Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

How to restore the geological environment of mine?

来源: | 作者:佚名 | 发布时间 :2023-12-21 | 321 次浏览: | Share:



In recent years, with the deepening of ecological civilization construction, the ecological restoration of mine geological environment has become a hot spot of the whole society. In particular, in order to speed up the solution of problems left over from the history of mining geological environment, the relevant ministries and commissions of the State proposed to "encourage the participation of social funds, and vigorously explore the construction of a new model of" government-led, policy support, social participation, development-oriented governance, and market-oriented operation "of mining geological environment restoration and comprehensive management. The new model of mine geological environment management with "development management" as the core has been emerging, which has promoted the solution of the problems left over from the history of mine geological environment to a large extent, but it has also exposed some problems, especially the legal risks.

So, how can the ecological restoration of the geological environment of mines, especially the road of "development management", be safer and more secure and achieve twice the effect with half the effort? And how to avoid the risk from the legal level? China Mining News reporter recently interviewed Shen Sheng, a partner of Beijing Yuren Law Firm specializing in legal research in the field of natural resources and director of the Mining Law Research Center, in order to crack the misunderstandings and risks of "development governance" from the legal level.

Mr. Shen is a researcher of the Land and Resources Law Research Center of China University of Political Science and Law, a tutor of graduate law students (including undergraduates) of China University of Geosciences, a director of the Mineral Resources Law Branch of China Society of Geological and Mineral Economics, and a reviewer of Land and Resources Information. He is especially good at dealing with difficult legal issues of mining, and has issued legal opinions for a number of mining administration projects of the former Ministry of Land and Resources. And participated in the completion of the Supreme People's Court, the former Ministry of Land and Resources, the National Energy Administration of a number of legislative proposals and research projects, the author of "Mining Legal Counsel", "Mining contract Management", "Mining rights Transfer Legal Practice", "Mining Typical case Analysis" and other books.

China Mining News: No rules can not be accomplished. In recent years, what policies and regulations have the state mainly introduced for the restoration of the geological environment of mines?

Shen Sheng: In recent years, with the promotion of ecological civilization construction, the state and relevant ministries have successively issued a series of policies and regulations on the restoration of mining geological environment.

First, The State Council issued the Notice of The State Council on Comprehensively Rectifying and standardizing the Order of Mineral Resources Development (Guofa [2005] No. 28), pointing out that it is necessary to explore the establishment of a compensation system for the restoration of the ecological environment in mines and clarify the responsibility for governance.

Second, the former State Environmental Protection Administration issued the "Mining ecological environmental Protection and pollution prevention and control technology Policy" (Huanfa (2005) No. 109).

Third, the Ministry of Finance, the former Ministry of Land and Resources, and the former State Environmental Protection Administration jointly issued the Guiding Opinions on Gradually Establishing the Responsibility Mechanism for environmental Management and Ecological Restoration in Mines (Caijian [2006] No. 215), requiring the formulation of ecological environmental protection and comprehensive management plans for mines, and proposing specific measures to achieve the goals of environmental management and ecological restoration in mines.

Fourth, the former Ministry of Land and Resources issued the Regulations on the Protection of the Geological Environment in Mines (Ministry of Land and Resources 2009 No. 44), pointing out that it is necessary to prepare the protection and restoration of the geological environment in mines, and carry out the prevention and restoration work of ground collapse, ground cracks, collapses, landslides, aquifer damage, and topographic and geomorphic landscape damage in mining areas.

Fifth, the former Ministry of Environmental Protection issued the "Twelfth Five-Year Plan for National Environmental Protection" (Guofa [2011] No. 42), pointing out that it is necessary to strengthen the ecological supervision of mineral, hydropower, tourism resources development and transportation infrastructure construction, and implement the responsibility of relevant enterprises in ecological protection and restoration.

Sixth, The General Office of the State Council issued "Opinions on Improving the Compensation Mechanism for Ecological Protection" (State Council [2016] 31, May 13, 2016)

Seventh, the former Ministry of Land and Resources and other five ministries and commissions jointly issued the "Guidance on Strengthening the Restoration and comprehensive management of the Geological Environment of Mines" (Land Resources Development (2016) No. 63, July 1, 2016), requiring the acceleration of the settlement of historical problems left over from the geological environment of mines, encouraging the participation of social funds, Vigorously explore the construction of "government-led, policy support, social participation, development-type governance, market-oriented operation" mining geological environment restoration and comprehensive management of a new model.

