Green mine construction status and existing problems and countermeasures

F: | Au:佚名 | DA:2023-12-21 | 603 Br: | 🔊 点击朗读正文 ❚❚ | Share:



First, construction status

Mining engineering activities, including coal, have played a huge role in ensuring China's economic and social progress and improving people's living standards, especially in the past 40 years of reform and development, especially in the western region, more than 80% of the GDP of many provinces are contributed by mining engineering activities. However, due to many reasons, mining engineering activities have created great wealth for our country, but also caused serious problems of mine ecological environment. These problems mainly include five types: "three wastes" discharge, ground deformation, aquifer structure damage caused by mining induced water discharge (sudden), water supply, ecological and environmental protection contradictions, desertification and soil erosion; In addition, there are also problems in mining area construction planning and design, mining operation management, mining enterprise culture and credit system construction, mining area and mining area harmony. Therefore, in order to build an upgraded version of China's main energy coal industry, it is necessary to walk out of the green road of efficient development of mineral resources, including coal, and coordinated development of the ecological environment through green mine construction and green mining development.

The concrete evaluation index of green mine construction mainly includes six aspects: mining environment, resource development mode, comprehensive utilization of resources, energy saving and emission reduction, scientific and technological innovation and enterprise construction.

Up to now, after enterprise self-assessment, third-party assessment, provincial verification and recommendation, in addition to Beijing and Shanghai, a total of 1,254 mining enterprises in 29 provinces (municipalities and districts) have been selected into the national Green Mine List database, accounting for about 2.1% of the total number of mines in the country. The level of green mines in different regions varies greatly, with the highest proportion of green mines in Jiangsu Province (12.3%) and the lowest in Tianjin City (0.3%).

Among the 1254 green mining enterprises, there are 284 green coal mines. Shanxi, Shaanxi, Inner Mongolia, Henan, Shandong and other provinces and cities, as important coal energy bases in China, have made an important example in the construction of national green mines.

In addition, on December 11, 2020, the Ministry of Natural Resources announced for the first time a list of 50 green mining development demonstration zones. It indicates that China has gradually moved from the point-like green mine construction to the face-like green mining development demonstration area.

In general, China's green mine construction and green mining development after more than ten years of efforts, from "pilot exploration" to "comprehensive promotion", from "single point mine" to "surface demonstration zone" has achieved remarkable results, its performance:

First, green mine construction, as a starting point for the construction of ecological civilization in the mining field, has been promoted as an important work by most provincial (autonomous regions and municipalities) people's governments, and its concept and method have been accepted by the majority of mining enterprises, basically forming a new pattern of green mine construction in the country;

Second, the green mine construction work system of national, provincial, city and county level joint creation, enterprise construction, third-party evaluation and social supervision has been initially established;

Third, under the premise that the overall level of mine construction in the country is not high, green mine construction has set up a number of models for the country and played a leading role in transforming the mining development mode, promoting the ecological environment of mining areas, scientific mining methods, efficient utilization of resources, standardized enterprise management and harmonious mining communities.

2. Existing problems

However, in the process of green mine construction practice, we also found some areas that need to be improved and perfected, the specific problems are as follows:

1, the enterprise has a deviation in the understanding of the connotation of green mine, and the motivation to create is insufficient

Limited to the industry's promotion and training of green mines is not in place, many people's understanding of green mines has a certain bias, mainly reflected in:

First, some localities and enterprises are only forced by the current ecological environmental protection pressure, do not recognize the deep-seated problems of resource exploitation;

Second, the green mine is considered as a "high input, high cost" mine, which indirectly leads to the promotion of green mine is limited;

Third, some localities and enterprises regard the title of green mine as a shield for ecological environmental protection supervision, paying more attention to "creation", thinking less about "construction", and lacking long-term planning.

2, the level of green mine construction needs to be improved

At present, 1,254 mines included in the national green mine list, accounting for only about 2.1% of the total number of mines in the country, and mainly large and medium-sized mines, but the proportion of small and below mines in China accounted for more than 80%, the green mine construction task is still difficult. Taking coal mines as an example, at present, the number of green coal mines created in China is relatively small, and the mines included in the national green mine list account for only 1.5%, and the proportion of green mines built needs to be improved.

3. Uneven regional development of green mine construction layout

The western region is an important development zone for the distribution of energy and mineral resources in China, but among the 661 national green mine pilots, the western region only accounts for less than 36%. Of the 57 coal enterprises' green mines, only about 25.5% are in the west.

Third, countermeasures and suggestions

1. Strengthen the systematic thinking of green mine construction

First, the construction of green mines should be coordinated by multiple departments in the horizontal management and organization.

