Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Problems and countermeasures of safety management in non-coal mines

F: | Au:佚名 | DA:2023-12-21 | 738 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

1 Introduction

Security is an eternal theme in the process of human survival and development. With the development and progress of society, security issues have received more and more attention. Mining enterprises as a high-risk industry, the number of accidents and casualties ranked second after traffic accidents, as mining workers, how to grasp the implementation of the system, effectively do a good job of safety management at the grass-roots level, to achieve scientific and effective safety production management, and really promote the continuous improvement of safety management, is the current urgent task.

2 Problems existing in the safety production management of non-coal mines in China

At present, there are still many outstanding problems and weak links in the field of non-coal safety production in China, which need to be further strengthened and implemented. Generally speaking, China is currently in the stage of accelerated industrialization development, in the production safety accident "prone period". The outstanding performance is that the overall stable and improving development trend coexists with the still severe status quo. With the scarcity of mineral resources in the world, the price of mineral products has also soared, and the temptation of huge benefits has made many people go above the law, and illegal mining has been repeatedly banned, causing chaos in the mining industry and seriously affecting the safety of production.

3. Influencing factors of safety production management in non-coal mines

3.1 Uneven development of mine safety production management

Some departments do not understand the work of mine safety production management, the organization of mine safety production management is weak, the foundation is unclear, there is a phenomenon of laissez-faire, and the implementation of mine safety production management is not in place.

3.2 The safety foundation of mining enterprises is poor and the investment is insufficient

The safety foundation of non-coal mining enterprises is poor, the investment is insufficient, the safety investment is insufficient, the safety awareness of managers and practitioners is weak, the quality is poor, and the management is not subject to management. I am not familiar with most of the mine safety technical standards and regulations of a series of laws and regulations such as the "Safety Production Law" and the "Mine Safety Law".

3.3 Mining enterprises are not standardized

Mining technology chaos is a prominent problem in the current safety production of non-coal mines, many non-coal mines lack detailed mining design and program, and some mining with mining design program are completely not in accordance with the requirements of the program. Concentrated in excess mining and cross-border mining, some non-coal mining mountains do not carry out their own mining after obtaining the mining right, but illegally transferred the mining right to other contractors for mining, the contractor mining qualification audit is extremely not strict, resulting in unlicensed mining and indiscriminate mining phenomenon, which brings great difficulties to the safety production management of non-coal mining mountains.

3.4 The mine layout is not reasonable

There are also unreasonable problems in the layout of non-coal mines. The layout of non-coal mines has not been scientifically and reasonably planned, resulting in many large mines opening small, which is undoubtedly a great waste of resources. In recent years, after special rectification by the state, many non-coal mines that do not meet the mining qualifications have been shut down, but at this stage, there are still a large number of small non-coal mines with unreasonable layout, most of these small mines have irregular mining technology and serious waste of resources. In view of the many problems of small mines, the state adopts the policy of "small for big", and the actual integration is also difficult.

3.5 Mining management is difficult

At present, there are many obstacles to the management of non-coal mining. A large number of non-coal mine owners have a very inadequate understanding of the national policy, most of them do not realize the ownership of mine resources by the state, and adopt a very narrow concept, which directly leads to more difficult management. In addition, some owners will take the initiative to handle non-coal mining licenses and safety production licenses, but because of the long processing time and complex procedures, many owners will adopt the mode of mining while handling, making mine production in a legal and illegal awkward situation for a long time.

4 Non-coal mine safety production management measures

4.1 Mining shall comply with the basic safety production conditions

The stage height, platform width and slope Angle of open-pit mine can meet the requirements of safe operation slope stability. The fireproof drainage system on the ground has measures to prevent surface water from leaking into the open pit. Mine fire control facilities, power supply system, storage of blasting materials in accordance with the state regulations. The dump site shall have measures to prevent the occurrence of mud-rock flow and other hazards.

4.2 The enterprise shall establish rules and regulations of production safety responsibility system

Mining enterprises must implement the safety production policy of "safety first, prevention first", and gradually realize scientific and standardized safety management. Enterprises must establish and improve the responsibility system for safe production. In particular, the mine manager, as the first person responsible for safety in production of his own enterprise, must earnestly implement the production Safety Law, the Mine Safety Law and other relevant provisions of laws and regulations on production safety, formulate the production safety management system of his own enterprise, appoint qualified safety personnel, conduct follow-up inspections at each site, and take effective measures to improve the working conditions of employees. To ensure the timely supply of materials, equipment, instruments and labor protection required for safe production, and conduct safety education and training for employees in accordance with the requirements of relevant laws and regulations.

