Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

The "14th Five-Year Plan" accelerated the development of renewable energy

来源: | 作者:佚名 | 发布时间 :2024-01-09 | 371 次浏览: | Share:

The development of leap presents four characteristics

Since the 18th National Congress of the CPC, China's renewable energy has achieved leapfrog development, and the installed capacity has exceeded 1 billion kilowatts, accounting for more than 40% of the country's total installed power generation capacity. Among them, the installed capacity of hydropower, wind power, photovoltaic power generation and biomass power generation has ranked first in the world for 17 consecutive years, 12 years, 7 years and 4 years respectively, and the international competitive advantages of photovoltaic and wind power industry chains are prominent.

The 14th Five-Year Plan period is the first five years for China to embark on a new journey to comprehensively build a modern socialist country and march toward the second centenary goal, and it is also a crucial period for China to accelerate its energy green and low-carbon transformation and implement the nationally determined Contribution to climate change.

The "Plan" proposed that the "14th Five-Year Plan" period of renewable energy to achieve high-quality development, how to understand the "high-quality development"? The relevant person in charge of the National Energy Administration said that this is mainly reflected in two aspects: on the one hand, China should consolidate the foundation of energy transformation in less than 10 years, the development of renewable energy is bound to "stand first", further shift and speed up, and become the main body of energy consumption increase; On the other hand, renewable energy should not only achieve continuous technological progress, continuous cost reduction, continuous improvement of efficiency, continuous enhancement of competitiveness, comprehensive realization of subsidy-free parity and even low-price market-oriented development, but also speed up the solution of high proportion of consumption, key technology innovation, industrial chain and supply chain security, stability and reliability, and further improve quality and efficiency.

In the new stage of high-quality development, what new characteristics will China's renewable energy development present? "New energy should have a new look in the new stage." Li Chuangjun, director of the New Energy Department of the National Energy Administration, introduced that during the "14th Five-Year Plan" period, China's renewable energy has stood at a new historical starting point and will present new characteristics of large-scale, high proportion, marketization and high-quality development.

Specifically, the first is large-scale development, and further accelerate the increase of the proportion of installed power generation; Second, high-proportion development, from the incremental supplement of energy and electricity consumption to the incremental main body, the proportion of energy and electricity consumption increased rapidly; Third, market-oriented development, from subsidy-supported development to affordable and low-cost development, from policy-driven development to market-driven development; Fourth, high-quality development, both large-scale development, but also a high level of consumption, more to ensure the stable and reliable supply of electricity.

It is worth noting that, different from previous plans, this Plan is jointly issued by nine departments of The State Council for the first time. "The development of renewable energy is inseparable from the strong support of various sectors." Li Chuangjun said that the "14th Five-Year Plan" renewable energy high-quality development, the task is more difficult, detailed survey of resources, land and sea, meteorological services, ecological environment, financial and other aspects of the new higher requirements, it is urgent to improve the development of renewable energy related land, finance, finance and other support policies, strengthen policy coordination.

"This is not only an innovation in the form of planning and release, but also helps to form a strong synergy to promote the high-quality development of renewable energy in the new era." Li Chuangjun said.

Renewable energy will be the main incremental

In order to achieve the high-quality development of renewable energy, the "Plan" anchors the target of peaking carbon and carbon neutrality, closely focusing on the requirement that the proportion of non-fossil energy consumption reaches about 20% in 2025, and specifies that the total renewable energy consumption reaches about 1 billion tons of standard coal in 2025. During the "14th Five-Year Plan" period, the increase in renewable energy consumption accounted for more than 50% of the increase in primary energy consumption.

"From the perspective of renewable energy, China's geothermal energy heating, biological liquid fuel, biological natural gas and other non-electric utilization by resource conditions, technology maturity, development and utilization of economic factors, the use of scale is relatively limited, 'fourteen five' renewable energy development and utilization will still be dominated by renewable energy electricity." Peng Cheng, president of the General Institute of Hydropower Planning and Design, said.

In view of the power generation target, the "Plan" proposed that the annual power generation of renewable energy will reach 3.3 trillion KWH in 2025, and during the "14th Five-Year Plan" period, the increase in renewable energy generation will account for more than 50% of the increase in electricity consumption in the whole society, and the power generation of wind and solar energy will double.

Peng Cheng analyzed that in terms of the development positioning and spatial expectations of various renewable energy power, the preliminary work of conventional hydropower projects is complicated, the construction cycle is long, and the production projects are basically clear during the "14th Five-Year Plan" period, and the production scale has grown steadily; Agricultural and forestry biomass power generation, waste incineration power generation, etc. are restricted by the economy of collection and utilization of available resources and environmental protection requirements, and their scale is limited; Solar thermal power generation, geothermal power generation, ocean power generation is still in the stage of commercial demonstration or research and development; Large reserves of resources, flexible construction sites, good economic wind power, photovoltaic power generation must assume the main responsibility of the new.

