Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Coordinate development and security, and promote the safe and high-quality development of the power industry

来源: | 作者:佚名 | 发布时间 :2024-01-25 | 431 次浏览: | Share:

Accurately understand the new situation and new problems facing the electric power industry

In today's world, major changes unseen in a century are accelerating, and China's development environment is facing profound and complex changes. An accurate understanding of the current new situation and new problems facing the development of the electric power industry is the premise and basis for doing a good job in the "14th Five-Year Plan" period of electric power work, and it is also an inevitable requirement for ensuring high-quality economic and social development.

The goal of carbon neutrality is steadily advancing, non-fossil energy sources are increasingly connected to the grid, and the reliable supply of electricity is facing challenges. The power industry has relatively large carbon emissions, undertakes important emission reduction tasks, and is also an important support for transportation, manufacturing and other industries to reduce carbon and decarbonize. Under the guidance of the "double carbon" goal, the proportion of new energy generation with high intermittenness and volatility has increased year by year, the construction of UHV AC and DC transmission channels has accelerated, the operation characteristics of the main grid and the system have undergone major changes, the superimposed system has insufficient flexible peak regulation, frequency regulation, voltage regulation and backup capacity, and some regions face double shortage of power in some periods, and the reliable supply of electricity is facing challenges.

With the acceleration of the construction of new power systems, there are deficiencies in the collaborative governance of "source and network load and storage", and the risk of safe operation of power grids is increasing. On the power side, the situation of power gap during peak hours in some areas is still continuing, and the peak power generation capacity is insufficient. On the power grid side, with a large number of grid-connected entities and uneven grid-related performance, the power grid pattern of multiple DC transmission and receiving is constantly strengthened, and the existing power grid operation control theory and modeling analysis method need to be reformed. On the load side, the existing regulation and control means are still unable to achieve comprehensive observation, measurement and control of massive load access, and the demand-side response mechanism still needs to be improved. On the energy storage side, the current energy storage configuration is still insufficient, and the energy storage technology with low cost, large capacity, long time and cross-season adjustment has yet to be broken through.

Entering the new stage of development, the internal and external environment of China's development has undergone profound changes, and the power information network security is facing prominent threats. With the continuous development of science and technology, all kinds of digital technologies are fully integrated into all aspects of power production and operation, the network security boundaries of various scheduling and monitoring systems and production information systems continue to extend, the network security exposure of power systems increases, and the attack paths increase, and the situation of network security in the power industry is more complicated and the challenges are more severe. In recent years, the trend of confrontation in the international cyberspace has become increasingly obvious, and attacks against power infrastructure have continued around the world. We must prevent and actively respond to them in advance.

The scale of power equipment has increased significantly, and extreme events are frequent, which puts higher requirements on power safety work. On the one hand, China's power facilities are widely distributed, large power plants, hub substations and other important power facilities with high load, precision equipment is relatively concentrated, once subjected to natural disasters and other force majeure factors, or the occurrence of switching, main protection refuse to operate mistakenly, may destroy the stability of the large power grid, causing a large area of power outage. On the other hand, in recent years, extreme weather has become more frequent and destructive around the world, with hotter, colder, more waterlogged and drier extreme weather continuing to occur, increasing the risk of damage to important power infrastructure due to disasters.

Balance development and security,

Deeply understand the new deployment and new requirements of the Party's 20th National Congress on electric power work

The Party's 20th National Congress made arrangements for further promoting the energy revolution, ensuring energy security, planning and building a new energy system, and pointed out the direction for further electricity security work. In-depth study and understanding of the spirit of the Party's 20 major Congress, a deep understanding of the Party's 20 major Congress of the new deployment and new requirements for power safety work, is the basic premise of doing a good job of power safety work.

Deeply understand the requirements of people-centered development thought, and provide safe and high-quality power guarantee for people's yearning for a better life. The report of the 20th National Congress of the Communist Party of China pointed out that "the country is the people, and the people are the country," and "We will build a safer China at a higher level, and ensure a new development pattern with a new security pattern." We must always bear in mind the fundamental purpose of the Party, firmly grasp the issue of electricity use that the people are most concerned about, and work hard to implement more practical measures to benefit the people's lives and warm the hearts of the people. We must take multiple measures at the same time to improve the level of electric power services, improve the ability to prevent and mitigate disaster relief and provide protection for major public emergencies, and provide safer and better quality electricity security for comprehensively building a modern socialist country.

