Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Implementation opinions on accelerating the construction of green mines

F: | Au:佚名 | DA:2023-12-21 | 887 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:



To promote the whole area green mine construction

The "Implementation Opinions" put forward three specific goals and tasks. First, transform the image: basically form a new pattern of green mine construction. All newly built mines meet the requirements of green mine construction; Speed up the transformation and upgrading of production mines, and gradually meet the standards; We will build more than 50 demonstration zones for green mining development. The second is to change the mode: explore new ways to change the mode of mining development. We will continue to balance the transformation of the growth model with steady growth, and create new models of industrial development and new ways of economic growth that conserve and recycle resources. Third, promote reform: establish a new mechanism for green mining development. Adhere to the mutual promotion of green transformation and management reform, research and establish a national provincial and county level joint venture, business owners, third-party evaluation, social supervision of green mine construction work system.

The person in charge said that through the formulation of local green mine construction standards, the formation of national industrial green mine standards, and the gradual introduction of national mandatory standards, the three steps to improve the development of green mine leading standards.

Green mine construction is the "point", the implementation subject is the mining enterprise, the green mining development demonstration area is the "face", the implementation subject is the local government. Select cities or counties with remarkable achievements in green mine construction, take green mining development demonstration zones as platforms for mineral resource management system reform and innovation, give full play to the government's guiding role, promote technological innovation, management innovation and institutional innovation, and focus on continuous and overall promotion of green mine construction in the whole region.

Innovate mechanisms to clarify the boundaries of government, market and society

According to the person in charge, green mine construction is a systematic project involving multiple stakeholders. Under the new situation and new requirements, the green mine construction work should further clarify the boundaries of government, market and society, and focus on building a new mechanism for green mine construction that is guided by government, dominated by enterprises, leading by standards, providing policy support, innovating mechanisms, strengthening supervision, implementing responsibilities and stimulating vitality.

-- Implementing the government's responsibility to guide, promote and supervise services. A four-level linkage, the center of gravity sinking, the implementation of responsibility. The six central departments mainly provide guidance and policy basis; Provincial land and resources and other relevant departments should effectively shoulder the work responsibilities, formulate work plans, strengthen organizational leadership, and comprehensively promote the construction of green mines; The city and county departments are responsible for the specific organization and implementation, and strengthen supervision and management. Second, it is necessary to formulate standards, clarify policies, formulate work plans for promoting the region, and refine and form operational policies and measures. Third, we must strengthen supervision, optimize services, and establish a regulatory mechanism for social supervision, government spot checks, reward for trustworthiness, and punishment for dishonesty.

-- Implementing the main responsibility of mining enterprises. First, we must take the initiative to carry out construction. All mining enterprises should adapt to local conditions, boldly explore and vigorously promote the innovation of technological system, industrial model and operation mode, and walk out a new path of mining development that is technically feasible, economically reasonable, quality and efficient. Two to be honest and trustworthy, strict self-discipline. We must adopt the concept of green development and increase internal driving force. For those who meet the green mine standards, a "red list" will be established, incorporated into the enterprise credit information system, and enjoy the corresponding incentive policies. Third, accept supervision and respond proactively. A grievance-response mechanism for major environmental, health, safety and social risk incidents should be established to respond promptly to the demands of the public, communities and other stakeholders.

-- Giving full play to the promoting role of trade associations. First, the China Mining Federation and various industry associations are invited to continue to play a good role as a bridge between the government and enterprises, do a good job in the publicity and promotion of the Implementation Opinions, unite the majority of mining enterprises, and expand the green consensus. The second is to give play to the role of intellectual support and experts, participate in the research and development of group standards and industry standards, and do a good job in the promotion of green technology, technology and equipment. The third is to do a good job in the selection of excellent green mines and strengthen the summary and exchange of advanced experience.

-- Innovating the selection mechanism. Green mine construction is not a new approval item, nor shall it adopt the traditional way of evaluation and identification. The new mechanism of mine self-evaluation, third-party evaluation, list management, standard storage and automatic enjoyment of relevant policies should be adopted to promote the work.

At the same time, it is necessary to formulate assessment methods for green mine construction according to local conditions, strengthen assessment of the implementation of main objectives, indicators, key tasks, major policies, etc., and incorporate the assessment results into the performance evaluation system to ensure that all tasks are implemented in practice.