4.3 Strengthen employee safety education

Employees must receive three levels of safety education before working. They must observe labor discipline, do not drink alcohol before or during work, concentrate on work, do not read, sleep, do private work, bring children to work, and do not leave work without permission; Before going to work, you must wear labor protective equipment, work near the machine, should tie the sleeves, pants, women should pull the hair into the work cap, before work must carefully check the mechanical equipment, tools and the site is safe, work must strictly implement the post operating rules and relevant rules and regulations. Where to work in the danger area, first of all, there must be safety measures, unit leaders to disclose to the staff, eliminate unsafe factors, otherwise not allowed to work. It is strictly prohibited to risk operation in violation of regulations, in addition to paying attention to their own safety, but also pay attention to the safety of people around. Accident should be reported in time and try to rescue.

4.4 Establish and improve the work safety supervision system

The establishment of vertical to the end, horizontal to the edge of the safety production supervision system: non-coal mine production is a large system project involving many production personnel, the relevant management personnel to coordinate the organization and the environment and staff optimization configuration, so the establishment of a comprehensive safety production supervision system, training professional and experienced supervisors is necessary. In the supervision process, it is not only necessary to clarify the post responsibility system, but also to regularly assess the supervisors, stimulate their work enthusiasm, and play their own application role. In the process of development of non-coal mine, gradually improve the safety management system, make it meet the development needs of the new era, and provide an effective guarantee for the production safety of flying coal mine. Establish education and training system to continuously improve the safety quality of all staff: non-coal mine production safety issues are mainly for the staff participating in the production process, relevant departments should be based on the actual situation, sum up the correct production experience at the same time, standardize the safety behavior of production personnel, to regularly organize safety education and training and carry out regular assessment; Specify a sound reward and punishment system, improve the enthusiasm and enthusiasm of production personnel, and strengthen the construction of safety culture. In addition, it is also necessary to regularly designate different production personnel to share their safety experience, full participation, mutual exchange, and enhance the weight of safety production in the minds of staff.

4.5 Strengthen the construction of safety management mechanisms

Establish and improve the safety management and mass prevention and governance mechanism of the Party, government and work groups: The development of non-coal mountains is based on scientific development, and the party and government departments in charge of coal mine production in the production process should establish a corresponding safety management mechanism, carry out comprehensive publicity and education, attach great importance to the safety of non-coal mine mountains, achieve mass prevention and treatment, and improve the characteristics of each link in the production process. Leaders and organizations at all levels should also carry out safety education in various forms, take safety as the core, and create a good production atmosphere. Establish and improve the risk pre-control and management mechanism, and comprehensively promote the standardization of safety quality and essential safety management: Non-coal mine production itself is very risky, and with the changes of The Times, the traditional risk prevention management mechanism has gradually been eliminated, and the types of risks are also changing. Only by actively exploring new safety management concepts and approaches, seizing the initiative of safety production, and improving the risk management mechanism can we promote the safety production quality of non-coal mine in a more comprehensive way. Establish and improve the accident emergency rescue mechanism, and constantly improve the accident emergency rescue ability: the occurrence of non-coal mine production safety accidents is not specific, but once it occurs, it will bring huge economic losses and personnel safety problems. It is necessary to establish a set of emergency rescue mechanism to prevent emergency rescue measures and control the situation comprehensively and quickly in the event of an accident to reduce the waste of resources. Relevant departments should regularly organize emergency rescue drills when accidents occur, improve the emergency rescue ability of production operators, and achieve prevention and control for non-coal mine production safety.

5 Closing remarks

Safety is the most basic problem of all projects, only do a good job of safety work, in order to further carry out the project implementation, for the relevant management personnel of non-coal mine mountain, the establishment of safety production responsibility system as the core of the safety rules and regulations system is urgent. The responsibility system is the core of production safety, which requires that in the production engineering, the staff should put the safety awareness into the heart, strictly abide by the relevant norms, clear the job responsibilities, and find the relevant person in charge to solve the problem in time; Relevant departments should also organize regular training on safe production and proper use of equipment, and take measures such as regular maintenance and update of equipment to prevent safety problems.