In addition, the "plan" also clarified the consumption target and non-electricity utilization target: in 2025, the total amount of renewable energy and non-hydropower consumption responsibility weight reached 33% and 18% respectively, and the utilization rate remained at a reasonable level. By 2025, the scale of non-electric utilization of solar thermal energy, geothermal energy heating, biomass heating, and biomass fuel will reach more than 60 million tons of standard coal.

"These targets are determined by taking into account the resource potential of various types of non-fossil energy, the progress of major projects, the economy of development and utilization and other factors, which can lay a solid foundation for achieving the goal of about 20% of non-fossil energy consumption in 2025 and about 25% in 2030." Li Chuangjun said.

In order to enhance the consumption capacity of renewable energy, the construction of UHV has been further accelerated. On May 19, State Grid Zhejiang Electric Power Co., Ltd. launched the Baihetan - Zhejiang UHV DC line project (Zhejiang section) to focus on the special action, after the completion of the project can send 8 million kilowatts of clean hydropower in Sichuan to the load center in northern Zhejiang. At present, the Wuxing section of the project has been through, opening up the first station for clean electric energy to enter Zhejiang at a high speed. It is expected that by 2030, the cross-regional and cross-provincial transmission capacity of the national grid will increase from the current 240 million kilowatts to more than 370 million kilowatts.

It has fully entered the market stage

"The life of the plan is implemented, and the Plan proposes to optimize development by regional layout, support development by major bases, lead development by demonstration projects, and implement development by action plans." Li Chuangjun said.

The reporter learned that in terms of regional layout optimization and development, the "three North" region has optimized and promoted the large-scale development of the base, the Southwest region has coordinated and promoted the comprehensive development of water scenery, the southern Middle East region has focused on promoting local development, and the eastern coastal region has actively promoted the cluster development of offshore wind power.

In terms of supporting the development of major bases, it is clear to focus on the desert, Gobi and desert areas, and speed up the construction of seven new energy bases on land: the upper reaches of the Yellow River, Hexi Corridor, Jizi Bay of the Yellow River, northern Hebei Province, Songliao, Xinjiang and lower reaches of the Yellow River, two major water-landscape integrated bases in southeast Tibet, Sichuan, Yunnan, Guizhou and Guangxi, and offshore wind power base clusters.

In terms of leading the development of demonstration projects, we will promote technological innovation demonstrations such as far-reaching sea breeze electricity and new high-efficiency photovoltaic cells, large-scale development and construction demonstrations of hydrogen production from renewable energy and photovoltaic sand control, and 18 demonstration projects in three categories of high-proportion application demonstration such as small and medium-sized pumped storage and new energy micro-energy grids in villages and towns, and accelerate the cultivation of new technologies, new models and new forms of renewable energy.

In terms of the implementation and development of the action plan, nine major action plans have been deployed, such as urban rooftop photovoltaic action, thousands of villages and wind control action, thousands of households Muguang action, and rural energy stations, to fully land a solid and effective action guarantee plan.

At the same time, the "Plan" more prominent integration of diversity. It not only emphasizes the complementary development of various varieties of renewable energy, but also emphasizes the integrated development of fossil energy, while implementing national strategies such as ecological civilization construction, new urbanization, rural revitalization, and new infrastructure, carrying out multi-mode innovation such as photovoltaic sand control, building photovoltaic integration, and renewable energy hydrogen production, and expanding renewable energy development scenarios. We will strive to build a new situation of multi-energy complementary and multiple iterative development of renewable energy.

With the withdrawal and cancellation of government subsidies, as the main body of new wind power, photovoltaic power generation has entered the parity stage, market-oriented development stage, and wind power photovoltaic power generation technology and equipment, industrial chain have reached the international advanced level, "fourteen five" period of wind power photovoltaic power installed more or less, where more or less, to play a decisive role in the market in the allocation of resources.


