacement Bezel for Industrial Panels
  • Lauer PCS8010 035/28B Operator Panel – Industrial HMI
  • Lauer PCS260FZ Membrane Keyboard Replacement
  • Lauer PCS plus MPI PCS090.m Operator Console
  • Lauer PCS 806 EEPROM Memory Module
  • Lauer VPC S95e 410 Control Panel System Controller
  • Lauer PG095.507.A Operator Panel PCS095 HMI
  • Lauer PCS8010 035/28B Operator Panel HMI Console