Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Develop a modern infrastructure system

F: | Au:佚名 | DA:2023-12-05 | 635 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Infrastructure, including traditional infrastructure such as transportation, energy, water conservancy and logistics, as well as new infrastructure with information networks as the core, plays a strategic, basic and leading role in the overall development of the country. The Outline proposes that during the "14th Five-Year Plan" period, we should promote the construction of traditional infrastructure and new infrastructure in a coordinated way, and build a modern infrastructure system that is systematic, efficient and practical, intelligent and green, safe and reliable.

I. Major achievements of the 13th Five-Year Plan Period

During the "13th Five-Year Plan" period, the layout of China's infrastructure network has continued to improve, the overall quality has been significantly improved, the comprehensive efficiency has been significantly improved, the institutional reform has been steadily advanced, and the formation of a super-large-scale infrastructure network has strongly supported and led economic and social development.

First, the advantages of network scale are prominent. The "13th Five-Year Plan" period is a key period for China's infrastructure network to accelerate and improve. The total length of optical cables increased from 24.86 million kilometers to 47.5 million kilometers by the end of 2019; the installed power generation capacity increased from 1.53 billion kilowatts to 2.01 billion kilowatts; and the routing of 220 kilovolt or above power lines increased from 609,000 kilometers to 755,000 kilometers. The length of oil and gas pipelines has increased from 109,000 kilometers to 150,000 kilometers; the total storage capacity of reservoirs has increased from 858.1 billion cubic meters to 903.5 billion cubic meters; the effective irrigated area of farmland has increased from 65.87 million hectares to 68.27 million hectares, accounting for about one-fifth of the world's total irrigated area; and the overall carrying capacity of urban infrastructure has been continuously enhanced. The operating mileage of high-speed railways, the operating mileage of expressways, the operating mileage of urban rail transit, the number of berths of 10,000-ton class and above at ports, the installed power capacity, the scale of the power grid, and the scale of the fourth-generation mobile communication (4G) network all rank first in the world.

Second, the service capacity has been continuously improved. During the "13th Five-Year Plan" period, China's passenger turnover increased from 3 trillion person-kilometers in 2015 to 3.5 trillion person-kilometers in 2019, and the cargo transport volume and turnover increased from 41.7 billion tons and 17.8 trillion ton-kilometers in 2015 to 47 billion tons and 19.9 trillion ton-kilometers in 2019, respectively. Railway passenger turnover and freight volume, highway passenger and freight volume and freight volume, waterway freight volume and freight volume rank first in the world. The transmission capacity of "west-east power transmission" increased from 140 million kilowatts at the end of 2015 to 240 million kilowatts at the end of 2019, and the mileage of natural gas main pipeline network increased from 64,000 kilometers in 2015 to 94,000 kilometers in 2019. The East-central route of the South-to-North Water Diversion Project has diverted more than 30 billion cubic meters of water, directly benefiting more than 100 million people. Information services cover more areas and benefit more people. The number of mobile communication users and the number of Internet users increased from 1.27 billion and 680 million in 2015 to 1.6 billion and 830 million in 2019, ranking first in the world. Urban public service indicators such as public water supply penetration rate, gas penetration rate and sewage treatment rate generally exceed 90%.

Third, the level of innovation has significantly improved. During the "13th Five-Year Plan" period, China has basically formed a complete and complete set of technical equipment system, and has a number of technological innovation achievements with independent intellectual property rights. High-speed railways, long-span Bridges, UHV power transmission, super large water conservancy projects, a new generation of mobile communications, a new generation of Internet and other technological fields have achieved leap-forward development. China has completed and actively operated the world's first quantum secure communication backbone line "Beijing-Shanghai Trunk Line", and its construction technologies such as offshore deep-water ports, regulation of giant estuaries and waterways, and large-scale airport projects have entered the world's advanced or leading ranks, forming a full-chain infrastructure industrial system from planning consultation, engineering design, financing, construction, operation and maintenance. The development of 5G, artificial intelligence and other new infrastructure is accelerating; the application of big data, cloud computing and blockchain in traditional infrastructure is accelerating; and the level of international connectivity is steadily improving.

