Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

The method and suggestion of drawing up green mine construction plan

F: | Au:佚名 | DA:2023-11-28 | 541 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Third, the preparation of green mine construction planning methods and suggestions

 The planner should have correct epistemology, values and methodology.

In terms of epistemology, it is necessary to change or even subvert the existing cognition of the production, operation and development law of the "mine", and use the "living body" to abstract and understand the mine. The "living body" of the mine has digestive, respiratory, circulation, nervous and other systems, and has the ability of learning, feedback, immunity, adaptation, repair and regeneration. If the green mine is compared to a person, it is to be a civilized person and a modern person, to have face (the mining environment is clean and reasonable layout), to have a good organ function, to achieve less input, more output, less emissions), and to have a brain (high IQ and EQ, digital mines and mines are harmonious).

In terms of values, it is necessary to guide the ideal goal of "symbiosis, co-prosperity, sharing, mutual benefit and co-governance" in the new era of ecological civilization, change the concept of "mineral resources" as a single tool value, establish the concept of "living body" of mines, and actively fulfill corporate social responsibilities. To promote the economic, ecological, environmental and social benefits of resource development and maximize the comprehensive benefits.

In terms of methodology, this paper puts forward the following suggestions from the two aspects of working method and planning concept.

1. Working method -- goal oriented + problem oriented

1) Find gaps against industry standards. At the end of June 2018, the Ministry of Natural Resources issued the green mine construction specifications for nine major industries in the form of Announcement No. 18, which is a milestone event in the development process of China's green mining industry, marking the transformation of China's green mine construction from "administrative promotion" to "standard guidance", and strengthening the self-discipline of the mining industry and accelerating the formation of a new pattern of green mine construction. It is of great significance to deepen the construction of ecological civilization in the mining industry and improve the ability of mining management. Green mine construction industry standards from mining environment (mine capacity and mine appearance, mining greening), resource development and utilization mode (green development, ecological environmental protection and restoration), comprehensive utilization of resources (co-associated resource utilization, solid waste utilization, mineral processing wastewater utilization), energy saving and emission reduction (energy saving and consumption reduction, pollutant discharge), scientific and technological innovation and digital mine, enterprise management and corporate image (Enterprise culture, enterprise management, enterprise integrity, enterprise harmony) put forward specific requirements, clear a series of qualitative and quantitative index requirements, green construction should be compared with industry standards for systematic analysis, shortcomings, strengths and weaknesses, at the same time can choose domestic and foreign benchmarking enterprises field research, learn from experience, expand ideas, learning methods. On the basis of benchmarking, planning should be problem-oriented, focus on the core links, determine priorities, and improve the pertinence and effectiveness of planning.

2) Overall planning and positioning. The green mine construction plan shall implement the national economic and social development plan, the overall plan of mineral resources and the green mining development plan of the region, take the enterprise construction and development plan or strategy as the guidance, and connect with the existing micro-level planning or program design of mine environmental protection and management, mining land reclamation and so on. Among them, the planning of different mines belonging to the same mining enterprise should fully reflect the characteristics; Different enterprises, but the same type of mines in the same area, have great similarities and can draw lessons from each other.

3) Use planning as a platform to gather force. Green mine construction is a systematic project, green mine construction planning involves a wide range of professional fields, many categories, large span, long chain, what kind of organization to choose is also a problem faced by many mining enterprises. More and more scientific research institutions or social organizations participate in the construction of green mines, but no matter what kind of institutions to prepare green mine construction planning, it is necessary to open the door to prepare planning, through planning to build a platform for communication and information sharing, one is to invite relevant experts to "pulse consultation", Such as mine design, mine restoration, digital mine construction and other technical experts, as well as familiar with local policy standards and requirements of management experts; The second is to encourage enterprise employees to offer suggestions, the most familiar with the problems of the enterprise is the mining enterprise employees, especially the relevant technical management personnel, to open the way, brainstorm.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series