Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Strive to make greater contributions to the security of energy and electricity

来源: | 作者:佚名 | 发布时间 :2024-01-25 | 711 次浏览: | Share:

Energy security is an overarching and strategic issue bearing on the country's economic and social development, and is crucial to the country's prosperity and development, the improvement of people's lives, and long-term social stability. The Party's 20th National Congress report pointed out that "national security is the foundation of national rejuvenation" and "strengthen security capacity building in key areas to ensure the security of food, energy and resources, and important industrial and supply chains."

As a "national team" related to the national economy, people's livelihood and energy security, State Grid Co., Ltd. earnestly studies and propagandises the spirit of the Party's 20 Major Congress, implements the overall national security concept, coordinates development and security, coordinates supply and transformation, effectively prevents and solves various risks, and provides strong support for ensuring energy security and firmly holding the energy rice bowl in its own hands. Strive to make greater contributions to the security of energy and electricity.

Secure the safety lifeline and consolidate the energy and power supply foundation

On December 30, 2022, Baihetan - Zhejiang ±800 kV UHV DC project was completed and put into operation, marking the completion of the power delivery channel project of Baihetan Hydropower Station. Clean electric energy is sent to Jiangsu and Zhejiang through the two UHV projects of Baihetan - Jiangsu and Baihetan - Zhejiang, injecting new momentum into the high-quality integrated development of Jiangsu and Zhejiang and the Yangtze River Delta.

The report of the Party's 20th National Congress pointed out that "strengthening security capacity building in key areas" and "ensuring energy security". In 2022, the Central Economic Work Conference proposed to "strengthen the domestic exploration and development of important energy and mineral resources and increase storage and production, accelerate the planning and construction of a new energy system, and improve the capacity of national strategic material reserves."

Power grid is an important national infrastructure and strategic facility, and power grid security is related to the national economy, people's livelihood and national security. 

In mid-winter, in Hunan, which has experienced the test of icing of power grid lines, the main network DC ice melting device independently developed by the State Grid Hunan Disaster Prevention and Reduction Center has been deployed in the province, providing technical support for the main network ice protection work.

In 2022, after key projects such as the 1000kV Jingmen-Wuhan UHV AC power transmission and transformation project are put into operation, the grid structure of the Central China regional power grid will be further strengthened, and the power mutual supply capacity between provinces in the region will be greatly improved.

Large power grid security is the top priority of the company's security work. The company strengthens the operation control of the power grid, continuously strengthens the "three lines of defense", prevents network security risks, and continuously enhances the security control ability of the large power grid; We will improve the transportation capacity of important corridors and key sections, and continue to strengthen the interconnection and mutual supply and backup of major power grids. Strengthen the management of distribution network, improve the lean operation and maintenance level of distribution network; Improve the emergency response system, strengthen the coordination mechanism of power supply and guarantee work, and ensure efficient operation and timely response.

Safety is the foundation of all work. The Party's 20th National Congress report pointed out that "to promote the special rectification of production safety risks, strengthen the safety supervision of key industries and key areas." The company strengthened the concept of the system and coordinated the work of safety production. In 2022, the company held a series of safety committee meetings and safety production teleconference, studied and proposed 38 measures of the company, deeply promoted the three-year action of special rectification of safety production, solidly carried out the major inspection of safety production and the annual action of safety production improvement of central enterprises, and fully promoted the CPC Central Committee and The State Council on the deployment of safety production.

In the face of the new situation and tasks of epidemic prevention and control, the company strictly implements the national and local epidemic prevention and control requirements, comprehensively strengthens the epidemic prevention and control management and personnel management of key positions in key places such as power dispatching control center, engineering construction site, power supply business hall, substation, etc., improves the emergency mechanism, strengthens regular prevention and control measures, and resolutely holds the epidemic prevention and control line. Ensure reliable power supply.

A series of practical measures have been effective, the company has implemented the requirements of safe development into various fields of production, operation and management, and the majority of cadres and employees have gathered a strong joint force to do a good job in power supply assurance, power grid development, operation and management, reform and innovation, epidemic prevention and control, and strive to provide reliable power guarantee for economic and social development.