Fourth, institutions and mechanisms have been continuously improved. During the "13th Five-Year Plan" period, substantial steps were taken in railway shareholding reform, and the former China Railway Corporation was successfully restructured into China National Railway Group Co., LTD. The reform of the oil and gas pipeline network system took an important step forward, and the National Oil and Gas Pipeline Network Group Co., Ltd. was established. Further progress was made in the reform of the electric power system, and power grid enterprises were encouraged to focus on their main business and open their competitive businesses in an orderly manner. Major progress was made in the reform of the water supply system, and China South-to-North Water Transfer Group Co., Ltd. was established. Reform in investment and financing continued to deepen, the expansion and application of the model of cooperation between the government and private capital was accelerated, the division of fiscal powers and expenditure responsibilities between the central and local governments was gradually clarified, and the investment coordination mechanism was further improved. The systems and mechanisms for regional integration in infrastructure development and operation along the Yangtze River Economic Belt, the Beijing-Tianjin-Hebei region, the Yangtze River Delta, Guangdong, Hong Kong and Macao have been continuously improved, and the level of infrastructure connectivity and service mutual guarantee has been significantly improved.

Second, problems and difficulties we face

Although China's infrastructure development has made historic achievements, the requirements for high-quality development, the infrastructure system is still not perfect, the level of coordinated, systematic and holistic development is not high, and the shortcomings of service capacity, operational efficiency and service quality are still relatively obvious. First, the level of systematic coordination is not high. The spatial layout needs to be optimized, inter-regional development is unbalanced, rural infrastructure is in arrearage, and connectivity, joint construction and sharing of urban clusters and metropolitan areas are not high. Point, line and surface do not match, node capacity is insufficient, the function is not perfect. There is insufficient overall planning and balance of various types of infrastructure, and the relationship between substitution, complementarity, coordination and restriction is not properly handled. Second, the facility service efficiency is not high. Heavy construction over maintenance, heavy hardware over software is still prevalent, the level of coordinated development of the whole life cycle is not high, the level of fine management needs to be improved, and the supply of facilities and services is difficult to meet diversified and diversified needs. Third, intelligent development needs to be accelerated. The digital upgrading of traditional fields and the construction of new infrastructure have just started, and there is still a big gap with developed countries. The scenario of the integration of new and traditional infrastructure is not clear, and the standards, norms and policy systems are still not perfect. Fourth, the mode of green development has not yet taken shape. The sustainability of the development model is insufficient; resources, environment and ecological issues in construction and operation are not considered enough; the energy structure and transportation structure need to be optimized; and the space for energy conservation in infrastructure has not been fully tapped. Fifth, the security guarantee capacity is still insufficient. In the face of natural disasters, public health, major accidents and other emergencies, the ability to respond is weak, the resilience of the network needs to be enhanced, the problem of critical infrastructure and technical equipment is still serious, and the overall national security capacity needs to be improved.

At the same time, it should be noted that the high-quality development of infrastructure in the "14th Five-Year Plan" period still faces some difficulties. First, we need to accelerate the transformation of the development model. For a long time, China has formed an infrastructure development model that focuses on construction, takes projects as the starting point, takes government as the main body, and takes bank loans as the main financing means, which has played an important role in eliminating infrastructure bottlenecks as soon as possible. As China's infrastructure enters a stage of development in which it pays equal attention to reinforcing its shortcomings, improving its functions, optimizing its services and integrating its development, the traditional development model is difficult to meet the needs of future development and urgently needs to change. Second, the difficulty of factor guarantee is increasing day by day. At present, the projects to be built generally have the characteristics of high engineering cost, poor economic benefits, limited local financial resources, and social capital participation is not strong. Under the pressure of the goal of carbon neutrality, the ecological environment is constrained, land, corridor and other resources are increasingly strained, the cost of raw materials, labor and other factors is rising, and the construction of infrastructure projects is difficult to promote. Third, institutional reform is not yet in place. The reform of the airspace management system is lagging behind, the market mechanism in the water conservancy sector is not fully playing its role, and reforms in key areas and key links such as electricity and oil and gas need to be deepened. Investment and financing model innovation is insufficient, excessive reliance on government investment, the role of finance is not fully played, and the technical and economic characteristics of new infrastructure do not match.