Mine construction involves the planning scheme of 3 departments and 5 divisions:

(1) The Department of Mineral Rights Management of the Ministry of Natural Resources and the associations of various mineral species are responsible for the review of mine development and utilization plans;

(2) The Department of Territorial and Spatial Ecological Restoration of the Ministry of Natural Resources and the provincial departments of Natural Resources, responsible for the review of land reclamation and mine geological environment protection and management restoration programs;

(3) The Department of Geological Exploration Management of the Ministry of Natural Resources and the departments of Natural resources of each province, responsible for geological disaster investigation, exploration design, evaluation, management and supervision;

(4) The Environmental Impact Assessment Department of the Ministry of Ecological Environment and the ecological environment departments of each province are responsible for the review of the environmental impact assessment reports of mining area planning and projects;

(5) The Department of Soil and Water Conservation of the Ministry of Water Resources and the provincial departments are responsible for the review of soil and water conservation programs.

Second, the construction of green mines should further improve the joint creation mechanism at the national, provincial, city and county levels in the vertical aspect, and decompose and implement the policies, standards and mechanisms from top to bottom.

Third, the green mine construction and green mining development should take the river basin as the implementation unit and be guided by the systematic concept. Because a river basin not only involves all kinds of mining problems, but also agricultural surface pollution, industrial spot pollution, black and smelly water bodies in urban and rural areas, polluted river wetlands, etc., it is necessary to use the concept of large-scale system engineering, closely combined with the overall planning of local social and economic development, watershed territorial spatial planning, ecological environment planning and disaster prevention and reduction planning, and make full use of natural geographical conditions. According to local conditions, integrated management of "mountains, rivers, forests, fields, lakes, grass and sand" will be carried out in the region, and integrated planning and construction of "mineral-agriculture-urban complex" will be strengthened.

The fourth is to build a social supervision system composed of the government, enterprises, the public, associations and other parties, and improve the information disclosure mechanism of green mining enterprises.

2. Release policy potential, encourage mining enterprises to adhere to innovation-driven and increase investment in science and technology, and improve the endogenous power of enterprises to build green mines

First, for the mining enterprises that have been included in the national green mine list, it is proposed to give necessary supporting incentive policies to give priority to meeting their related mining land, resource allocation, capacity conversion, capacity release, financial support, tax incentives, listing financing, issuing green mine bonds, realizing the value of green mine ecological products, carbon peak carbon neutrality and other needs.

The second is to use the economic benefit evaluation method and model of green mine construction, according to the economic benefit calculation results of the new technology adopted in green mine construction, quantitative evaluation of the economic effect and ecological environmental benefit obtained by green mine construction, and encourage mining enterprises to take the initiative to build green mines.

3. Improve the legal system and normative system of green mine construction, improve the dynamic management mechanism of green mine list, and build a third-party evaluation and supervision mechanism

First, we will give play to the binding role of laws and the guiding role of standards and norms. The green mine construction requirements rise to the legal level. In the revised Mineral Resources Law and implementation regulations, the requirements and standards for green mine construction are clearly set forth, and the provisions on liability recovery, economic punishment and subsequent compensation are clearly defined, providing a legal basis for the planning and design of green mines and the formulation and implementation of relevant technical standards.

The second is to improve the normative system of green mine construction, revise and improve the relevant standards, norms, guidelines, guidelines and other contents in a timely manner, and promote the formulation of national standards for green mine construction.

Third, improve the dynamic management of the national green mine list. Establish a dynamic update mechanism for the list, strengthen periodic spot checks in mines, and remove mining enterprises that do not meet the standards from the list in a timely manner.

Fourth, establish a third-party evaluation and supervision mechanism for green mine construction. Strengthen the supervision of third-party evaluation agencies for green mine construction, establish and improve the responsibility system of third-party evaluation agencies, increase the punishment and punishment of third-party violations, and ensure the fairness and openness of selection, evaluation and list management. Explore the adoption of "green certification" into the CNCA voluntary certification field directory, and promote the standardization and standardization of third-party assessment.

4. Encourage "development-type" construction of green mines

The mining environment positive effect resources such as "three wastes" resources, underground space resources, mine surface site resources, residual resources and other resources have been developed and utilized, and efforts have been made to turn waste into treasure and harm into benefit, and the income after the positive effect development and utilization of the mine environment with resource attributes has been used to supplement green mine construction and reduce the re-investment in green mine construction.