  • Alstom vajh13yf1001aba - Automatic Trip Relay 220-250 V
  • ALSTOM Servo Inverter Type:ALSPA MV 1007-IT - - 3.0 kW
  • ALSTOM Cegelec Interface Modnet 1 / MB+ Fbk Mbp S1/S - Interface Module
  • Alstom Input / Output Card I/O Module SA44647.A - Module
  • Alstom Plug-in card Input/Output module SA44650.C - Module
  • ALSTOM Adjustment Module Keypad Alspa MV1000 - Keypad
  • Alstom Operating module Keypad Alspa MV1000 - Keypad
  • Alstom Plug-In Input/Output Module Sa 45629.B - Module
  • ALSTOM Adjustment Module Keyboard Alspa MV1000 - Keyboard
  • ALSTOM Control Set - 15 V 029.069642/26472/1011 - Voltage regulator
  • Alstom Input/Output Card Module SA44650.C - Module
  • Alstom Input / Output Card I/O Module - Module
  • Alsthom Alstom Plug-In Input/Output Module SA41630 B - Module
  • ALSTOM Servo Inverter Type: ALSPA MV 1007-IT - - 3.0 kW
  • Alstom Plug-In Input/Output I/O Module SA44647.A - Module
  • Alstom Plug-In Input/Output Module Sa 45629.B - Module
  • Alstom Plug-in card Input/Output module SA46623.B - Module
  • ALSTOM Control Module Keyboard Alspa MV1000 - Keyboard
  • Alstom Plug-In Input/Output Module SA46623.B - Module
  • Alstom Plug-In Input/Output Module SA44650.C - Module
  • Alstom Plug-In Input/Output Module SA43610.E - Module
  • Alstom Insertion Card Input / Output Module SA43610.E - Module
  • Alsthom Alstom Plug-In Input/Output Module SA41630 B - Module
  • Alstom Plug-In Input/Output I/O Module - Module
  • Alstom Plug-In Input/Output Module SA46623.B - Module
  • Alstom Plug-in card Input/Output I/O module SA44647.A - Module
  • Alstom Plug-in card Input/Output I/O module SA44647.A - Module
  • Alstom Plug-in card Input/Output module SA 45629.B - Module
  • ALSTOM Alspa VF Inverter Type : VF 4004b - - 1.5 Kw
  • Alstom Plug-In Input/Output Module SA46617.B - Module
  • Alstom PS 431 - Control Unit
  • Alstom Plug-In Input/Output Module Sa 46624.A - Module
  • Alstom Plug-In Input/Output Module SA44650.C - Module
  • Alstom Plug-In Input/Output Module SA43610.E - Module
  • ALSTOM Alspa MV1000 Frequency Type : Alspa MV1032 - - 15 Kw
  • Alstom Input/Output Card Module SA46617.B - Module
  • Alstom Input/Output Card Module Sa 45629.B - Module
  • Alstom Input/Output Card Module SA46623.B - Module
  • ALSTOM Servo-Converter Type : ALSPA MV 1007-IT - - 3.0 Kw
  • ALSTOM Frequency Type : ALSPA MD2000 - 43-400 (49-460)
  • ALSTOM Servo-Converter Type : ALSPA MV 1007 - - 3.0kW
  • Alstom PS 431 - Control
  • ALSTOM Alspa Cegelec Guide Value Transmitter 029.087.176/98N115099109 - Transmitter
  • Alstom Input/Output Card Module Sa 46624.A - Module
  • ALSTOM Control Set - 15 V 029.069642/26472/1011 - Voltage regulator
  • ALSTOM Alspa Module Control Set 029.111.890/27347/1018 - Module
  • ALSTOM Alspa Module Control Set 029.063.255/25443/1044 - Module
  • ALSTOM Alspa Cegelec Module Control Set 029.063.292/25943/1008 - Module
  • ALSTOM Microverter D 4-8/500/029.130.005 - Inverter
  • Alstom ISTAT M233 M233X2GUYECAL0A - Measurement unit M233X2GUYECAL0A NEW
  • ALSTOM Alspa Cegelec Guide Value Transmitter 029.087.176/98N115099109 - Transmitter
  • Alstom Input/Output Module SA 46624.A - Plug-in card
  • ALSTOM Cegelec Interface Modnet 1 / MB + Fbk - Mbp S1/S
  • ALSTOM MAE 00-11 - 8 Channel isolated analog i/o termination panel LC11-13 24118b
  • Alstom MMLG01 137945N - Test block electric panel 715209M T&D protection and control
  • ALSTOM Mae 00-11 - Channel Isolated Analog I/O Terminal Panel LC11-13 24118b Al
  • CONVERTEAM S20X4262/50 / S20X426250 - Module
  • CONVERTEAM MV530A4C1A / MV530A4C1A - Inverter
  • CONVERTEAM C100/5302 / C1005302 - Module
  • CONVERTEAM 20X4355B1L / 20X4355B1L - (new without box)
  • CONVERTEAM GM0020002 / GM0020002 - Module
  • CONVERTEAM P111-6052 / P1116052 - Module
