Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • ABB Industrial Drive ACS880-7407LC Semiconductor switching unit
    ❤ Add to collection
  • ABB Industrial Drive ACS880-7407LC Semiconductor switching unit

    • ¥36457.00
      ¥32547.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:0.000KG
    • Quantity:
    • (Inventory: 15)
Description

Operating principle

When short circuit occurs, the semiconductor switching unit provides protection for the transmission DC bus, and the main component is the semiconductor DC circuit breaker switch. The DC circuit breaker switch disconnects the DC bus when fault current is detected. Through the application of semiconductor technology, the current can be effectively and quickly limited. The DC circuit breaker switch is connected to the DC+ or DC-copper bar.

• If the fault current needs to be disconnected at both poles, two units (and DC breaker switches) can be added to the system, one connected to the DC+ copper bar and the other to the DC-copper bar.

• Liquid cooling

• Bidirectional function

• Three sizes

• If necessary, the unit can be equipped with a fuse for backup protection (option +F260). Please refer to applicable rules,

For example, for ship projects, reference can be made to the regulatory requirements of the relevant classification societies.

• If isolation is required in addition to short circuit and overload protection, the semiconductor switching unit can be connected to the DC in-line unit

(ACS880-7207LC or ACS880-7307LC) used in combination.

• The semiconductor switching unit operates independently without any external control system.

• The semiconductor switching unit provides an interface to the external control system for monitoring, interlocking/triggering and configuration.

Electrical safety precautions

1. Clearly identify the workplace and equipment.

2. Disconnect all possible voltage sources. Make sure you cannot reconnect. Lock and tag.

• Disconnect the main isolation device of the drive.

• If there is a charge switch, disconnect it.

• Turn off the isolation switch of the power transformer. The main isolator in the transmission cabinet does not disconnect the transmission cabinet AC input master

The voltage of the circuit bus.)

• If the drive is equipped with a DC/DC (DC/DC) converter unit (optional) or DC (DC) feeder unit

(Optional) : Turn on the DC disconnecting switch of the unit ([Q11], optional +F286 or +F290). 

Open withIsolation device of the connected accumulator (located outside the drive cabinet).

• Disconnect the auxiliary voltage isolation switch (if any) to disconnect the dangerous voltage source connected to the drive.

• In the water cooling unit (if any), turn on the isolation switch of the cooling pump.

• If a permanent magnet motor is connected to the drive, disconnect the motor from the drive using a safety switch or other means.

• Disconnect the control circuit from the external dangerous voltage.

• After disconnecting the transmission power, be sure to wait five minutes for the intermediate circuit capacitor to discharge before proceeding.

3. Avoid contact with any other live parts in the workplace.

4. Take special precautions when working near exposed wires.

5. Measure to determine that the device is powered off. Use a qualified voltage tester. Remove or disassemble cover plates if measurements require

For other cabinet structures, please comply with local laws and regulations regarding live work (including but not limited to shock and arc protection)

Protect).

• Verify that the voltage measuring instrument meets the voltage measuring range before and after measuring the equipment.

• Ensure that the voltage between the transmission input power terminal (L1, L2, L3) and the ground (PE) bus is zero.

• Ensure that the voltage between the transmission output terminals (T1/U, T2/V, T3/W) and the ground (PE) bus is zero.

It's important! When repeated measurements are made, the tester should also be set to DC voltage. Measurement between phases and ground. by

There is a risk of dangerous DC voltage charging in the leakage capacitance of the motor circuit. Even after the transmission power is turned off

For a long time, the voltage can also be maintained in the charging state. The measurement operation releases voltage.

• Ensure that the voltage between the transmission DC terminals (UDC+ and UDC-) and the ground (PE) terminals is zero. In the cabinet

In motion, measure between the drive DC busbar (+ and -) and the ground (PE) busbar.

6. Install temporary grounding according to local regulations.

7. Obtain a work permit from the person responsible for electrical installation work.

Air blower

■ Replace the cooling fan

1. Repeat the steps described in the section on Electrical Safety Precautions (page 22).

2. If it is a Marine structure (+C121), remove all shields in front of the cooling fan.

3. Disconnect cables to the fan.

4. Loosen the two fixing screws (a).

5. Pull the fan outward to separate it from the heat exchanger shell.

6. Install new fans in reverse order. Align the guide pin (b) at the rear of the fan hood with the slot (c) of the guide plate at the bottom of the module,

Then reinstall the fixing screw (a).


Choose Xiamen control Smith after sale worry

Excellent product quality

Only cooperate with manufacturers of first-line brands in the industry

Imports/Products

Good pre-sale service

Communicated with customers repeatedly about product model, quality, price and delivery date

Work with the customer to determine the best solution

Address user concerns in advance

Business execution in place

Ordered products delivered on time

Make perfect delivery plan to ensure the time limit

Assist users to handle the acceptance procedures

Perfect after-sales service

During the warranty period, problems will only be replaced and not repaired

Never put a problem on the back of your head

Service hotline 7x24 hours service

Solemn promise

1. All the items sold by the company, module card parts, etc., the quality problems arising from normal use during the warranty period are replaced free of charge, and there is no evasion.

