Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Work plan to expand the current investment in agricultural and rural infrastructure construction

来源: | 作者:佚名 | 发布时间 :2023-12-05 | 417 次浏览: | 🔊 Click to read aloud ❚❚ | Share:

I. General requirements

 We will accelerate the progress of agricultural and rural infrastructure construction and form a physical workload as soon as possible to lay a solid foundation for ensuring supply and preventing inflation and stabilizing the economic market.

In the promotion of work, first, we must reflect the speed, seize the favorable opportunity of autumn and winter farming, accelerate the progress of projects that have been started, the projects that have been approved to start, and the investment plans that have been issued to implement in place, concentrate time, gather resources and gather strength, accelerate construction, and ensure that the results within the year; Second, we should focus on key areas, focusing on irrigation areas and other water conservancy facilities to strengthen weaknesses and upgrade, repair agricultural facilities in disaster-stricken areas, and related to the consolidation and improvement of food production capacity and agricultural quality and efficiency projects, on the basis of completing the existing construction tasks, appropriately increase the amount of construction, promote production development, and improve rural people's livelihood; Third, we should innovate the mechanism, take the province as the unit, allow cross-city and cross-county bundling, adhere to the joint participation of diversified subjects in the construction, innovate the investment and financing mechanism of agricultural and rural infrastructure, and promote the linkage investment of government investment and financial and social capital to help agriculture and villages under the premise of not adding new hidden debts of local governments. Fourth, it is necessary to pay attention to actual results, strengthen the organization and implementation, in order to select accurate projects, establish project ledgers, ensure that they are completed as soon as possible and give full play to benefits, and form an investment driving effect.

Second, construction content

From now until the end of the year, we will focus on the weaknesses of agricultural and rural infrastructure, and highlight the construction of water conservancy facilities such as large and medium-sized irrigation areas, small farmland water conservancy facilities, and modern facility agriculture and cold chain logistics facilities for agricultural products' storage and preservation, so as to ensure that construction starts as soon as possible and results as soon as possible.

(1) Construction, renovation and upgrading of irrigation areas and other water conservancy facilities. Irrigation area and other water conservancy facilities are an important basis for ensuring food security. This year's flood and drought disasters exposed the outstanding shortcomings of irrigation areas and other water conservancy facilities, and it is urgent to speed up the repair.

First, construction and transformation of large and medium-sized irrigation areas. At present, the problem of aging and disrepair of irrigation district projects is prominent, which needs to be reformed and upgraded as soon as possible. We will promptly carry out the construction and modernization of a number of large and medium-sized irrigation areas, and build a number of large irrigation areas.

The second is to strengthen the reservoir. We will strengthen the strengthening of small and medium-sized reservoirs, promptly eliminate potential security risks in reservoirs, and promptly restore and enhance the capacity of existing reservoirs to withstand drought and ensure water supply and agricultural production. According to the "14th Five-Year Plan" reservoir reinforcement implementation Plan approved by The State Council, a number of large and medium-sized reservoirs and small reservoirs will be strengthened before the end of this year.

Third, capacity building for flood drainage. In view of the frequent disasters in key waterlogging areas such as the Yangtze River and Songhua River basins, which affect national food security, and the urgent need for control, key waterlogging areas such as the Hanjiang Plain in Hubei Province and Dongting Lake in Hunan Province, key waterlogging prone areas in Anhui and Jiangxi Province, and low-lying areas in Songnen Plain and Sanjiang Plain have been put under control, and the key project for control of the waterlogging areas in Liaoning Province has been accelerated. We will promptly implement a number of projects to build capacity for flood drainage.

Fourth, small and medium-sized water source projects. We will build a number of small and medium-sized water source projects, improve the level of water security for agricultural irrigation, effectively solve the problem of water scarcity, and enhance the ability to withstand drought. We will focus on implementing a number of medium-sized and small reservoirs and water diversion projects.

Fifth, other rural water conservancy infrastructure. We will improve the dredging of rural rivers and ponds, connect and comprehensively improve rural water systems, control soil erosion on sloping farmland, build silting DAMS, and prevent and control mountain floods. We will do a good job in maintaining and maintaining rural water conservancy facilities, and carry out a number of other rural water conservancy infrastructure projects to further consolidate the foundation of water conservancy for agricultural and rural development.