5. Accelerate the establishment of ecological restoration funds for abandoned mines left over from history and do a good job in market operation

There are large historical abandoned mines in the country, and the government is responsible for ecological restoration. The treatment of abandoned mines left over from history is an urgent task and a large investment. Depending on the difficulty of treatment, the treatment cost is about 200,000-300,000 yuan/hectare. At present, there is a serious shortage of investment in mine ecological restoration, and the annual special transfer payment from the central government is about 2 billion yuan for the treatment of historical abandoned mines, and local governments generally rarely set up special funds. To achieve the goal of building a beautiful China, we must establish a stable investment mechanism that can meet the needs. Therefore, it is suggested that in the provinces with large coal resources development, such as Shanxi, Shaanxi, Mongolia, Henan and Lu provinces with large coal mining volume in the Yellow River basin, the ecological restoration fund of historical abandoned mines should be established at the provincial level, and the fund should be calculated from the sales income of mineral products of enterprises according to a certain proportion for the ecological restoration of abandoned mines in the whole province. At the same time, with the guidance of the fund, through healthy market operation, who repairs, who benefits, attract social capital investment, and solve the "bottleneck" problem of capital investment.


  • Basler Electric BE1-700 Digital Protective Relay
  • Basler Electric SR8A-2B01B3A Static Voltage Regulator
  • Basler Electric SR4A-2B01B3E Static Voltage Regulator
  • Basler Electric 9017709102 PC Board
  • Basler Electric SR4A-2B01B3A Static Voltage Regulator
  • Basler Electric PRS-250 Veri-Sync Relay
  • Basler Electric 9066800102 Excitation Support System
  • Basler Electric BE1-87G Generator Differential Relay 9 1708 18 100
  • Basler Electric 36T865-2 BE03752001 Power Supply
  • Basler Electric M-300 149D940G02 Power Supply
  • Basler Electric ACA2040-25GM 4Mp 25Fps Area Scan Camera
  • Basler BE1-87G-S1A-A1C-A0N0 Differential Relay
  • Basler SR8A-2B06B3E Static Regulator SR8A2B06B3E
  • Basler SCP-210 Frequency Controller 9095400100
  • Basler BE1-59-A3E-A1J-N1N3F Overvoltage Relay BE159A3EA1JN1N3F
  • Basler 9 2011 11 100 Bracket Mounted Terminal Unit
  • Basler 9 1606 00 101 Voltage Regulator
  • Basler CBS-377 Current Boost System 9109600102
  • Basler 8650C72 Exciter Control Module PCB Rev 5
  • Basler C2EE1PA0N1F BE1-32R Reverse Power Relay
  • ADLINK HPCI-14S12U - Industrial Control Backplane 12PCI Backplane PCI-14S Passive Backplane
  • ADLINK PCIe-GIE74C - image acquisition card 4-CH GigE Vision PoE+ Frame Grabber
  • ADLINK PCI-8164 - control card 4-Axis Advanced Motion Controller Board
  • ADLINK PCIe-U304 - 4 Port USB3 PCIe Frame Grabbers USB Screw Hole Card
  • ADLINK PCI-9112 - Multi-Function Data Acquisition Card DAQ Card
  • ADLINK PCI-7432 - 51-12013-0A50 4-CH Isolated Numérique I/O PCI Cartes Digital I/O Card
  • ADLINK PCA-6106P3-0C1 REV.C1 - backplane 6-Slot Passive Backplane Board
  • ADLINK PCI-7224 - 24-CH Opto-Isolated Digital I/O PCI Board
  • ADLINK CPCI-7433R(G) - Digital Input Board Rear I/O CompactPCI Card
  • ADLINK EBP-13E4 - 51-46703-0A30 Industrial PC Backplane Passive Backplane
  • ADLINK PCIE-HDV62 - Image acquisition card High Definition Video Frame Grabber
  • ADLINK EBP-13E4 - 51-46703-0A30 Industrial Backplane Board Passive Backplane