Third, the requirements of the situation facing the "14th Five-Year Plan" period

From an international perspective, developed countries have accelerated the intergenerational replacement of infrastructure, and the United States, the United Kingdom, and Japan have successively proposed action plans or national strategies for the intelligent transformation of infrastructure. We need to follow the direction of intergenerational replacement of infrastructure, enhance the scale advantage of infrastructure networks, service capabilities and adaptability to demand, and accelerate the intelligent upgrading of traditional infrastructure and the development of new infrastructure.

From a domestic perspective, building a new development pattern, forming a strong domestic market, and further releasing the potential of domestic demand require improving the precision and effectiveness of infrastructure investment, and improving the level of coordinated development and service quality throughout the life cycle. A spatial pattern with city clusters and metropolitan areas as the main resource factors and growth poles is taking shape, and integration of urban and rural areas and revitalization of rural areas are being deepened. Infrastructure development in different regions needs to be carried out in accordance with local conditions and with precision. Accelerating the construction of an innovative country requires accelerating the layout of new infrastructure such as 5G, big data, artificial intelligence, industrial Internet, and Internet of Things. To promote the comprehensive green transformation of economic and social development and build a beautiful China, we need to change the mode of investment and operation management of infrastructure elements as soon as possible, and develop green and low-carbon infrastructure. Adhering to the overall national security concept and building a strong national security barrier requires that security be implemented in all aspects and the whole process of infrastructure development and enhance strategic security guarantee capabilities.

Fourth, the development direction and key tasks of the 14th Five-Year Plan period

During the "14th Five-Year Plan" period, it is necessary to take overall optimization and coordinated integration as the guide, promote infrastructure construction in a coordinated way, and improve the level of networked and integrated development and system resilience.

1. Accelerating the construction of new infrastructure

The "14th Five-Year Plan" period is a critical period for the large-scale construction, development and evolution of new global infrastructure, and an accelerated period for the transformation and upgrading of traditional infrastructure by relying on modern information intelligent technology. Focusing on strengthening digital transformation, intelligent upgrading, integrated innovation support, layout and construction of information infrastructure, integration infrastructure, innovation infrastructure and other new infrastructure.

The first is to build a high-speed, universal, integrated, interconnected, secure and efficient information infrastructure. We will accelerate the large-scale deployment of 5G networks and promote 5G converged applications. We will promote the upgrading of gigabit optical fiber networks, expand the number of interconnection nodes in backbone networks, and carry out projects to improve basic networks. Accelerate the construction of a national integrated big data center system, strengthen the overall planning and intelligent scheduling of computing power, and build a national hub node. Build a space infrastructure system for communication, navigation and remote sensing with global coverage and efficient operation.

Second, we need to raise the level of integrated infrastructure development. In light of the development direction and requirements of various types of infrastructure, demand-oriented, speed up the digital transformation of traditional infrastructure such as transportation, energy, municipal affairs, logistics, and water conservancy, promote the comprehensive development of the Internet of Things, and actively and steadily develop the industrial Internet and the Internet of vehicles.

Third, we will accelerate the development of innovation infrastructure. We will further implement the innovation-driven development strategy, strengthen overall planning and layout, and continue to improve the linkage construction and integrated development of facilities in the national innovation system. We will plan major scientific and technological infrastructure in advance, optimize and improve the layout of science and education infrastructure, and accelerate the construction of industrial innovation platforms such as national industrial innovation centers and engineering research centers. Class E and Class 10E supercomputing centers will be built to effectively serve scientific exploration and research.

Fourth, establish a sound policy system for new infrastructure development. New infrastructure covers a wider range, market demand is changing rapidly, technological innovation is developing rapidly, and the development environment is changing rapidly. We need to better leverage the decisive role of the market in resource allocation and mobilize the enthusiasm of private capital. We will give better play to the role of the government, adopt policies tailored to specific industries and local conditions, and further improve system design, institutional innovation, and policy guarantees.

