Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

The main problems and prevention measures of mine ecological restoration

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 243 次浏览: | Share:

Under the background of ecological civilization construction and dual-carbon goal, ecological restoration of mines has become a research hotspot. Based on the analysis of the main problems in mine ecological restoration in China, the corresponding solutions are put forward. It is found that the related concepts of mine ecological restoration are various, but the connotation is similar, and green development is the absolute principle; Affected by factors such as the failure of the supervision mechanism, the misunderstanding of the mine ecological restoration project, and the difficulty of promoting the new technology, China's mine ecological restoration has not paid the old account, the new account is owed, and the failure project is common; In order to promote the ecological restoration of mines in China, it is necessary to strengthen the basic theoretical research, promote the implementation of supervision mechanism, and implement new technologies such as mining and restoration in production mines.

Mining may bring about ecological and environmental problems such as soil erosion, landslide and desertification. The abandoned industrial and mining land also has many bad soil physical and chemical properties, especially the high content of heavy metals in the soil, and the pollution process of some heavy metals in the soil system is long-term, hidden and irreversible, which often has a serious impact on the ecological environment of the surrounding area. Therefore, the ecological restoration of abandoned mines has important ecological significance. Mine ecological restoration is not only one of the important steps to alleviate desertification and soil erosion, but also one of the important means to tap its social and economic value through mine ecological restoration and transformation. At present, the selection of tourism development mode after ecological restoration has occupied more than half of the mine restoration cases, so considering economic factors has a high restoration value. In practice, the transformation of the abandoned site is mainly to add some humanistic landscape elements on the basis of its unique natural landscape and its own land resources, and at the same time, it is selected to transform into urban park, wetland park, ecological park, mine relic park and other tourist and leisure scenic spots. At present, the concept of ecological restoration at home and abroad mainly regards restoration as the state before destruction, requiring the restoration of forests, water bodies and farmland to the original state, and controlling the deposition of toxic and harmful substances and soil erosion. Ensure that the water table remains at its original level and the surface shape remains unchanged; Keep topsoil in place; Pay attention to the prevention and control of acidic substances and harmful and toxic substances; Prevent mine tailings from landslide and other secondary geological disasters.

1. Principles to be followed for mine ecological restoration

Mine ecological restoration is not only the restoration of damaged terrain, simple greening and so on. Mine ecological restoration is a systematic project, which is a complex project integrating damage investigation, design planning and construction. In order to achieve the result of restoring the damaged ecology, it is necessary to have a deep understanding of the connotation of the restoration goal. At the beginning of the planning, it is necessary to clarify the use of land use after restoration, the ecological structure and the ecological function that should be realized. Therefore, the goal setting of mine ecological restoration needs to comply with the following six principles: respect for nature, people-oriented; Adapt to local conditions and conform to the overall regional planning; Safe, efficient and sustainable use; Priority should be given to ecological and environmental benefits, and attention should be paid to economic benefits. Priority is given to restoring cultivated land, grassland and forest land; End treatment is combined with source and process control.

2. Strengthen the basic research of mine ecological restoration

The practice of mine ecological restoration for more than 40 years shows that the restoration theory lags far behind the practice, and many restoration cases fail due to lack of scientific restoration, which shows that there is a decoupling phenomenon between theory and practice. In order to repair the ecological environment damage caused by mining, many places have carried out spontaneous restoration and utilization of the damaged land and ecological environment. For densely populated areas with rapid economic development, mine ecological restoration is often promoted faster. However, the basic theory of this field and the principles of restoration technology still need to be deeply studied to support and promote the development of this field.

In the face of complex mining environmental damage problems, restoration methods and technologies need to be innovated, enriched and promoted, and the connotation of scientific restoration should be enriched from the scientific, different, advanced and economic aspects of technology, so as to balance the restoration benefits with funds and policy investment. Although there are many kinds of ecological restoration technologies, there are often some basic common technologies for ecological restoration, which is also the key to ecological restoration. Water is the source of life, soil is the basis of life, and plants are the root of life. Therefore, water, soil and plants are the three major elements of ecological restoration, and the restoration technology centering on these three major elements is the common core technology, namely, geomorphic remodeling, soil reconstruction and vegetation restoration.

(1) Geomorphic remodeling refers to the reconstruction of a new landform in harmony with the surrounding landscape by taking measures such as orderly discharge and land reshaping, aiming at the landform characteristics of the mining area, combined with mining design, mining technology and land damage methods, so as to eliminate and alleviate factors affecting vegetation restoration and land productivity improvement to the maximum extent. In general, Geomorphic remodeling is the basis of land quality restoration in mining area.