  • Alstom PS 431 - Controller
  • ALSTOM Type : Alspa BC 32 - Brake Chopper Unit
  • ALSTOM Alspa MV500 SE23400075/MV502A4C1A - - 0.75kW Inverter
  • Alstom M30-Tx200 DIN931 - Hexagon screw stamped 8A B screw GE Alstom SW 46
  • Alstom Sa 46624.A - Plug-In Input/Output Module
  • ALSTOM Adjustment Module Keyboard Alspa MV1000 - Keyboard
  • Alstom PA20397/2186-03-H01 - Circuit Board
  • Alstom KBCH12001H12MEL 228633J - Relay Differential KBCH120
  • Alstom MMLG01 137945N - TestBlock Electric Panel 715209M T&D Protection & Control
  • Alstom KBCH12001H12MEL 228633J - Differential Relay KBCH120
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T&d Protection &
  • ALSTOM Mae 00-11 - 8 Channel Isolated Analog I/O Terminal Panel LC11-13 24118b
  • Alstom KBCH12001H12MEL 228633J - Differential Relay KBCH120 and extended warranty
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T & D Protection & De
  • Alstom DFI-110-0340F - DFI1100340F Diagnostic Flame Indicator
  • KCGG142 KCGG14201D20EEA - 287362J
  • ALSTOM MAE 00-11 - Channel isolated analog i/o termination panel LC11-13 24118b Al
  • KCGG122 KCGG12201DEED - 463055L and extended warranty
  • Alstom MMLG01 137945N - Test Block Electrical Panel T&D Protection & Control
  • Alstom 3FAFA5100A - Voltage Sensor TN7 112 003 Alstom T&D Protection & Control
  • Used ALSTOM PIB100 F 3BEB0169 - Board
  • Alstom Keypad - Alspa MV 1000
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T & D Protection &
  • ALSTOM PS441 - Overcurrent protection - Used
  • Alstom Power 2506305 - Circuit Board
  • ALSTOM PS431 - CONTROL UNIT
  • ALSTOM MV502S2B1A - 1 pc X Frequency Drive Alspa MV500
  • Alstom 3VAFS5500A - Voltage Sensor TN7105 002 Alstom T&D Protection & Control
  • ALSTOM MV507A2D1A - 1 pc X Frequency Drive Alspa MV500
  • KCGG KCGG12201L20EED - 655002M and extended warranty
  • ALSTOM TRVP059753000 - AGC3X-007 BLOCK ENCODER TRVP05975400
  • KCGG KCGG14202l20EEB - 654833M and extended warranty
  • Alstom 029 204 538 - cegelec Interface RS422/RS232 Alspa MV 1000
  • ALSTOM PIB100 F - 3BEB0169 Board
  • CONVERTEAM 8321-4002 / 83214002 - (new with box)
  • CONVERTEAM MVAJ14D1GA0774A / MVAJ14D1GA0774A - Relay
  • CONVERTEAM 8178-4002 / 81784002 - (new with box)
  • CONVERTEAM QTWIE2-VD4A / QTWIE2VD4A - (new with box)
  • CONVERTEAM A48DI-40DX-B7/95 / A48DI40DXB795 - Meter
  • CONVERTEAM V96LC/0-400RPM / V96LC0400RPM - Meter
  • CONVERTEAM A72DI-5-40X4/95 / A72DI540X495 - Meter
  • CONVERTEAM 8321-4002 / 83214002 - Module
  • CONVERTEAM 029.081-942 / 029081942 - Module
  • CONVERTEAM V96LC/0-600RPM / V96LC0600RPM - Meter
  • CONVERTEAM 20X4524B1L / 20X4524B1L - Module
  • CONVERTEAM EGS3C-ST11001 / EGS3CST11001 - Module
  • CONVERTEAM S8503-4001 / S85034001 - Module
  • CONVERTEAM MVAX12B1DA0752A / MVAX12B1DA0752A - Relay
  • CONVERTEAM 11P408ND8268/7 / 11P408ND82687 - (new without box)
  • CONVERTEAM MVAJ26L1BB0502A / MVAJ26L1BB0502A - Relay
  • CONVERTEAM C100/5120 / C1005120 - Module
  • CONVERTEAM D-984-0578 / D9840578 - Board
  • CONVERTEAM GDS1017-4001 / GDS10174001 - Enhancement Card
  • CONVERTEAM MBC101F1AD0761A / MBC101F1AD0761A - Module
  • CONVERTEAM GDS1006-4001 / GDS10064001 - Keypad
  • CONVERTEAM 25X8521/10 / 25X852110 - Module
  • CONVERTEAM VSELC1011A1AB / VSELC1011A1AB - (new without box)
  • CONVERTEAM RTS-13060102-R / RTS13060102R - Relay
  • CONVERTEAM LGPG-11101P55LEF / LGPG11101P55LEF - Relay
  • CONVERTEAM 203-399 / 203399 - Module
  • CONVERTEAM MV516A4C1 / MV516A4C1 - Inverter
  • CONVERTEAM SW867577-007 / SW867577007 - Module
  • CONVERTEAM MCGG22D1CD0503D / MCGG22D1CD0503D - Relay
  • CONVERTEAM MV506A4C1A / MV506A4C1A - Inverter
  • CONVERTEAM GM0025002 / GM0025002 - Module
  • CONVERTEAM MBCI01F1AD0511A / MBCI01F1AD0511A - Module