(2) Making up for weaknesses in farmland water conservancy facilities. In view of the weak farmland infrastructure, especially the lack of field water conservancy facilities, we will strengthen the water conservancy facilities in high-standard farmland project areas to make up for shortcomings, and improve the ability of farmland to resist drought and flood, prevent damage and reduce disaster. In accordance with the requirements of comprehensive control of drought, waterlogging and damage, we will vigorously carry out the construction of farmland irrigation and drainage facilities, focusing on the construction and supporting renovation of farmland canals, agricultural canals and other transmission and distribution channels (pipes) and drainage ditches (pipes), pumping stations, storage facilities, culverts and other canal system buildings. Construction of efficient water-saving irrigation facilities in accordance with local conditions. Supporting the construction of field leveling, field roads, agricultural electricity facilities, and farmland protection projects will be carried out to give full play to the overall benefits of infrastructure. A number of projects to make up for weaknesses in farmland water conservancy facilities began ahead of schedule this winter.

3. Building modern facility agriculture. Facility agriculture is an important way to improve resource utilization and increase food supply capacity. At present, the scale of facility agriculture in China is small and the overall level of facilities and equipment is low, which affects the output and efficiency, and it is necessary to speed up the transformation and improve the level and ask for food from facility agriculture.

One is facility planting. A new number of facilities vegetable greenhouse greenhouses, make up for the short board of raising seedlings. Focus on the advantage areas of facility vegetables, and build and upgrade modern facility vegetable bases in a centralized or multi-garden way, including the construction of a number of high-end production facilities such as year-round production, three-dimensional planting, intelligent regulation and multi-greenhouse and plant factories. A number of centralized rice seedling rearing centers will be built in 10 provinces in the double-cropping rice region in southern China, and a number of regional intensive seedling rearing centers will be built in areas with advantages in facility vegetables.

Second, facility animal husbandry. Construction and upgrading of large-scale farms, livestock and poultry slaughterhouses. Focusing on the three major livestock breeds of dairy cows, beef cattle and poultry, we will build or expand a number of large dairy farms with a focus on building high-standard breeding enclosures, equipped with intelligent environmental control facilities such as waste cleaning and utilization, and digital equipment such as automatic milking. Focusing on major beef cattle producing areas and potential areas, we will build a number of standardized beef cattle farms, focusing on supporting the construction of mechanized feed collection, storage and processing, precise feeding and intelligent information control. With the focus on the main poultry producing areas and potential areas, a number of three-dimensional and efficient poultry facilities will be built. Build or expand a number of livestock slaughterhouses, supporting refrigeration and fresh-keeping, inspection and quarantine facilities, and improve livestock slaughtering and processing capacity.

Third, facility fishery. We will build Marine pastures and central fishing ports, and upgrade aquaculture facilities and equipment. In Liaoning, Shandong, Zhejiang, Fujian, Hainan and other places to build a number of Marine pastures, including artificial fish reefs, species (transfer) planting restoration, Marine pasture monitoring facilities, seedling breeding facilities. In coastal areas, a number of fishing port economic zones, central fishing ports and ocean-going fishing bases will be built, including water and land structures such as breakwaters, wharves, revealments and roads in port areas, as well as aquatic product trading, processing and logistics facilities. In key aquaculture provinces, a number of high-standard aquaculture parks, factory aquaculture facilities, and far-reaching Marine aquaculture equipment will be built, and core pond water purification projects and supporting projects, seedling breeding and aquaculture workshops, circulating water aquaculture equipment, precise feeding and intelligent information control facilities and equipment, trussed deep-water cages and aquaculture workers' boats will be improved.

(4) Construction of cold chain logistics facilities for storage and preservation of agricultural products. At present, the low-temperature treatment rates of fruits and vegetables, meat and aquatic products are only 11%, 52% and 54%, respectively, and the postpartum loss rate of fruits and vegetables exceeds 20%. Based on the reasonable and centralized construction of cold storage facilities in accordance with actual needs, the project will drive the whole province, the whole city and the whole county to accelerate the improvement of the node layout, service network and support system of cold chain logistics facilities in agricultural production areas, integrate into the national cold chain logistics backbone channel network, and achieve loss reduction and efficiency and smooth sales.

First, the origin of refrigeration and preservation facilities. In key towns and central villages, promote the construction of a number of small field cold storage facilities, increase the storage capacity of production areas, and build a solid foundation of cold chain logistics facilities network.

The second is the origin of cold chain distribution center. In the important circulation nodes of producing areas, promote the construction of a number of cold chain distribution centers with storage and preservation, primary processing, and cold chain distribution capabilities, and form a comprehensive service platform for supporting agricultural products.