Play a good combination of condensed multi-force to ensure the power supply

In the middle of winter, in the power plant, the power supply supervision group composed of government staff and employees of power supply enterprises supervises the storage and transportation of electric coal in the power plant, inspects the operation of relevant units and puts forward technical suggestions; In the heating enterprise, power grid staff door-to-door maintenance of power supply equipment, make emergency plans; While the conventional power supply is guaranteed, wind power photovoltaic power generation is working at the same time, key power grid projects are completed and put into operation, and pumped storage power stations play a role... Momentum for energy security is gathering.

The supply of electricity and heating has a bearing on overall economic development and social stability, and is a major issue affecting people's livelihood. The report of the Party's 20th National Congress pointed out that "strengthen the construction of the energy production, supply, storage and marketing system to ensure energy security."

As a responsible central enterprise, the company shoulders the responsibility of power supply guarantee, adheres to the work positioning of "governments at all levels are in charge, power enterprises are the main force, power grid enterprises are the vanguard, and power users are the masters", relying on the government-led guarantee coordination mechanism. We will give full play to the role of coal power as the basic guarantee and backstop, the effective support role of various types of power supplies and energy storage, the flexible adjustment role of load side, and the role of the market in optimizing resource allocation, and promote the joint efforts of all parties to ensure the steady and orderly supply of electricity.

On December 13, 2022, Changji-Guquan ±1100 kV UHVDC power supply 750 kV supporting project three 750 kV line projects were completed and put into operation, further improving the reliability of "Xinjiang electricity transmission", and effectively supporting the overall situation of power supply.

In 2022, a number of major projects will be accelerated, and the role of large power grids in ensuring supply will continue to play. Fuzhou-xiamen, Zhumadian - Wuhan 1000 kV UHV AC project started, Zhejiang Taishun, Jiangxi Fengxin, Hunan Anhua, Heilongjiang Shangzhi and other pumped storage power plants started, key projects in various places orderly progress...

The company strives to improve the layout and structure of the main grid, orderly construction of trans-provincial and trans-regional transmission channel key projects, and actively promotes the transformation of distribution networks and the construction of rural power grids. At present, the State Grid has completed 33 UHV power transmission projects, forming a situation of "west power transmission to the east, north power supply to the south", significantly improving the national energy security capability.

The report of the 20th National Congress of the Communist Party of China pointed out that "improving the ability to ensure the supply of strategic resources", "implementing a comprehensive conservation strategy" and "promoting the formation of green and low-carbon production methods and lifestyles".

While giving full play to the advantages of large power grid resource allocation, the company coordinates the load and storage of the source network and makes joint efforts to ensure a stable and orderly power supply. The company promotes the optimal combination of coal power and new energy power, and makes every effort to promote all types of units to be combined and sent. Strengthen the power demand side management, relying on the new power load management system, to achieve accurate load control; We will expand and implement energy efficiency improvement projects, guide the whole society to save electricity, and make every effort to ensure the warm winter of the people and the smooth operation of the economy.

The two-pronged approach of increasing source and reducing expenditure will help ease the pressure on energy supply. In Shandong province, Laizhou offshore wind power and Marine pastures integrated development research and test project to develop and utilize new energy, annual online electricity can reach 1 billion KWH; In Shanghai, the power supply company has built a smart city energy cloud platform, where regional energy carbon emissions and other data are clear to help customers save energy and reduce carbon. In Ningxia, power supply employees visited enterprise customers to build a classified, real-time and efficient adjustable load resource base...

The company goes all out to ensure security, power supply and people's livelihood, plays the role of supporting economic and social development and safeguarding energy security "national team", and better serves the stable operation of economy and society.

Resolutely shoulder the responsibility of the power grid to serve the overall situation of national energy supply

Climbing "into the cloud" in cold weather, rocking and walking on high-altitude power lines, is a daily routine for many grid employees. At the end of 2022, after the People's Daily Online released a video of "electricity workers climbing rope ladders to walk the line at an altitude of 80 meters", netizens left a message "hard work!" The understanding of netizens reflects the important role of power supply guarantee in the overall situation of economic and social development.