2. Accelerating the building of China into a transport powerhouse

During the "14th Five-Year Plan" period, China's transportation is in the accelerated period of taking the lead in realizing modernization, the key period of accurately making up the shortcomings of facilities, and the continuous period of improving the overall efficiency. It is necessary to promote all-round transformation and development in accordance with the requirements of the construction of a powerful transportation country, and build a safe, convenient, efficient, green and economic modern comprehensive transportation system.

First, we will improve comprehensive transport corridors. At present, the "ten vertical and ten horizontal" comprehensive transport channel pattern has been basically formed, but the functional problems of the channel structure are still prominent. It is necessary to speed up the construction of strategic backbone corridors, speed up the connecting of missing sections, and orderly promote the upgrading and expansion of corridors with limited capacity. With the focus on the Belt and Road Initiative, China will strengthen infrastructure connectivity with neighboring countries and promote the construction of a staging center for China-Europe express trains.

The second is to build a high-quality comprehensive three-dimensional transportation network. We need to improve the layout of the high-speed network, basically connect the main corridors of the eight-vertical and eight-horizontal high-speed railway, improve the quality of the national highway network, and accelerate the development of world-class airport and port clusters in the Beijing-Tianjin-Hebei Region, the Yangtze River Delta, and the Guangdong-Hong Kong-Macao Greater Bay Area. We need to improve the quality of the backbone network, coordinate the construction of new lines and the upgrading of existing ones, place equal emphasis on passengers and goods, accelerate the construction of high-speed railways, upgrade bottlenecked sections of ordinary national and provincial highways and connect those to be built, expand and upgrade the capacity of high-level inland waterways, and steadily build regional airports, general airports, and cargo airports. We will promote the implementation of the express delivery project "entering villages and factories and going to sea" to improve the inclusiveness of logistics services. We will strengthen the capacity of basic networks, increase the depth of transport connections, promote the construction of regional railways, speed up the construction of roads to and from border areas, implement the rural revitalization road project, and promote the construction of road safety facilities.

Third, we will take the lead in modernizing transportation in urban agglomerations. We will accelerate the construction of intercity railways and urban (suburban) railways around major city clusters and metropolitan areas, promote the development of urban rail transit in an orderly manner, and promote the "four-network integration" of trunk railways, intercity railways, urban (suburban) railways and urban rail transit. It is necessary to construct a highway loop system according to the actual situation, effectively separate urban traffic and transit traffic, and reduce traffic congestion.

Fourth, we will strengthen the integrated connectivity of the comprehensive transportation network and the service capacity of the whole chain. It is necessary to vigorously develop combined passenger transport and multimodal transport of goods, and promote the "one-ticket" and "one-ticket" services for the whole process. Improve the functional layout of the hub city level, and focus on the transfer and installation efficiency and collection and distribution system construction between the hub terminals and stations. Improve major logistics infrastructure networks such as the national logistics hub and the national backbone cold chain logistics base, and promote the formation of a modern logistics operation system of "channel + hub + network". Strengthen the comprehensive development of the hub and promote the deep integration with urban functions. We will comprehensively deepen reforms in key areas such as railways, the air traffic control system, and the road toll and maintenance system.

3. Building a modern energy system

During the "14th Five-Year Plan" period, actively respond to global climate change and the uncertainty of stable international energy supply, and work in both directions to accelerate energy transformation. It is necessary to control coal, stabilize oil and increase gas, vigorously develop non-fossil energy, and simultaneously improve the regulation capacity of the power system to build a clean, low-carbon, safe and efficient energy system.

First, accelerate the development of non-fossil energy. In order to support economic development and address climate change, non-fossil energy has become an inevitable choice. During the "14th Five-Year Plan" period, the competitive advantages of photovoltaic power generation and wind power market gradually emerged, we must adhere to centralized and distributed simultaneously, pay equal attention to onshore and offshore, build photovoltaic power generation and wind power bases, accelerate distributed development, and orderly construction of offshore wind power. We will start the hydropower development project on the lower reaches of the Brahmaputra River, make full use of the large hydropower regulation capacity, and build a number of integrated wind and water storage energy bases. Promote the upgrading of in-service coal power base to wind and fire (storage) integrated base. Safe and sound construction of coastal nuclear power.

