Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Present situation of urban sewage treatment in China

F: | Au:佚名 | DA:2023-12-20 | 656 Br: | 🔊 点击朗读正文 ❚❚ | Share:

With the rapid development of the first activated sludge as the process of the sewage plant in our country, the large-scale urban sewage plant began to operate, marking the rapid development of China's urban sewage industry. The basic treatment method of early urban sewage in our country is to trim the suburban pits and depressions, swamps or waste rivers, and to build a stable pond by dam. The traditional activated sludge method is the earliest study of sewage treatment in China, and has been applied in engineering on the basis of research. This method can obtain good effluent quality at low cost, and is the treatment process used by most of the urban sewage plants in China. The biochemical treatment process based on traditional activated sludge process, contact oxidation process, oxidation ditch process and AB process has been widely used in China because of its advantages of stable effect, easy operation and management, and low cost.

With the acceleration of China's urbanization process, the problem of urban water pollution is becoming more and more prominent, and the discharge of urban sewage shows an increasing trend. According to incomplete statistics, small and medium-sized towns account for 30% of the total urban sewage discharge.

The construction and operation of a large number of new sewage treatment plants reflects China's attention to the problem of urban sewage, and also shows the government's determination to improve the status quo of urban sewage. More than 90% of China's cities have built sewage treatment plants, as of the end of 2010, China's urban domestic sewage treatment capacity has reached 125 million m3/d, urban sewage treatment rate has reached 77.5%, in 2014, China's urban sewage treatment plants A total of more than 3,900, the daily treatment capacity of 155 million m3/d, of which 860 first-class A projects, Daily processing capacity 29.25 million m3. In recent years, Liaoning Province alone has built many sewage plants of different sizes, and the sewage has been treated to a certain extent, but the task of treating sewage is still quite heavy.

Relevant national standards for secondary sewage treatment plant effluent water quality requirements, with the "Twelfth Five-Year" energy conservation and emission reduction goals to promote, China's urban sewage treatment plant effluent water quality standards continue to improve, "urban sewage treatment plant pollutant discharge standards", urban sewage treatment plant effluent into the key river basins determined by the state and province and lakes, reservoirs and other closed, semi-closed waters, Implementation of Level 1 A standards. Due to the pressure of policy and environment, it is imperative to upgrade the standard of the municipal sewage treatment plant built in the early stage based on the traditional activated sludge process.

With the rapid development of the first activated sludge as the process of the sewage plant in our country, the large-scale urban sewage plant began to operate, marking the rapid development of China's urban sewage industry. The basic treatment method of early urban sewage in our country is to trim the suburban pits and depressions, swamps or waste rivers, and to build a stable pond by dam. The traditional activated sludge method is the earliest study of sewage treatment in China, and has been applied in engineering on the basis of research. This method can obtain good effluent quality at low cost, and is the treatment process used by most of the urban sewage plants in China. The biochemical treatment process based on traditional activated sludge process, contact oxidation process, oxidation ditch process and AB process has been widely used in China because of its advantages of stable effect, easy operation and management, and low cost.

With the acceleration of China's urbanization process, the problem of urban water pollution is becoming more and more prominent, and the discharge of urban sewage shows an increasing trend. According to incomplete statistics, small and medium-sized towns account for 30% of the total urban sewage discharge.

The construction and operation of a large number of new sewage treatment plants reflects China's attention to the problem of urban sewage, and also shows the government's determination to improve the status quo of urban sewage. More than 90% of China's cities have built sewage treatment plants, as of the end of 2010, China's urban domestic sewage treatment capacity has reached 125 million m3/d, urban sewage treatment rate has reached 77.5%, in 2014, China's urban sewage treatment plants A total of more than 3,900, the daily treatment capacity of 155 million m3/d, of which 860 first-class A projects, Daily processing capacity 29.25 million m3. In recent years, Liaoning Province alone has built many sewage plants of different sizes, and the sewage has been treated to a certain extent, but the task of treating sewage is still quite heavy.