In coordination with departments, we will clarify incentive policies from the four aspects of land use, mining, finance and finance

The person in charge pointed out that the six departments jointly issued the "Implementation Opinions", and came up with "real gold and silver" incentive policies and measures from the four aspects of land use, mining, finance and finance.

-- Implementing policies to support mineral resources. From the regulation of total mining quotas, mining rights investment and transfer, priority will be given to supporting the construction of green mines and green mining development demonstration zones in accordance with the law.

-- Ensuring land for green mine construction. First, plan and guarantee. In the adjustment and improvement of the overall plan for land use, the project land required for green mine construction should be included in the planning and overall arrangement, and the annual plan for land use should give priority to ensuring the reasonable demand for new construction land for the construction, renovation and expansion of green mines. The second is to reduce land costs. For mining land, after going through the procedures for construction land according to law, it can be transferred, leased or leased first and then granted by agreement; According to the production cycle and mining life of the mine, within the maximum legal period of transfer, the land-use right transfer period can be flexibly selected and flexible transfer can be implemented. The third is to support green mining enterprises in timely reclamation and revitalization of existing industrial and mining land, and be linked to new construction land. The construction of green mining development demonstration zones will be coordinated with the reclamation and utilization of abandoned industrial and mining land, the restoration and restoration of mining geological environment, the control of soil pollution in mining areas, and the improvement of land, and relevant pilot and support policies will be applied. Under the premise of meeting the planning and ecological requirements, the cultivated land increased by the reclamation of abandoned industrial and mining land left over from history is allowed to be used for the balance of cultivated land occupation and compensation. The fourth is to mine according to law caused land damage and irreparable, according to the relevant provisions, after field investigation and special report review, into the annual change survey, involving arable land, according to the actual reduction of arable land, but not break through the local control number, involving basic farmland to make up.

-- Increasing fiscal and tax policy support. When the Ministry of Finance and the Ministry of Land and Resources arrange funds for geological and mineral investigation and evaluation, they will give appropriate preference to eligible projects in the green mining development demonstration zone. While making good use of the central funds, local governments can make overall arrangements for geology and mineral resources, mine ecological environment management, heavy metal pollution prevention and control, land reclamation and other funds, and give priority to supporting qualified projects in the green mining development demonstration zone. Actively coordinate local financial funds, establish a reward system, and reward outstanding green mining enterprises.

-- Innovating green financial support policies. First, banking financial institutions are encouraged to develop credit products with green mining characteristics, and increase financial support for environmental restoration and management, heavy metal pollution prevention and control, and resource recycling. The second is to encourage financial institutions to actively do a good job of financial services and financing support for green mining enterprises. The third is to encourage provincial governments to establish a green mine project database and strengthen support for green credit. The green mine information will be incorporated into the enterprise credit information system as an important reference for banks to handle credit business and other financial institutions. Fourth, support government guarantee institutions to explore the establishment of a structured green mining guarantee fund. Encourage social capital to set up various green mining industry funds. The fifth is to promote qualified green mining enterprises in the domestic small and medium-sized board, GEM and main board listing, as well as to the "new third board" and regional equity market listing financing.