Third, regional cold chain logistics base. Relying on the national agricultural products producing area market, large agricultural products trading center, large logistics park, agricultural reclamation enterprise group and other subjects, the construction of a number of regional cold chain logistics bases with the ability to lead the industry, radiate urban and rural areas and "vegetable basket" emergency supply.

The fourth is the on-site processing of aquatic products and cold chain logistics facilities and equipment. In coastal areas such as Guangdong and Fujian, and in major inland aquaculture provinces such as Hunan and Jiangxi, China has built a number of facilities and equipment for on-site processing of aquatic products and cold-chain logistics, supporting the processing of key varieties such as freshwater fish and crayfish, the production of prepared vegetables, and the production of Marine food and functional products.

3. Investment and financing mechanisms

(A) In the construction of the main body, encourage qualified market players to participate in the construction. Qualified relevant market entities can participate in the construction of major agricultural, rural and water conservancy infrastructure projects in accordance with laws and regulations and procedures, undertake financial subsidies and investment funds, apply for credit funds, borrow and return, promote the bundling and overall implementation of scattered projects, and achieve project construction upgrading and expansion, centralized contiguity, and overall development.

(2) In raising funds, promote the linkage between government investment and financial credit and lending. For major projects carried out by market players, local governments are encouraged to adopt a variety of ways that meet the requirements of regulations, and focus on supporting the construction of a number of modern agricultural and rural infrastructure. We will promote the linkage between government investment and financial credit investment and lending for qualified projects, so that financial credit funds can be better landed. At the same time, we will strengthen supervision to avoid local financial risks and debt risks.

(3) In the mode of operation, encourage social capital to cooperate in the construction and operation of agricultural and rural infrastructure investment projects. For agricultural and rural infrastructure projects with a high degree of marketization, such as facility agriculture and cold chain logistics, local governments are encouraged to actively explore effective and safe ways to strengthen cooperation with private capital investment, give full play to the advantages of social capital market operation, reduce the pressure on social capital to invest heavily in assets, and promote positive interaction between investment and development.

(4) In terms of repayment sources, establish stable and diversified loan repayment channels. Based on the production and operation income formed after the completion of the project, through the project bundling construction and operation, the overall construction of diversified repayment channels to achieve self-balance and sustainable project income, so as to achieve long-term stable management of the project subject.

Fourth, safeguard measures

1. Strengthening overall planning and coordination Agricultural and rural departments and water conservancy departments should strengthen communication and coordination with relevant departments, docking with relevant financial institutions, establishing a coordinated promotion mechanism, strengthening the guarantee of project implementation land, environmental assessment and other factors, consolidating responsibilities at various levels, and promoting the implementation of items.

2. Strengthening policy support. For eligible agricultural and rural infrastructure construction projects, policy-oriented development financial instruments will actively support them. We will increase credit support for agricultural and rural infrastructure, strengthen commercial loan support, and encourage policy-oriented development banks to provide credit support for agricultural and rural infrastructure-related projects within their business scope based on their functional positioning. Encourage eligible places to explore ways to support the construction of modern facility agriculture through discounted interest, and give priority to ensuring land targets for the construction of agricultural and water conservancy facilities. Under the premise of strengthened supervision by government departments, controllable risks and moderate competition, market entities such as agricultural and water conservancy investment enterprises are allowed to act as project entities and undertake high-standard farmland construction projects in accordance with relevant national laws and regulations. We will accelerate comprehensive pricing reform for water used in agriculture.

3. Strengthen guidance services. Formulate project implementation plans by field, speed up the preliminary work of projects such as planning, project approval, bidding and bidding, so that the project can be started as soon as the funds arrive. We will deepen the reform of "delegating control services", optimize the project approval process in accordance with the law, and encourage local governments to trial a commitment system for investment approval matters such as land use and environmental assessment in accordance with their duties and powers, so as to improve the efficiency of approval. Encourage financial institutions and project units to strengthen docking, one-to-one sorting out and improving project financing plans, to achieve accurate credit funds. Strictly implement the safety responsibility to ensure safe construction.

4. Strengthen supervision and inspection. Make a list of construction projects by field, establish a work ledger, regularly dispatch the progress of work, timely report the completion of tasks, and urge the construction body to speed up the construction progress. For key regions and key projects, timely field guidance and supervision are carried out to help solve difficulties and problems in the implementation of projects, and ensure that the projects are fully implemented. Summarize and refine projects with typical and promotional value to form replicable cases and models.


