Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Clean and low-carbon, energy structure transformation

来源: | 作者:佚名 | 发布时间 :2024-01-09 | 282 次浏览: | Share:



"In recent years, China's renewable energy has achieved leapfrog development, and the scale of development and utilization has ranked first in the world." China's installed capacity of renewable energy will reach 930 million kilowatts by the end of 2020, accounting for 42.4 percent of the total installed capacity, up 14.6 percentage points from 2012, Zhang Jianhua, director of the National Energy Administration, said Wednesday. In 2020, renewable energy generation will reach 2.2 trillion KWH, accounting for 29.5% of the total electricity consumption in society, an increase of 9.5 percentage points over 2012.

Renewable energy includes water energy, wind energy, solar energy, biomass energy, etc., which is a green and low-carbon energy. To achieve the goal of carbon peak and carbon neutrality, what more effective measures will be taken in the energy sector? At the press conference held by the State New Office on the 30th, the relevant person in charge of the National Energy Administration made an introduction.

By the end of the 14th Five-Year Plan, renewable energy will change from the incremental supplement of energy and electricity consumption to the incremental main body

Data show that by the end of 2020, China's hydropower installed capacity of 370 million kilowatts, wind power installed capacity of 280 million kilowatts, photovoltaic installed capacity of 250 million kilowatts, biomass power installed capacity of 29.52 million kilowatts, respectively for 16 consecutive years, 11 years, 6 years and 3 years ranked first in the world. If you take the total installed capacity of 22.5 million kilowatts of the Three Gorges power Station to compare, 930 million kilowatts of renewable energy generation capacity is almost equivalent to 41 Three Gorges power stations.

"Renewable energy emits neither pollutants nor greenhouse gases, and has achieved remarkable results in reducing pollution and carbon." Zhang Jianhua said that by 2020, China's renewable energy development and utilization scale is equivalent to replacing coal by nearly 1 billion tons, reducing carbon dioxide, sulfur dioxide and nitrogen oxide emissions by about 1.79 billion tons, 864,000 tons and 798,000 tons respectively, providing a strong guarantee for the fight against air pollution. At the same time, with the significant improvement of the level of technology and equipment, the cost of renewable energy generation has continued to decline, the average cost of onshore wind power and photovoltaic power generation projects per kilowatt has dropped by 30% and 75% respectively in the past 10 years, and the industrial competitiveness has rapidly improved.

To ensure that the target of carbon peak and carbon neutrality is achieved on schedule, what new characteristics will be presented in the "14th Five-Year Plan" renewable energy development pattern? "Facing the new situation and new tasks, the boundary conditions, development logic and development mechanism of renewable energy development will undergo a series of major changes." Li Chuangjun, director of the New Energy and Renewable Energy Department of the National Energy Administration, summarized the four characteristics:

- "Large-scale", by the end of the "14th Five-Year Plan", renewable energy generation capacity will account for more than 50% of China's total electricity installed capacity.

- "high proportion", by the end of the "14th Five-Year Plan", it is expected that the proportion of renewable energy in the increase of electricity consumption in the whole society will reach about 2/3, the proportion in the increase of primary energy consumption will exceed 50%, and renewable energy will change from the original incremental supplement of energy and electricity consumption to the incremental main body of energy and electricity consumption.

- "Marketization", further play the decisive role of the market in the allocation of renewable energy resources, from this year, the development of wind power photovoltaic will enter the parity stage, get rid of the dependence on financial subsidies, and achieve market-oriented and competitive development.

- "High quality", the "14th Five-Year Plan" will enhance the absorption and storage capacity of new energy, not only to achieve large-scale development of renewable energy, but also to achieve a high level of consumption and utilization, and more effectively ensure the reliable and stable supply of electricity.

We will vigorously enhance the flexible adjustment ability of the power system, and build a new type of power system with new energy as the main body

Wind power, photovoltaic and other new energy to a certain extent "depend on the sky to eat", with volatility, intermittent and other characteristics, the future large-scale high proportion of access, how to ensure the stable supply of power and achieve a high level of consumption and utilization, is a concern of the industry. The ninth meeting of the Financial and Economic Commission of the CPC Central Committee held recently proposed to build a new power system with new energy as the main body.

