Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Anchoring carbon to peak carbon neutral goal "14th Five-Year" renewable energy ushered in high-quality development

来源: | 作者:佚名 | 发布时间 :2024-01-09 | 300 次浏览: | Share:



New situation: into the "high quality jump" stage

In recent years, with the continuous development of policies and the continuous upgrading of technology, China's renewable energy has achieved leapfrog development, installed capacity, utilization level, and industrial competitiveness to a new level, and has made remarkable achievements, laying a solid foundation for the further high-quality development of renewable energy. Data show that by the end of 2020, China's renewable energy power generation capacity reached 934 million kilowatts, accounting for 42.5% of the total installed power generation capacity.

At present, China is building a carbon peak carbon neutral "1+N" policy system, and the development of renewable energy is the focus of it. Peng Cheng, secretary of the Party Committee and chairman of the General Institute of Hydropower and Water Conservancy Planning and Design, pointed out that in the energy supply side, it is necessary to vigorously develop clean renewable energy, as far as possible to replace fossil energy with non-carbon energy generation and hydrogen production, and build a "new power system or energy supply system"; At the end of energy consumption, it is necessary to strive to replace fossil energy consumption with non-carbon energy such as electricity, hydrogen energy, geothermal energy and solar energy in most fields such as residential life, transportation, industry, agriculture and construction.

The relevant person in charge of the new energy Department of the National Energy Administration said that in the face of the new situation and new requirements, renewable energy on the one hand should "stand first", further shift and speed up, and become the main body of energy consumption increase; On the other hand, China's renewable energy not only needs to achieve continuous technological progress, continuous cost reduction, continuous improvement of efficiency, continuous enhancement of competitiveness, and comprehensive realization of subsidy-free parity and even low-price market-oriented development, but also needs to accelerate the solution of key issues such as high proportion of consumption, key technology innovation, industrial chain and supply chain security, stability and reliability, and further improve quality and efficiency. We will move faster into a new stage of high-quality development.

"Plan" put forward the development goal, by 2025, China's renewable energy consumption will reach 1 billion tons of standard coal, "fourteen five" period, renewable energy in the primary energy consumption increase will account for more than 50%. Among them, in terms of non-electric utilization, in 2025, the scale of non-electric utilization such as geothermal energy heating, biomass heating, biomass fuel, and solar thermal utilization will reach more than 60 million tons of standard coal.

In terms of renewable energy generation, the "Plan" requires that by 2025, annual renewable energy generation will reach 3.3 trillion KWH; During the "14th Five-Year Plan" period, the increase in renewable energy generation accounted for more than 50% of the increase in electricity consumption in the whole society, and wind and solar power generation doubled. At the same time, for the consumption of renewable energy electricity, it is clear that "by 2025, the national total consumption of renewable energy electricity responsibility weight reached about 33%, renewable energy electricity non-water consumption responsibility weight reached about 18%, renewable energy utilization rate remained at a reasonable level."

New path: Adhere to the "five simultaneous development" and "four development"

Entering the stage of "high-quality development", renewable energy will usher in a new development path. The "Plan" pointed out that during the "14th Five-Year Plan" period, the development of renewable energy will adhere to the "five simultaneous developments", that is, centralized and distributed simultaneous developments, onshore and offshore simultaneous developments, local consumption and export consumption simultaneous developments, single-variety development and multi-variety complementary developments, and single scene and comprehensive scenarios simultaneously.

In Peng Cheng's view, "single variety development and multiple varieties complement each other" and "single scene and comprehensive scene simultaneously" are new measures put forward in the face of land use space, consumption and system security and marketization issues. Among them, "single-variety development and multi-variety complementarities" requires that while doing a good job in the high-quality development of various types of renewable energy, it promotes the coordinated development of multiple varieties such as water scenery, water and fire storage in scenery, and regional coupled heating. "Single scenario and comprehensive scenario at the same time" requires the development of renewable energy power generation and energy supply itself, while promoting the integrated development of renewable energy with agriculture and forestry, ecological governance, and rural revitalization.