  • Mannesmann Rexroth VT3006-36 Analog Amplifier Card
  • Bosch Rexroth R900086160 PGF1 Gear Pump
  • Bosch Rexroth R911173263 VDP15.3 Touch Display
  • Bosch Rexroth PPC-R22.1 RJ522 Industrial Controller
  • Bosch Rexroth MSK060C-0300-NN-S1-UG0-NNNN Servo Motor
  • Bosch Rexroth R911325068 NYS04.1 Controller
  • Bosch Rexroth R911335439 CSH01.1C Control Unit
  • Bosch Rexroth R917010287 BODAS RC10 Controller
  • Bosch Rexroth R911329791 CSH01.1C Drive Controller
  • Bosch Rexroth R182432310 Runner Block Guide
  • Bosch Rexroth VT-VSPA2-1-11 Amplifier Card R900021909
  • Bosch Rexroth MKD090B-047-KG1-KN Servo Motor
  • Bosch Rexroth LTU350 Servo Amplifier 0608750108
  • Bosch Rexroth 5610102050 Pneumatic Vacuum Regulator
  • Bosch Rexroth VT5041-23/3-OV PLC Control Board
  • Bosch Rexroth VT3015 S10/E Servo Amplifier Board
  • Bosch Rexroth MSK070D-0300-NN-M2-UG1 Servo Motor
  • Bosch Rexroth 3DREP6C-21 Valve R900955887
  • Bosch Rexroth R151244013 Ball Screw Bearing Unit
  • Bosch Rexroth MSM031C-0300 Servomotor R911325140
  • Bosch Rexroth EMD-B16.1-DC024N Box R911291681
  • Bosch Rexroth MKD071B-061-GP0-KN Servo Motor
  • Bosch Rexroth MSK030C-0900-NN-M1-UG1 Servo Motor
  • Bosch Rexroth EcoDrive DKC01.3-004-3-MGP-01 Servo Controller (299772)
  • Bosch Rexroth DKC02.3-040-7 EcoDrive Controller
  • Bosch Rexroth CLC-D02.3 CLC Motion Control Board
  • Bosch Rexroth HDS05.2-W300N Drive R911190019
  • Bosch Rexroth DKCXX.3-100-7 Servo Drive Unit
  • Bosch Rexroth CSE02.1A-S3-EC Control Unit R911339030
  • Bosch Rexroth MSK040C-0600-NN-S1-UP0 Servo Motor
  • Bosch Rexroth VT3013 S36 R5 Circuit Board Card
  • Bosch Rexroth VT3000-36A Amplifier Card R90020298
  • Bosch Rexroth VPB40.3 IndraControl Module R911374113
  • Bosch Rexroth HCS02.1E-W0054-A-03-NNNN Converter with R911332574 Control Unit
  • Bosch Rexroth MHD071B-061-PG1-UN Servo Motor
  • Bosch Rexroth A2F5/60W-B3-S Piston Motor R909418904
  • Bosch Rexroth HCS01.1E-W0018-A-03-B-ET-EC-NN-NN-NN-FW IndraDrive Cs Converter
  • Bosch Rexroth 4WRPEH 6 C4B40P-2X/G24K0/A1M Proportional Directional Valve (0 811 404 647)
  • Bosch Rexroth R911405975 ctrlX OS PLC Controller
  • Bosch Rexroth CSB02.1B-ET-EC-NN-S4-NN-NN-FW Servo Control Card R911338543
  • Rexroth MSK050B-0300-NN-M1-UG0-NNN Servo Motor
  • Rexroth IndraControl VEPXX.5-ATOM Set R911374889 Panel
  • Rexroth 1070089906-GC1 1070089907-201 Board
  • Rexroth CSB01.1C-SE-ENS-EN2-NN-S-NN-FW Control Unit
  • Rexroth MKD071B-024-KG3-KN Servo Motor
  • Rexroth Indramat DKC02.3-040-7-FW Controller
  • Rexroth HCS02.1E-W0028-A-03-NNNN Servo Module
  • Rexroth HMD01.1N-W0036-A-07-NNNN Drive Module
  • Rexroth MSK050C-0600-NN-M1-UG0-NNN Servo Motor
  • Rexroth DKC02.3-040-7-FW Servo Controller
  • Bosch Rexroth VT-5014S30-R1 Amplifier Card
  • Bosch Rexroth MSK040C-0600-NN-M1-UG1 Servo Motor
  • Bosch Rexroth MKD071B-061-GG0-KN Servo Motor
  • Bosch Rexroth VT5012-S45-R1 Amplifier Card
  • Bosch Rexroth SHL03.1-NNN-S-NNN Encoder Module
  • Bosch Rexroth EFC3600-0K75 Frequency Converter
  • Bosch Rexroth VFC3610-1K50-3P4-MNA-7P-NNNNN-NNNN 1.5kW Frequency Inverter
  • Bosch Rexroth EFC5610-2K20-3P4-MDA-7P-NNNNN-L1NN 2.2kW Frequency Converter
  • Bosch Rexroth XM21 XM2100.01 PLC Control Unit
  • Rexroth CSH01.1C-ET-ENS R911328178 HMS01.1N-W0020 Drive Package
  • April AXI0010 - Single Axis Servo Controller
