Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

How to restore the geological environment of mine?

F: | Au:佚名 | DA:2023-12-21 | 669 Br: | 🔊 点击朗读正文 ❚❚ | Share:

The content of the comprehensive treatment plan is that the solid waste such as slag, coal gangue and surrounding rock should be formulated for storage, treatment and reuse. The main point of the comprehensive treatment plan of open-pit mining is that the best storage plan of solid waste such as slag and surrounding rock should be formulated before mining, and attention should be paid to the rational utilization of available beneficial components.

At present, the more popular and social attention is relatively high "development governance", mainly involving safety, ecology and resource utilization of three standards, mine environmental governance must not only meet the safety standards and ecological standards, but also take into account the reuse of resources, that is, after management to use it to develop leisure parks, orchards, woodland or construction land, in order to give full play to its resource efficiency. The main obstacle to the current development of "development governance" is the lack of implementation rules, the former Ministry of Land and Resources and other departments of the opinion No. 63 is only a guiding document, but in the actual application of the need for clearer, more detailed norms.

At present, the most sensitive issue is the comprehensive utilization of resources in the "development governance". The comprehensive utilization of resources is defined as: the comprehensive development and rational utilization of symbiotic and associated ore in the process of mineral resources exploitation; Recycling and rational utilization of waste residue, waste water (liquid), waste gas, heat and pressure generated in the production process; Recovery and recycling of all kinds of waste generated in the process of social production and consumption; For the solid waste generated in the process of mineral resources development, the principle of treatment is to make the best use of what can be used and dispose of what can not be used reasonably.

Strictly speaking, although the current concept of comprehensive utilization of resources reflects some characteristics of comprehensive utilization of resources, with the continuous progress of society, from today's perspective, there are still some limitations in the content of this definition, which needs to be re-recognized and expressed under new historical conditions. Resource utilization is not only limited to industrial production process, but also needs to consider the comprehensive utilization of resources under all the conditions of resource utilization. In the process of mineral resources development, it is not only limited to the comprehensive development and rational utilization of symbiotic and associated ore, but also includes the comprehensive utilization of tailings resources.

Adhering to the comprehensive utilization of resources is in line with the thought of the 18th and 19th National Congresses of the Communist Party of China that "we must establish the concept of respecting, adapting to and protecting nature as an ecological civilization". Comprehensive utilization of resources is an objective description of the way of resource utilization, which reflects the respect for the objective reality of resource utilization. This statement shows that people use resources in a variety of ways, not rigid, dogmatic, static. The concept of comprehensive utilization of resources is put forward from the Angle of resource efficiency and economic benefit, which is consistent with the law of market and economic law, and considers the maximization of resource utilization efficiency.

On January 17, 2019, the National Natural Resources Work Conference pointed out when clarifying the key work in 2019, "Ensuring energy and resources security." We will take multiple measures to intensify oil and gas exploration and development, improve the protection and comprehensive utilization of mineral resources, and strengthen geological survey and mineral exploration."

The Fifth Plenary Session of the 18th CPC Central Committee put forward five development concepts, namely innovation, coordination, green development, opening up and sharing. The report to the 19th National Congress of the Communist Party of China further stressed that "we must unswervingly implement the concept of innovative, coordinated, green, open and shared development." Comprehensive utilization of resources is closely related to these five development concepts. First, on innovation. Comprehensive utilization of resources is always based on technological innovation, it can be said that without technological innovation, there will be no development of comprehensive utilization of resources, or even no basis for existence. Secondly, on coordination. The meaning of "comprehensive" in the comprehensive utilization of resources is closely related to coordination. Synthesis means to systematically consider all kinds of resource utilization methods, while coordination means to rationally allocate all kinds of resource utilization methods. Both comprehensive utilization and coordinated utilization of resources are to consider the utilization of resources from a global perspective. Third, about green. The concept of green development requires the protection of the ecological environment system and the harmonious coexistence between the guarantor and nature, which is an inevitable requirement for the construction of ecological civilization. While emphasizing economic benefits, comprehensive utilization of resources must consider environmental benefits, otherwise it is impossible to maximize the efficiency of resource utilization. Fourth, on openness. Comprehensive utilization of resources truly, objectively and accurately reflects the law of resource utilization, and is consistent with the thinking and actions of rational and efficient utilization of resources in the world. Fifth, about sharing. The concept of resource comprehensive utilization and sharing is closely related: through the comprehensive utilization of resources to realize resource sharing; Use the means of comprehensive utilization of resources to realize the sharing of economic benefits, environmental benefits and social benefits of resource utilization.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series