According to the "Plan", the specific measures to promote the development of renewable energy during the "14th Five-Year Plan" can be summarized as "four developments" : optimizing development with regional layout, supporting development with major bases, leading development with demonstration projects, and implementing development with action plans. Among them, the "Optimized development by regional layout" clearly promotes the large-scale development of wind power and photovoltaic power generation base in the "three North" region, coordinates the comprehensive development of water scenery in the southwest region, focuses on the local development of wind power and photovoltaic power generation in the southern Middle East region, and actively promotes the cluster development of offshore wind power in the eastern coastal region.

At the same time, as the "big base" construction that has attracted much attention this year, it is also the focus of renewable energy development during the "14th Five-Year Plan" period. As early as March, the 14th Five-Year Plan for National Economic and Social Development of the People's Republic of China and the Outline of the 2035 Vision Goals proposed to build nine large-scale clean energy bases. The construction of large-scale wind power photovoltaic base aims to give play to the large-scale and intensive effect of large-scale wind power photovoltaic base project construction, ensure the depth and strength of coordinated project promotion, and show the efficiency and effect of project implementation.

"At present, the first batch of large-scale wind power photovoltaic base projects of about 100 million kilowatts have started nearly 90%, and the planning layout of large-scale wind power photovoltaic base focusing on desert, Gobi and desert areas is accelerating the implementation." According to the relevant person in charge of the new energy Department of the National Energy Administration, the "Plan" clearly puts forward the focus on desert, Gobi and desert areas, and speeds up the construction of seven new energy bases on land, such as the upper reaches of the Yellow River, Hexi Corridor, Yellow River, North Hebei, Songliao, Xinjiang and the lower reaches of the Yellow River. At the same time, it is required to promote the construction of large-scale hydropower bases in a scientific and orderly manner, and coordinate the development and construction of the two major water-scenery comprehensive bases in Sichuan, Yunnan, Guizhou and southeast Tibet, focusing on the construction of five major offshore wind power base clusters in Shandong Peninsula, Yangtze River Delta, southern Fujian, eastern Guangdong and Beibu Gulf.

In addition, in order to cooperate with the national "rural revitalization" strategy, renewable energy to help rural energy reform has become an important mission of the "14th Five-Year Plan". To this end, the "Plan" proposed the implementation of "thousands of villages to control the wind action", "thousands of households Muguang action", rural energy station action, rural power grid consolidation and upgrading action plans, while improving the accessibility of rural energy, for the "beautiful rural construction".

New measures: Technology and system "two-pronged approach"

The relevant person in charge of the new energy Department of the National Energy Administration stressed that the high-quality development of renewable energy in the 14th Five-Year Plan, the task is more difficult, and it must be "two-pronged" in technology and system, adhere to innovation-driven, market-oriented development and high-quality development of renewable energy.

In terms of technology, adhere to innovation-driven, high-quality development of renewable energy. The "Plan" pointed out that to increase the efforts of renewable energy technology innovation, to carry out far-reaching sea breeze electricity technology, photovoltaic power generation outdoor demonstration, new high-efficiency photovoltaic cell technology, geothermal power generation technology and deep geothermal heating technology demonstration; Cultivate new models and forms of renewable energy development, actively promote the deep integration of renewable energy with new technologies, new industries, and new forms of business such as artificial intelligence and electric vehicles, vigorously develop comprehensive energy services, and innovatively promote the large-scale development of photovoltaic sand control; Upgrade the level of modernization of the industrial chain and supply chain of renewable energy, implement green manufacturing and intelligent manufacturing projects in the renewable energy industry, forge the long board of the industrial chain and supply chain, supplement the shortcomings of basic materials, basic parts and advanced basic processes, and improve the organizational system of technical standards, testing, certification and quality supervision of renewable energy; We will improve the renewable energy innovation chain, implement collaborative research in major science and technology and collaborative innovation in major engineering technologies, and accelerate the empirical verification of new technologies and the transformation of products and engineering applications.

In the institutional aspect, improve the institutional mechanism, market-oriented development of renewable energy. 