In this regard, Huang Xuenong, director of the Power Department of the National Energy Administration, introduced that the next step will be to build a power generation, supply, storage and marketing system that ADAPTS to the development of large-scale new energy, enhance the flexible adjustment ability of the power system, promote the interactive integration of source and network load and storage, increase the promotion and application of key technologies of the new power system, and promote the construction of the power market and institutional innovation. To ensure a steady supply of electricity.

In terms of improving the flexible adjustment ability of the power system, Huang Xuenong said that on the power generation side, it is necessary to strengthen the flexible transformation of thermal power, and promote the construction of pumped storage power stations and natural gas peaking power stations; On the power grid side, it is necessary to increase infrastructure construction, improve the ability to optimize the allocation of resources, and in particular, give play to the mutual benefit of large power grids. On the user side, promote the replacement of terminal electric energy, especially green electric energy, to improve the response ability on the demand side; In addition, it is necessary to accelerate the large-scale development of energy storage, promote the comprehensive digitization of the power system, and build an efficient and intelligent scheduling and operation system.

"For example, an electric vehicle may become an energy storage device for the power system, and the power system will charge it when the power consumption is low; "We will use electric vehicles to discharge electricity to the power system through economic measures during peak hours." Huang Xuenong, for example.

We will give play to the guiding and constraining role of planning and diversify the development of non-fossil energy

China has proposed that by 2030, non-fossil energy will account for about 25% of primary energy consumption. "The task is very difficult indeed." Li Fulong, director of the Development Planning Department of the National Energy Administration, analyzed that during the "13th Five-Year Plan" period, the proportion of non-fossil energy consumption in China increased from 12.1% to 15.9%, an average annual increase of 0.76 percentage points. By 2030, the proportion of non-fossil energy consumption will reach about 25%, which means that the average annual increase in the next 10 years will be 0.9 percentage points, equivalent to an average annual increase in non-fossil energy of about 70 million tons of standard coal.

Li Fulong introduced that the next will play the role of planning guidance and constraints, and diversify the development of non-fossil energy. Under the condition of ensuring safety, the construction of coastal nuclear power should be actively and orderly promoted. Adhering to ecological priority, we will develop and build hydropower stations in key river basins such as the southwest and the upper reaches of the Yellow River. Anchor the goal of more than 1.2 billion kilowatts by 2030, and vigorously develop wind and solar power generation; At the same time, we will promote the development and utilization of biomass energy, geothermal energy and other renewable energy sources according to local conditions.

In addition to vigorously developing non-fossil energy, Zhang Jianhua said that it will also vigorously promote green energy use models, adopt more stringent energy consumption standards, and support the promotion of non-fossil energy replacement and energy use changes in key industries and fields such as industry, construction and transportation. We will accelerate the development of green energy models such as new energy vehicles and the integration of building photovoltics, accelerate the replacement of electric energy for heating and cooking, and raise the level of electrification of the whole society.

"In the next step, the National Energy Administration will accelerate the implementation of the carbon peak action in the energy sector, formulate more positive new energy development goals, and effectively promote the growth of renewable energy from the new force of energy green and low-carbon transformation to the main force of carbon peak and carbon neutrality, providing a strong guarantee for the construction of a clean, low-carbon, safe and efficient energy system." "Zhang Jianhua said.


