Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

The main problems and prevention measures of mine ecological restoration

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 217 次浏览: | Share:

Under the background of ecological civilization construction and dual-carbon goal, ecological restoration of mines has become a research hotspot. Based on the analysis of the main problems in mine ecological restoration in China, the corresponding solutions are put forward. It is found that the related concepts of mine ecological restoration are various, but the connotation is similar, and green development is the absolute principle; Affected by factors such as the failure of the supervision mechanism, the misunderstanding of the mine ecological restoration project, and the difficulty of promoting the new technology, China's mine ecological restoration has not paid the old account, the new account is owed, and the failure project is common; In order to promote the ecological restoration of mines in China, it is necessary to strengthen the basic theoretical research, promote the implementation of supervision mechanism, and implement new technologies such as mining and restoration in production mines.

Mining may bring about ecological and environmental problems such as soil erosion, landslide and desertification. The abandoned industrial and mining land also has many bad soil physical and chemical properties, especially the high content of heavy metals in the soil, and the pollution process of some heavy metals in the soil system is long-term, hidden and irreversible, which often has a serious impact on the ecological environment of the surrounding area. Therefore, the ecological restoration of abandoned mines has important ecological significance. Mine ecological restoration is not only one of the important steps to alleviate desertification and soil erosion, but also one of the important means to tap its social and economic value through mine ecological restoration and transformation. At present, the selection of tourism development mode after ecological restoration has occupied more than half of the mine restoration cases, so considering economic factors has a high restoration value. In practice, the transformation of the abandoned site is mainly to add some humanistic landscape elements on the basis of its unique natural landscape and its own land resources, and at the same time, it is selected to transform into urban park, wetland park, ecological park, mine relic park and other tourist and leisure scenic spots. At present, the concept of ecological restoration at home and abroad mainly regards restoration as the state before destruction, requiring the restoration of forests, water bodies and farmland to the original state, and controlling the deposition of toxic and harmful substances and soil erosion. Ensure that the water table remains at its original level and the surface shape remains unchanged; Keep topsoil in place; Pay attention to the prevention and control of acidic substances and harmful and toxic substances; Prevent mine tailings from landslide and other secondary geological disasters.

1. Principles to be followed for mine ecological restoration

Mine ecological restoration is not only the restoration of damaged terrain, simple greening and so on. Mine ecological restoration is a systematic project, which is a complex project integrating damage investigation, design planning and construction. In order to achieve the result of restoring the damaged ecology, it is necessary to have a deep understanding of the connotation of the restoration goal. At the beginning of the planning, it is necessary to clarify the use of land use after restoration, the ecological structure and the ecological function that should be realized. Therefore, the goal setting of mine ecological restoration needs to comply with the following six principles: respect for nature, people-oriented; Adapt to local conditions and conform to the overall regional planning; Safe, efficient and sustainable use; Priority should be given to ecological and environmental benefits, and attention should be paid to economic benefits. Priority is given to restoring cultivated land, grassland and forest land; End treatment is combined with source and process control.

2. Strengthen the basic research of mine ecological restoration

The practice of mine ecological restoration for more than 40 years shows that the restoration theory lags far behind the practice, and many restoration cases fail due to lack of scientific restoration, which shows that there is a decoupling phenomenon between theory and practice. In order to repair the ecological environment damage caused by mining, many places have carried out spontaneous restoration and utilization of the damaged land and ecological environment. For densely populated areas with rapid economic development, mine ecological restoration is often promoted faster. However, the basic theory of this field and the principles of restoration technology still need to be deeply studied to support and promote the development of this field.

In the face of complex mining environmental damage problems, restoration methods and technologies need to be innovated, enriched and promoted, and the connotation of scientific restoration should be enriched from the scientific, different, advanced and economic aspects of technology, so as to balance the restoration benefits with funds and policy investment. Although there are many kinds of ecological restoration technologies, there are often some basic common technologies for ecological restoration, which is also the key to ecological restoration. Water is the source of life, soil is the basis of life, and plants are the root of life. Therefore, water, soil and plants are the three major elements of ecological restoration, and the restoration technology centering on these three major elements is the common core technology, namely, geomorphic remodeling, soil reconstruction and vegetation restoration.

(1) Geomorphic remodeling refers to the reconstruction of a new landform in harmony with the surrounding landscape by taking measures such as orderly discharge and land reshaping, aiming at the landform characteristics of the mining area, combined with mining design, mining technology and land damage methods, so as to eliminate and alleviate factors affecting vegetation restoration and land productivity improvement to the maximum extent. In general, Geomorphic remodeling is the basis of land quality restoration in mining area.