Relevant national standards for secondary sewage treatment plant effluent water quality requirements, with the "Twelfth Five-Year" energy conservation and emission reduction goals to promote, China's urban sewage treatment plant effluent water quality standards continue to improve, "urban sewage treatment plant pollutant discharge standards", urban sewage treatment plant effluent into the key river basins determined by the state and province and lakes, reservoirs and other closed, semi-closed waters, Implementation of Level 1 A standards. Due to the pressure of policy and environment, it is imperative to upgrade the standard of the municipal sewage treatment plant built in the early stage based on the traditional activated sludge process.

The rapid development of China's sewage treatment industry is also facing many problems and challenges, which are reflected in the following aspects, ① lack of construction funds Construction of sewage treatment plants requires a lot of capital investment, so the lack of funds has become a major obstacle to limit sewage treatment. With the development of China's economy and the improvement of people's environmental protection awareness, more and more funds will be invested in the construction of urban sewage treatment plants. (2) The high operating costs of sewage treatment plants lead to a lot of equipment in sewage treatment plants. In response to this problem, the government has increased the capital investment in sewage treatment plants, but also reformed the operating mechanism accordingly, and diversified management models such as :TOT model.

The managed operation mode, BOT mode, etc., will be the future development trend of China's urban sewage treatment plant. (3) The water treated by the sewage treatment plant is discharged directly, which causes pollution of the downstream river on the one hand, and wastes the reusable water resources on the other hand. For the utilization of recycled water, China also needs to continuously introduce foreign advanced technology and develop a variety of ways. (4) Although the early construction of urban sewage treatment plants has a good effect on the removal of organic matter and suspended matter, but the removal effect of nitrogen and phosphorus is not obvious. It has not reached the current discharge standard for urban sewage in China - "Pollutant Discharge Standard for Urban sewage Treatment Plants" (GB18918-2002). At present, most sewage treatment plants in our country face the problem of upgrading standards. How to improve the removal rate of nitrogen and phosphorus nutrients has become a hot issue in the operation and control of municipal sewage plants.

The rapid development of China's sewage treatment industry is also facing many problems and challenges, which are reflected in the following aspects, ① lack of construction funds Construction of sewage treatment plants requires a lot of capital investment, so the lack of funds has become a major obstacle to limit sewage treatment. With the development of China's economy and the improvement of people's environmental protection awareness, more and more funds will be invested in the construction of urban sewage treatment plants. (2) The high operating costs of sewage treatment plants lead to a lot of equipment in sewage treatment plants. In response to this problem, the government has increased the capital investment in sewage treatment plants, but also reformed the operating mechanism accordingly, and diversified management models such as :TOT model.

The managed operation mode, BOT mode, etc., will be the future development trend of China's urban sewage treatment plant. (3) The water treated by the sewage treatment plant is discharged directly, which causes pollution of the downstream river on the one hand, and wastes the reusable water resources on the other hand. For the utilization of recycled water, China also needs to continuously introduce foreign advanced technology and develop a variety of ways. (4) Although the early construction of urban sewage treatment plants has a good effect on the removal of organic matter and suspended matter, but the removal effect of nitrogen and phosphorus is not obvious. It has not reached the current discharge standard for urban sewage in China - "Pollutant Discharge Standard for Urban sewage Treatment Plants" (GB18918-2002). At present, most sewage treatment plants in our country face the problem of upgrading standards. How to improve the removal rate of nitrogen and phosphorus nutrients has become a hot issue in the operation and control of municipal sewage plants.