Deeply understand the inherent requirements of high-quality development, and unswervingly promote the high-quality development of the power industry. The report of the Party's 20th National Congress stressed that "high-quality development is the primary task of comprehensively building a modern socialist country." In the process of electric power transformation and development, it is necessary to fully and accurately implement the new development concept, adhere to the system concept, focus on deepening the energy revolution, improve the risk monitoring and early warning system, the national emergency management system, accelerate the construction of a high-level, self-reliant and self-reliant new power system, and establish a sound national unified power market system adapted to the new development stage. The high-quality power supply escorts the high-quality economic and social development.

Deeply understand the strategic requirements of carbon peak carbon neutrality, and actively and steadily promote the safe carbon reduction of the power industry. The report of the 20th National Congress of the Communist Party of China put forward the requirement to "actively and steadily promote carbon peak carbon neutrality" and "promote the transformation of public security governance model to prevention in advance". It is necessary to focus on the future and plan ahead, improve the industrial, university and research technology innovation system and the application mechanism of the results for the safe carbon reduction of the power industry, strengthen the construction of scientific and technological and management personnel, accelerate the construction of technical advantages and equipment foundation leading the green and low-carbon transformation of global power, and promote the deep integration of innovation chain, industrial chain, capital chain and talent chain. Ensure that the dual-carbon targets in the power sector are met on schedule and safely.

Deeply understand the implementation requirements of the overall national security concept, and integrate the power safety work into the overall situation of the national security system.  At present, energy has become an important strategic resource related to national security and the game between major powers. We must comprehensively and correctly understand the deployment requirements of the Party Central Committee and The State Council, integrate power security work into the overall situation of the national security system, examine power security from a higher position, a broader vision, and a stricter standard, and make greater contributions to maintaining national security.

Strengthen responsibility,

We will unswervingly promote the safe and high-quality development of the power industry

Adhere to the bottom line thinking, enhance the awareness of potential dangers, and strive to prevent and resolve major power safety risks. First, it is necessary to implement a detailed security risk control mechanism, focus on key periods and key areas such as peak summer and major power project construction, formulate targeted risk control measures, and resolutely prevent and curb the occurrence of major personal casualties. Second, it is necessary to focus on the security of the large power grid, further strengthen the investigation and management of major security risks, do a good job in the risk control of key parts and key links such as important power facilities and dispatch control systems, resolutely prevent large-scale failures of new grid-connected subjects, firmly hold the bottom line of the safe operation of the power system, and ensure that the safety of power supply is safe. The third is to speed up the improvement of the security protection system of power critical information infrastructure, establish a sound network security monitoring and early warning system, promote the high-quality development of network security ranges in the power industry, improve the emergency response capacity of power network security incidents, strictly implement the network security review system, carry out in-depth network security inspection and detection, and resolutely prevent major network security incidents.

Continue to consolidate the power production safety foundation, and further improve the industry safety governance capacity. First, adhere to the safety first, prevention first, starting from the safety technology system, safety management system, safety culture system and other dimensions, constantly improve the power safety governance system, improve governance capabilities, and realize the transformation from management to governance, from single factor control to systematic governance, from curbing accidents to comprehensively improving the essential safety level. Second, adhere to the combination of problem-oriented and goal-oriented, strengthen central and local coordination and government-enterprise linkage, resolutely implement the "Fifteen hard measures", the National Energy Administration agencies should actively work with local government power management departments to jointly carry out "five one" activities, and promote the territorial power safety supervision and management responsibilities at all levels of provinces, cities and counties. Accelerate the establishment of a joint management system of power safety supervision that is interconnected, mutually supportive and seamless. The third is to give better play to the important role of scientific and technological innovation in supporting the safe production of electricity, in-depth implementation of the innovation-driven development strategy, speed up the strengthening of the weak board and forging the long board, increase the original, leading and subversive technology research efforts, and improve the modernization of the power industry chain and supply chain.

Systematically strengthen the construction of emergency response forces, and accelerate the improvement of power disaster prevention, mitigation and relief capabilities. First, it is necessary to earnestly implement the relevant requirements of the National Emergency Plan for Large-scale Power outage Events, improve the emergency organization and command system and emergency plan system for large-scale power outage events at provincial, city and county levels, strengthen emergency drills, and enhance emergency handling capabilities. Second, it is necessary to do a good job in the top-level planning and design of the national emergency base and emergency research center, do a good job in the construction of the power emergency materials and equipment system and the rescue team, improve the emergency team and equipment collection and invocation mechanism, and strengthen the power emergency work support system. The third is to continue to promote the promotion and application of new technologies and new equipment in electric power emergency work, improve the level of electric power emergency information management, accelerate the development of electric power emergency services, and actively build an all-domain linkage, three-dimensional and efficient electric power emergency system.