(2) Soil reconstruction is aimed at soil restoration or reconstruction of damaged land in mining areas. Appropriate reconstruction technology and engineering measures as well as physical, chemical, biological and ecological measures are adopted to reconstruct a suitable soil profile, restore and improve the productivity of reconstructed soil in a relatively short period of time, and improve the environmental quality of reconstructed soil [6].

(3) On the basis of geomorphic remodeling and soil reconstruction, vegetation restoration is based on different types and degrees of land damage in mines, comprehensive climate, altitude, slope, slope direction, surface material composition and effective soil layer thickness, etc., for different types of damaged land, the selection of pioneer plants and suitable plants and other vegetation configuration, planting and management are carried out to ensure the sustained stability of the restored plant community.

It has become a common understanding to learn from nature to reshape landform, reconstruct soil and restore vegetation, but how to define and realize the imitation of natural restoration is still a difficult problem and bottleneck to be solved. At present, there are also many cases due to the imitation of only part of the original ecological environment structure or the imitation is not in place, resulting in unreasonable reconstruction of the landscape, low soil productivity, vegetation population allocation and so on. The author believes that ecological restoration is a gradual and dynamic process, and the restoration scheme should be planned systematically and scientifically according to the original landform characteristics of the mining area, from the aspects of basin connectivity, landscape connectivity, ecological structure stability and so on. Therefore, the basic theories of the three key technologies of geomorphic remodeling, soil remodeling and vegetation restoration should be deeply studied to achieve a major breakthrough in the theory and practice of imitating nature restoration as soon as possible.

2.3 Improve the supervision mechanism and implement it

As mentioned above, the Regulations on the Protection of Mining Geological Environment and the Measures for the Implementation of the Regulations on Land Reclamation all put forward requirements for the monitoring and supervision of mine ecological restoration. However, due to the involvement of mining enterprises, the public, restoration enterprises and other multi-party interests [8], the implementation has not been in place so far. In 2021, the Ministry of Natural Resources plans to complete the inspection of the damage pattern of the national abandoned mines, after which the ecological restoration plan will be formulated and the treatment results will be monitored annually. At the same time, combined with the reform of mining rights, it is planned to strengthen the supervision and management of ecological restoration in production mines, and normalize the annual report system.

Some provinces and cities are trying to establish a big data platform for the supervision of mine ecological restoration to gradually implement the supervision mechanism. If the mechanism operates normally, the old account of ecological restoration will be completed year by year, and the new account will not increase or increase less, and the monitoring and supervision of mine ecological restoration with the help of big data platform is a practical way. Therefore, in the new round of territorial space planning and territorial space ecological restoration planning, self-examination is required to establish a database in the county, and the ecological restoration work will fall to the map spot, including the ecological restoration work in mines. For example, the big data platform for territorial ecological restoration in Shaanxi Province can realize the unified information platform, unified portal and unified management of geological environment monitoring, management and restoration, land reclamation, development management, comprehensive management of territorial space, restoration of mountain, water, forest, farmland, lake and grassland system in Shaanxi Province. At the same time, the implementation of the annual report system of mine ecological restoration is also crucial, and the future focus is to improve its reporting, approval and acceptance system, clarify responsibilities and time requirements of each link, and formulate corresponding incentives and punishment measures.

2.4 Strengthen the supervision and management of production mines, and vigorously promote the technology of mining while repairing

The old account of mine ecological restoration is fixed, according to the unified arrangement of the Ministry of Natural Resources, it is planned to be completed during the "14th Five-Year Plan" period, and the supervision and management of subsequent production mines is the key. If you want to make production mines do not owe new debts, the implementation of the concept of mining while repairing is the key.