Eight, the National Development and Reform Commission and nine other departments jointly issued the "Action Plan to Establish a market-oriented and diversified ecological protection compensation Mechanism" (Development and Reform of the West [2018] No. 1960, December 28, 2018), pointing out that the boundary and total amount of resource development should be reasonably defined to ensure that the ecosystem function is not affected.

China Mining News: As a systematic project, mining geological environment ecological restoration has large investment and slow return, so the national level proposes to implement market-oriented operation. So, what are the specific policies of the state in terms of marketization?

Shen Sheng: First, the report of the 19th National Congress of the Communist Party of China proposed to "strengthen the protection of the ecosystem and establish a market-oriented and diversified ecological compensation mechanism."

Second, The General Office of the State Council issued the Notice on the Recent Work Arrangements for Soil Environmental Protection and comprehensive Management (2013), proposing the principle of "who invests, who benefits" to guide and encourage social funds to invest in soil environmental protection and comprehensive management.

Third, the Decision of the Central Committee of the Communist Party of China on Several Major Issues concerning Comprehensively Deepening Reform (2013) proposed the establishment of a market-oriented mechanism for ecological and environmental protection and the implementation of third-party environmental pollution control.

Fourth, The General Office of the State Council issued the Opinions on the Implementation of Third-party Governance of Environmental Pollution (2014), which clarified the market-oriented, professional and industrial-oriented third-party governance mechanism.

Fifth, the Ministry of Finance issued the "Administrative Measures for Government Purchase of Services (Interim)" (2015), including "environmental governance" services in the guidance directory of government procurement.

Sixth, the Opinions on Accelerating the Construction of Ecological Civilization (2015), the Action Plan for Water Pollution Prevention and Control (2015), the Action Plan for Soil Pollution Prevention and Control (2016), and the Plan for Wetland Protection and Restoration System (2016) issued by The State Council, The Implementation Opinions of the Ministry of Environmental Protection on Promoting the Third-party Governance of Environmental Pollution (2017) issued by the former Ministry of Environmental Protection clearly proposed to promote the market-oriented mechanism of third-party governance of environmental pollution and promote the development of governance and restoration industries. For wetland restoration with clear responsibility subjects, it can be carried out by itself, or it can be commissioned to repair third-party institutions with restoration capabilities.

The market-oriented positioning of ecological restoration in national policy documents, on the one hand, reflects the grim reality of ecological environmental damage, and on the other hand shows the determination of the state to promote the restoration of the damaged ecological environment. As a new type of environmental governance, the marketization of ecological restoration has been clearly defined in national laws and policies, and the operation mode of "government-enterprise cooperation" and "enterprise-enterprise cooperation" has been shown in practice.

China Mining News: How to realize the comprehensive utilization of resources in the restoration of geological environment and ecology in mines?

Shen Sheng: The main tasks of mine geological environment protection and management include: ecological environment protection for mine development and construction, "three wastes" treatment for mine development and utilization, mine land reclamation, mine environmental pollution and ecological damage control, and mine secondary geological disaster monitoring and prevention.

The principles of mining geological environment restoration and land reclamation are to adhere to the principles of "prevention first, prevention and control combined", "development in protection, protection in development", "scientific planning, local conditions, comprehensive management, economic feasibility and reasonable utilization".

The content of the comprehensive treatment plan is that the solid waste such as slag, coal gangue and surrounding rock should be formulated for storage, treatment and reuse. The main point of the comprehensive treatment plan of open-pit mining is that the best storage plan of solid waste such as slag and surrounding rock should be formulated before mining, and attention should be paid to the rational utilization of available beneficial components.

At present, the more popular and social attention is relatively high "development governance", mainly involving safety, ecology and resource utilization of three standards, mine environmental governance must not only meet the safety standards and ecological standards, but also take into account the reuse of resources, that is, after management to use it to develop leisure parks, orchards, woodland or construction land, in order to give full play to its resource efficiency. The main obstacle to the current development of "development governance" is the lack of implementation rules, the former Ministry of Land and Resources and other departments of the opinion No. 63 is only a guiding document, but in the actual application of the need for clearer, more detailed norms.