The report of the Party's 20th National Congress pointed out that "safeguarding the fundamental interests of the people, improving the well-being of the people" and "taking more measures to benefit the people and warm the hearts of the people, and focusing on solving the urgent problems of the people."

Cold tide resistance, power supply. It protects people's livelihood and warms people's hearts. Ensuring the reliable supply of electricity is the concentrated embodiment of the company's "three responsibilities". The company keeps in mind the "biggest of the country", adheres to the overall situation of the Party and the state, takes the fundamental interests of the people as the priority, goes all out to ensure power supply, security and stability, and serves the "six stability" and "six guarantees" overall situation.

-- Successfully completing the Party's 20 major power conservation tasks, and contributing to power conservation in major activities.

It is a major political task of the company to ensure the Party's 20 major power safety. With "the highest standards, the strongest organization, the most stringent requirements, the most practical measures, the best state", the company has achieved the goal of "zero equipment failure, zero customer flash, zero work error, zero service complaints", and successfully completed the Party's 20 major power preservation tasks. In 2022, the Winter Olympics will be guaranteed electricity, the reliability of power supply in the competition area will reach 99.999%, and green electricity will light up the Winter Olympics venues. The company strives to ensure the good situation of safe production and ensure the stable and orderly power supply of the National Two Sessions, the Shanghai Import Expo, and major festivals.

-- Electric escort for epidemic prevention and control to build a bright defense line in the major battle.

At the forefront of epidemic prevention and control, power supply employees went to the scene to escort medical institutions with electricity, and to enterprises and communities to help customers solve electricity problems; Power dispatching personnel to strengthen duty, scientific and accurate dispatch; Emergency repair personnel are on standby and quickly rush to the repair point... National Grid staff guard the lights of thousands of homes to provide reliable electricity protection for epidemic prevention and control.

-- Protect the light at peak times, and contribute to the power of the state grid in ensuring economic and social development and people's livelihood.

Faced with the challenges of the highest temperature, the least hydropower, the maximum load, and the longest time in the summer, the company strengthened the linkage between government and enterprise, promoted stable supply and increased supply, increased mutual relief of surplus and shortage, and improved demand response measures. The company's power security team is busy in the streets, fields, and enterprise workshops, and uses persistence in exchange for the electricity safety of thousands of households.

To meet the peak of winter to cope with the cold wave, the company issued a cold wave rain and snow freezing warning, and all units quickly launched an emergency response. State Grid North China Branch organized all provincial power grids in North China to actively carry out surplus and deficiency mutual relief; The Northeast branch of the State Grid reasonably arranges the operation mode of the power grid, and coordinates the power supply guarantee and the consumption of new energy; The Northwest Branch of the State Grid supervises the relevant units to operate and maintain line equipment, etc., and prepare for support in advance......

In the power supply encounters and attacks again and again, the company fights all lines and guards all staff. At present, the company fully implements the spirit of the Party's 20 Major Congress, with a strong sense of political responsibility and mission responsibility, and always regards ensuring the safe and reliable supply of electricity as the first responsibility and primary task, making positive contributions to the warm winter of the people, and escorting the higher quality and more sustainable development.


