Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

How does China's geothermal industry run out of speed?

来源: | 作者:佚名 | 发布时间 :2024-01-05 | 520 次浏览: | Share:



"14th Five-Year Plan" and the next period of time, China will resolutely implement the goal of carbon peak carbon neutral tasks, geothermal energy and other renewable energy into a new stage of high-quality development.

On February 11, the second plenary meeting of the Organizing Committee of the Seventh World Geothermal Congress and the 2023 annual working conference of the National Geothermal Energy Center were held in Beijing. Participating experts and business representatives worked together to promote China's geothermal industry out of acceleration, to a new level, to achieve high-quality development.

Rich resources, vast space for development and utilization

China is rich in geothermal energy resources and has a broad space for development and utilization. The annual recoverable resources of shallow geothermal energy in 336 major cities are equivalent to 700 million tons of standard coal, and the annual recoverable resources of medium and deep geothermal energy are equivalent to 1.865 billion tons of standard coal, and the geothermal energy resources of dry hot rock have huge potential.

It is reported that in recent years, with the continuous advancement of China's ecological civilization construction, the control of air pollution and the promotion of clean heating in the north have been strengthened, the development and utilization of geothermal energy has continued to expand, and a number of major projects such as Beijing's urban deputy center, Beijing Daxing International Airport, Xiongan New Area have used geothermal energy for heating (cooling).

The "14th Five-Year Plan" renewable Energy Development Plan jointly issued by the National Energy Administration and other nine departments clearly states that "actively promote the large-scale development of geothermal energy", and proposes the development goal of reaching 60 million tons of standard coal in the scale of non-electric utilization of geothermal energy heating by 2025.

"There is much to be done in the development and utilization of geothermal energy." Du Li, president of the New Energy Research Institute of Sinopec Nova Company, proposed in an interview with reporters that China should continue to strengthen the development of medium and deep geothermal heating projects. Compared with natural gas, biomass, coal, etc., medium and deep geothermal energy heating has obvious economic advantages in the development and utilization of high-quality resource areas, and the operating cost is low. At the same time, geothermal is also a local energy source, which is an important form of energy supply for service heating other than natural gas and coal.

"It is recommended that the state support the construction of shallow geothermal energy heating (cooling) projects in public buildings by means of buried pipes, and dual heating and cooling supply." Dooley added that this approach will both improve the utilization of the equipment and help maintain a balance between the use of underground heat.

At the same time, the role that geothermal energy can play in the field of agriculture should not be underestimated. At present, the use of geothermal energy for aquaculture has spread over more than 20 provinces in China, forming a certain scale, the development of geothermal planting and aquaculture is of great significance to make up for the shortcomings of rural clean energy.

Policy guidance geothermal development momentum is abundant

In recent years, the "Opinions of the Central Committee of the Communist Party of China and The State Council on the complete, accurate and Comprehensive Implementation of the new Development Concept to do a good job of carbon peak carbon neutrality", the "14th Five-Year Plan" renewable Energy Development Plan ", "Several Opinions on Promoting the development and utilization of Geothermal energy" and other policies have provided specific basis for local efforts to promote the implementation of energy transformation and development and the implementation of the "dual carbon" strategy.

All localities have incorporated the development and utilization of geothermal energy into the overall energy planning of each province (region and city), urban green building development planning, carbon peak implementation plan and rural revitalization strategy, etc., concretized the top-level design of the national geothermal field, further clarified the management responsibilities and development ideas of the geothermal industry, and helped promote the large-scale development and utilization of geothermal energy. Achieve high-quality development of the industry.

"We should also be soberly aware that our country is still only a big country in the development and utilization of geothermal energy, not a powerful country." Geothermal energy development and utilization still face challenges." Experts at the meeting suggested that they continue to strengthen the research on geothermal application technology and key technologies, further deepen the application research on sandstone heat storage and recharge technology and underground heat transfer technology, focus on the research and development of key technologies for the development and utilization of dry hot rock resources, and tackle key technologies and complete sets of equipment for geothermal power generation.

"As the country pays more and more attention to the development of renewable energy, resource indicators such as geothermal mineral rights, as the fundamental and primary premise of new energy projects, have become important resources that new energy enterprises strive to seize." Dang Liqiang, deputy director and secretary-general of the National Geothermal Energy Center Steering Committee, said that at present, the development of China's geothermal industry is still facing some policy bottlenecks. For example, in terms of geothermal exploration management, local policies are not clear, and only Hebei, Tianjin and Shaanxi have introduced the management process of geothermal mining rights, and there is still overlap between geothermal mining rights and other mining rights such as oil zone mining rights in some areas.