At present, the most sensitive issue is the comprehensive utilization of resources in the "development governance". The comprehensive utilization of resources is defined as: the comprehensive development and rational utilization of symbiotic and associated ore in the process of mineral resources exploitation; Recycling and rational utilization of waste residue, waste water (liquid), waste gas, heat and pressure generated in the production process; Recovery and recycling of all kinds of waste generated in the process of social production and consumption; For the solid waste generated in the process of mineral resources development, the principle of treatment is to make the best use of what can be used and dispose of what can not be used reasonably.

Strictly speaking, although the current concept of comprehensive utilization of resources reflects some characteristics of comprehensive utilization of resources, with the continuous progress of society, from today's perspective, there are still some limitations in the content of this definition, which needs to be re-recognized and expressed under new historical conditions. Resource utilization is not only limited to industrial production process, but also needs to consider the comprehensive utilization of resources under all the conditions of resource utilization. In the process of mineral resources development, it is not only limited to the comprehensive development and rational utilization of symbiotic and associated ore, but also includes the comprehensive utilization of tailings resources.

Adhering to the comprehensive utilization of resources is in line with the thought of the 18th and 19th National Congresses of the Communist Party of China that "we must establish the concept of respecting, adapting to and protecting nature as an ecological civilization". Comprehensive utilization of resources is an objective description of the way of resource utilization, which reflects the respect for the objective reality of resource utilization. This statement shows that people use resources in a variety of ways, not rigid, dogmatic, static. The concept of comprehensive utilization of resources is put forward from the Angle of resource efficiency and economic benefit, which is consistent with the law of market and economic law, and considers the maximization of resource utilization efficiency.

On January 17, 2019, the National Natural Resources Work Conference pointed out when clarifying the key work in 2019, "Ensuring energy and resources security." We will take multiple measures to intensify oil and gas exploration and development, improve the protection and comprehensive utilization of mineral resources, and strengthen geological survey and mineral exploration."

The Fifth Plenary Session of the 18th CPC Central Committee put forward five development concepts, namely innovation, coordination, green development, opening up and sharing. The report to the 19th National Congress of the Communist Party of China further stressed that "we must unswervingly implement the concept of innovative, coordinated, green, open and shared development." Comprehensive utilization of resources is closely related to these five development concepts. First, on innovation. Comprehensive utilization of resources is always based on technological innovation, it can be said that without technological innovation, there will be no development of comprehensive utilization of resources, or even no basis for existence. Secondly, on coordination. The meaning of "comprehensive" in the comprehensive utilization of resources is closely related to coordination. Synthesis means to systematically consider all kinds of resource utilization methods, while coordination means to rationally allocate all kinds of resource utilization methods. Both comprehensive utilization and coordinated utilization of resources are to consider the utilization of resources from a global perspective. Third, about green. The concept of green development requires the protection of the ecological environment system and the harmonious coexistence between the guarantor and nature, which is an inevitable requirement for the construction of ecological civilization. While emphasizing economic benefits, comprehensive utilization of resources must consider environmental benefits, otherwise it is impossible to maximize the efficiency of resource utilization. Fourth, on openness. Comprehensive utilization of resources truly, objectively and accurately reflects the law of resource utilization, and is consistent with the thinking and actions of rational and efficient utilization of resources in the world. Fifth, about sharing. The concept of resource comprehensive utilization and sharing is closely related: through the comprehensive utilization of resources to realize resource sharing; Use the means of comprehensive utilization of resources to realize the sharing of economic benefits, environmental benefits and social benefits of resource utilization.

China Mining News: In the "development management" of geological environment ecological restoration of mines, how to deal with residual ore?

Shen Sheng: The former Ministry of Land and Resources and other five ministries and commissions (2016) No. 63 pointed out that it is necessary to adhere to the concept of innovative development and break the institutional barriers of investment, policy, scientific research and other mechanisms for the restoration and comprehensive management of mining geological environment. We will innovate policies for the redevelopment of residual tailings mines, the reclamation and utilization of abandoned mining land, and the transfer and utilization of collective land, guide the investment of social funds, resources, and asset elements, actively explore the use of PPP models and third-party governance methods, fully mobilize the enthusiasm of all parties, and accelerate governance. We will strengthen the comprehensive utilization of resources. Promote the comprehensive utilization of tailings and waste rock, with the focus on extracting valuable components from tailings and waste rock, producing high value-added building materials, filling, and harmless agricultural and ecological applications, accelerate the promotion and application of advanced and applicable technologies and equipment, organize the implementation of comprehensive utilization demonstration projects of tailings and waste rock, constantly increase the proportion of comprehensive utilization of tailings and waste rock, and expand the scale of comprehensive utilization industry. Reduce the impact on the ecological environment. At the same time, we will encourage the participation of social funds. In accordance with the principle of "who governs, who benefits", give full play to the guiding role of financial funds, and vigorously explore the construction of a new model of mining geological environment restoration and comprehensive management of "government-led, policy support, social participation, development-type governance, and market-oriented operation".