  • ABB 1TGE120010R1300 Industrial Control Module
  • ABB 216BM61b HESG448267R1021 Advanced Process Control Module
  • ABB BDD110 HNLP205879R1 Digital I/O Module
  • ABB IEMPU02 Power Supply Module
  • ABB G3FE HENF452697R1 High performance control module
  • ABB G3FD HENF452692R1 High-Performance Industrial Control Module
  • ABB B5EC HENF105077R1 Electronic Motor Protection Relay
  • ABB G3EFa HENF450295R2 Industrial Automation Module
  • ABB B5EEd HENF105082R4 Electronic Motor Protection Relay
  • ABB O3EId HENF452777R3 Digital Output Module
  • ABB NWX511a-2/R HESG112548R12 Industrial Automation Module
  • ABB E3ES Power communication module
  • ABB O3EX HENF315845R2 Industrial Control Module
  • ABB O3EHa HENF315087R2 Digital Output Module
  • ABB E3ED High-Performance Industrial Controller
  • ABB O3EGb HENF315118R2 Digital Output Module
  • ABB O3ED Digital Input Module
  • ABB O3ES HENF445789R1 Digital Input Module
  • ABB G3ESa HENF318736R1 control module
  • ABB 8025-235 Industrial Control Module
  • ABB 216NG61A HESG441633R1 HESG216875/K main control board
  • ABB SCYC51020 58052582G programmable Logic Controller
  • ABB RED670 Line differential protection
  • ABB PP825A 3BSE042240R3 Touch Screen Panel
  • ABB SCYC51020 58052582/G pulse trigger board
  • ALSTOM COP232.2 VME A32/D32.029.232 446 Controller Unit
  • ABB AO2000 LS25 Laser analyzers
  • ABB LM80 Laser level transmitter
  • ABB PM803F 3BDH000530R1 Base Unit 16 MB
  • ABB SD822 3BSC610038R1 Power Supply Device
  • ABB PCD235B1101 3BHE032025R1101 Industrial Control Module
  • ABB AZ20/112112221112E/STD Control Module
  • ABB UAD142A01 3BHE012551R0001 Industrial Control Module
  • ABB 5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 main control board
  • ABB FET3251C0P184C0H2 High-Performance Power Module
  • ABB CAI04 Ability ™ Symphony ® Plus Hardware Selector
  • ABB R474A11XE HAFAABAAABE1BCA1XE output hybrid module
  • ABB REF542PLUS 1VCR007346 Compact Digital Bay Control
  • ABB REF542PLUS 1VCF752000 Feeder Terminal Panel
  • ABB PPD113B03-26-100100 3BHE023584R2625 output hybrid module
  • ABB 3BHE022293R0101 PCD232A Communication Interface Unit
  • ABB CI857K01 3BSE018144R1 Module Controller
  • ABB 3ASC25H216A DATX132 Industrial Controller
  • ABB LWN2660-6 High-Voltage Industrial Controller
  • ABB 1MRK00008-KB Control Module
  • ABB SC540 3BSE006096R1 Submodule Carrier
  • ABB REF615C_C HCFFAEAGANB2BAN1XC feeder protection and measurement and control device
  • ABB S-073N 3BHB009884R0021 multi-function servo driver
  • ABB SK827005 SK827100-AS 480V 60HZ coil
  • GE 029.381208 module
  • ABB REF615E_E HBFHAEAGNCA1BNN1XE Module
  • ABB TP830 3BSE018114R1 Baseplate Module
  • ABB TK803V018 3BSC950130R1 Cable Assembly
  • ABB DSRF197 3BSE019297R1 Controller Module
  • ABB DSAO120A 3BSE018293R1 Advanced Analog Output Board
  • ABB DSDP170 57160001-ADF Pulse Counting Module
  • ABB DSBC176 3BSE019216R1 Bus Extender Board
  • ABB DSDO115A 3BSE018298R1 Digital Output Module
  • ABB PM865K01 3BSE031151R1 Processor Unit HI
  • ABB 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 auxiliary DC power supply unit
  • ABB TP853 3BSE018126R1 Power Supply Module
  • ABB REM545AG228AAAA High Precision Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB REM615C_D HCMJAEADAND2BNN1CD Motor protection and control
  • ABB TP857 3BSE030192R1 DCS System
  • ABB PP865A 3BSE042236R2 Touch Panel
