Green mine construction status and existing problems and countermeasures

F: | Au:佚名 | DA:2023-12-21 | 656 Br: | 🔊 点击朗读正文 ❚❚ | Share:



First, construction status

Mining engineering activities, including coal, have played a huge role in ensuring China's economic and social progress and improving people's living standards, especially in the past 40 years of reform and development, especially in the western region, more than 80% of the GDP of many provinces are contributed by mining engineering activities. However, due to many reasons, mining engineering activities have created great wealth for our country, but also caused serious problems of mine ecological environment. These problems mainly include five types: "three wastes" discharge, ground deformation, aquifer structure damage caused by mining induced water discharge (sudden), water supply, ecological and environmental protection contradictions, desertification and soil erosion; In addition, there are also problems in mining area construction planning and design, mining operation management, mining enterprise culture and credit system construction, mining area and mining area harmony. Therefore, in order to build an upgraded version of China's main energy coal industry, it is necessary to walk out of the green road of efficient development of mineral resources, including coal, and coordinated development of the ecological environment through green mine construction and green mining development.

The concrete evaluation index of green mine construction mainly includes six aspects: mining environment, resource development mode, comprehensive utilization of resources, energy saving and emission reduction, scientific and technological innovation and enterprise construction.

Up to now, after enterprise self-assessment, third-party assessment, provincial verification and recommendation, in addition to Beijing and Shanghai, a total of 1,254 mining enterprises in 29 provinces (municipalities and districts) have been selected into the national Green Mine List database, accounting for about 2.1% of the total number of mines in the country. The level of green mines in different regions varies greatly, with the highest proportion of green mines in Jiangsu Province (12.3%) and the lowest in Tianjin City (0.3%).

Among the 1254 green mining enterprises, there are 284 green coal mines. Shanxi, Shaanxi, Inner Mongolia, Henan, Shandong and other provinces and cities, as important coal energy bases in China, have made an important example in the construction of national green mines.

In addition, on December 11, 2020, the Ministry of Natural Resources announced for the first time a list of 50 green mining development demonstration zones. It indicates that China has gradually moved from the point-like green mine construction to the face-like green mining development demonstration area.

In general, China's green mine construction and green mining development after more than ten years of efforts, from "pilot exploration" to "comprehensive promotion", from "single point mine" to "surface demonstration zone" has achieved remarkable results, its performance:

First, green mine construction, as a starting point for the construction of ecological civilization in the mining field, has been promoted as an important work by most provincial (autonomous regions and municipalities) people's governments, and its concept and method have been accepted by the majority of mining enterprises, basically forming a new pattern of green mine construction in the country;

Second, the green mine construction work system of national, provincial, city and county level joint creation, enterprise construction, third-party evaluation and social supervision has been initially established;

Third, under the premise that the overall level of mine construction in the country is not high, green mine construction has set up a number of models for the country and played a leading role in transforming the mining development mode, promoting the ecological environment of mining areas, scientific mining methods, efficient utilization of resources, standardized enterprise management and harmonious mining communities.

2. Existing problems

However, in the process of green mine construction practice, we also found some areas that need to be improved and perfected, the specific problems are as follows:

1, the enterprise has a deviation in the understanding of the connotation of green mine, and the motivation to create is insufficient

Limited to the industry's promotion and training of green mines is not in place, many people's understanding of green mines has a certain bias, mainly reflected in:

First, some localities and enterprises are only forced by the current ecological environmental protection pressure, do not recognize the deep-seated problems of resource exploitation;

Second, the green mine is considered as a "high input, high cost" mine, which indirectly leads to the promotion of green mine is limited;

Third, some localities and enterprises regard the title of green mine as a shield for ecological environmental protection supervision, paying more attention to "creation", thinking less about "construction", and lacking long-term planning.

2, the level of green mine construction needs to be improved

At present, 1,254 mines included in the national green mine list, accounting for only about 2.1% of the total number of mines in the country, and mainly large and medium-sized mines, but the proportion of small and below mines in China accounted for more than 80%, the green mine construction task is still difficult. Taking coal mines as an example, at present, the number of green coal mines created in China is relatively small, and the mines included in the national green mine list account for only 1.5%, and the proportion of green mines built needs to be improved.