  • ADLINK 90111-B1 / CPCI-6770 - PCB CPU MODULE CompactPCI Single Board Computer
  • ADLINK PCI-7248 - DATA ACQUISITION PCI CARD 48-CH Parallel Digital I/O Board
  • ADLINK PCI-7230 - 51-12003-0a50 board PCI7230 32-CH Isolated Digital I/O Card
  • ADLINK PCI2A000CB - 51-20000-0B30 Multi-Function DAQ Card Baseboard
  • ADLINK PCI-8134-005 - 4-Axis Motion Controller Card
  • ADLINK PCI-7224 - 24-CH Opto-Isolated Digital I/O PCI Card
  • ADLINK PCI-7434 - 64-CH Isolated Digital Output Card
  • ADLINK PCI-8132 - motion control card 2-Axis Servo & Stepper Controller
  • ADLINK PCI-8134 - Motion Controller PCI Card 4-Axis Controller Board
  • ADLINK PCI-8164 - Motion Control Card 51-12406-0A40 4-Axis Controller
  • ADLINK 51-12001-0C20 - Circuit Board Data Acquisition Interface Module Hardware
  • ADLINK NuPR0-840 - industrial control motherboard Full-Size PICMG CPU Board
  • ADLINK PCI-7444 - 51-12023-0A10 card 128-CH Isolated Digital Output Board
  • ADLINK PCI-1612B - data acquisition card 4-Port RS-232/422/485 Serial Communication Card
  • ADLINK PCI-6208V 009 - 8/16-CH 16-Bit Analog Output Cards PCB-I-E-482=6BX3
  • ADLINK NUPRO-935A/LV - industrial control motherboard Full-Size PICMG SBC Board
  • ADLINK PCI-9114DG - Multi-Function DAQ Card Data Acquisition PCI Card
  • ADLINK ACL-7130 - Data acquisition card Isolated Digital I/O Board
  • ADLINK ABX-6300D-4E1-BP - board ABX6300D4E1BP Video Interface Expansion Card
  • ADLINK CPCI-6940 - CPCI-6940/D1539/M16-0(EA)-000E 6U CompactPCI Processor Board
  • ADLINK NuPRO-760 - industrial control motherboard Half-Size PICMG SBC CPU Board
  • ADLINK IMB-M42H (G)-0020 - industrial control motherboard LGA1155 Micro-ATX Mainboard
  • ADLINK RTV-24 / PCI-MP4S - 51-12519-1C30 4-Channel Real Time Video Capture Board
  • ADLINK PCI-8134 - 4-Axis Servo & Stepper Motion Controller Card
  • ADLINK MXC-6101D - V.PC000.002.ST.00 Box PC Configurable Embedded Computer
  • ADLINK PCI-8134A - 51-12421-0A10 Motion Control Card 4-Axis Controller Card
  • ADLINK DIN-100S / DIN-100SA1 - Technology SCSI-II TB 100-PIN Terminal Block Board
  • ADLINK DIN-812M001 / DIN812M001 - 51-14034-0A1 51140340A1 Terminal Module Breakout Interface
  • ADLINK PCI-8164 - Servo motion control 4-Axis Advanced Controller Card
  • ADLINK PCIe-GIE64 - Acquisition card GigE Vision PoE+ Frame Grabber
  • ADLINK M-302 - Industrial control motherboard ATX PC Board Mainboard
  • ADLINK PCI-8134 - Motion Controller PCI Card 4-Axis Controller Board
  • ADLINK PCI-RTV24 - Image capture card Analog Video Frame Grabber
  • ADLINK PCI-8102 - Motion control card 2-Axis Servo & Stepper Controller Board
  • ADLINK PCI-9112 REV.B1 - Card Multi-Function Data Acquisition Card
  • ADLINK HSI-DI32-M-N / HSL-TB32-M-DIN - Discrete I/O MODULE Distributed Automation Module System
  • ADLINK PCI-7296 - IO card REV.A3 96-CH Parallel Digital I/O Card
  • ADLINK DIN-814P-A4 / 814Y - terminal board Motion Control Interface Block
  • ADLINK DIN-814P-A4 - 51-14056-0A10 PCB-I-E-2736=ZA01 Screw Terminal Board Breakout
  • ADLINK M-322 - motherboard Industrial Control Computer Mainboard
  • ADLINK NUPRO-406 REV:B1 - industrial control motherboard Full-Size PICMG CPU Board
  • ADLINK AMP-204C - card DSP-Based 4-Axis Advanced Pulse-Train Controller
  • ADLINK HPCI14S REV.B1 - industrial computer baseboard 14-Slot Passive Backplane
  • ADLINK PCI-7250 - 8-CH Relay Output & 8-CH Isolated DI PCI Card
  • ADLINK EBP-13E2 - baseplate Passive Backplane Industrial Computer Chassis Board
  • ADLINK LPCI-3488A - PCI-GPIB card 51-12801-0A30 acquisition card IEEE-488 Interface Board