In strengthening policy support, it is pointed out that the mineral resources development policy should be improved. Under the premise of meeting the planning and ensuring safety, the stock resources shall be developed according to law to provide financial guarantee for regional comprehensive governance. Accelerate the construction of green mining development demonstration zones and green mines, and promote the coordinated development of mineral resources development and ecological environmental protection.

Before the mine geological environment treatment, the mine situation is mainly divided into three kinds: first, the mine is closed normally, and the ore body has been mined; Second, the mine is closed abnormally, and there are still residual ore bodies, especially those forced to close due to safety factors or environmental protection requirements; Third, there are some residual ore bodies in abandoned mines. If the scope of mine geological environment restoration is within the scope of design control, it is not illegal mining. If the scope of mine geological environment restoration is outside the scope of design control, and ore is extracted, it is illegal mining.

For the exploitation of residual ore in the "development management", from the legal sense, there is no need to apply for mining certificate, but to prevent the development of new mines. The main basis includes:

First, mine ecological restoration is not mineral development, closing the mine is a trade-off made after the balance between environmental protection and development, and for ecological restoration to require mining certificates is contrary to the original intention of closing the mine due to environmental protection.

Second, the treatment of residual ore within the scope of treatment belongs to the comprehensive utilization of resources under the concept of development of the new period in the restoration process, and should not require mining certificates. The Opinions of the Ministry of Land and Resources on Promoting the Comprehensive Conservation and Efficient use of Mineral Resources (Land Resources Development (2016) No. 187) clearly states that the priority is to adhere to protection. In the development of mineral resources and the protection of the ecological environment, we firmly adhere to the concept of "protection is conservation", give priority to protection, adhere to the development in protection and protection in development, and support sustainable economic and social development with the least consumption of mineral resources. Adhere to efficient use. In the exploration and development of mineral resources, firmly adhere to the concept of "efficient use is conservation", carry out comprehensive exploration, comprehensive evaluation, comprehensive exploitation and comprehensive utilization of associated mineral resources, promote high-quality and optimal use, cascade utilization and recycling, and promote the resource utilization of waste rock and other wastes, so as to improve the comprehensive benefits of resources, economy and ecology.