3. Uneven regional development of green mine construction layout

The western region is an important development zone for the distribution of energy and mineral resources in China, but among the 661 national green mine pilots, the western region only accounts for less than 36%. Of the 57 coal enterprises' green mines, only about 25.5% are in the west.

Third, countermeasures and suggestions

1. Strengthen the systematic thinking of green mine construction

First, the construction of green mines should be coordinated by multiple departments in the horizontal management and organization.

Mine construction involves the planning scheme of 3 departments and 5 divisions:

(1) The Department of Mineral Rights Management of the Ministry of Natural Resources and the associations of various mineral species are responsible for the review of mine development and utilization plans;

(2) The Department of Territorial and Spatial Ecological Restoration of the Ministry of Natural Resources and the provincial departments of Natural Resources, responsible for the review of land reclamation and mine geological environment protection and management restoration programs;

(3) The Department of Geological Exploration Management of the Ministry of Natural Resources and the departments of Natural resources of each province, responsible for geological disaster investigation, exploration design, evaluation, management and supervision;

(4) The Environmental Impact Assessment Department of the Ministry of Ecological Environment and the ecological environment departments of each province are responsible for the review of the environmental impact assessment reports of mining area planning and projects;

(5) The Department of Soil and Water Conservation of the Ministry of Water Resources and the provincial departments are responsible for the review of soil and water conservation programs.

Second, the construction of green mines should further improve the joint creation mechanism at the national, provincial, city and county levels in the vertical aspect, and decompose and implement the policies, standards and mechanisms from top to bottom.

Third, the green mine construction and green mining development should take the river basin as the implementation unit and be guided by the systematic concept. Because a river basin not only involves all kinds of mining problems, but also agricultural surface pollution, industrial spot pollution, black and smelly water bodies in urban and rural areas, polluted river wetlands, etc., it is necessary to use the concept of large-scale system engineering, closely combined with the overall planning of local social and economic development, watershed territorial spatial planning, ecological environment planning and disaster prevention and reduction planning, and make full use of natural geographical conditions. According to local conditions, integrated management of "mountains, rivers, forests, fields, lakes, grass and sand" will be carried out in the region, and integrated planning and construction of "mineral-agriculture-urban complex" will be strengthened.

The fourth is to build a social supervision system composed of the government, enterprises, the public, associations and other parties, and improve the information disclosure mechanism of green mining enterprises.

2. Release policy potential, encourage mining enterprises to adhere to innovation-driven and increase investment in science and technology, and improve the endogenous power of enterprises to build green mines

First, for the mining enterprises that have been included in the national green mine list, it is proposed to give necessary supporting incentive policies to give priority to meeting their related mining land, resource allocation, capacity conversion, capacity release, financial support, tax incentives, listing financing, issuing green mine bonds, realizing the value of green mine ecological products, carbon peak carbon neutrality and other needs.

The second is to use the economic benefit evaluation method and model of green mine construction, according to the economic benefit calculation results of the new technology adopted in green mine construction, quantitative evaluation of the economic effect and ecological environmental benefit obtained by green mine construction, and encourage mining enterprises to take the initiative to build green mines.

3. Improve the legal system and normative system of green mine construction, improve the dynamic management mechanism of green mine list, and build a third-party evaluation and supervision mechanism

First, we will give play to the binding role of laws and the guiding role of standards and norms. The green mine construction requirements rise to the legal level. In the revised Mineral Resources Law and implementation regulations, the requirements and standards for green mine construction are clearly set forth, and the provisions on liability recovery, economic punishment and subsequent compensation are clearly defined, providing a legal basis for the planning and design of green mines and the formulation and implementation of relevant technical standards.

The second is to improve the normative system of green mine construction, revise and improve the relevant standards, norms, guidelines, guidelines and other contents in a timely manner, and promote the formulation of national standards for green mine construction.

Third, improve the dynamic management of the national green mine list. Establish a dynamic update mechanism for the list, strengthen periodic spot checks in mines, and remove mining enterprises that do not meet the standards from the list in a timely manner.

Fourth, establish a third-party evaluation and supervision mechanism for green mine construction. Strengthen the supervision of third-party evaluation agencies for green mine construction, establish and improve the responsibility system of third-party evaluation agencies, increase the punishment and punishment of third-party violations, and ensure the fairness and openness of selection, evaluation and list management. Explore the adoption of "green certification" into the CNCA voluntary certification field directory, and promote the standardization and standardization of third-party assessment.