  • OEMAX NX-CPU700P PLC Controller
  • OEMAX NX-BASE10 PLC Backplane
  • OEMAX NX-AO4C 4-Channel Analog Output Module
  • OEMAX NX-AI8C 8-Channel Analog Input Module
  • OMACO GF0-57CQD-002 Industrial Control Module Precision Automation
  • OPTIMATE OP-620 Industrial Automation Control Module
  • OPTIMATE OM1510 Industrial Control Module Performance Solution
  • OPTO 22 SNAP-IDC5D Digital Input Module for Automation
  • OPTO 22 SNAP-AITM-2 Thermocouple Module
  • ORIENTAL A4722-9215KM Cooling Fan
  • ORIENTAL MOTOR 2GK180K Gearhead Specifications
  • OSRAM DULUX L 36W 840 865 Lamp Specification
  • OTHER FLASH SERIES 2 Memory Module Data
  • OVATION 1X00458H01 Control Module Specification
  • Emerson Ovation 1C31157G02 Event Sequence Module
  • Emerson Ovation 5X00070G04 Analog Input Module
  • OXIDE 0020-31655 Industrial Controller
  • ABB FAU810 C87-11006 / C10-12010 Flame Analyzer
  • Pilz PSSu E F 4DI Safety Input Module
  • Pepperl+Fuchs KFD2-UFC-1.D Frequency Converter
  • Pacific Scientific VDE0530-S1 Stepper Motor
  • Pacific Scientific 6410-001-N-N-N Stepper Drive
  • PACIFIC LA23GCKC-1Y Servo Motor Reliable Automation Motion Solution
  • PACIFIC LA23GCKX-P500A Servo Motor Advanced Industrial Motion Control
  • PACIFIC LA23GCKC-P500A High Precision Servo Motor for Industrial Automation
  • Pacific Scientific E32NCHA-LNN-NS-00 Hybrid Stepper Motor
  • Pacific Scientific SCE903A3-002-01 Servo Drive
  • Pacific Scientific 6410-024-N-N-N Stepper Motor Drive
  • PALCLEAN JD-BXG Industrial Control Module
  • Panametrics 704-673-20 Ultrasonic Flow Meter
  • Panasonic MSD043A1XX AC Servo Driver
  • Panasonic KX-FT936CN Plain Paper Fax Machine
  • Panasonic DL-1109CWS Electric Bidet Toilet Seat
  • PACIFIC SCIENTIFIC 33VM52-000-29 LDA-196-1000CE Servo Motor Controller
  • PACIFIC LA23GCKC-1G Linear Actuator Specifications
  • PACIFIC PC3406AI-001-E Stepper Controller Manual
  • PACIFIC SCE904AN-002-01 Servo Drive Analysis
  • PACIFIC 6445-001-K-N Digital Servo Drive Details
  • PACIFIC SCIENTIFIC R43HCNA-R2-NS-VS-00 Motor Data
  • Pacific Scientific H32NCHA-LNN-NS-00 Hybrid Motor Performance
  • ABB DSAI130DK01 3BSE020828R1 Analog Input Module
  • Parker 466966-0001-3820 Industrial Component Data
  • PARKER ZETA6104 Microstepping System
  • PARKER COMPAX 2500S/F3 Servo Drive Manual Details
  • PARKER CX-DH Indexer Drive Technical Specifications
  • PARKER 6K8 Motion Controller Features and Specifications
  • PARKER EVM32-BASE I/O Module Base Technical Specification
  • ABB Pb PN-112718 Digital Input Module
  • Pb PN-45734 PN-73899 Industrial Automation Module
  • Control Techniques Pb PN-40856 Industrial Control Module
  • Pb PN-104412 4002910956 Industrial Control Module
  • Siemens Pb PN-41513 Industrial Ethernet Module
  • Pelco PA30-0065-00-A1 PTZ Decoder Module
  • Pentek FILTER 3F11 800000919 Pleated Filter Cartridge
  • Pepperl+Fuchs RSD-TI-EX8 Temperature Input Module
  • PERITEK AC7-00712-1113 Industrial Interface Module
  • PFEIFFER EVR116 Vacuum Control Module
  • Pepperl+Fuchs RSD-CI-EX8 Hazardous Area Interface Module
  • PEPPERL+FUCHS 2108HAT Intrinsic Safety Barrier Module
  • Philips 958481320201 PROC+ Processing Unit
  • Philips 958481321300 PSB Power Supply Board
