(3) Improving the early-warning ability of slope safety. The slope displacement online monitoring system should set three levels of collapse risk warning, yellow, orange and red, reasonably determine the early warning value, clear the corresponding early warning signal, and specify the corresponding emergency disposal measures in the relevant emergency rescue plan. Mining enterprises should carry out at least one targeted slope collapse emergency evacuation drill every six months in combination with the special emergency plan drill for slope collapse accidents.
email:1583694102@qq.com
wang@kongjiangauto.com