4. Encourage "development-type" construction of green mines

The mining environment positive effect resources such as "three wastes" resources, underground space resources, mine surface site resources, residual resources and other resources have been developed and utilized, and efforts have been made to turn waste into treasure and harm into benefit, and the income after the positive effect development and utilization of the mine environment with resource attributes has been used to supplement green mine construction and reduce the re-investment in green mine construction.

5. Accelerate the establishment of ecological restoration funds for abandoned mines left over from history and do a good job in market operation

There are large historical abandoned mines in the country, and the government is responsible for ecological restoration. The treatment of abandoned mines left over from history is an urgent task and a large investment. Depending on the difficulty of treatment, the treatment cost is about 200,000-300,000 yuan/hectare. At present, there is a serious shortage of investment in mine ecological restoration, and the annual special transfer payment from the central government is about 2 billion yuan for the treatment of historical abandoned mines, and local governments generally rarely set up special funds. To achieve the goal of building a beautiful China, we must establish a stable investment mechanism that can meet the needs. Therefore, it is suggested that in the provinces with large coal resources development, such as Shanxi, Shaanxi, Mongolia, Henan and Lu provinces with large coal mining volume in the Yellow River basin, the ecological restoration fund of historical abandoned mines should be established at the provincial level, and the fund should be calculated from the sales income of mineral products of enterprises according to a certain proportion for the ecological restoration of abandoned mines in the whole province. At the same time, with the guidance of the fund, through healthy market operation, who repairs, who benefits, attract social capital investment, and solve the "bottleneck" problem of capital investment.