Second, we will significantly improve the power system regulation capacity. It is necessary to accelerate the construction of a new generation of power systems that can adapt to the high proportion and large-scale access of photovoltaic power generation and wind power, promote the intelligent transformation of power grid infrastructure and the construction of smart microgrids, and improve the power grid's acceptance, configuration and regulation of photovoltaic power generation and wind power. We will continue to promote the flexible transformation of existing coal power, accelerate the large-scale and commercial development of energy storage, vigorously build pumped storage power stations, implement energy storage demonstration projects such as electrochemistry, compressed air, hydrogen energy, and flywheel, enhance the capacity of the source network to load and store energy, and promote integrated planning, synchronous construction, and joint operation of photovoltaic power generation, wind power and energy storage.

Third, promote the positioning and transformation of coal and coal power. We should give full play to the basic role of coal and coal power in energy security, and at the same time strictly control the scale of development to leave room for the development of non-fossil energy. It is necessary to optimize the distribution of coal production, promote the concentration of coal production in resource-rich areas, and improve the elasticity of coal supply. We will step up efforts to replace coal with electricity, gradually reduce the bulk burning of coal by region, and reduce the proportion of coal in final consumption. Support photovoltaic power generation, wind power transmission in the western region and power grid operation in the eastern and central regions, and strictly control the scale and pace of coal power construction.

Fourth, expand the development space of the oil and gas sector. It is necessary to further strengthen the competitive transfer of oil and gas mineral rights, and promote the fair and open introduction of social partners for joint development of reserves difficult to use by oil enterprises. We will strengthen exploration and development of deep conventional oil and gas, offshore, and unconventional oil and gas such as shale oil, shale gas and coal-bed methane, focusing on the Sichuan, Tarim, Junggar, Ordos and Songliao basins. We will steadily expand natural gas consumption and accelerate the integration of natural gas with non-fossil fuels.

Fifth, improve the layout of natural gas infrastructure. We will speed up the construction and improvement of trunk gas pipelines and regional and feeder pipelines, and promote the formation of a nationwide network of connectivity. Focus on the construction of the China-Russia Eastern route, the second line of Sichuan gas transmission to the east, the third line of west gas transmission to the east and other main natural gas pipelines. Speed up the construction of Zhongyuan Wen 23, Liaohe gas storage group and other underground gas storage. Promote the construction of additional storage tanks at existing LNG receiving stations, improve the capacity of gas storage and emergency supply, and orderly advance the preliminary work of LNG receiving stations.

(4) Implementing the national water network project

During the "14th Five-Year Plan" period, we should speed up the construction of a national water network based on the national river and lake system, with transport and drainage projects as channels, controlled regulation and storage projects as nodes, and intelligent regulation as means, so as to comprehensively solve the problems of water resources, water ecology, water environment, and water disasters, and ensure water security at a higher level.

First, we will build embankments and comprehensively improve the main rivers of major rivers. We will comprehensively carry out the construction of major river embankments to meet standards, and promote the upgrading of key river sections involving major national strategic areas, economic zones, city clusters, and flood control cities in a timely manner. We will accelerate the comprehensive management of major rivers and lakes, focusing on the Yangtze River regime control, bank collapse management and the "two lakes management", and the Yellow River channel and beach areas, so as to restore flood flow and ecological functions of river channels and enhance their ability to cope with major regional floods.

Second, we will promote the construction of major water transmission and distribution channels. We will build national backbone water transport and drainage channels, and build a number of cross-basin and cross-regional backbone water transport channels. We will promptly promote the construction of follow-up projects for the eastern and middle routes of the South-to-North Water Transfer project, and carry out comparative selection and demonstration of planning schemes for the western route. Speed up the construction of water diversion projects in central Yunnan, river diversion and Huaihe river, and water resource allocation in Pearl River Delta and western Chongqing. The second phase of the Huaihe Waterway into the sea and the backbone drainage channel of Taihu Lake were built to improve flood discharge capacity.

Third, we will promote the construction of comprehensive water conservancy projects and regulation and storage projects. We will speed up the construction of comprehensive control hubs such as Dtengxia and Yangxi, with a focus on building a number of large reservoir projects in the southwest and other regions, accelerate the reinforcement of existing large and medium-sized reservoirs in danger, and advance the construction of major flood storage and detention areas and some general flood storage and detention areas, so as to bring into full play the comprehensive functional benefits of water conservancy infrastructure.