The "Plan" clearly states that, first, it is necessary to deepen the reform of "decentralization service" in the renewable energy industry, simplify the distributed renewable energy investment management procedures, establish a multi-departmental coordination mechanism, and promote "one-stop" service for project approval (filing). The second is to establish a development and construction management mechanism guided by the weight of renewable energy power consumption responsibility, strengthen the weight evaluation and incentive mechanism, and build a diversified grid-connected consumption mechanism composed of grid guarantee consumption, market independent consumption, and distributed generation transaction consumption. The third is to improve the market-oriented development mechanism of renewable energy, establish and improve the management mechanism of renewable energy development and construction, price formation and compensation mechanism, and market participation trading mechanism. The fourth is to establish and improve the green energy consumption mechanism, expand the scope of green certificate issuance, encourage parity projects to actively carry out green certificate trading, establish green energy consumption certification and identification system, encourage new energy equipment manufacturing enterprises to increase the proportion of green energy consumption, produce green products, and actively guide green energy consumption.


  • GE HYDRAN 201Ti Single Channel Gas Monitoring Transmitter
  • GE Hydran M2-X Transformer Online Monitoring Equipment
  • GE Hydran M2 Transformer Monitoring System
  • Kollmorgen Seidel 65WKS-CE310/6PB - Servo Drive Control
  • Kollmorgen U9M4T - Servodisc DC Motor, With Harmonic Drive Transmission
  • KOLLMORGEN TT-2952-1010-B - INLAND BRUSH SERVO MOTOR WITH TACH
  • ONE VF-RA2474N-5/10/12/15 - Servo Drive Power Cable
  • Kollmorgen S30601-NA - Servostar 346 + EtherCat
  • Kollmorgen HDIL100P1 - Direct Drive Linear Hall Effect Assembly
  • Kollmorgen TT-4239-1010-AA - DC Servo Motor 875 RPM
  • PMI Kollmorgen 00-00907-999 - ServoDisc DC Motor 0.5" Diameter Shaft
  • INLAND KOLLMORGEN TT-2952-1010-B - MOTOR (USES RESOLVER)
  • KOLLMORGEN CTI-187-2 - BRUSHLESS MOTOR DANAHER MOTION
  • Kollmorgen 12-0857 - Lead Screw Electric Cylinder without Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • kollmorgen 6sm, 10m - Cable
  • KOLLMORGEN ME2-207-C-94-250 - GOLDLINE SERVOMOTOR-ENCODER COMMUTATED
  • Kollmorgen MT308A1-R1C1 - GoldLine Motor
  • Kollmorgen 73 & 54 cm Travel - Ironless Linear Motors on THK Rail
  • Kollmorgen AKM53H-ACCNR-00 - Servo Motor
  • Kollmorgen PA5000 - Power Supply
  • KOLLMORGEN D082M-12-1310 - GOLDLINE DDR DIRECT DRIVE ROTARY MOTOR 230Vrms 300 RPM
  • Kollmorgen RBEH-01210-A14 - Brushless Motor, Heidenhain D-83301
  • KOLLMORGEN Servotronix PRD-CC18551H-11 - Servo Board
  • Kollmorgen DH083M-13-1310 - Ho Direct Drive Rotary. Max Speed: 400/500 RPM