  • Atlas Copco 49X10301AB Pressure Transducer Sensor
  • Atlas Copco 8436180002 Replacement Filter Element
  • Atlas Copco C4700A01V216 Compressor Control Module
  • Alcatel-Lucent 3HE01019AAAA01 High-Speed Interface Module
  • Alcatel-Lucent 111381 Power Distribution Module
  • Alcatel TN 2523 1:1 CDN III Module – MRPQAE3
  • Alcatel-Lucent 3he06151aaac01 8-Port Interface Module – IPUIBKB3AA
  • Alcatel-Lucent LNW46 DMX Metro OC12 Interface Module – 108694878
  • Alcatel-Lucent 41A12C FT-2000 Optical Transponder Unit – 108188053
  • Alcatel-Lucent 8DG02607AA POW100 DC-DC Converter Module
  • Alcatel-Lucent LambdaXtreme WWBQ21 40G Optical Transponder
  • Alcatel-Lucent TN1891 5ESS Protocol Handler PHV5 Commcode 108747064
  • Alcatel-Lucent 300-0303-900 T1D3PDL1AE Digital Matrix Card
  • Alcatel-Lucent G-821M-A Module
  • Alcatel Lucent MPT-GC Eth 1G+ARM TX 81-86GHz 3DB80005AAAAO1
  • Nokia 3KC48990AB 1830PSS 16FAN2 Fan Unit
  • Alcatel 3EC17041AA PSPC-G4 PCB CP011200552
  • Alcatel 300-0437-906 Rev F DEXCS DMC T1D1L0S Module
  • Alcatel-Lucent 3DW03697ABBA01 TFD64A Module
  • Alcatel-Lucent AWR12 S1-1 UN Interface T3PQAC3AAA
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC 3DB20914BAAA03 6GHZ
  • Alcatel-Lucent 9500-MPR ODU 300 11GHz Microwave Radio MPT 3DB23035AEAA01
  • Alcatel 2C7-1005-000 Teflon Bell Jar Holder Ring – 146111
  • Alcatel-Lucent BNJ118 S1:4 Circuit Board – Interface Module
  • Alcatel-Lucent 9500-MPR ODU 300 6GHz Microwave Radio MPT 3DB23215AFAA01
  • Alcatel 3EM04001AA Signal Processing Unit with Accessory Cards
  • Alcatel VAUCAL5KAB AA1418FE2BG 3FE67437AAD02 Interface Card
  • Alcatel-Lucent 1642 Edge Multiplexer N1217P YF – Access Node
  • Alcatel-Lucent 3HE07158BA 7750 SR-12 12-Port 10GIGE MultiCore IMM IPUCA741AA
  • Alcatel 101200429000 Power Divider 746-776 MHz with Heatsinks
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215ADAA01 High Power Radio
  • Alcatel-Lucent 9500-MPR MPT-HC 23GHz 2/2P ODU Radio 3DB20474BA
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215AAAA01 Low Power Radio
  • Alcatel 3BA52126ABAA OmniPCX 4400 Compact Cabinet
  • Alcatel-Lucent 3HE12300AA 7750 SR-1 Subrack with Licenses
  • Alcatel 300-1368-903 Rev C DEXCS SPA-1 T1PQAC1 Line Card
  • Alcatel-Lucent 408977981 WOWUAB6HAA 10G XPR OTU2 XPonder Card
  • Alcatel-Lucent-Nokia 3HE08423AARC01 7750 SR Control Processor Module IPUCBGZ1AA
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215ABAA01 Low Power Radio
  • Alcatel-Lucent CPU7-2 3BA23259ABJE 05 Control Processor Module
  • Alcatel WTM11AD 3DW03915DABA01 Optical Transponder Module
  • Alcatel-Lucent 1340FMPK Card Chip BA5IVY6BAA – Processor Module
  • Alcatel-Lucent 3HE06151ACAC01 Control Fabric Module
  • Alcatel-Lucent 9500-MPR 18GHz 1P-1 Protection ODU Radio 3DB20433BA AA04
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 18GHz Radio 3DB20433BAAA04
  • Alcatel-Lucent SM269 LMPQ04KAXX Circuit Pack – Interface Module
  • Alcatel OME25HP Filter Cartridge – 107494
  • Alcatel-Lucent ALU-BZ74 99BC-4 –48V Battery Cabinet
  • Alcatel-Lucent WWAA37 Optical Amplifier WMAPZNZAAB – CP Series
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC MPT-XP 3DB20476BAAA04 23GHZ
  • Alcatel Tyco Yukon ES760A Rectifier
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 23GHz 3DB23045HMAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 11GHz 3DB20548ACAA01 Microwave Radio
  • Alcatel Lucent 3DH03173AKAA Module
  • Alcatel-Lucent 76-0300-02 CSM-V2 PCB
  • Alcatel 9400 UX ODU Module 3CC06729ABAA
  • Alcatel-Lucent 408981363 Jigsaw A Band Block 24/-48V KS24624L58
  • Alcatel 3BA53095 PCB Card
  • Alcatel 2C7-1005-000 Bell Jar Holder Ring Teflon PC7-1005-000
  • Alcatel-Lucent ES640 PWDQAGKUAA 5ESS 48V DC Alarm Control Unit
  • Alcatel-Lucent 9500-MPR ODU 300 23GHz Microwave Radio MPT 3DB23045HM
  • Alcatel-Lucent KFA720 WMOTCMVLAB Optical System Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 15GHz Microwave Radio 3DB20373BAAB04
  • Alcatel-Lucent AKM70 S1-7 SMUX1 Sub-Multiplexer – T3PQWAEAAH
  • Alcatel-Lucent 107486490 DDM-2000 SONET DS3 Circuit Pack – BBG4B
  • Alcatel-Lucent SBEVM BNJ82 1:12 Module – AV950-01168
  • Alcatel-Lucent 938A Optical Loss Set – Test & Measurement Kit
  • Alcatel-Lucent MS1025-25O16-ED Fiber Optic Unit – 48VDC
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 1/1P Microwave Radio 3DB20473BA AA04
  • Alcatel-Lucent bCEM-U Control Module – 3BK28676ABAC01
  • Alcatel ASI20 Detector Control Module
  • Alcatel Lucent 130B S-1 PWPQ08B Power Unit
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20441BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20824AAAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20822AAAB02 Microwave Radio
  • Alcatel-Lucent 3AL92111AA 1P10GSO Interface Module
  • Alcatel 8220 CTT 450 Turbo Pump Controller 127821
  • Alcatel-Lucent 3AL78823AAAE 02 Module
  • Alcatel-Lucent 90-0413-01 Universal Card
  • Alcatel-Lucent BRMA 10Base-T/100Base-TX Connecting Box 3BA56170ACAB010842
  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card