(2) Soil reconstruction is aimed at soil restoration or reconstruction of damaged land in mining areas. Appropriate reconstruction technology and engineering measures as well as physical, chemical, biological and ecological measures are adopted to reconstruct a suitable soil profile, restore and improve the productivity of reconstructed soil in a relatively short period of time, and improve the environmental quality of reconstructed soil [6].

(3) On the basis of geomorphic remodeling and soil reconstruction, vegetation restoration is based on different types and degrees of land damage in mines, comprehensive climate, altitude, slope, slope direction, surface material composition and effective soil layer thickness, etc., for different types of damaged land, the selection of pioneer plants and suitable plants and other vegetation configuration, planting and management are carried out to ensure the sustained stability of the restored plant community.

It has become a common understanding to learn from nature to reshape landform, reconstruct soil and restore vegetation, but how to define and realize the imitation of natural restoration is still a difficult problem and bottleneck to be solved. At present, there are also many cases due to the imitation of only part of the original ecological environment structure or the imitation is not in place, resulting in unreasonable reconstruction of the landscape, low soil productivity, vegetation population allocation and so on. The author believes that ecological restoration is a gradual and dynamic process, and the restoration scheme should be planned systematically and scientifically according to the original landform characteristics of the mining area, from the aspects of basin connectivity, landscape connectivity, ecological structure stability and so on. Therefore, the basic theories of the three key technologies of geomorphic remodeling, soil remodeling and vegetation restoration should be deeply studied to achieve a major breakthrough in the theory and practice of imitating nature restoration as soon as possible.

2.3 Improve the supervision mechanism and implement it

As mentioned above, the Regulations on the Protection of Mining Geological Environment and the Measures for the Implementation of the Regulations on Land Reclamation all put forward requirements for the monitoring and supervision of mine ecological restoration. However, due to the involvement of mining enterprises, the public, restoration enterprises and other multi-party interests [8], the implementation has not been in place so far. In 2021, the Ministry of Natural Resources plans to complete the inspection of the damage pattern of the national abandoned mines, after which the ecological restoration plan will be formulated and the treatment results will be monitored annually. At the same time, combined with the reform of mining rights, it is planned to strengthen the supervision and management of ecological restoration in production mines, and normalize the annual report system.

Some provinces and cities are trying to establish a big data platform for the supervision of mine ecological restoration to gradually implement the supervision mechanism. If the mechanism operates normally, the old account of ecological restoration will be completed year by year, and the new account will not increase or increase less, and the monitoring and supervision of mine ecological restoration with the help of big data platform is a practical way. Therefore, in the new round of territorial space planning and territorial space ecological restoration planning, self-examination is required to establish a database in the county, and the ecological restoration work will fall to the map spot, including the ecological restoration work in mines. For example, the big data platform for territorial ecological restoration in Shaanxi Province can realize the unified information platform, unified portal and unified management of geological environment monitoring, management and restoration, land reclamation, development management, comprehensive management of territorial space, restoration of mountain, water, forest, farmland, lake and grassland system in Shaanxi Province. At the same time, the implementation of the annual report system of mine ecological restoration is also crucial, and the future focus is to improve its reporting, approval and acceptance system, clarify responsibilities and time requirements of each link, and formulate corresponding incentives and punishment measures.

2.4 Strengthen the supervision and management of production mines, and vigorously promote the technology of mining while repairing

The old account of mine ecological restoration is fixed, according to the unified arrangement of the Ministry of Natural Resources, it is planned to be completed during the "14th Five-Year Plan" period, and the supervision and management of subsequent production mines is the key. If you want to make production mines do not owe new debts, the implementation of the concept of mining while repairing is the key.