  • ABB BC25 Controller Module
  • ABB 3HAB8859-1/03A Industrial Control Module
  • ABB 3HAB9271-1/01B Robotic Control Interface Module
  • ABB 3HAC5498-1 High-Performance Control Module
  • ABB 3HAC5518-1 Industrial Control Module
  • ABB 3HAC5497-1 Industrial Control Module
  • ABB 3HAC7344-1 Mains line filter unit
  • ABB 3HAC7681-1 Process Interface Module
  • ABB 3HAC6428-1/04 high-performance control module
  • ABB 3HAC6157-1 Floppy sign/supply cable
  • ABB 3HAC10847-1 Ethernet on front,Harness
  • ABB 3HAC5566-1 Industrial Communication Bus Cable
  • ABB 3HAC9710-1 Heat exchanger unit
  • ABB IMFECI2 Industrial Control Module
  • ABB IMDS014 Digital Slave Output Module
  • ABB INIT03 Control Module
  • ABB 3HAC031683-004 Cable Teach Pendant 30m
  • ABB HAC319AEV1 High-Performance Control Module
  • ABB UFC092BE01 Binary input module
  • ABB DAPC100 3ASC25H203 Industrial Control Board
  • ABB 57160001-KX DSDO 131 Digital Output Unit
  • ABB 3HAC4776-1/1 Industrial Control Module
  • ABB DSTF610 terminal
  • ABB YB560100-EA S3 Industrial Control Module
  • ABB XO16N1-B20 XO16N1-C3.0 High-Performance Industrial Control Module
  • ABB TU804-1 Programmable Logic Controller (PLC) Module
  • ABB TU515 I/O terminal unit
  • ABB TK516 Connection Cable with Contacts
  • ABB SPCJ4D34-AA Industrial Ethernet I/O System Module
  • ABB SPAD346C Integrated Differential Relay
  • ABB 1SAM101904R0003 SK-11 Signal contact 1NO+1NC
  • ABB SE96920414 YPK112A Communication Module
  • ABB SC610 3BSE001552R1 Submodule Carrier
  • ABB SC513 PLC Analog Input Module
  • ABB SAFT110 Advanced Safety Termination Module
  • ABB RVC6-5A Control Module
  • ABB RB520 Linear Motion Controller Module
  • ABB R1.SW2/3 Industrial Control Module
  • ABB PU517 Controller Automation System
  • ABB PS130/6-75-P Industrial Control Module
  • ABB 3BSE008062R1 PM633 Processor Module
  • ABB L110-24-1 Industrial Control Module
  • ABB IMDSO14 Digital Slave Output Module
  • ABB DSU10 Control Module
  • ABB DSQC627 3HAC020466-001 Advanced Power Supply Module
  • ABB DSQC354 Industrial I/O Module
  • ABB DSQC352 High Performance Input/Output Module
  • ABB 37911-4-0338125 Control Module
  • ABB DSPC172 CPU Module
  • ABB DSBB175 Industrial PLC Expansion Module
  • ABB CR-M4LS Industrial Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB BB510 (DC5256) Digital Control Module
  • ABB 61615-0-1200000 High-Precision Industrial Controller
  • ABB 3HNE 00313-1 TILLV.0317 Machine No. 64-25653
  • ABB 3HNA000512-001 Control Module
  • ABB 3HAC025466-001 Industrial Control Module
  • ABB 3HAB8101-8/08Y Industrial Control Module
  • ABB 3BHB003689 Multifunction Controller Module
  • ABB PXBHE65 206-00212 power module
  • ZUNKU 6203-2RS Deep Groove Ball Bearing
  • ZUNKU 6201-2RS Deep Groove Ball Bearing
  • ZYCOM IGLACS01281 Control Module
  • Zygo 8010-0105-02 ZMI-501 Displacement Measurement Interferometer
  • Zygo 1115-801-346 laser head cable
  • ZYGO HSSDC2 TO HSSDC2 CABLE 1115-800-055