2. For materials and equipment that have not been discontinued beyond the warranty period, only the cost of relevant parts will be charged for quality problems.

3. Provide replacement models and equipment replacement process services for discontinued materials and equipment.

4. Customers have purchased materials and equipment, lifetime free upgrade system software, related technical information provided free of charge.

5. Visit the use of materials purchased by customers from time to time, and solve any problems in time.

6. The company hotline provides 24-hour service, and the questions raised by customers are answered within 1 hour.

7. Not done, the company spirit of "thoughtful service, responsible to the end" attitude, from the customer's point of view to solve the problem, with serious and rigorous enterprise style, dedicated to each customer service.




  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit
  • Installation and I/O configuration of DEIF PPM-3 power management module
  • Beckwith M-3520 Interconnection Protection Relay
  • Beckwith M-3430 Generator Protection Relay
  • Beckwith M-2293B adapter panel replacement GE regulator guide
  • Selection and Networking of Beckwith M-2001C Digital Voltage Regulating Controller
  • Beckwith M-2001B Digital Voltage Regulating Controller
  • Beckwith M-0388/M-0389 Synchronous Inspection Relay Application Guide
  • Beckwith M-0193B Synchronizer Debugging and System Integration Guide
  • Beckwith M-0115A Parallel Balance Module Debugging Guide
  • Beckwith M-0067E On Load Voltage Regulating Controller Selection and Debugging Guide
  • Debugging and Fault Handling of Beckwith M-4272 Digital Busbar Conversion System
  • Beckwith M-3311A Transformer Protection Relay Debugging Guide
  • Beckwith M-3425A Generator Protection Relay Debugging Guide
  • Setting and troubleshooting of Basler BE1-27/59 voltage relay
  • Debugging and troubleshooting of Basler AVC63-12/AVC125-10 voltage regulator
  • Basler L301kc Line Array Camera Technology and Troubleshooting
  • Selection and Debugging of Basler CBS 212A Current Boosting System
  • Selection and commissioning of Basler BE3-25 synchronous inspection relay
  • Basler BE1-32R/32O/U Direction Power Relay Setting and Testing Guide
  • Basler PRS 250 Synchronous Relay Maintenance and Replacement Guide
  • Basler piA2400-17gc Industrial Camera Replacement and Optimization Guide
  • Basler BE1-11g Generator Protection System
  • Basler VR63-4C/UL Voltage Regulator
  • Basler BE1-DFPR feeder protection relay
  • Basler CBS 310/320 Current Boosting System
  • Basler UFOV 250A/260A protection module
  • Basler MVC104/MVC108/MVC232 manual voltage control device
  • Basler XR2002/XR2002F Regulator
  • Basler DECS-400 excitation system
  • Basler DGC-2020 Generator Set Controller: Integrated Control and Debugging Guide
  • Basler MVC-300 Manual Voltage Controller: Characteristics and Engineering Applications
  • Basler MVC Series Manual Voltage Controller: Application and Selection
  • Basler SSR Static Voltage Regulator: A Complete Guide to Debugging and Troubleshooting
  • Basler SR4A/SR8A Voltage Regulator: Detailed Debugging and Troubleshooting Explanation
  • Basler BE2000E Voltage Regulator: Replacement and Application Details
  • Basler DECS-2100 Excitation System: Modular Upgrade and Engineering Application
  • Basler BE1-851 Overcurrent Protection System: A Complete Guide to Professional Debugging and Troubleshooting
  • Basler APR 63-5 Voltage Regulator: Professional Debugging and Troubleshooting Guide for Industrial Generator Excitation Systems
  • Basler BE1-FLEX Protection System: A Complete Guide to Professional Installation, Configuration, and Troubleshooting
  • Debugging and Testing of Basler BE1-700 Relay
  • Basler BE1-87B busbar differential setting test
  • Basler BE1-40Q demagnetization relay setting test
  • Basler BE1-60 Voltage Balance Relay Setting Test
  • Basler BE1-47N Relay Field Setting and Testing Guide
  • Basler BE1-81O/U Frequency Relay: On site Debugging and Protection Configuration Guide
  • Basler BE1-11f Feedline Protection System Debugging and Troubleshooting Guide
  • Basler DECS-250 Excitation System: Installation, Configuration, and Troubleshooting Practice Guide
  • Basler DECS-100 Digital Excitation System Debugging Guide
  • Application Guide for Basler BE1-BPR Circuit Breaker Protection Relay
  • Basler BE1-50/51B-255 Replacement CO Relay Guide