The 20th National Congress of the CPC drew a blueprint for comprehensively promoting the great rejuvenation of the Chinese nation through Chinese-style modernization, and sounded the call of The Times for comprehensively building a modern socialist country. 



  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell MU-TD0D13 - 51304650-100 / MU-TDOD13 Digital Output FTA SS Relay Rev. H
  • Honeywell STD810-A1HC4AS-1-A-AD0-11S-A-00A0-00-0000 - NSMP
  • Honeywell PI000-05076 - "target, M2000 sputtering, 59.5Ti/.5CU, 4.460X11.64X13.050, "
  • Honeywell 51401286-100 - / 51401286100 (NEW NO BOX)
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx)
  • Honeywell CC-PDIL01 - 1PCS PKS DI 24V IOM 51405040-175() /PL3
  • Honeywell TK-PRS021 - 51404305-375 NSNP
  • Honeywell STR93D-21C-1K0AFCAA21A0-A1,CC,F8,FC,FF,MB,TG,W2,3H-XXXX - NSMP
  • Honeywell 9437310 - Measurex - - MxOpen UAP (Unitec Applications Processor)
  • Honeywell 51305552-100 - / 51305552100 (USED TESTED CLEANED)
  • Honeywell 97350 - Target /BP Assy .25 IN TI 5N AMAT Endura Applied Materials New
  • Honeywell 51305508-200 - / 51305508200 (NEW NO BOX)
  • Honeywell U2-1018S-PF - Brand New Expedited Shipping
  • Honeywell 2MLR-AC22 - "Masterlogic-200 ,2MLR-DBSF,2MLF-AD4S Rack Modules"
  • Honeywell 2075252-D2 - Enraf PCB XPU1 + Display Mount 2558 584-1
  • Honeywell MC-PAIL02 - 51304481-150 Low Level Analog Input Module FW: K
  • Honeywell 51304493-200 - PM Modem Card Rev.K
  • Honeywell C7012F1052 - Flame Detector Expedited Shipping UPS Express GQ
  • Honeywell WA800 - Radar Antenna MI-585353 w/ May 2024 Inspected 8130
  • Honeywell W7704D-1016 - / W7704D1016 (NEW IN BOX)
  • Honeywell VE4100B3000 - Brand NEW gas solenoid valve one year warranty
  • Honeywell MIDAS-M - MMC-A2U20000 Detector #H254CC YD
  • Honeywell C-AA201 - 30734772-002 Auxiliary Alarm With Relay Board PWB
  • Honeywell 51401598-200 - Time-Sync Communication Daughter Card
  • Honeywell MCT202 - Communicator Brand New Fast Shipping via DHL
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell VE4100B3000 - NEW gas solenoid valve one year warranty
  • Honeywell AZ960 - 7024900-90 Air Data Computer
  • Honeywell FC-RUSIO-3224 - Programmable Logic Controller Module
  • Honeywell SM200 - Servo Drive 4006719-921 w/ October 2023 Inspected 8130
  • Honeywell V5013C1019U - New 1PC V5013C1019/U 1 year warranty
  • Honeywell MU-PPIX02 - Pulse Input Module 51304386-100
  • Honeywell CC-TAON01 - 1PCS Module 51308371-175 Brand new
  • Honeywell U2-1018S-PF - New Flame Detector DHL
  • Honeywell TC-IAH161 - 1PC PLC Module TCIAH161 Via DHL or FedEX
  • Honeywell SPS5713 - 51199930-100 (AS PICTURED) NSMP
  • Honeywell TK-CCR014 - REDUNDANT NETINTERFACE NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell DR45AT-1000-00-011-0-000000-0 - 120/240VAC NSMP
  • Honeywell XNX-UTAI-RNNNN - Universal Transmitter New DHL
  • Honeywell 82408449-001 - Yamatake- IBCD Card PCB
  • Honeywell K2LCN-8 - Via DHL or FedEx
  • Honeywell FC-PSU-UNI2450U - V2.1 Power Supply Module
  • Honeywell CD815 - Control Display Unit 7022360-902 Removed Working