  • ABB SCYC51020 58052582H Industrial Automation Control Module
  • ABB SCYC51090 58053899E Control Module
  • ABB CB801 3BSE042245R1 Profibus DP Slave Expansion Module
  • ABB 5SHY4045L0001 3BHB018162R0001 IGCT Module
  • ABB 5SHY6545L0001 AC10272001R0101 5SXE10-0181 High-Power IGCT Module
  • ABB RMU811 Module Termination Unit
  • ABB TVOC-2-240 1SFA664001R1001 Industrial Control Module
  • ABB LDSTA-01 63940143B Input/Output (I/O) Module
  • ABB GJR5252300R3101 07AC91H Analog Input/Output Module
  • ABB GJR5252300R3101 07AC91F Industrial Control Module
  • ABB TB711F 3BDH000365R0001 Industrial Control Module
  • ABB TU715F 3BDH000378R0001 I/O Terminal Unit (ITU)
  • ABB DC732F 3BDH000375R0001 Industrial Controller
  • ABB TTH300 Head-mount temperature transmitter
  • ABB UNS3670A-Z V2 HIEE205011R0002 Industrial Automation Module
  • ABB RC527 3BSE008154R1 Redundant System Control Module
  • ABB 5SHY5055L0002 3BHE019719R0101 GVC736BE101 Industrial Control Module
  • ABB PM866 3BSE050200R1 AC800M series PLC core controller
  • ABB UFC718AE01 HIEE300936R0001 Main Circuit Interface Board
  • ABB DSAI130A 3BSE018292R1 Industrial I/O Module Controller
  • ABB 07KT98 GJR5253100R0278 Advanced Controller Module
  • ABB PFTL101B-5.0kN 3BSE004191R1 Power Conversion Module
  • ABB 5SHX1445H0002 3BHL000387P0101 IGCT Module
  • ABB 3HNM07686-1 3HNM07485-1/07 Controller Module
  • ABB DSCS131 57310001-LM DS Communication Board
  • ABB DSBC172 57310001-KD BUS REPEATER
  • ABB DSRF180A 57310255-AV Digital Remote I/O Module
  • ABB DSTC175 57310001-KN Precision Control Module
  • ABB DSSB140 48980001-P Battery Unit Industrial Control Module
  • ABB UAC389AE02 HIEE300888R0002 PCB Board
  • ABB PFTL101B 20KN 3BSE004203R1 DCS Module
  • ABB UFC718AE101 HIEE300936R0101 PCB Circuit Board
  • ABB UNS2880b-P,V2 3BHE014967R0002 Control Board
  • ABB UNS0887A-P 3BHE008128R0001 Communication Module
  • ABB UNS2882A-P,V1 3BHE003855R0001 EGC Board
  • ABB UNS2882A 3BHE003855R0001 Interface Board
  • ABB UNS4881b,V4 3BHE009949R0004 Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F 216EA62 Redundant system modules
  • ABB 216DB61 HESG324063R100/J Controller Module
  • ABB PFSK142 3BSE006505R1 Control board
  • ABB DSAI133A 3BSE018290R1 Analog Input Module
  • ABB PFTL201C-10KN 3BSE007913R0010 Load Cells
  • ABB CI858-1 3BSE018137R1 Industrial Module
  • ABB 5SHY35L4520 5SXE10-0181 AC10272001R0101 Controller
  • ABB TU847 3BSE022462R1 Module Termination Unit
  • ABB 6231BP10910 PLC Analog Output Module
  • ABB 07BR61R1 GJV3074376R1 Distributed I / O Coupler
  • ABB DI93A HESG440355R3 Digital Input Module
  • ABB IC660BBA104 6231BP10910 Industrial Control Module
  • ABB TP858 3BSE018138R1 Module Controller
  • ABB PFEA111-65 3BSE050090R65 Tension Electronics Module
  • ABB DSMB-02C 3AFE64666606 Power Supply Board
  • ABB MC91 HESG440588R4 HESG112714/B Wireless Router Modules
  • ABB PPD113-B03-23-111615 Excitation system controller
  • ABB AB91-1 HESG437479R1 HESG437899 Graphics Expansion Module
  • ABB IT94-3 HESG440310R2 HESG112699/B controller
  • ABB NF93A-2 HESG440280R2 HESG323662R1/HESG216665/K Module Controller
  • ABB IW93-2 HESG440356R1 HESG216678/B I/O module
  • ABB PM861K01 3BSE018105R1 Processor Module
  • ABB RB520 Dummy Module For Submodule Slot
  • ABB SR511 3BSE000863R1 SR511 Regulator 24V/5V
  • ABB DSDP140B 57160001-ACX Counter Board