  • Rexroth CFL01.1-R3 Sercos III Interface Module
  • Rexroth CKK-110-NN-1 Linear Axis with MSK040C
  • Bosch Rexroth 047018-104401 Controller Card
  • Rexroth MDSD1K-2X/4 Solenoid Driver Module
  • Rexroth DKC02.3-012-3-MGP-01VRS Servo Drive
  • Rexroth HCS01.1E-W0006 Compact Servo Drive
  • Rexroth NAM1.2-08 Line Former R911246505
  • Rexroth VPB40 Industrial PC Control Cabinet
  • Rexroth FWA-ECODR3-SGP-03-MS Firmware Module
  • Rexroth HEDE10-31 Pressure Switch R901425475
  • Rexroth HM 17-11/315-C/V0/0 Pressure Sensor
  • Rexroth VFC 3610-2K20-3P4-MNA-7P Inverter 2.2kW
  • Rexroth MSK040C-0600-NN-M1-UG1-NNNN Right Angle Geared Motor
  • Rexroth DKC02.3-012-3-MGP-01VRS EcoDrive Cs
  • Bosch Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth HCS02.1E-W0012-A-03-NNNN Power Section
  • Rexroth DBDS 20 P18/400V Pressure Relief Valve
  • Rexroth 3460565500 Pneumatic EP Converter Regulator
  • Rexroth VT-SWA-1-12/DFEE Angle Sensor R900913641
  • Rexroth 0-608-830-250 Interface Module SM24V
  • Rexroth MHD071B-035-NP0-UN8 Servo Motor 12Nm 1000rpm
  • Rexroth MKD025B-144-KG0-KN R911263737 Servo Motor
  • Rexroth KCU02.2N-ET-ET*-025-NN-N-NN-NW Control Unit
  • Rexroth MV-VPB40*3-RB001VPB R911337529 Valve Terminal
  • Bosch Rexroth AS 2/R-2200 Drive Module 3842998041
  • Rexroth HMS01.1N-W0036 Power Section
  • Rexroth CKK-145-NN1 Compact Linear Module
  • Rexroth MS2N04-C0BTN-BSDK0-NNNNN-NN Geared Servo Motor
  • Rexroth HCS02.1E-W0028-A-03-NNNN Power Section
  • Rexroth MS2N04-D0BQN-CMSG0-NNNNN-NN Servo Motor
  • Rexroth MSM031C-0300-NN-M0-CH0 Servo Motor
  • Rexroth MKD041B-144-KP1-KN Servo Motor R911262307
  • Rexroth ESA075G Handheld Nutrunner 0608841033
  • Rexroth MSK070D-0450-NN-M1-UP1-NSNN Motor
  • Rexroth CKK-145-NNG1 Linear Kit with HCS02 Drive
  • Rexroth MSK060C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth MKD090B-047-KP1-KS Servo Motor
  • Rexroth MLS140S-3A-0450-NNN Linear Motor
  • Rexroth VPB40.3 Industrial PC R911338689 CB1
  • Rexroth HCS02.1E-W0012 Servo Drive R911313871
  • Rexroth R151349014 R151145672 Ball Screw Assembly
  • Bosch Rexroth CKK-110-NN-1 Compact Module
  • Rexroth MSK060B-0300-NN-M1-UG1-NNNN Servo Motor
  • Rexroth Indramat TBM 1.2-40-W1-024 Servo Bleeder
  • Rexroth MSK040B-0600-NN-M1-UG1-NNNN Servo Motor
  • Rexroth MLS200S-3A-0450-NNN R911299213 Linear Motor
  • Rexroth SB356 Tool Tightening Controller Rack
  • Rexroth MSK050C-0300-NN-M1-UG0-NNNN Servo Motor
  • Rexroth Indramat DKC11.3-040-7-FW Eco Drive
  • Rexroth VT2000 Proportional Amplifier
  • Rexroth VT1118-10 Analog Module
  • Rexroth MSK060C-0600-NN-M1-UP1-NSNN Motor
  • Rexroth MSK060C-0300-NN-S1-UG0-NNNN Motor
  • Rexroth R911173937 IndraControl XM AI1
  • Rexroth R412018225 AES-D-BC-ECAT Module
  • Rexroth CDB02.1B R911338542 Controller Card
  • Rexroth VT-HNC100-2-30/P-I-00/000 Module
  • Bosch Rexroth CSB02.1B R911372549 Control
  • Bosch Rexroth R185321310 Runner Block
  • Rexroth VPB40.3 Industrial PC R911338689
  • Rexroth HNK01.1A-A075-E0106-A-500 Drive Controller
  • Rexroth CSH02.1B-CC-EC-ET-S4-NN-NN-FW Controller
  • Rexroth CSB01.1C-PB-ENS-NNN Control Unit
  • Rexroth MKD041B-144-KP0-KN Permanent Magnet Motor
  • Rexroth SE-B2.020.030-14.000 Servo Motor
  • Rexroth MSK060C-0600-NN-M1-UG0-NNNN Servo Motor
  • Rexroth HCS01.1E-W0018-A-03-B Drive Controller