  • Rexroth DKC10.3-004-3-MGP-01VRS Servo Drive
  • Bosch DKC02.3-040-7-FW Servo Drive
  • Rexroth DKC06.3-040-7-FW Servo Drive Controller
  • Rexroth VPB40.3 SE T R911374113 Control Module
  • Rexroth S20-SSI-AO-1/1 R911172544-AB1 Module
  • Rexroth R911173004 AC1 GH1 PLC Control Set
  • Rexroth VPB40.3D1L-1G0NN-D1D-DN-NN-FW Module
  • Rexroth MDD071B-N-040-N2T-095GB1 Servo Motor
  • Bosch Rexroth DM15K1101-D Servo Drive Module
  • Rexroth CSH01.3C-PB-ENS-MA1-CCD-S2-S-NN-FW Drive
  • Rexroth HMS01.1N-W0036 CSB02.1B Drive Package
  • Rexroth MSK070E-0300-NN-M2-UG0-RNN Servo Motor
  • Rexroth AZPF-1X-004RCB20KB Gear Pump
  • Rexroth NFD03.1-480-055 Powerline Filter
  • Rexroth VT-VARAP1-537-20/V0 Valve Amplifier
  • Rexroth HVE04.2-W075N Supply Module
  • Rexroth HMD01.1N-W0020-A-07-NNNN Drive Controller
  • Rexroth VDP40.3DIN-D1-NN-CG HMI Computer
  • Rexroth HDS05.2-W300N-HS12-01FW Drive Module
  • Rexroth HMS01.1N-W0070-A-07-NNNN Power Section
  • Rexroth Indramat MKD071B-061-GP0-KN Servo Motor
  • Rexroth HDS03.2-W075N-HS12-01-FW Control Unit
  • Rexroth HCS02.1E-W0054-A-03-NNNN Servo Drive
  • Rexroth CML40.2-SP-330-NA-NNNN-NW IndraControl
  • Rexroth CSH01.1C-PB-ENS-NNN-MA1-S2-S-NN-FW Drive
  • Rexroth PPC-R22.1 DAQ03 Servo Drive
  • Rexroth HCS02.1E-W0070-A-03-NNNN Servo Drive
  • Rexroth RF-FLS PB M12 DIO 8/8 M12 Module
  • Rexroth Indramat TBM 1.2-40-W1-024 Servo Bleeder
  • Rexroth Indramat MKD071B-061-KG1-KN Servo Motor
  • Rexroth CML40.2-SP-330-NA-NNNN-NW IndraControl L40
  • Rexroth VCP08.2DTN-003-NN-NN-PW Operator Panel
  • Bosch Rexroth DM30K1101-D Servo Drive 670V DC
  • Rexroth PPC-R22.1N-N-Q1-NN-NN-FW Motion Controller
  • Rexroth MSK040C-0600-NN-M1-UG1-NNNN Servo Motor
  • Rexroth CSH01.1C-S3-ENS-NNN-NNN-S2-S-NN-FW Drive Controller
  • Rexroth PPC-R22.1 Motion Control Module 004566384
  • Rexroth CSH01.1C-PB-ENS-NNN-MA1-S2-S-NN-FW Controller
  • Rexroth CML25.1-3N-400-NN-NNC1-NW IndraControl L25
  • Rexroth MSK030C-0900-NN-M1-UP1-NSNN Servo Motor
  • Rexroth HCS02.1E-W0028-A-03 CSH01.1C-PB Drive Package
  • Bosch Rexroth VT-VARAP 1-537-20/V0 Amplifier
  • Bosch Rexroth PPC-R02.2N R911285402 Control Unit
  • National Instruments PCI-7342 Motion Controller
  • National Instruments PXIe-6535 Digital I/O Module
  • National Instruments PCIe-6738 Analog Output Card
  • National Instruments NI-6583 Digital I/O Adapter Module
  • National Instruments NI TB-9214 Terminal Block
  • National Instruments NI 9222 Simultaneous Analog Input Module
  • National Instruments PXIe-8364 MXI-Express Module
  • National Instruments PXI-8185 Embedded Controller
  • National Instruments PCI-1405 Device
  • National Instruments SCXI-1160 Module
  • National Instruments PCI-MIO-16E-1 Device
  • National Instruments USB-6216 Device
  • National Instruments PXIe-2543 Module
  • National Instruments PCI-5102 Digitizer
  • National Instruments PXI-6284 DAQ Device
  • National Instruments PXI-7330 Controller
  • National Instruments cFP-2100 Controller
  • National Instruments USB-6002 DAQ Device
  • National Instruments PCIe-6374 Multifunction DAQ Card
  • National Instruments PXIe-4610 Power Amplifier Module
  • National Instruments PXIe-4154 Battery Simulator
  • National Instruments PXIe-7858R Reconfigurable I/O Module
  • National Instruments BNC-2090A BNC Terminal Block
  • National Instruments cRIO-9066 CompactRIO Controller