In this regard, Party Liqiang said that the National geothermal Energy Center will promptly and efficiently do policy research and market analysis, actively offer suggestions to the National Energy Administration and provincial and municipal governments, do a good job of regional development planning research, take the initiative to docking and assist relevant provinces (municipalities) to prepare new energy development plans, promote the local introduction of new energy industry favorable policies, and create a policy environment conducive to the development of geothermal energy. Actively strive for geothermal mineral rights, management rights and other basic resources, strive for geothermal resource tax policy support, and constantly win industrial support.

Build a platform to gather industry development consensus

Strengthening the information management level of geothermal energy industry plays an important role in finding out the bottom number of the industry, standardizing the management process, connecting renewable energy consumption and other work, and is the basic work to ensure the sustainable and healthy development of geothermal energy development and utilization.

In August 2022, the National Energy Administration issued the "Notice on Accelerating the Information Management of Geothermal Energy Development and Utilization Projects", and at present, provinces are paying close attention to relevant work.

The reporter learned from the meeting that the construction of the national geothermal energy development and utilization information management platform has been gradually promoted, and the industry's chronic diseases of many geothermal data sources and inaccurate statistical information are being solved, which will provide support for the geothermal development decision-making in various regions.

The participants suggested that it is necessary to continue to promote the deepening application of the geothermal data statistics platform, guide local governments and relevant geothermal enterprises to pay attention to the importance of geothermal energy project data statistics, actively fill in the geothermal information data in the platform, and strive to incorporate it into the national energy utilization statistical system at an early date. At the same time, do a good job of data connection with the renewable energy information management center.

At the meeting, the National Geothermal Energy Center also announced the first batch of selected "China geothermal heating one million square meters Club" list of 20 enterprises, its projects cover Beijing, Tianjin, Hebei, Shandong, Henan, Shaanxi, Shanxi and other major geothermal industry provinces, covering shallow, medium and deep geothermal heating, geothermal power generation, hot spring tourism and other geothermal industry chain, with a wide range of industry representative. It is reported that the establishment of the club will play an effective role in promoting the information interconnection of the geothermal industry, cultivating certified geothermal leading enterprises, enhancing independent innovation capabilities and competitiveness, and will regularly carry out activities such as geothermal data sharing, technology and project exchanges in the future to promote the growth and development of China's geothermal enterprises.