  • Basler BE1-25 synchronous inspection relay principle and testing
  • Basler BE1-51 Time Overcurrent Relay Debugging Guide
  • Practical Guide to Basler DECS-300 Digital Excitation System
  • Mitsubishi FX Series PLC Data Communication Practical Manual
  • Selection of Hirschmann cSCALE S6/C8 Mobile Safety Controller
  • Hirschmann OZD Profi G12D repeater explosion-proof installation configuration
  • Hirschmann OCTOPUS OS20/24 Switch Installation Power Supply
  • Hirschmann RS20/30/40 Switch Selection and PoE Deployment
  • Hirschmann EAGLE One Firewall Installation and Configuration Guide
  • Hirschmann MACH102 Switch Installation and Power Supply Guide
  • Hirschmann MICE MS20/MS30 Installation and DIP Configuration
  • Hirschmann BOBCAT BRS Switch Installation and Power Supply Guide
  • Hirschmann RSB20 Switch Deployment and Redundant Configuration
  • Hirschmann RS20 Basic Switch Installation and Debugging Guide
  • BECKHOFF EP20xx/EP28xx Output Module Installation and Debugging Guide
  • BECKHOFF EL5102 Encoder Terminal Debugging and Troubleshooting
  • BECKHOFF CU8803 Launch Box Installation and Explosion proof Guide
  • BECKHOFF CU20xx/CU22xx Switch Installation and Troubleshooting
  • BECKHOFF AMP8000 Servo Drive Installation and Debugging Manual
  • BECKHOFF EL2911 Safety Feed Terminal Debugging Guide
  • BECKHOFF EL600x/EL602x Serial Port Module Debugging Manual
  • BECKHOFF CP6700 Panel PC Installation and Maintenance Manual
  • BECKHOFF CP70xx panel maintenance and troubleshooting
  • BECKHOFF CP29xx Panel Installation and Troubleshooting
  • Beckhoff C6650-0060 Industrial Control Computer Hardware Architecture and RAID Data Security
  • Beckhoff BK1120/BK1250 EtherCAT Coupling Debugging and KL Terminal Parameterization Complete Guide
  • Beckhoff CX20x0 Embedded Controller Hardware Maintenance and Troubleshooting Complete Manual
  • Beckhoff CP77xx Panel PC Hardware Maintenance and Troubleshooting Complete Guide
  • Beckhoff EL41xx Analog Output Terminal Deep Analysis: Parameter Configuration, Fault Diagnosis, and Firmware Compatibility Guide
  • Beckhoff C63xx industrial computer power supply and shutdown configuration
  • Beckhoff C6920 Industrial Control Computer Selection and Expansion Guide
  • Beckhoff CU8800 USB extender diagnostic guide
  • Beckhoff AX2000 Shutdown Braking and Debugging
  • Beckhoff AX8000 servo installation fuse selection
  • Beckhoff CP27xx Multi finger Touch PC Maintenance
  • Beckhoff CP69xx long-distance transmission and installation
  • Beckhoff CP60xx remote deployment and maintenance
  • Beckhoff CP72xx Installation and Maintenance Complete Manual
  • Beckhoff CP78xx Installation and Troubleshooting Guide
  • Beckhoff CP39xx Control Panel
  • Beckhoff CX8110 Embedded PC
  • Beckhoff CX50x0 series DIN rail embedded industrial PC
  • Beckhoff CP62xx panel PC
  • BECKHOFF C6030 Industrial Control Computer
  • UniOP ePAD32B/ePAD33B/ePAD33BT Industrial HMI
  • UniOP ePAD05/06 Human Computer Interface
  • UniOP ePAD03/04 Human Computer Interface
  • UniOP BKDR-46-0045 Human Machine Interface
  • UniOP BKDR-16 human-machine interface
  • Beckwith M-3425A Relay Guide
  • Basler DECS-200-2L excitation system
  • Basler DECS-250 Excitation System Debugging Guide
  • HA-800A Servo Drive Debugging Guide
  • JUMO dTRANS p35 Manual
  • KEBA XE020 RFID Module Manual
  • Honeywell SmartLine Transmitter Complete Guide
  • Eaton CROUSE-HINDS Series MA30 Lightning Protection Filter Installation Guide
  • BECKHOFF EL31xx Series 16 Bit EtherCAT Analog Input Terminal Manual
  • BECKHOFF AX5000 Servo Drive Maintenance Guide
  • BECKHOFF EL30xx Analog Input Diagnostic Guide
  • BECKHOFF EL70x7 Stepper Terminal Maintenance Guide
  • BECKHOFF CX52x0 Industrial Control Computer Maintenance Guide
  • BECKHOFF CX9000/CX9010 Hardware Maintenance Guide
  • BECKHOFF AM8xxx Motor Guide
  • BECKHOFF EL9xxx System Terminal Guide
  • Beckhoff EK110x/EK15xx Coupling Guide
  • BECKHOFF CX51x0 Embedded PC Deployment Guide
  • BECKHOFF CX2100-0014 Power Module Guide
  • BECKHOFF CX1000 Industrial Control PC Complete Manual
  • BECKHOFF CP69xx Panel Installation and Troubleshooting
  • Beckhoff C6030-0080 Industrial Control PC Guide
  • IFM O3D300 3D Sensor Debugging and Troubleshooting Guide
  • Allen Bradley Guardmaster 440R Safety Relay Troubleshooting and Configuration Guide
  • OMRON CS1 PLC System Maintenance and Troubleshooting Guide