Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • ABB 2032-04-16-06 The Integrated Gate Commutated  Thyristor
    ❤ Add to collection
  • ABB 2032-04-16-06 The Integrated Gate Commutated Thyristor

    ABB 2032-04-16-06 The Integrated Gate Commutated  Thyristor

    • ¥23650.00
      ¥25630.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:3.600KG
    • Quantity:
    • (Inventory: 31)
Description

ABB 2032-04-16-06 The Integrated Gate Commutated  Thyristor


ABB 2032-04-16-06 The Integrated Gate Commutated  Thyristor

DESCRIPTION

The outstanding feature of the IGCT - leading to its name and its  main advantages - is not only the silicon wafer itself, but the way  it is driven by the gate - the electrical and mechanical gate-drive  design. The «hard- drive» concept at the heart of IGCT operation  requires the mechanical integration of gate driver and semiconductor into one single unit with low circuit inductance. It also  implies a number of new converter features, which make IGCT  converters different from GTO or IGBT converters. It is the scope  of this application note to make designers familiar with the data  sheets and the use of IGCTs in their main application areas.

The following features are important to remember:

• no turn-off snubber is needed in applications without series  connection; where turn-off snubbers are used, they are  considerably smaller than those of GTOs 

• the customer control interface is reduced to a power supply,  an optical control input and an optical status feedback output 

• gate drive geometry is an important parameter in mechanical  stack design.

Data sheet user’s guide

This section is a detailed guide to the correct understanding  of an IGCT data sheet. Parameters and ratings will be defined  and illustrated by figures where appropriate, while following the  sequence in which parameters appear in the data sheet. For  explanation purposes, data and diagrams associated with IGCT  type 5SHY 55L4500 have been used, but because all IGCTs  have similar data sheets, this guide is applicable to all IGCTs.  Additionally a 5SHX 26L4520 data sheet is used to explain the  diode parameters of reverse-conducting devices. The data sheets distinguish between maximum rated values and  characteristic values. Maximum rated values indicate limits  beyond which damage to the device may occur. Characteristic  values are parameters defined under typical application  conditions.

Key features

·High snubberless turn-off rating
·Optimized for medium frequency
·High electromagnetic immunity
·Simple control interface with status feedback
·Ac or Dc supply voltage
·Option for series connection (contact factory)

Thermal data

In addition to the thermal data of the IGCT, the data sheets of  reverse conducting IGCTs have thermal data for the diode part.  The data is documented in the same way as in section 2.6. Rth and Zth are specified without heat flow between the GCT-part  and diode-part.

IGCTs in Voltage Source Inverters (VSI)

Reverse conducting IGCTs (RC-IGCT), asymmetric IGCTs  (AS-IGCT) and their corresponding diodes are qualified and tested  in test circuits built according to the circuit diagram below. It is  an equivalent circuit for the switching events occurring in a VSI  circuit, be it of 2-level or 3-level topology.