  • Basler XR2002F Voltage Regulator 9139400101
  • Basler 2D80367G23 DXCB De-Excitation Module 1200V 5000A
  • Basler SR4A-2B15B3A Static Regulator 120V 50/60Hz
  • Basler SSR 125-12NF Static Regulator 9 1859 00 106
  • Basler BE1-BPR Breaker Protection Relay 9272000315
  • Basler SSR 63-12 Static Regulator 9 1859 00 101
  • Basler AEM-2020 Analog Expansion Module
  • Basler BE 25231-001 Transformer BE25231001
  • Basler MVC 108 Manual Voltage Control 9037000102
  • Basler PSS-100-Y5 Power System Stabilizer 0.1-5.0Hz
  • Basler Electric BE1A-25-M1G-A6T-N4V1F Sync-Check Relay
  • Basler Electric SR8A2B10B1A Static Voltage Regulator
  • Basler Electric SR8A2B10B1A Static Voltage Regulator
  • Basler Electric SSR 125-12 Static Voltage Regulator 9185900102
  • Basler Electric 90-73900-102 Power Supply (Westinghouse 2374A07G03)
  • Basler Electric 9400200117 Control Power Unit 12/24VDC 20W
  • Basler Electric BE1-87G Solid State Generator Differential Relay
  • Basler Electric BE1-32R Style C3ED1TA0S1F Solid State Protective Relay
  • Basler Electric SR32A2B05B3E Static Voltage Regulator
  • Basler Electric SR8A2B06B3A Static Voltage Regulator
  • Basler MOC3502 90-72300-116 Motor Potentiometer
  • Basler SR4A2310B1A Static Voltage Regulator
  • Basler Electric 90-88800-102 PRS-250 Veri-Sync Relay
  • Basler Electric 90-88800-102 PRS-250 Veri-Sync Relay
  • Basler SR4A-2B05A3E Static Regulator SR4A2B05A3E
  • Basler 9-0723-00-130 9072300130 Control Module
  • Basler BE1-79MA10A6JC0L0F Reclosing Relay
  • Basler CBS-377 Current Boost System 91096001
  • Basler SR4A1B05A3A Static Regulator 480V 62.5V 10VA
  • Basler BE159N A7ED1JC0S0F Protective Relay BE159N-0
  • Basler BE3-25A Auto-Synchronizer S.No. 728
  • Basler BE1-50 Instantaneous Overcurrent Relay G4EA1RG0N0F
  • Basler Electric KT3B Voltage Regulator
  • Basler Electric ACA2500-14GCSYM GigE Camera
  • Basler Electric XR2002F Voltage Regulator
  • Basler Electric BE1-50 Instantaneous Overcurrent Relay F2EA1PA0N5F
  • Basler Electric CBS 212A Current Boost System
  • Basler Electric BE147NE3FE1PC3N3F Negative Sequence Voltage Relay
  • Basler Electric BE1-79MA10A6JC0L0F Automatic Reclosing Relay
  • Basler Electric BE1-59N A6E E1C B0N1F Neutral Overvoltage Relay
  • Basler Electric MVC 108 Manual Voltage Control
  • Basler Electric BE1-59-A4E-E1C-A0N0F Overvoltage Relay
  • Basler BE1-57/27R Solid State Protective Relay
  • Basler BE3-25AX Time Overcurrent Relay
  • BASLER ELECTRIC BE1-24/A1EF1JC1N0F / BE124A1EF1JC1N0F Overvoltage Relay
  • Basler Electric Solid State Protective Relay BE1-32R Style B2ED1PB0N0F
  • Basler BE3-51-3E1E1 9320000110 24VDC Overcurrent Relay
  • Basler UFOV 260A Underfrequency Overvoltage Module
  • Basler 50F4EA1PA0N0F Instantaneous Overcurrent Relay
  • Basler BE1-50 Instantaneous Overcurrent Relay
  • Basler BE1-32 Solid State Protective Relay
  • Basler SCP 250-G-60 VAR Power Factor Controller
  • Basler BE1-59N A5EE1KC0N0F Ground Fault Relay
  • Basler BE1-79A Reclosing Relay
  • Basler BE1-32R E1EA1OA0N0F Reverse Power Relay
  • Basler DCQA-103 DCQC104-1 CMX-7D Circuit Board
  • Basler SSR125-12 Static Regulator 918500102
  • Basler 90 17709 112 Regulator Control Board
  • Basler AVC63-4 AVC634 Voltage Regulator
  • Basler 9 1049 04 100 PC Board Control Module