  • Raymond RE648 - 703 bowl mill feed scroll "NEW" by Alstom Power
  • ALSTOM Power 5415 - NEW combination for GV7 fan, item no: 5415, with gray accessories, new
  • Alstom Power 1BMBR0000090 - Lot of 3 UNC 50 Gram Balance Weights 5/16"
  • GEC Alstom KCC8302 - Thyristor Rectifier Stack Power Module 20X-1310CRL 30Z-2116
  • Alstom Micom P139 - Feeder Management Rack Control Equipment Onebox NFP
  • Alstom Alspa MD2000 - Operation Unit
  • Alstom Single Phase Overcurrent AC Relay KCGG14201T50CEC - by Areva T&D UL Ltd.
  • ALSTOM RP3-77-9786-PT1 - ARM GUIDE FAST SHIPPING!!! (B168)
  • Alstom/Brown Boveri r303772p1 - Cover Gasket, 13335400
  • Alstom R303779P1 - 3/6 Pinion 1-1/2 inch shaft 25 tooth gear
  • Alspa Alstom VF 2002 A - Frequency Converter *H2R39E4*
  • Alstom Bushing 06714-271-00 - NEW!!! FREE SHIPPING!!!
  • ALSTOM MC15-M2 - Gecostat excitation manual control excitation setting
  • CONVERTEAM EPIC III E3-F-FN / EPICIIIE3FFN - Control Module
  • GE FANUC/ALSTOM 316 - FIP CH S2 - IR129 - #NAME?
  • New GE Alstom Cegelec IC693CMM311M - Communications Control Module Alspa 80-35
  • CONVERTEAM ALSTOM MVS3000-4001 - ALSPA MV3000 Drive Data Manager SKU#2
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • CONVERTEAM S98101/118 / S98101118 - (New with box)
  • General Electric Alstom Combustion Engineering GP-2375-B - Heavy Hex Jam Nut
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC High Speed Tripping and Control Relay
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED TRIPPING AND CONTROL RELAY
  • ALSTOM MVAAM11BJCJ5516A - PROTECTION RELAY
  • ALSTOM LGPG 111 LGPG11101R551 - EE DIGITAL INTRGRATED GENERATOR PROTECTION RELAY
  • CONVERTEAM 251459-000 / 251459000 - Module
  • NOS Alstom D-996-326-PC25 C161-2991M25 - Threaded Pipe Nipple 4730009866528
  • GE FANUC/ALSTOM 317 - FIP CH S2 - IR129 - #NAME?
  • ALSTOM GE D-984-0579 TP305 A/W REV 02 - FREQUENCY DETECTION BOARD
  • Alstom 01054-000-0N - Throw Rod Bearing NEW!!! !!!
  • ALSTOM Microverter D 3.4/500,029.130 004 - #NAME?
  • Alstom Alspa MD2000 - Operating Unit
  • Alstom Bombardier UMD-125-C - Contactor Coil 4078B71H01
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • Alstom Ge D-984-0579 TP305 A/W Rev 02 - Frequency Detection Board
  • Alstom Villeurbanne N895600512D - Card M 1000417012 Board 1040 ECPU1
  • Alstom Ps 421 - PS421 Control Unit
  • GE ALSTOM PIB504 - Fiber Optic Interface Board
  • Alstom Auxiliary Relay VAA23ZG8507F(M) - 110-250V AC/DC
  • Cegelec/Alstom gds1017-4001 - Alstom Improvement Card
  • Alstom 34232-084-01 - Sw Mach Oiler Fitting NEW!!! FREE SHIPPING!!!
  • ALSTOM MVAJM15JA1002A - HIGH SPEED TRIPPING AND CONTROL RELAY
  • Alstom 00441-005-0N - Screw 4PK NEW!!! !!!
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • Alstom Limelight FS-100-331 - Flame Spectrometer P/N :FS-100-331 110-220 VAC 50-60 Hz (New with Box)
  • Ge Alstom Combustion Engineering 101-295 - Stud Adjusting Jam Nut NOS
  • CONVERTEAM 20X4498/110C / 20X4498110C - Module
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • Alstom 54549-000-02 - Sw Mach Gear Complete NEW!!! FREE SHIPPING!!!
  • Alstom Alspa gd3000e - Reader Course Board 30v9200/110 With gds1003-4001 Keyboard
  • ALSTOM POWER R461 - PAWL LIFTING LEVEL (1 PC) NEW R-461 132214
  • Alstom 029.069 615 - PCB Board
  • Alstom Power Conversion 20x4496 - PCB Card Rev 0004
  • ALSTOM VTT DEFINITE TIME RELAY VTT11ZG8050LCH - 110-125V AC
  • GEC Alstom KCC8302 - Thyristor Rectifier Stack Power Module 20X-1310CRL 30Z-2116 a
  • Alstom GE Combustion Engineering 94-165 - Hinge Pin NOS
  • ALSTOM GECOSTAT FV223-M2 - EXCITER DIODE FAILURE DETECTOR
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • Alstom 34232-064-02 - Drive .188 Oiler Fitting NEW!!! FREE SHIPPING!!!
  • Alstom Villeurbanne N895604516F - Card ECPU2_2_2GS SOS.512B Board ECPU2 1000268972