In 2013, the author proposed the concept, connotation, basic principle, technical classification and key technologies of "reclamation while mining" in Jinggong Coal Mine [8-9]. Professor Y. P. Chugh, former director of the Central and Western Branch of the National Mining Land Reclamation Research Center of the United States and Professor of Southern Illinois University, also systematically introduced the results in the paper "Mining and recovery Technology of coal subsidence in China" in 2017, that "in the reclamation of coal subsidence area, mining and recovery technology is an advanced technology, which is in a leading position in the world". It is also named CMR-UM(Concurrent Mining and Reclamation for Underground Mining) technology [10]. In 2020, in the article "On the ecological Environment of Coal Mine Area" [11], the author further improved the concept, principle and technical system of the integration of coal mine mining and restoration, and redefined the concept of "mining and restoration" of coal mine ecological environment as follows: In view of the ecological and environmental damage caused by coal mining process, closely combined with the mining process, a variety of measures are taken simultaneously to reduce the ecological and environmental damage and control simultaneously, that is, repair while mining, so that it can be used and coordinated with the local ecosystem. The ecological environment of coal mine area "recovery while mining" is based on the concept of "source and process control", rather than the concept of "end management", which is characterized by synchronous management in the mining process. The "recovery" in the concept of "recovery while mining" includes both the narrow "reclamation" and the concept of "restoration". Its core purpose is to timely restore and control the damaged ecological environment, alleviate the contradiction between the exploitation and utilization of mineral resources and environmental protection, and ensure the development of mining activities in the direction of sustainable, circular and green. Relevant studies have shown [9] that using the mining and recovery technology to control the subsidence area of coal mining can restore 10% ~ 40% more land. In the future, the mining and recovery technology of Jinggong coal mine will seek a breakthrough in reclamation time, reclamation elevation and reclamation technology in practice. In the aspect of open pit mining, it is emphasized that the integration process of mining, drainage and complex must be implemented, internal drainage as early as possible, boundary management, and reducing the area of external drainage and excessive mining pit.


