(18) Construction units or production and business units shall carry out environmental protection acceptance inspection of construction projects completed in accordance with regulations, and enter into the national environmental protection acceptance information platform for construction projects completed. For a construction project that is constructed or put into production or use by stages, the corresponding environmental protection facilities shall be checked and accepted by stages.
(19) After the implementation of the production capacity construction project in the land block, the construction unit or the production and operation unit shall carry out long-term follow-up monitoring of groundwater, ecology and soil, and rectify the problems found in a timely manner. After the project is officially put into production or operation, a post-environmental impact assessment shall be carried out every 3-5 years and reported to the competent ecological environment department for the record according to law. Existing rolling development blocks that are required to carry out EIA may not carry out a separate post-environmental impact assessment, unless otherwise provided for by laws and regulations. Specific requirements for post-environmental impact assessment of offshore oil and gas development projects shall be specified separately.
(20) The construction unit or production and operation unit shall, in accordance with the relevant requirements, take effective measures to protect the ecological environment. At the same time, in accordance with the requirements of the "Soil Pollution Prevention and Control Law of the People's Republic of China" and "Soil Pollution Risk Control Standard for Soil Environmental Quality Construction Land (Trial)" (GB 36600), measures such as plugging, soil and groundwater restoration and ecological restoration shall be implemented for all kinds of Wells, pipelines and other engineering facilities that are permanently discontinued, dismantled or abandoned. After the termination of offshore oil and gas exploration and development activities, if the relevant facilities need to be abandoned at sea, the parts that may cause pollution damage to the Marine environment or affect the development and utilization of Marine resources shall be dismantled, and the provisions on the management of Marine dumping waste shall be referred to. At the time of demolition, an environmental protection plan for demolition shall be drawn up and necessary measures shall be taken to prevent pollution and damage to the Marine environment.
(21) Oil and gas enterprises shall take the initiative to disclose environmental information of oil and gas exploitation projects in accordance with relevant requirements such as the environmental information disclosure measures of enterprises and public institutions and the public participation measures for environmental impact assessment, so as to ensure the public's right to know, participate, express and supervise. The competent departments of ecological environment at all levels shall, as required, do a good job in the information disclosure of EIA approval, supervision and law enforcement and other related work.
email:1583694102@qq.com
wang@kongjiangauto.com