Fourth, we will promote the intelligent transformation and upgrading of the national water network. Using the new generation of information technology, on the basis of online real-time monitoring and through network coordination and sharing, we will accelerate the construction of smart water conservancy projects, accelerate the intellectualization of water conservancy projects, the digitization of river basins and water systems, and the intellectualization of the national water network. We will build big data centers and dispatch centers for the national water network, and promote the construction of joint dispatch and comprehensive monitoring systems for water projects in the seven major river basins, including the Yangtze and Yellow Rivers.


  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio
  • Alcatel-Lucent ACT2300M Turbo Pump Controller AF042134A
  • Alcatel-Lucent OmniPCX Office Medium PowerCPU PRA-TI
  • Alcatel-Lucent 9500 MPR 23GHz ODU 3DB23045HDAA01
  • Alcatel-Lucent 9500 MPR ODU Outdoor Unit 300 11GHz TX Low HP 3DB23035AAAA01
  • Alcatel-Lucent ECNT-C 3FE25676 BA AK 06 Termination Card
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8606-45 with 13 Modules
  • Alcatel-Lucent 849144415 KS-24829L1 Remote Radio Head v1.4
  • Alcatel CFF 450 Turbo Pump Controller 137171
  • Alcatel-Lucent ACS108 109579896 004 Access Controller
  • Alcatel-Lucent OS6850-48 Network Switch with PS-126W-AC Power Supply
  • Alcatel Lucent DFP-CM-14B/2T Filter DCMA Base Station
  • Alcatel Lucent ESX-K100C32W4 ESXK100C32W4 Power Supply Module
  • Alcatel Lucent 91-E03100-A 91E03100A Interface Module
  • Alcatel-Lucent STGR-LIM-A2P-72-HBI ADSL2+ High Bandwidth Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20547BBAA02
  • Alcatel Lucent Enterprise 4049-4059 MMK Keyboard Console Kit
  • Alcatel-Lucent RRH4X40-1900 Remote Radio Head
  • Alcatel Lucent OS6450-P48 Switch
  • Alcatel Lucent 625617-000-001 Cable Assembly
  • Alcatel Lucent 108320 Module
  • Alcatel Lucent TN801B Board
  • Alcatel-Lucent RRH2X50-800 LTE Remote Radio Head
  • Alcatel Lucent CPU8 Board 3BA23258AB OmniPCX 4400
  • Alcatel-Lucent 3EM22617AAAE 9500 MPT-HL Microwave Radio Transceiver
  • Alcatel-Lucent CPU7-2 3BA23259AAAD 7750 SR Control Processor Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20371BCAA01
  • Alcatel-Lucent Enterprise 4059 MMK Keyboard + Phone PAC Kit
  • Alcatel-Lucent Nokia 3HE10329AA 7750 SR Series Router Module
  • Alcatel-Lucent 7705 SAR-W IP MPLS Service Aggregation Router 3HE07349AA
  • Alcatel-Lucent-Nokia 3HE08429AARC01 7750 SR SFM5-7 Switching Module
  • Alcatel-Lucent 3HE00272DB 7750 SR-7 DC Chassis with PEM3+EFT
  • Alcatel-Lucent ACT 1300M/1600M HT Turbo Pump Controller
  • Alcatel Lucent IMM48-1GB-TX 3HE03625AAG01 48-Port 7750 SR-12 Interface Module
  • Alcatel-Lucent AP-500 Wireless Access Point
  • Alcatel-Lucent ATP-150 Power Supply
  • Alcatel-Lucent 622-8603-012 Optical Transceiver
  • Alcatel-Lucent 270-0038-010 10.5 VDC Power Supply
  • Nokia 9500-MPR Microwave Radio Module XPIC-RPS/3DB20116BCAA01
  • Alcatel-Lucent 3DB19017AB EAS Access Switch v2
  • Alcatel-Lucent 3AL81072AA Matrix Enhanced Unit - Cross-Connect Module