  • KOLLMORGEN BMHR-4.8XX - INLAND MOTOR
  • Kollmorgen Seidel 84421 - Motor Cable 20 Metre 6SM 27/37 AKM DBL Engines
  • Kollmorgen AKD1207-NBCC-0000 - Drive
  • HP Indigo / Kollmorgen VLM32H-ALNR-00 - Motor
  • SUPERIOR ELECTRIC / KOLLMORGEN GM05009005 - POWERSTAT 50 AMP VARIAC w/ PMI MOTOR
  • Kollmorgen CM12A1-015-033-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • Kollmorgen U9M2 - DC Motor
  • Kollmorgen AKM11C-ANMN2-00 - 3-Phase PM Servo Motor 110W
  • Kollmorgen 60-023168-000 - MOTOR GEARBOX ASSEMBLY SERVODISC DC NO REAR SHAFT
  • Kollmorgen AS10300 - servo drive servo star Cincinnati
  • Kollmorgen AKM23D-EFC2C-00 - Servo Motor AKD Drive
  • KOLLMORGEN E33HRFB-LNK-NS-01 - STEPPER MOTOR 2.7AMP 251W 1500RPM 170V
  • Kollmorgen AKM21G-ENM2DB00 - Servomotor
  • KOLLMORGEN SERVO STAR 620-AS - 230-480V 20A Servo Drive
  • Kollmorgen CFE0A1-002-006-00 - Encoder Cable 6.00m
  • KOLLMORGEN AKM21C-ANM2DBOO - PM SERVOMOTOR
  • Kollmorgen 03200-2G205A - ServoStar Servo Drive
  • Kollmorgen CR10251 - SERVOSTAR CD AC Servo Driver
  • Kollmorgen VF-DA0474N-03-0 - 10 Ft Feedback Cable
  • KOLLMORGEN AKM21S-ANMNR-03 - Servo Motor
  • Danaher Motion Kollmorgen S403AM-SE - Servostar 443M-S Servo Drive
  • Kollmorgen Seidel digifas 7204 - Servo Amplifier Digital
  • Kollmorgen Industrial Drive B-406-B-A1-B3 - Goldline Brushless Servomotor
  • Danaher Motion S20630-CNS - Servo Kollmorgen S200 Series
  • KOLLMORGEN B-206-A-31-B3 - GOLDLINE BRUSHLESS PM SERVO MOTOR 1400RPM
  • Kollmorgen Seidel SR6-6SMx7 - 4m Cable
  • Cincinnati Milacron Kollmorgen Vickers PSR4/5-250-7500 - Power Supply
  • Kollmorgen AKM 13C-ANCNR-00 - Gripper Handling with Neugart PLE 40 gears
  • Kollmorgen SERVOSTAR 403 A-P - 3a servo drive
  • KOLLMORGEN S6M4H - INDEXER ASSY SERVO MOTOR
  • SERVOMOTOR KOLLMORGEN SEIDEL 6SM 57M-3.000-G-09 - Servo Motor
  • Kollmorgen VP-507BEAN-03 - Valueline AKD 10 Ft Power Cable
  • KOLLMORGEN 28454 - SERVO DRIVE, SERVOSTAR 300 SERVOSTAR 310
  • KOLLMORGEN TT-4205-4017-C - INDUSTRIAL DRIVE DC MOTOR
  • Kollmorgen T150551 - Servostar 343 Control Drive
  • Kollmorgen ICD05030A1C1 - Platinum DDL Direct Drive Linear Motor w/ 30" Rail Way
  • Kollmorgen SERVOSTAR 303 S30361-SE - Servo Drive
  • Kollmorgen 00-00907-002 - ServoDisc DC Motor Varian Semiconductor 3500054
  • Kollmorgen CM12A1-025-005-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • KOLLMORGEN MOTION TECH IL18100A3TRC1 - BRUSHLESS LINEAR MOTOR PLATINUM DDL
  • Kollmorgen SERVOSTAR 406 M-C - Servo Drive FW: 7.36
  • Kollmorgen IC11030A1P1103 - platinum direct drive linear motor
  • W&T 10/100BaseT - Com Server Highspeed 3×RS232/RS422/RS485
  • Kollmorgen S30361-NA - drive brand
  • Kollmorgen Industrial Drives PSR3-208/50-01-003 - Power Supply
  • Kollmorgen RBE-03011-A00 - Brushless Frameless Servo Motor, OD: 5-5/64"/129mm
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Kollmorgen IC44030A2P1 - LINEAR DRIVE MOTOR
  • KOLLMORGEN AKM22E-ANS2R-02 - servo motor + Micron X-TRUE 60