In 2013, the author proposed the concept, connotation, basic principle, technical classification and key technologies of "reclamation while mining" in Jinggong Coal Mine [8-9]. Professor Y. P. Chugh, former director of the Central and Western Branch of the National Mining Land Reclamation Research Center of the United States and Professor of Southern Illinois University, also systematically introduced the results in the paper "Mining and recovery Technology of coal subsidence in China" in 2017, that "in the reclamation of coal subsidence area, mining and recovery technology is an advanced technology, which is in a leading position in the world". It is also named CMR-UM(Concurrent Mining and Reclamation for Underground Mining) technology [10]. In 2020, in the article "On the ecological Environment of Coal Mine Area" [11], the author further improved the concept, principle and technical system of the integration of coal mine mining and restoration, and redefined the concept of "mining and restoration" of coal mine ecological environment as follows: In view of the ecological and environmental damage caused by coal mining process, closely combined with the mining process, a variety of measures are taken simultaneously to reduce the ecological and environmental damage and control simultaneously, that is, repair while mining, so that it can be used and coordinated with the local ecosystem. The ecological environment of coal mine area "recovery while mining" is based on the concept of "source and process control", rather than the concept of "end management", which is characterized by synchronous management in the mining process. The "recovery" in the concept of "recovery while mining" includes both the narrow "reclamation" and the concept of "restoration". Its core purpose is to timely restore and control the damaged ecological environment, alleviate the contradiction between the exploitation and utilization of mineral resources and environmental protection, and ensure the development of mining activities in the direction of sustainable, circular and green. Relevant studies have shown [9] that using the mining and recovery technology to control the subsidence area of coal mining can restore 10% ~ 40% more land. In the future, the mining and recovery technology of Jinggong coal mine will seek a breakthrough in reclamation time, reclamation elevation and reclamation technology in practice. In the aspect of open pit mining, it is emphasized that the integration process of mining, drainage and complex must be implemented, internal drainage as early as possible, boundary management, and reducing the area of external drainage and excessive mining pit.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell VITO - Enraf Lt Interface 762 Up 762 Aga / Z
  • Honeywell QPP-0001 - FC-QPP-0001 Module
  • Honeywell TC-PRS021 - / TCPRS021 (USED TESTED CLEANED)
  • Honeywell 51403698-100 - / 51403698100 (USED TESTED CLEANED)
  • Honeywell XCL8010A - 24V NSMP
  • Honeywell 91884 - "Target, 15.620 X 12.846 X 0.250"" BTL, 07-613, 5N TI, 118305"
  • Honeywell 51403776-100 - / 51403776100 (USED TESTED CLEANED)
  • Honeywell LG1093AC01 - UV Flame Sensor/Detector
  • Honeywell CC-PCNT02 - Controller Module Expedited Shipping CCPCNT02 Spot Goods Zy
  • Honeywell FFSB14ER10KS2 - / FFSB14ER10KS2 (NEW IN BOX)
  • Honeywell RF600 - Radio Frequency Unit 7516240-60060 Removed Working
  • Honeywell 51196881-100 - NEW UPGRADE KIT EC W/ODEP 51196881100
  • Honeywell CC-IP0101 - 51410056-175 Brand New Expedited Shipping
  • Honeywell AL300 - Alt Preselect Command Controller 7002412-904 w/ August 2011 Repaired 8130
  • Honeywell 094377-00 - / 09437700 (USED TESTED CLEANED)
  • Honeywell IRTP271 - Tata Printed Circuit Board Rev.0 DPCB21010003
  • Honeywell TVMUGR-888880-020-52-3-030-0U000G-000 - MULTITREND GR GRAPHIC RECORDER
  • Honeywell RM850 - Radio Management Unit 7012100-811 w/ December 2017 Repaired 8130
  • Honeywell PGM-7360 - Gas Detector
  • Honeywell WU660 - Radar RTA 7021450-601 w/ April 2024 Overhauled 8130
  • Honeywell 9243201 - / 9243201 (NEW NO BOX)
  • Honeywell AZ850 - Micro Air Data Computer 7014700-601 Removed Working
  • Honeywell DCP550 - Yamatake- Digital Programmable Controller Temperature
  • Honeywell FF-SEDGE6G2-1M-C - / FFSEDGE6G21MC (USED TESTED CLEANED)