  • CONVERTEAM MVDL800-4701 / MVDL8004701 - Module
  • ALSTOM SCN 804D - Measurement Interface Module
  • ALSTOM RP3-77-9783 - NEW Arm Guide for Alstom Grid SPO Precipitator (B278)
  • Alstom Brown Boveri HTGD333336P0049 - Lot of 4 4.5" Inch Key Segment
  • Alstom Bitronics M870D - Remote Display Unit 3773
  • ALSTOM GE D-984-0579 TP305 A/W REV 02 - FREQUENCY DETECTION BOARD
  • Alstom Bitronics M870D - Remote Display Unit 19490 4053
  • Alstom TFM GW-FE Module P701000011S - M 1000742179
  • ALSTOM TYPE A96LC - Relay
  • Alstom S20-0007-02 - Power Hub Accessories * NEW *
  • ALSTOM RS422 - Module * NEW NO BOX *
  • GE ALSTOM PIB315B - PCB Board
  • ALSTOM PRIMA PRS12N04BH - Relay
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • NASG Holdings 7115 - Green-Amber Light Panel Assembly for Alstom Cabs
  • Alstom P241911B2M0600J - Modular Protection Platform
  • ALSTOM MOTPRO MCHNM - Protection Relay MCHNM01H1AB0500A
  • ALSTOM RS100 - 100A 690VAC NSNP
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM MVAJM14JB1004A1 - N/O-4N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM CDG - OVER CURRENT RELAY (INVERSE) CDG31FF012SACH
  • ALSTOM PD 521 - Power Drive
  • CONVERTEAM PSF3B / PSF3B - (BRAND NEW)
  • Auburn Engineering 1G-4765-C - NEW! Spark Ignitor Plug Assembly Alstom Free Shipping!
  • Alstom 55153-000-01 - Switch Machine Roller Arm NEW!!! FREE SHIPPING!!!
  • GE Alstom Cegelec Alspa 80-35 IC693PWR324X - New Power Supply Module 30W STD
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • Alstom Bitronics M870D - Remote Display Unit
  • C-E ALSTOM 723 - NEW Mill Grinder Crank Warranty
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • ALSTOM AMS 3300515 - AMS2,AMS3300515
  • ALSTOM 8122-4001 - NSNP
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • GE FANUC/ALSTOM IR139-1 - 063022350 - 80801419 - B0037299 - C259/335
  • Alstom VAA12YF26B - VAA Type Auxiliary Relay 110V DC
  • Alstom Gateway Module P701000010R - M 1000741824
  • NOS Alstom Power MIL-E-17624 F167-149ITEM318 - Roller Tube Cage Assembly
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • Alstom Villeurbanne N895604516F - Card ECPU2 _2_ 2GS SOS.512B Board 1000268972
  • Alstom 20263-001-00 - Bevel Gear NEW!!! FREE SHIPPING!!!
  • Alstom Micom p743 - Generator Protection Numeric Relay p743316a6m0510k
  • ALSTOM 8213-6332 - MULTIGEM IOP 7.5MHZ 512K Central Processor Module NEW
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM 1G-5556 - SPARK PLUG ASSY (LOT OF 2)
  • ALSTOM Micom P139 - Ptb 04 ATEX3044 P1393604544AW00E01
  • ALSTOM S30Z2582/01 - NSMP & Extended technical support
  • ALSTOM VAJC11ZF0754ABA - HIGH SPEED TRIPPING RELAY
  • Alstom Single Phase Overcurrent AC Relay MVTU13T1BA0751H - by Areva T&D UL Ltd.
  • ALSTOM MVAXM31D1CE3005A - Three-Coil Super Relay
  • Alstom D-984-0578 - Intensity and Fault Detection Board A/W Rev 02
  • Alstom Bitronics M870D - Remote Display Unit 19490
  • C-E ALSTOM 723RPS - NEW Pulverizer ball and socket assembly warranty
  • Alstom alspa gd3000e - drive course board 30v9200/110 with gds1003-4001 keypad
  • Alstom M99-40001 - Micro Keyboard 24V7000/10 Alspa Micro 1
  • GE FANUC/ALSTOM 251-1 - 80801399 - /C0300150
  • ALSTOM SKE11BF8003BCH - CHECK SYNCHRONISING RELAY
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM EPSC-0069 - NSMP Coal flow monitor
  • General Electric Alstom PIB504 PIB-504 - Fiber Optic PIB Module Interface Converteam SKU#1E
  • ALSTOM POWER MP-7848 - SPLIT OIL SEAL (11266-NUP) FOR BOWL MILL
  • Alstom 31v6900/10 - GD Delta Cooling System Build Rev 0015
  • ALSTOM Micom P139 - Ptb 04 ATEX3044 P1393604544AW00E01
  • Cegelec/Alstom gds1017-4001 - Alstom Enhancement Card
  • Alstom GDS1004-4002 - Sigma Client I/O Panel
  • Alstom 20x4506/10 - PCB Circuit Board
  • Alstom 20x4373/10B - Pcb Thyristor Gate Drive VDM25000 Circuit Board