  • ABB, ALSTOM Power GP-2695-A - Scraper Clip and Bushing
  • Alstom SPC160 - Servo Motor Position Controller v2.1
  • CROWN 700 Alstom EX-4654 - Coal Pulverizer Exhauster Whizzer 63099
  • ABB F12M4H 57344 - Servomotor Type Alstom
  • Alstom AB125 VOS125 - Versatile Output Module SCH 54-329309
  • GE FANUC 90 70 CARD - ALSTOM MARTEK POWER AL122A - CD101320 - C292
  • CONVERTEAM MMLG02 / MMLG02 - Test Block
  • Alstom PS421 - Overcurrent time protection device P89421-0-1420000-300-403-600-705
  • Alstom AB125 VOS125 - Versatile Output Module SCH 54-329309 Unused
  • Alstom MVTT14R1NA0751E - Tripping and Control Relay SN.311664/05/08
  • Alstom Power 28689 - Cartridge Filter APF715X (Pack of 4) 9-3/4" x 2-5/8" x 1"Bore
  • Alstom MV3000 - Spare bidirectional DC power converter transistor pre-charge module
  • Alstom ALSPA MD2000 178-400 (205-460) - Frequency converter No: 029.300111
  • Alstom TUG 0212 - Tropicalized Relay
  • CONVERTEAM MVAJ14D1GA0783A / MVAJ14D1GA0783A - Relay
  • Alstom vajhm23bf22d - tripping relay
  • CONVERTEAM / ALSTOM / GE ENERGY PIB 100G / 3BEE0226 A - Power Interface Board
  • Alstom KCGG14201T50CEC - Single Phase Overcurrent AC Relay Areva
  • GE Alstom Cegelec IC693MDL632D - Alspa 80-35 Digital Input Module 8 Port VGC
  • alstom STC.ZN0019101.A01,STC.ZN0017212.A16,WGS.ZN0019101.A01 - 3x Board, Part
  • CONVERTEAM MVTT14B1BA0752A / MVTT14B1BA0752A - Relay
  • Alstom MVAX31S1DD0754A - Grid Alstom 10418907
  • CONVERTEAM MVAJ11D1GB0780A / MVAJ11D1GB0780A - (tested cleaned)
  • Areva Alstom MVAJ23R1AB0757F - Light and Control Relay
  • Alstom D-984-0578 - Intensity and Fault Detection Board A/W Rev 01
  • ALSTOM MFVUM 22D1AA0014A - Digital Frequency Relay Freq Rating 10.001 - 500 Hz
  • Alstom 70AI01 - NEW CARD
  • Alstom MVAA23T1BA0810A - Single Phase Overcurrent AC Relay By Areva
  • Alstom MVAJ23R1AB0757 - Single Phase Overvoltage AC Relay By Areva
  • CONVERTEAM P-802-110-C / P802110C - Module
  • Alstom vaa11yf8752ca - auxiliary relay
  • ALSTOM ALSPA MV500 MV504A4C1 - Inverter
  • CONVERTEAM MVAA21B1BA0755B / MVAA21B1BA0755B - Relay
  • Alstom D-984-072102 - , LAMP AND METER CIRCUIT BOARD #217588
  • Alstom KCEG14201F51EEC - Overcurrent Protection Relay, IN 5A VX 48-250Vdc, VN 110d ~^
  • Alstom KCGG14201T50CEC - Single Phase Overcurrent AC Relay Areva
  • General Electric Energy / CONVERTEAM / ALSTOM MVC 3006-4006 / MVC30064006 - / DELTA Module
  • Areva Alstom KCGG14201T50CEC - Single Phase Overcurrent AC Relay
  • Alstom KCGG14201T50CEC - Single Phase Overcurrent AC Relay By Areva
  • Alstom KCGG14201T50CEC - Single Phase Overvoltage AC Relay By Areva
  • Alstom MVAZ03T1AA0751A - Single Phase Overcurrent AC Relay By Areva
  • Alstom time-2 - Relay 220/240v AC / Dc
  • Alstom Bitronics M870D - Remote Display Unit 19490
  • CONVERTEAM P-802-117-C / P802117C - Module
  • ALSTOM D-984-072101 - , LAMP AND METER CIRCUIT BOARD #217611
  • GEC ALSTOM MWTU11-D1CD0102A - SINGLE PHASE DEFINITE TIME OVER/REVERSE POWER RELAY
  • ALSTOM / CONVERTEAM / GE ENERGY PIB 651B-2100 -3.3 KV/L 1308 - Power Interface Board
  • ALSTOM / CONVERTEAM / GE Energy 651B-2100-3.3 kV/L 1529 - NEW with box
  • CONVERTEAM P-802-110-C / P802110C - Module
  • General Electric Energy / ALSTOM PIB702A / PIB-702A - Power Interface Board
  • ALSTOM / CONVERTEAM / GE Energy 671 -2600 / 3BEI0136F - NEW with box
  • CONVERTEAM ALSPA-C100/P1 / ALSPAC100P1 - Module
  • ALSTOM POWER SC-2387-D - Bevel Pin (24 teeth) - BORE 2-3/4 inches with 5/8 inch keyway
  • Alstom RF120 - Filter Pack U1000510 Rev A.02
  • ALSTOM D-984-0579 - , FREQUENCY DETECTION BOARD #217606
  • Alstom KCEG14201V21CEE - Overcurrent Protection Relay, Used, UK ^ 7278
  • CONVERTEAM MVTP31V1CB0751E / MVTP31V1CB0751E - Relay
  • ALSTOM 94.105.645-02 L2 - & Extended technical support
  • CONVERTEAM VX500 / VX500 - Drive
  • Alstom RF120 - Filter Pack U1000510 Rev A.02
  • ALSTOM / CONVERTEAM / GE Energy PIB-671/1500/F 1409 / 3BEI0136 G - Power Interface Board
  • Alstom MiCom P241311A2M0570J - Motor Protection Relay 0395