  • ZYGO HSSDC TO HSSDC2 CABLE 1115-800-056
  • ZYGO ZMI 4104C Measurement Electronics Board
  • ZYGO ZMI-2002 8020-0211 Measurement Board
  • ZYGO 7702 8070-0102-35 Laser Head
  • ZYGO ZMI 7702 8070-0102-01X Laser Head
  • ZYGO ZMI-4004 4-Axis VME64x Measurement Board
  • ZYGO PC200 CS1115-801-346 Laser interferometer cable
  • ZYGO 8010-0105-01 ZMI Power Supply
  • ZYGO ZMI-2002 8020-0211-1-J Laser system measurement board card
  • ABB 35AE92 control card
  • ABB 200900-004 I/O Adapter PLC Board
  • Siemens 6ES7193-4CA40-0AA0 ET 200S Electronic Module
  • Siemens 6AV2124-2DC01-0AX0 Comfort Panel
  • Siemens 6ES7421-7DH00-0AB0 Digital Input Module
  • Siemens 6ES7350-2AH01-0AE0 Counter Module
  • Siemens 6ES7231-0HC22-0XA0 Analog Input Expansion Module
  • Siemens ET200SP 6ES7193-6PA00-0AA0 server module
  • Siemens 6ES7193-4JA00-0AA0 Terminal Module
  • Siemens 6AG1204-2BB10-4AA3 Ethernet Switch
  • SIEMENS 6GK1105-2AA10 SIMATIC NET series optical switching module (OSM ITP62)
  • Schneider Modicon Quantum 140CPU65260 Unity Processor
  • Schneider Modicon Quantum 140ACO02000 Analog Output Module
  • Schneider Modicon Quantum 140CPS11420 power module
  • Allen-Bradley 1747-CP3 SLC ™ Series of programming cables
  • Kollmorgen S33GNNA-RNNM-00 - Brushless Servo Motor
  • Kollmorgen 6sm56-s3000-g-s3-1325 - Servo Motor
  • Kollmorgen AKM52K-CCCN2-00 - Servo Motor
  • Kollmorgen PSR3-230/75-21-202 - Power Supply
  • Kollmorgen akm24d-anc2r-00 - Servo Motor
  • Kollmorgen AKM22E-ANCNR-00 - Servo Motor
  • Kollmorgen S60300-550 - Servo Drive
  • Kollmorgen B-204-B-21 - Servomotor
  • Kollmorgen AKM21E-BNBN1-00 - Servo Motor
  • Kollmorgen TT2953-1010-B - DC Servo Motor
  • Kollmorgen pa8500 - Servo Power Supply
  • Kollmorgen BDS4A-210J-0001-207C2 - Servo Drive
  • Kollmorgen TTRB1-4234-3064-AA - DC Servo Motor
  • Kollmorgen MH-827-A-43 - Servo Motor
  • Kollmorgen AKM24D-ACBNR-OO - Servo Motor
  • Kollmorgen 00-01207-002 - Servo Disk DC Motor
  • Kollmorgen AKM21C-ANBNAB-00 - Servo Motor
  • Kollmorgen PSR3-208/50-01-003 - Power Supply
  • Kollmorgen 6SM56-S3000 - Servo Motor
  • Kollmorgen DBL3H00130-B3M-000-S40 - Servo Motor
  • Kollmorgen 6SN37L-4000 - Servo Motor
  • Kollmorgen AKM65K-ACCNR-00 - Servo motor
  • Kollmorgen 6SM56-L3000-G - Servo Motor
  • Kollmorgen AKMH43H-CCCNRE5K - Servo Motor
  • Kollmorgen PSR4/52858300 - Power Supply
  • Kollmorgen KBM-79H03-E03 - Direct Drive Rotary Motor
  • Kollmorgen AKM33E-ANCNDA00 - Servo Motor
  • Kollmorgen U9M4/9FA4T/M23 - ServoDisc DC Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • Kollmorgen AKM43L-ACD2CA00 - Servo Motor
  • Kollmorgen AKM54K-CCCN2-00 - Servo Motor
  • Kollmorgen M-605-B-B1-B3 - Servo Motor
  • Kollmorgen AKD-P00606-NBAN-0000 - Rotary Drive
  • Kollmorgen 6SM-37M-6.000 - Servo Motor
  • Kollmorgen A.F.031.5 - Sercos Interface Board
  • Kollmorgen 918974 5054 - Servo PWM
  • Kollmorgen U12M4 - ServoDisc DC Motor
  • Kollmorgen AKD-B00606-NBAN-0000 - Servo Drive