  • Rexroth 3 842 547 996 IE3 Geared Motor
  • Rexroth CSH01.1C-NN-ENS R911309709 Control Section
  • Rexroth R151349013 Ball Screw Nut
  • Mannesmann Rexroth VT3006-36 Analog Amplifier Card
  • Bosch Rexroth R900086160 PGF1 Gear Pump
  • Bosch Rexroth R911173263 VDP15.3 Touch Display
  • Bosch Rexroth PPC-R22.1 RJ522 Industrial Controller
  • Bosch Rexroth MSK060C-0300-NN-S1-UG0-NNNN Servo Motor
  • Bosch Rexroth R911325068 NYS04.1 Controller
  • Bosch Rexroth R911335439 CSH01.1C Control Unit
  • Bosch Rexroth R917010287 BODAS RC10 Controller
  • Bosch Rexroth R911329791 CSH01.1C Drive Controller
  • Bosch Rexroth R182432310 Runner Block Guide
  • Bosch Rexroth VT-VSPA2-1-11 Amplifier Card R900021909
  • Bosch Rexroth MKD090B-047-KG1-KN Servo Motor
  • Bosch Rexroth LTU350 Servo Amplifier 0608750108
  • Bosch Rexroth 5610102050 Pneumatic Vacuum Regulator
  • Bosch Rexroth VT5041-23/3-OV PLC Control Board
  • Bosch Rexroth VT3015 S10/E Servo Amplifier Board
  • Bosch Rexroth MSK070D-0300-NN-M2-UG1 Servo Motor
  • Bosch Rexroth 3DREP6C-21 Valve R900955887
  • Bosch Rexroth R151244013 Ball Screw Bearing Unit
  • Bosch Rexroth MSM031C-0300 Servomotor R911325140
  • Bosch Rexroth EMD-B16.1-DC024N Box R911291681
  • Bosch Rexroth MKD071B-061-GP0-KN Servo Motor
  • Bosch Rexroth MSK030C-0900-NN-M1-UG1 Servo Motor
  • Bosch Rexroth EcoDrive DKC01.3-004-3-MGP-01 Servo Controller (299772)
  • Bosch Rexroth DKC02.3-040-7 EcoDrive Controller
  • Bosch Rexroth CLC-D02.3 CLC Motion Control Board
  • Bosch Rexroth HDS05.2-W300N Drive R911190019
  • Bosch Rexroth DKCXX.3-100-7 Servo Drive Unit
  • Bosch Rexroth CSE02.1A-S3-EC Control Unit R911339030
  • Bosch Rexroth MSK040C-0600-NN-S1-UP0 Servo Motor
  • Bosch Rexroth VT3013 S36 R5 Circuit Board Card
  • Bosch Rexroth VT3000-36A Amplifier Card R90020298
  • Bosch Rexroth VPB40.3 IndraControl Module R911374113
  • Bosch Rexroth HCS02.1E-W0054-A-03-NNNN Converter with R911332574 Control Unit
  • Bosch Rexroth MHD071B-061-PG1-UN Servo Motor
  • Bosch Rexroth A2F5/60W-B3-S Piston Motor R909418904
  • Bosch Rexroth HCS01.1E-W0018-A-03-B-ET-EC-NN-NN-NN-FW IndraDrive Cs Converter
  • Bosch Rexroth 4WRPEH 6 C4B40P-2X/G24K0/A1M Proportional Directional Valve (0 811 404 647)
  • Bosch Rexroth R911405975 ctrlX OS PLC Controller
  • Bosch Rexroth CSB02.1B-ET-EC-NN-S4-NN-NN-FW Servo Control Card R911338543
  • Rexroth MSK050B-0300-NN-M1-UG0-NNN Servo Motor
  • Rexroth IndraControl VEPXX.5-ATOM Set R911374889 Panel
  • Rexroth 1070089906-GC1 1070089907-201 Board
  • Rexroth CSB01.1C-SE-ENS-EN2-NN-S-NN-FW Control Unit
  • Rexroth MKD071B-024-KG3-KN Servo Motor
  • Rexroth Indramat DKC02.3-040-7-FW Controller
  • Rexroth HCS02.1E-W0028-A-03-NNNN Servo Module
  • Rexroth HMD01.1N-W0036-A-07-NNNN Drive Module
  • Rexroth MSK050C-0600-NN-M1-UG0-NNN Servo Motor
  • Rexroth DKC02.3-040-7-FW Servo Controller
  • Bosch Rexroth VT-5014S30-R1 Amplifier Card
  • Bosch Rexroth MSK040C-0600-NN-M1-UG1 Servo Motor
  • Bosch Rexroth MKD071B-061-GG0-KN Servo Motor
  • Bosch Rexroth VT5012-S45-R1 Amplifier Card
  • Bosch Rexroth SHL03.1-NNN-S-NNN Encoder Module
  • Bosch Rexroth EFC3600-0K75 Frequency Converter
  • Bosch Rexroth VFC3610-1K50-3P4-MNA-7P-NNNNN-NNNN 1.5kW Frequency Inverter
  • Bosch Rexroth EFC5610-2K20-3P4-MDA-7P-NNNNN-L1NN 2.2kW Frequency Converter