  • ALSTOM Tipo A96LC - Relay
  • ALSTOM / CONVERTEAM / GE Energy 671 -1500 /F 1406 - NEW with box
  • CONVERTEAM P343111B2A0030A / P343111B2A0030A - Relay
  • Alstom Power 1BMBR0000091 - LOT OF 3 UNC 60 GRAM BALANCE WEIGHTS 5/16"
  • Alstom WGS.ZN0028011 A04 - PCB Card ,D12213090127 ,Un&7455
  • ALSTOM / CONVERTEAM / GE Energy 671 -1500 /F 1332 / 3BEI0136 J - NEW with box
  • Alstom Drives and Controls GDS1192-6003 - Power Supply,XP PLC SX200N649,New/Sealed
  • ALSTOM Pib 100G - Pib 101C 310 - CONVERTEAM Bgtr 8HE Rack Vme 8 Slots
  • Alstom Bitronics M870D - Remote Display Unit
  • ALSTOM Micom P139 - Ptb 04 ATEX3044 P1393604544AW00E01
  • ALSTOM ETU-V3707750 R4 - Ethernet Terminal Unit (150-1)
  • ALSTOM MAE 00-11 - I/O TERMINATION PANEL AVE248520
  • Alstom RF120 - Filter Pack U1000510 Rev A.02
  • Alstom STC.ZJ0407101.A03 - PCB Card ,&7454
  • General Electric Alstom Bcm - Outdoor 03749110 Unused
  • CONVERTEAM MV1024 / MV1024 - (REPAIR EVALUATION ONLY)
  • CONVERTEAM RX620JR1104 / RX620JR1104 - Resistor
  • ALSTOM / CONVERTEAM / GE Energy 651B - 2100-3.3 kV/L 1603 - NEW with box
  • ALSTOM MVAJ105RA0802A - Protection Relay,VX 110-125 AC / Dc ,MVAJ101RA00802A,GB
  • CONVERTEAM MVAJ13D1GB0780A / MVAJ13D1GB0780A - Relay
  • Alstom vaa11yf8752ca - Auxiliary Relay
  • Alstom Alspa MD2000 - Operating Unit
  • Alstom mcgg62n1cd0503f - Over Current Protection Relay
  • Alstom cdg11af015sach - Earth Fault Relay
  • Alstom Micom p40 Agile - Distance Relay Transmitter p44291ab6m0720m
  • Alstom vajc11bf1004aba - Voltage Control Relay
  • Alstom rtx-151 - time relay
  • CONVERTEAM MVAA11B1DA0784A / MVAA11B1DA0784A - Relay
  • ALSTOM / CONVERTEAM / GE Energy PIB-651A / 3BEF0010 A - [NEW] NEW with box 651A
  • ALSTOM MCGG22D1CB0503B - MCGG 22 Single Phase Over Current & Earth Fault Relay
  • Alstom Power 1BMBR0000092 - LOT OF 5 UNC 80 GRAM BALANCE WEIGHTS 5/16"
  • ALSTOM MAE 00-11 - I/O Termination Panel AVE248520
  • ALSTOM / CONVERTEAM / GE Energy 651A -1500-3.3 kV/L 1323 - NEW with box
  • ALSTOM MAE 00-05 - I/O Termination Panel AVE250712
  • ALSTOM / CONVERTEAM / GE Energy PIB651B 3BEF0010 A - Power Interface Board
  • Alstom vag11yf8011adch - No Voltage Relay 110v AC
  • Alstom Vax - Travel Circuit Monitoring Relay vax31zg8075bch
  • ALSTOM MAE 00-07 - Termination Panel
  • Alstom Vaa - Auxiliary Relay vaa11yfb401f (M)
  • Alstom vajhm23bf22d - tripping relay
  • Cegelec / Alstom gds1017-4001 - Alstom Upgrade Card
  • ALSTOM / CONVERTEAM / GE Energy PIB651B 3BEF0010 A - Power Interface Board
  • CONVERTEAM VNTC-4025E / VNTC4025E - Drive
  • Alstom KCEG14201V21CEE - Overvoltage Protection Relay, Used, GB ^ 7278
  • CONVERTEAM C10/120-M2 / C10120M2 - Control Module
  • Alstom Single Phase Overcurrent AC Relay KCGG14201T50CEC - by Areva
  • CONVERTEAM 029.108-410 / 029108410 - Module
  • Alstom KCEG14201F51EEC - Overcurrent Protection Relay, In 5A VX 48-250Vdc, VN 110d ~^
  • ALSTOM / CONVERTEAM / GE Energy 671 -2100 / 3BEI0136F - NEW with box
  • ALSTOM / CONVERTEAM / GE Energy 671 -2600 /A 1332 - NEW with box
  • Alstom RF120 - Filter Pack U1000510 Rev. A.02 Used
  • GEC MIDOS ALSTOM MCAG14C1DD0003B - *NEW* PROTECTIVE RELAYS MCAG (2F3)
  • CONVERTEAM 30V9400/10 / 30V940010 - Power Supply
  • CONVERTEAM MVAJ11D1GB0783A / MVAJ11D1GB0783A - (used tested cleaned)
  • ALSTOM / CONVERTEAM / GE Energy 651B -2100 -3.3 kV/L 1504 - NEW with box
  • Alstom MX3IPG1A.11 - Modulex3 Integrated protection for generator MX3IPG1A
  • ALSTOM / CONVERTEAM / GE Energy PIB651A-1500-3.3kV/L 1330 - Power Interface Board
  • CEGELEC ALSTOM GDF15 4001 - GEMDRIVE FIELD CONTROL REV C.............NEW PACKAGED
  • Alstom WGS.ZN0028011 A04 - PCB Board,D12213090127,Un&7455
  • Alstom time-2 - Relay 220/240v AC/Dc
  • Alstom S98101/106 - Fan 220V 50/60Hz 4.5" w/ Finger Guard ! NEW !
  • Alstom RF120 - Filter Pack U1000510 Rev A.02
  • ALSTOM Type A96LC - Relay
  • General Electric Alstom Bcm Remote 03749110 - Switch
  • ALSTOM GEC MOTORMASTER 203 - MN16D3T155 WOW!!
  • Alstom CBU.ZN0069002A/03 120 - Control Board, Part, &8082