  • Honeywell FC-RUSIO-3224 - Brand New Expedited Shipping Via DHL
  • Honeywell RM850 - Radio Management Unit 7012100-801 w/ March 2021 Tested 8130
  • Honeywell HIMA-6E-B - Large System Controller Via DHL or FedEx
  • Honeywell RM855 - Radio Management Unit 7013270-973 w/ April 2024 Modified 8130
  • Honeywell MP-DNCF02-200 - REV B Upper & Lower / 51305072-300 51305072-200 REV L.
  • Honeywell 80360206-001 - / 80360206001 (USED TESTED CLEANED)
  • Honeywell DE132-0-A-BB-0-Z-1-0C-EE0-00 - Chart Recorder
  • Honeywell 51403519-160 - NSNP
  • Honeywell 627-1002RC - / 6271002RC (USED TESTED CLEANED)
  • Honeywell 51400997-100 - / 51400997100 (USED TESTED CLEANED)
  • Honeywell J-AOM10 - Yamatake- /J-A0M10 Analog Output Module 24Vdc 480Ma Hw/Fw Rev: C
  • Honeywell AZ800 - Digital Air Data Computer 7000700-953 w/ July 2016 Repaired EASA Form 1
  • Honeywell FC-RUSIO-3224 - Brand New
  • Honeywell BZ-2RW82272-A2 - Micro Switch 1a 125vac
  • Honeywell FC-RUSIO-3224 - 1PC Brand New
  • Honeywell 10268S-1-020-201-0-2-03100-000-00 - Electric Actuator 121va 120v-ac
  • Honeywell 14CE102-1RS - Limit Switch IP65
  • Honeywell FC-PSU-UNI2450U - Brand New Fast Shipping FedEx or DHL
  • Honeywell 696658-1 - SUPPORT ASSY. NS 11764 (3)
  • Honeywell TK-PRR021 - ONE New 51309288-475 DC
  • Honeywell PSU-UNI2450 - (AS PICTURED) NUPI
  • Honeywell 80360146-011 - / 80360146011 (USED TESTED CLEANED)
  • Honeywell EGWPM - MODULE Assembly 7028419-1904 Inspected/Tested Jun. 2021
  • Honeywell DE131-0-A-0B-0-Z-1-0B,0C-EE0-000 - "Chart Recorder"
  • Honeywell 51454493-126 - / 51454493126 (NEW IN BOX)
  • Honeywell 965-1186-003 - "MK VI, GPWS Computer, EASA FORM ONE/FAA 8130 Guaranteed"
  • Honeywell 51401996-100 - / 51401996100 (USED TESTED CLEANED)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118222"
  • Honeywell SPS5785 - 1pc 51198651-100 Power Supply Brand New Fast shipping
  • Honeywell FX-USI-0002 Security Manager System Module 5Vdc
  • Honeywell SPS5785 - 51198651-100 power supply
  • Honeywell HIMA-6E-B - Large System Controller Fast Shipping
  • Honeywell 51301882-100 - RTD MUX Terminal Board
  • Honeywell 51198821-100 - 1PC new module PLC One year warranty free Shipping#XR
  • Honeywell EAMR - 51401996-100 E CARD card
  • Honeywell 51305734-100 - / 51305734100 (USED TESTED CLEANED)
  • Honeywell 50065674 - Basic Display PWA Assembly HNWG50049911-001
  • Honeywell TSENCOBTM-07889 - "15.620X12.913X0.125 MPS-5-002/M TARGET, 109953"
  • Honeywell 86220000 - / 086220000 (USED TESTED CLEANED)
  • Honeywell CC-IP0101 - C300 system card Brand new fedex or DHL
  • Honeywell WU880 - Radar Antenna 7021450-801 w/ May 2024 Repaired 8130
  • Honeywell CC-IP0101 - ONE Profibus DP Gateway Module NEW
  • Honeywell 397124-2-4 - Gulfstream Valve New Overhauled
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping DHL or FedEX
  • Honeywell RCZ850 - Integrated Communication Unit 7510100-731 w/ March 2024 Tested 8130
  • Honeywell STS103-001-00006-12-1137 - NSNP
  • Honeywell AL300 - Altitude Preselect Command Ctlr 7002412-906 w/ March 2024 Overhauled 8130
  • Honeywell 2119020-8000 - Series 1 N1 Digital Electronic Engine Control
  • Honeywell 51198685-100 - Power Module Brand New Shipping FedEx or DHL
  • Honeywell 620-0073C - / 6200073C (NEW IN BOX)
  • Honeywell GTS-3PA-B - "Timer 0-60 Sec, 220v 50/60 Hz"
  • Honeywell IVA81D - TCAS Vertical Speed Indicator 066-01171-2804 w/ January 2020 Tested 8130
  • Honeywell 51403299-200 - / 51403299200 (NEW NO BOX)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118221"
  • Honeywell AT860 - Loop Sense Antenna 7510300-901 w/ May 2024 Tested 8130
  • Honeywell XL2000B3A - 1PCS USED /
  • Honeywell CC-PCNT02 - C300 Controller Module
  • Honeywell ASDX015D44R - SenSym Pressure Sensor Micro Switch 0-15 psi 8 pin DIP
  • Honeywell 900CS15-00 - Touch Panel NEW SHIP DHL OR EMS 1 Year Warranty cl
  • Honeywell FC-SCNT01 - S300 Control Module 51454926-176 Security Control - 400mA
  • Honeywell DC1010CR-301000-E - Digital Temperature Controller 85-265VAC
  • Honeywell TK-PRR021 - redundancy module 51309288-475
  • Honeywell K4LCN - 51402755-100 Motherboard SS 51201795-400
  • Honeywell XL2000B3A - plc new FREE EXPEDITED SHIPPING
  • Honeywell FC-SCNT02 - 51460114-176 S300 Controller Module 78-4
  • Honeywell BVS - 99ATEX2259X 03ATEXG016X Tester new