  • Philips 958481321220 PD208 Power Module
  • PHILIPS 958481321200 PD216 Control Module
  • PHILIPS 958481320201 PROC PLUS Control Module
  • Philips 958481320400 PIF Interface Module
  • Philips 958481320100 LCB Control Board
  • PHILIPS 958481223220 Industrial Control Module
  • PHILIPS 958481223223 Industrial Control Module
  • PHILIPS 958481321300 Industrial Control Module
  • PHILIPS SCM040 Digital Output Synchronization Module
  • PHILIPS DSI020 Data Storage Interface Module
  • PHILIPS OPM010 Optoelectronic Control Module
  • PHILIPS VBM010 Industrial Automation Module
  • PHILIPS VBM030 Turbine Supervisory Instrumentation
  • PHILIPS PR1613 Industrial Control Module
  • PHOENIX PATG1/23 1013847 Ground Terminal Block
  • Phoenix Contact IB ST 24 AI 4/SF Analog Input
  • Phoenix Contact OPC5315-004-AB Industrial PC
  • Phoenix Contact UMK-SE11.25-1 Side Element
  • PHOENIX 2961192 Relay Module
  • PHOENIX IB ST ZF 24 AI 4/SF Analog Input Module
  • Phoenix Contact PLC-BSC-24DC/21 Relay Base
  • Phoenix Contact UK6N Feed-Through Terminal Block
  • Phoenix Contact UK4-T Disconnect Terminal Block
  • Phoenix UK3N Screw Terminal Block
  • Phoenix QUINT-PS-100-240AC/10 Power Supply
  • Phoenix QUINT PS-100-240AC/24DC/10 Power Supply
  • Phoenix UT 6-HE SI Surge Protection Terminal Block
  • Phoenix UT 4-MTD Feed-through Terminal Block
  • Phoenix UT 4-HE SI Surge Protection Terminal Block
  • Phoenix IBS 24BK-I/O-T Bus Coupler
  • Phoenix Contact HDFK4 High-Current Terminal Block
  • PHOENIX ST-SI-UK4 Fuse Terminal Block
  • PHOENIX FLMC10BASE-T/FO G850 Fiber Media Converter
  • PHOENIX CONTACT QUINT-PS-100-240AC/24DC/40 Power Supply
  • PHOENIX CONTACT QUINT-DIODE/40 Redundancy Module
  • Phoenix Contact 2884208 Wireless I/O MUX
  • Photonetics 3646 HE 1540 Tunable Laser Source
  • PI C-663.12 Mercury Multi-Axis Step Motor Controller
  • PI C-663.10 Mercury Step Motor Controller
  • Pillar CB6687-2L Industrial Communication Board
  • Pilz DE-106712 A.F.051.5/01 Safety Module
  • Pilz 680003 Safety Relay Module Set
  • Pilz 301140 PNOZ X3 Safety Relay
  • Pilz P1U-1NB Safety Relay
  • Pioneer PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3326B-6-1-2-E Power Supply
  • Pioneer Magnetics HYRSP-1500-56 Power Supply
  • Pioneer Magnetics PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3328BP-6 Power Supply
  • Potter & Brumfield SDAS-01-7Y2S1024 Relay
  • Powec PMP10.48 SIC High-Efficiency Rectifier
  • Powerbox PU200-31C Industrial DC-DC Converter
  • PIONEER MAGNETICS PM3398BP-6-1-3-E Power Supply Module
  • PIONEER MAGNETICS PM1253AL-6-3-Z03 Power Supply Module
  • Powerex PD411811 Rectifier Diode Module
  • Power-One MAP55-1024 AC-DC Power Supply
  • ProSoft MVI56-MDA4 ControlLogix Multi-Protocol
  • POLYSPED PRD2-200 Industrial Drive Module
  • P-OPEN P-OPEN-P4-150 PAC-OP150 Operator Panel
  • ABB Processor 958481321210 350211080320 Rugged CPU
  • ABB Processor 958481320201 350211080460 Safety CPU
  • ABB Processor 958481321200 350211080320 CPU Module
  • ABB Processor 958481321220 350211080320 CPU Module
  • ABB Processor 958481320100 350211080090 CPU Module
  • Pro-Face PL5901-T42-24V HMI Touch Panel
  • PROFIBUS PB3-VME-1-E V1.2.2 Interface Card
  • PROMESS 850040060P Force Displacement Monitor