  • Basler SR4A-2B03B3A Static Voltage Regulator
  • Basler SR8A-2B15B3A Static Voltage Regulator
  • Basler KR7FFX Static Regulator 840V
  • Basler EL200-7 Voltage Regulator 90-660VAC 7A
  • Basler PRP210-1 Reverse Power Relay 9056300102
  • Basler SSR 63-12 Static Regulator 600VAC
  • Basler 9289901106 Digital Board
  • Basler DECS100 Voltage Regulator DECS100A01
  • Basler Electric CEM-2020 Contact Expansion Module
  • Basler Electric BE3-25-1 C1 N4 Synchronizing Check Relay
  • Basler Electric ACA2000-50GM GigE Camera 2MP 50fps
  • Basler Electric ACA2240-20GMSYM GigE Camera Sony IMX264
  • Basler BE1-50G Ground Overcurrent Relay
  • Basler PRS250 Veri-Sync Relay
  • Basler MOC2199 Output Module
  • Basler UFOV 260A Underfrequency Overvoltage Module
  • Basler BE-15482-001 Control Module
  • Basler LSP4-7 Protective Relay
  • Basler SCP 250-G-60 VAR Power Factor Controller
  • Basler BE146N Negative Sequence Overcurrent Relay
  • Basler APR63-5 Automatic Voltage Regulator
  • Basler 9507900107 SR8A Retrofit Voltage Regulator
  • Basler BE1-320 Directional Power Relay
  • Basler KR7F Voltage Regulator 9116200100
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler AEC63-7 Analog Excitation Controller
  • Basler 9992D90G01 Control Module
  • Basler 6966D22G01 Control Board
  • Basler 6965D40G01 Control Board
  • Basler BE1-50/51M-104 Overcurrent Relay
  • Basler BE1-BPR Programmable Breaker Relay
  • BASLER Electric SSR 125-9 1256 00 102 Static Voltage Regulator
  • Basler Electric MVC 112 Manual Voltage Control
  • Basler Electric 9321000102 Control Module
  • Basler Electric RA-70-MDCT7 Rectifier Assembly
  • Basler Electric ACA1300-60GM GigE Camera
  • Basler Electric 6427C85G01 Interface Board
  • Basler Electric 6965D05G01 Control Board
  • Basler Electric ACA2500-14UC Current Transducer
  • Basler Electric 9170206111 Protective Relay
  • Basler Electric BE1-11-G6D1M1J1P0E000 Protection Relay
  • Basler Electric BE1-50/51B-107 Overcurrent Relay
  • Basler 9121000106 Voltage Controller
  • Basler B3E-E1P-A0N0F Solid State Protective Relay
  • Basler 9121000106 Manual Voltage Control
  • Basler PRP320 Motor Pull-out Relay
  • Basler SSE-N 250-9KW Shunt Exciter Regulator
  • Basler BE1-50-51B-107 Overcurrent Relay
  • BASLER ELECTRIC MVC 108 MANUAL VOLTAGE CONTROL MODULE 9 0370 00 102
  • Basler BE1-59N-A7E-D1J-D0N0F Ground Overvoltage Relay
  • Basler BE1-46N-G1E-B8P-B0N0F Negative Sequence Overcurrent Relay
  • Basler BE1-951 Overcurrent Protection System
  • Basler Electric MOC2199 Motor Operated Potentiometer
  • Basler Electric BE1-60 Voltage Balance Solid State Relay B1FA1C1M1F
  • Basler Electric BE1-67N Directional Overcurrent Relay
  • Basler Electric PIA2400-17GM Interface Module
  • Basler Electric V6RAB Rectifier Module
  • Basler Electric BE1-32R Reverse Power Relay B2E E1R A0N1F
  • Basler Electric IFM-150 Firing Circuit Chassis 120V AC
  • Basler Electric IFM-102 Firing Circuit Chassis 120V AC
  • Basler Electric 9170206111 NSNP Control Module
  • Basler Electric SSR 63-12 Static Voltage Regulator
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler SCA1300-32GM CCD Camera Lens Enclosure
  • Basler BA1-27 Under Voltage Relay
  • Basler 149D866G06 Control Board
  • Basler 9072300130 Power Supply Module
  • Basler CBS 305 Current Boost System