  • FOXBORO P0916VB power supply module
  • GE Hydran M2-X Transformer Condition Monitoring Device
  • FOXBORO P0916VL control module
  • FOXBORO P0916VC High Performance Terminal Cable
  • FOXBORO P0916WG system module
  • FOXBORO P0972ZQ interface channel isolation 8-input module
  • FOXBORO P0973BU high-frequency fiber optic jumper
  • FOXBORO P0926MX Splasher Confluencer
  • FOXBORO P0961S connector module
  • FOXBORO P0903NU system module
  • FOXBORO CM902WM control module
  • FOXBORO P0972VA ATS Processor Module
  • FOXBORO P0916Js digital input terminal module
  • FOXBORO PO961BC/CP40B control module
  • FOXBORO PO916JS Input/Output Module
  • FOXBORO PO911SM Compact Monitoring Module
  • FOXBORO P0972PP-NCNI Network Interface Module
  • FOXBORO P0971XU Control System Module
  • FOXBORO P0971DP Controller
  • FOXBORO P0970VB control module
  • FOXBORO P0970BP (internal) cable assembly
  • FOXBORO P0961EF-CP30B High Performance Digital Output Module
  • FOXBORO P0961CA fiber optic LAN module
  • FOXBORO P0926TM Modular I/O PLC Module
  • FOXBORO P0916BX series control system input/output module
  • FOXBORO P0916AG Compression Period Component
  • FOXBORO P0916AC I/A series module
  • FOXBORO P0912CB I/O Terminal Module
  • FOXBORO P0911VJ high-precision control module
  • FOXBORO P0911QC-C 8-channel isolated output module
  • FOXBORO P0911QB-C High Performance Industrial Module
  • FOXBORO P0903ZP Embedded System Debugging Module
  • FOXBORO P0903ZN control module
  • FOXBORO P0903ZL High Frequency Industrial Module
  • FOXBORO P0903ZE I/A series fieldbus isolation module
  • FOXBORO P0903NW Industrial Control Module
  • FOXBORO P0903NQ control module
  • FOXBORO P0903AA Industrial Control Module
  • FOXBORO FBM205 cable
  • FOXOBORO P0960HA I/A series gateway processor
  • FOXBORO P0926TP high-performance control module
  • FOXBORO P0926KL control module
  • FOXBORO P0926KK PLC system functional module
  • FOXBORO P0924AW wireless pressure transmitter
  • FOXBORO P0916NK differential pressure transmission cable
  • FOXBORO P0916JQ PLC module
  • FOXBORO P0916JP I/A series control module
  • FOXBORO P0916GG Digital Input Module
  • FOXBORO P0916DV I/A series digital input module
  • FOXBORO P0916DC Terminal Cable
  • FOXBORO P0916DB I/A series PLC module
  • FOXBORO P0914ZM recognition module
  • FOXBORO P0902YU control module
  • FOXBORO P0901XT Process Control Unit
  • FOXBORO P0800DV fieldbus extension cable
  • FOXBORO P0800DG Standard Communication Protocol Module
  • FOXBORO P0800DB Universal I/O Module
  • FOXBORO P0800DA Industrial Control Module
  • FOXBORO P0800CE control module
  • FOXBORO P0700TT Embedded System
  • FOXBORO P0500WX Control System Module
  • FOXBORO P0500RY Terminal Cable Assembly
  • FOXBORO P0500RU control module
  • FOXBORO P0500RG Terminal Cable
  • FOXBORO P0400ZG Node Bus NBI Interface Module
  • FOXBORO P0400GH fieldbus power module
  • FOXBORO FBM207B Voltage Monitoring/Contact Induction Input Module
  • FOXBORO FBM205 Input/Output Interface Module
  • FOXBORO FBM18 Industrial Controller Module
  • FOXBORO FBM12 Input/Output Module
  • FOXBORO FBM10 Modular Control System
  • FOXBORO FBM07 Analog/Digital Interface Module
  • FOXBORO FBM05 redundant analog input module
  • FOXBORO FBM02 thermocouple/MV input module
  • FOXBORO FBI10E fieldbus isolator
  • FOXBORO DNBT P0971WV Dual Node Bus Module
  • FOXBORO CP30 Control Processor
  • FOXBORO CM902WX Communication Processor
  • FOXBORO AD202MW Analog Output Module
  • FOXBORO 14A-FR Configuration and Process Integration Module
  • FOXOBORO 130K-N4-LLPF Controller
  • FUJI FVR004G5B-2 Variable Frequency Drive
  • FUJI FVR008E7S-2 High Efficiency Industrial Inverter
  • FUJI FVR008E7S-2UX AC driver module
  • FUJI RPXD2150-1T Voltage Regulator
  • FUJI NP1PU-048E Programmable Logic Control Module
  • FUJI NP1S-22 power module
  • FUJI NP1AYH4I-MR PLC module/rack
  • FUJI NP1BS-06/08 Programmable Controller
  • FUJI NP1X3206-A Digital Input Module
  • FUJI NP1Y16R-08 Digital Output Module
  • FUJI NP1Y32T09P1 high-speed output module
  • FUJI NP1BS-08 Base Plate​
  • FUJI A50L-2001-0232 power module
  • FUJI A50L-001-0266 # N Programmable Logic Control Module
  • GE GALIL DMC9940 Advanced Motion Controller
  • GE DMC-9940 Industrial Motion Control Card
  • GE IS200AEADH4A 109W3660P001 Input Terminal Board
  • GE IC660HHM501 Portable Genius I/O Diagnostic Display
  • GE VMIVME 4140-000 Analog Output Board
  • GE VMIVME 2540-300 Intelligent Counter
  • GE F650NFLF2G5HIP6E repeater
  • GE QPJ-SBR-201 Circuit Breaker Module
  • GE IC200CHS022E Compact I/O Carrier Module
  • GE IC695PSD140A Input Power Module
  • GE IC695CHS016-CA Backboard
  • GE IC800SS1228R02-CE Motor Controller
  • GE IS215WEMAH1A Input/Output Communication Terminal Board
  • GE CK12BE300 24-28V AC/DC Contactor
  • GE CK11CE300 contactor
  • GE DS3800NB1F1B1A Control Module
  • GE VMIVME2540 Intelligent Counter
  • GE 369B1859G0022 High Performance Turbine Control Module
  • GE VME7865RC V7865-23003 350-930007865-230003 M AC contactor
  • GE SR489-P5-H1-A20 Protection Relay
  • GE IS200AEPGG1AAA Drive Control Module
  • GE IS215UCCCM04A Compact PCI Controller Board
  • GE VME7768-320000 Single Board Computer
  • GE SR489-P5-LO-A1 Generator Protection Relay
  • GE IS215WETAH1BB IS200WETAH1AGC Input/Output Interface Module
  • GE D20 EME210BASE-T Ethernet Module
  • GE IS200EXHSG3REC high-speed synchronous input module
  • GE IS200ECTBG1ADE exciter contact terminal board
  • GE VPROH2B IS215VPROH2BC turbine protection board
  • GE F650BFBF2G0HIE feeder protection relay
  • GE SLN042 IC086SLN042-A port unmanaged switch
  • GE SR489-P1-HI-A20-E Generator Management Relay
  • GE IS400JPDHG1ABB IS410JPDHG1A track module