  • Honeywell MCB3-A3C1REZ-020 - 0 to 100 PPM LCD Display Multi-Gas Detector
  • Honeywell HP600 - High Power Amplifier 7516250-60050 Removed Working
  • Honeywell C7061F2001 - 1PC New replace C7012F1052 flame detector Fast Shipping
  • Honeywell 620-0025RC - 1pcs Brand New Fast Fast Shipping
  • Honeywell ED-600 - 7003403-901 Electric Display with Mods (Cracked Face)
  • Honeywell 3075388-2 - ", TRANSDUCER PN "
  • Honeywell EN-2018-5607 - Smartline HART Communication Assy
  • Honeywell EX52710100036 - / MTU EXHAUST TURBOCHARGER
  • Honeywell Q7055A-1007 - / Q7055A1007 (USED TESTED CLEANED)
  • Honeywell 51304190-200 - E Jumper Card 51304189 Rev A
  • Honeywell TK-PRR021 - 1PC New PLC Module in box 1 year warranty#XR
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping
  • Honeywell 05704-A-0145 - / 05704A0145 (NEW NO BOX)
  • Honeywell C7012F1052 - New UV Flame Detector Free Expedited Shipping
  • Honeywell MC-PAIL02 - 51304481-150 Low Level Analog Input Module Rev: E
  • Honeywell 80363969-150 - / 80363969150 (NEW IN BOX)
  • Honeywell 8694700 - USED MEASUREX COP PROCESSOR
  • Honeywell 900C70-0360-00 - 5VDC NSMP
  • Honeywell 51401392-100 - ",51403422-150,51304485-100 Module Rack 24VDC"
  • Honeywell CC-PDOB01 - / CCPDOB01 (NEW IN BOX)
  • Honeywell SPS5785 - NEW 1PCS 51198651-100 replace 51198947-100 HPM POWER SUPPLY
  • Honeywell 965-1210-020 - "EGPWS Computer w/ GPS MK VIII, P/N: , HONEYWELL"
  • Honeywell VE4100B3000 - NEW gas solenoid valve one year warranty
  • Honeywell PW6K1R2 - 13PCS Brand New Expedited Shipping
  • Honeywell TSQUALWDX-07821 - "Sputtering Target 59Al/1Cu 7.830x11.640x13.050"" New"
  • Honeywell 900C70-0360-00 - 900 CONTROL STATION Touch Screen
  • Honeywell 620-0036 - / 6200036 (NEW IN BOX)
  • Honeywell DR45AT-1100-00-001-0-00000E-0 - 120/240VAC UNMP
  • Honeywell LG1093AA24 - NEW ULTRAVIOLET FLAME SENSOR 261A1812P012
  • Honeywell TC-IAH161 - ANALOG INPUT TCIAH161 NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell TK-PRS021 - F/W G 24VDC 1.6A NSNP
  • Honeywell G3I-D22C - Programmable Logic Controller 12-24Vdc 5-11Ma
  • Honeywell TK-PRS021 - / TKPRS021 (NEW NO BOX)
  • Honeywell VM3A - "Thor - 30.7cm (12.1in) - 1024 x 768 Pixel - LED - Capacitive"
  • Honeywell MCL1326 - HOUSING ASSY P/N (HONEYWELL) NE COND # 11383 (4)
  • Honeywell 50126003-001 - Smartline Integrally Mounted Basic Indicator Rev A
  • Honeywell 053669-01 - "USED MEASUREX PC BOARD REV. A, 05366901"
  • Honeywell 620-0025RC - 1pcs Brand New Fast Shipping FedEx or DHL
  • Honeywell FC-RUSIO-3224 - 1pc Brand New Programmable Logic Controller Module
  • Honeywell 7000836-916 - Display Unit Attitude Reference Indicator Agusta A109E #AR
  • Honeywell STF724-E1HS4A-H1F-A-AHC-11C-B-01A0-F1-000 - ST 700 Pression Transmett
  • Honeywell PGM-7340 - ppbRAE 3000+ VOC Gas detector
  • Honeywell MCT202 - Communicator Fast Shipping
  • Honeywell QPP-0002 - Security Manager 24vdc Processor
  • Honeywell 8C-PCNT02 - New C300 Controller In Box DHL
  • Honeywell 1616-350-01A - Iridium FlightDeck Tranceiver P/N
  • Honeywell V5013C1019U - New V5013C1019/U 1 year warranty