  • ADLINK PCI-6216V-GL - 51-12201-0C30 16-CH 16-Bit Voltage Analog Output Card
  • ADLINK ACL-8454 - 16-CH Isolated Digital I/O & 4-CH Counter Card
  • ADLINK HPCI-9S7U - backplane Passive Backplane Compatible with NuPRO-A301 852 841 842
  • ADLINK DAQ-2010-007 - Simultaneous-Sampling Multi-Function Data Acquisition Card
  • ADLINK MP-C154 - 51-64205-0A10 Motion Control Card 4-Axis Controller Board
  • ADLINK MXE-202/mSSD16B/WiFi-BT - Matrix Rugged I/O Platform Embedded Fanless Computer
  • ADLINK CM-920-R-17 - PC/104-Plus Single Board Computer Module Intel Celeron M
  • ADLINK PCI-7250 NSMP - 8-CH Relay Output & 8-CH Isolated DI Card
  • ADLINK PCI-8164 - 4-Axis Motion Controller PCI Card W/ Cable and Breakout Box
  • ADLINK EMX-100 - Ethernet-based 4-axis Motion Controllers Distributed Motion Module
  • ADLINK PCI-8134A - Press control card 4-Axis Motion Controller Board
  • ADLINK M-845EG REV:3.2 - industrial motherboard Pentium 4 Socket 478 Micro-ATX
  • ADLINK PCI-9114A Rev A2 DG - card High-Resolution Multi-Function Data Acquisition Board
  • ADLINK IEC-915GV - REV 1.1 Industrial motherboard Socket 478 CPU Board
  • ADLINK PCI-9111DG(G) - Data Acquisition Card Multi-Function DAQ Card
  • ADLINK HPCI-15S10 REV:B2 - Industrial computer base plate Passive Backplane Board
  • ADLINK NuPR0-840 / NuPR0-840DV - industrial control motherboard Full-size PICMG CPU Board
  • ADLINK RTV-24 / PCI-MP4S - 51-12519-1C30 4-Channel Real Time Video Capture Board
  • ADLINK NUPRO-780 - industrial control motherboard Pentium III Single Board Computer
  • ADLINK PCI-7296 - 0050 card 96-CH Opto-Isolated Parallel DIO Card Set
  • ADLINK NUPRO-780 - industrial control motherboard PICMG Full-Size SBC
  • ADLINK PCI-7248 - 51-12006-0A3 002 Pci 7248 48-CH Parallel Digital I/O Card
  • ADLINK PCI-7230 - 32-CH Isolated Digital I/O Card
  • ADLINK AMP-204C - motion control card 4-Axis Advanced Controller Board
  • ADLINK PCI-1714UL - Card Ultra High-Speed 4-CH Simultaneous Sampling DAQ
  • ADLINK NuPRO-E330 - industrial computer equipment motherboard PICMG 1.3 SHB SBC
  • ADLINK AMP-204C - DSP-Based 4-Axis Advanced Pulse-Train Motion Controller Module
  • ADLINK PCI-7256 - 001 51-12206-0A2 REV.A2 LPCI-7256 16-CH Latching Relay Output Card
  • ADLINK ND6050 - NUDAM DIGITAL I/0 MODULE Distributed I/O Unit
  • ASEM BM100 - Box PC Embedded Fanless Industrial Computer
  • ADLINK PCI-7250 - PCI Acquisition Card 8-CH Relay Output & Isolated DI Board
  • ADLINK PCI-8164 - Servo motion control 4-Axis Controller Card
  • Basler XR2002F Voltage Regulator 9139400101
  • Basler 2D80367G23 DXCB De-Excitation Module 1200V 5000A
  • Basler SR4A-2B15B3A Static Regulator 120V 50/60Hz
  • Basler SSR 125-12NF Static Regulator 9 1859 00 106
  • Basler BE1-BPR Breaker Protection Relay 9272000315
  • Basler SSR 63-12 Static Regulator 9 1859 00 101
  • Basler AEM-2020 Analog Expansion Module
  • Basler BE 25231-001 Transformer BE25231001
  • Basler MVC 108 Manual Voltage Control 9037000102
  • Basler PSS-100-Y5 Power System Stabilizer 0.1-5.0Hz
  • Basler Electric BE1A-25-M1G-A6T-N4V1F Sync-Check Relay
  • Basler Electric SR8A2B10B1A Static Voltage Regulator
  • Basler Electric SR8A2B10B1A Static Voltage Regulator
  • Basler Electric SSR 125-12 Static Voltage Regulator 9185900102
  • Basler Electric 90-73900-102 Power Supply (Westinghouse 2374A07G03)
  • Basler Electric 9400200117 Control Power Unit 12/24VDC 20W
  • Basler Electric BE1-87G Solid State Generator Differential Relay
  • Basler Electric BE1-32R Style C3ED1TA0S1F Solid State Protective Relay