Determining the value of the di/dt limiting inductor

In a VSI, as in most power electronic circuits, a diode turn-off  is caused by an IGCT turn-on and the diode’s turn-off di/dt  capability is, in most cases, lower than the turn-on di/dt  capability of the IGCT. This is especially true in common applications without a turn-off snubber. Hence the di/dt choke LI  must be  large enough to allow operation within the di/dt range of the diode  even at the highest DC-link voltages. Typical values for  ABB diodes are between 200 and 1000 A/µs depending on  diode wafer size and switching voltage. Diode switching losses and surge currents are also dependent  on the choke size and these considerations may require a larger  inductance value. This, however, will come at the cost of a slower  clamp circuit transient (tdyn) and longer switching dead times.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Edwards CTI Kryogenics On Board 8F Enhanced Cryopump Explanation
  • ADLINK PCI-9112 Multi functional Data Acquisition Card
  • ADLINK PCI-8102 Two Axis Pulse Motion Control Card
  • ADLINK PCI-9812/10 high-speed synchronous acquisition card
  • ADLINK PCI-7200 High Speed Digital I/O Card
  • ADLINK MXE-1000 series fanless industrial computer
  • ADLINK IMB-T10 Mini ITX Embedded Motherboard
  • ADLINK HSL-DO32-M-N/P distributed I/O module
  • ADLINK DAQ-2500 Series Multi Channel Analog Output Card
  • ADLINK DAQ-2200 Series Data Acquisition Card
  • ADLINK ETX-AT-N270 Embedded Module
  • ADLINK ACL-7225B Relay Isolation Input Card Guide
  • ADLINK DAQ-2000 Synchronous Sampling and Acquisition Card Selection Guide
  • ADLINK NuPRO-E330 Industrial Motherboard Selection and Deployment
  • ADLINK ACL-8112 Data Acquisition Card Configuration and Programming
  • ADLINK USB-2405 Dynamic Signal Acquisition Module Deployment Guide
  • ADLINK PXIS-3320 PXI chassis installation troubleshooting
  • ADLINK PCIe-GIE72/74 Image Acquisition Card Deployment Guide
  • ADLINK PCIe-7856/7853 Sports I/O Controller Card Guide
  • ADLINK PCI-6308 Isolation Output Card Programming and Installation
  • ADLINK PCI-7432 installation and configuration troubleshooting
  • adlink nupro-e72 التحكم الصناعي اللوحة
  • ADLINK NuPRO-E72 Industrial Control Motherboard
  • ADLINK MXE-5400 Industrial Control Computer
  • ADLINK M-322 Industrial Motherboard Configuration and Deployment Guide
  • ADLINK IMB-M43H Industrial Motherboard Configuration and 6th/7th Generation Core Deployment Guide
  • ADLINK IMB-M42H Industrial Motherboard Deployment and BIOS Optimization Guide
  • ADLINK i915GV-INA motherboard configuration and ISA compatibility tuning guide
  • ADLINK ETX-NR667 Core2 Duo Module Selection and Deployment
  • ADLINK ETX-BT Module Configuration and PATA to SATA Upgrade Guide
  • ADLINK CM1-BT1 Extreme Environment Deployment and Configuration
  • ADLINK cPCI-8217 VGA/LCD Module Configuration and Troubleshooting
  • ADLINK AmITX-SL-G Mini ITX Motherboard Deployment and SEMA Guide
  • ADLINK AmITX-AL-I Embedded Motherboard Deployment and SEMA Management Guide
  • ADLINK NuPRO-E315 PICMG 1.3 Industrial Motherboard Deployment Guide
  • ADLINK NuPRO-842 Pentium 4 Industrial Motherboard Deployment and Debugging Guide
  • ADLINK NuPRO-900A Dual Xeon ePCI-X Motherboard Deployment Guide
  • ADLINK cPCI-6910 Dual Core Xeon Single Board Computer Deployment Guide
  • ADLINK cPCI-6860A Dual Xeon Single Board Computer Deployment Guide
  • ADLINK CPCI-8168 Eight Axis Motion Control Card Deployment and HSL Integration Guide
  • ADLINK NuPRO-E340 Industrial Motherboard Debugging and BIOS Optimization Guide
  • ADLINK NuPRO-A40H Industrial Single Board Computer Hardware Deployment and BIOS Calibration Guide
  • ADLINK NuPRO-852 LGA775 Industrial Control Motherboard Maintenance Guide
  • ADLINK NuPRO-841 Industrial Motherboard Maintenance and Troubleshooting
  • ADLINK NuPRO-590 Series Socket7 Industrial Control Motherboard Maintenance Guide
  • Deployment and Troubleshooting of ADLINK MXE-5500 Series Industrial Control Computer
  • ADLINK MXE-200 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK cPCI-6770 Series CompactPCI Motherboard Maintenance Guide
  • ADLINK NuPRO-A301 Industrial Motherboard Troubleshooting Manual
  • ADLINK NuPRO-965 SHB Debugging and Maintenance Complete Manual
  • ADLINK NuPRO-935A Industrial Motherboard Debugging and Maintenance Guide
  • ADLINK NuPRO-865 Single Board Computer Hardware Troubleshooting Guide
  • ADLINK NuPRO-840 P4 Industrial SBC Architecture Maintenance