  • Kollmorgen 18442-01B - Pendant (E2)
  • Kollmorgen AKD-P00306-NBEC-0069 - Drive
  • Kollmorgen AKM53H-ACCNR-00 - Servomoteur
  • Kollmorgen AKD-P01207-NACN-0056 - Servo Drive
  • Kollmorgen SERVOSTAR 403a-c - Servo Drive
  • Kollmorgen B-204-B-39-016 - Servo Motor
  • Giddings & Lewis Dahaner Motion Kollmorgen M.1017.3140 R3 - Output Module
  • Kollmorgen KNSG300 - Emergency Light Unit
  • KOLLMORGEN 62-0050 Model T31V-EM-C0 - Servo Motor Shaft Size 3/8" Dia 1-1/4" Long
  • Kollmorgen S30601-NA-ARM9 - SERVOSTAR346 Controller w/o Fan As Is
  • Kollmorgen PMI Motors 00-00903-010 - ServoDisc DC Motor Type U9M4H 1/2" shafts
  • Kollmorgen PMI Motion U12M4 - Servo Disc DC Motor Universal Instruments 11467000
  • Kollmorgen AKM53H-accnr-00 - Servo Motor
  • DANAGER MOTION / KOLLMORGEN ACD4805-W4 - (70A ) Vehicle / Motor Controller
  • Kollmorgen s60300 - SERVOSTAR 603 3 x 230-480v 2kva
  • KOLLMORGEN B-404-C-21 - GOLDLINE BRUSHLESS P.M. SERVOMOTOR
  • Kollmorgen T-5144-A - GE Aviation 739034-01 Direct Drive DC Torque Motor
  • KOLLMORGEN M.1302.8761 - CABLE, POWER
  • Kollmorgen CE03250 - Servostar Servo Drive
  • Kollmorgen K-342 - dual axis automatic autocollimator
  • Kollmorgen TT-4500-1010-B - Inland Motor
  • Kollmorgen S20260-Srs - Synqnets200 Series Servo Drive Forparts
  • Kollmorgen PRDRHP720SND-65 - drive CR06703-R
  • KOLLMORGEN S70362-NANANA - driver
  • Kollmorgen CR06260-000000 - SERVOSTAR CD AC Servo Driver
  • KollMorgen akd-m00306-mcec-D000 - Multi-Axis Master Programmable Drive AKD PDMM
  • KOLLMORGEN S61000 - SERVOSTAR 610 3X230-480V 10A
  • Kollmorgen AKD-P00306-NBCC-0000 - AKD Servo Drive
  • KOLLMORGEN CP306250 - SERVOSTAR SP Servo Drive
  • Kollmorgen MPK411 - controller
  • Kollmorgen S64001 - SERVOSTAR 640, factory-certified
  • Kollmorgen Servotronix Prdr0087006Z-00 - Lvd Servo Drive
  • Kollmorgen AKD-P00306-NAAN-0000 - Servo Drive Controller, 1.2KVA, 240Vac, 3 Phase
  • Kollmorgen MCSS08-3232-001 - MCSS06-3224-001 ServoStar Drives (AS-IS)
  • Kollmorgen CR06250-2D063A - drive
  • YASKAWA SGDP-04APA - SERVOPACK SERVO DRIVE
  • Kollmorgen s62001 - servostar 620-as 14kva 20a ip2o 3x 230-480v
  • Kollmorgen Seidel S60100 - Servostar 601 Servo Drive
  • KOLLMORGEN CR06703-R - HP SERVOSTAR CD CONTROLLER
  • kollmorgen Prdr0052200z-05 - graco inter Servo Component
  • KOLLMORGEN S403AM-SE - drive SERVOSTAR 443M-S
  • YASKAWA SGDP-01APA - SERVOPACK SERVO DRIVE
  • Kollmorgen CE06200-1H348H - SERVOSTAR CD Servo Driver
  • Kollmorgen S71262-NANANA - S700 Servo Amplifier 208Y/120V 480Y/277V
  • Kollmorgen S70302-NANANA-NA - S700 Servo Driver
  • KOLLMORGEN S61401-560 - ATS-SERVOSTAR 614-AS Servo Drive
  • KOLLMORGEN Industrial Drives BDS4A-103J-0001/102A21P - Servo Controller
  • Kollmorgen S71202-NANANA-NA-024 - S700 Servo Driver
  • KOLLMORGEN S70302-NANANA - driver
  • Kollmorgen CR06250 - SERVOSTAR Servo Drive
  • Kollmorgen CE03550 - drive
  • Kollmorgen S71202-NANANA - S700 Servo Driver