  • ADLINK NuPRO-770 Full length SBC Configuration and Maintenance
  • ADLINK NuPRO-595 Industrial Half length SBC Motherboard Configuration and Maintenance Guide
  • ADLINK cPCI-6840 Series Single Board Computer Installation, Configuration, and Maintenance Guide
  • Foxboro 43AP Pneumatic Controller Technical Specifications and Selection Guide
  • ADLINK cPCI-3720: 3U CompactPCI Low Power Pentium III CPU Module
  • ADLINK NuPRO-E47: PICMG 1.3 13th Generation Core Industrial SHB
  • ADLINK NuPRO-E43: PICMG 1.3 Core 7th Generation Industrial SHB
  • ADLINK NuPRO-780 PICMG Bus Core CPU Card
  • ADLINK cPCI-6965 6U CompactPCI Core Dual Core Single Board Computer
  • ADLINK USB/LPCI/LPCIe-3488A GPIB Interface Card Selection and Application Guide
  • Rittal SK 3241.700 Blue e+Cabinet Fan Filter Unit
  • ADLINK CPCI-8168 8-Axis Motion Control Card and HSL Network Integration Solution
  • ADLINK PCIe-PXIe-8638 High Speed PXIe Bus Expansion Scheme
  • ADLINK PCIe GIE7x Poe+Frame Grabber Hardware and Power Management Detailed Explanation
  • ADLINK PCIe-7396 Digital I/O Card Deployment Guide
  • ADLINK PCI-8164 Advanced Motion Control Card Deployment Guide
  • ADLINK PCI-8154 Motion Control Card Deployment Guide
  • ADLINK PCI-8134 Motion Control Card Deployment Guide
  • ADLINK NuPRO-E42 Industrial Control Motherboard Deployment Guide
  • ADLINK MXC-6600 Embedded Platform Deployment Guide
  • ADLINK MXC-6000 Industrial Control Computer Deployment and Optimization Guide
  • ADLINK MXC-2300 Embedded System Deployment Guide
  • ADLINK MCM-204 Edge DAQ Deployment Configuration Guide
  • ADLINK MCM-100/102 Deployment Calibration Guide
  • Deployment and Performance Optimization of ADLINK MXC-6400 Industrial Control Computer
  • Selection and Deployment of ADLINK Matrix Series Industrial Control Computers
  • российские промышленные новые машины.Наш отдел дебютировал в 2026 году в России Международная промышленная ярмарка INNOPROM
  • Deeply cultivating the Eurasian industrial market, linking new industrial opportunities between China and Russia
  • Deployment and troubleshooting of ADLINK GIE64+PoE acquisition card
  • Honeywell UMS Security System Troubleshooting Guide
  • Honeywell Expert Series C I/O Troubleshooting Guide
  • ADLINK EOS-1200 Vision System Deployment and Troubleshooting
  • ADLINK DLAP-5200 series AI engine deployment and optimization
  • ADLINK DLAP-4000 Deployment and BIOS Optimization
  • ADLINK Matrix MXC-2000 Deployment and Troubleshooting
  • ADLINK DAQe-2000 series acquisition card calibration and synchronization
  • ADLINK cPCI-6520 Core i7 Processor Blade Engineering Application Guide
  • ADLINK CM1-86DX3 PC/104 Embedded Single Board Computer Engineering Application Guide
  • Honeywell DC1000 Series PID Temperature Controller Engineering Application Guide
  • ALSTOM MiCOM C264 Substation Controller Engineering Application Guide
  • EMERSON AMS 2140 Practical Guide for On site Dynamic Balance and Vibration Analysis
  • ADLINK NuPRO-E320 motherboard deployment and tuning guide
  • ADLINK NuPRO-800 Dual PIII Industrial SBC Maintenance and Upgrade Guide
  • ADLINK NuPRO-598 SBC Maintenance Practical Guide
  • ADLINK MXC-6300 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK Express-BASE7 Carrier Board Quick Deployment and Debugging Guide
  • ADLINK DLAP-211 Edge AI Platform Selection and Deployment Guide
  • ADLINK 7230 Series Isolation DIO Card Selection and Engineering Application Guide
  • ADLINK cPCI-6965 SBC Embedded Installation and BIOS Tuning Guide
  • ADLINK 7200 Series High Speed DIO Card Practical Guide
  • ADLINK DLAP Series Edge AI Acceleration Platform Selection and Deployment Practical Guide
  • DEIF TCM-2 thyristor control module: Wind power cut in control engineering guide
  • DEIF MVR-200 Medium Voltage Relay: Installation and Wiring Engineering Guide
  • DEIF MDR-2 Differential Relay: Engineering Guide for Generator Differential Protection
  • DEIF Delomatic 3 AOM: Engineering Guide for Analog Output Modules
  • DEIF AGI 400 Graphic Interface: Ship and Industrial HMI Solution
  • DEIF BRW-1 Marine Instruments: Installation and Calibration Guide for Offshore Bridge Indicators
  • DEIF AGC 200 Controller: Quick Deployment and Configuration Guide for Generator Sets
  • DEIF AGC-2 Controller: The Ultimate Guide to Automatic Control and Protection of Generator Sets
  • ABB SPA-ZC400 Gateway: REM54x Access to IEC 61850 Ultimate Engineering Guide
  • ABB REM 543/545 Terminal
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit