The main problems and prevention measures of mine ecological restoration

F: | Au:佚名 | DA:2023-12-21 | 959 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Under the background of ecological civilization construction and dual-carbon goal, ecological restoration of mines has become a research hotspot. Based on the analysis of the main problems in mine ecological restoration in China, the corresponding solutions are put forward. It is found that the related concepts of mine ecological restoration are various, but the connotation is similar, and green development is the absolute principle; Affected by factors such as the failure of the supervision mechanism, the misunderstanding of the mine ecological restoration project, and the difficulty of promoting the new technology, China's mine ecological restoration has not paid the old account, the new account is owed, and the failure project is common; In order to promote the ecological restoration of mines in China, it is necessary to strengthen the basic theoretical research, promote the implementation of supervision mechanism, and implement new technologies such as mining and restoration in production mines.

The significance of mine ecological restoration

Mining may bring about ecological and environmental problems such as soil erosion, landslide and desertification. The abandoned industrial and mining land also has many bad soil physical and chemical properties, especially the high content of heavy metals in the soil, and the pollution process of some heavy metals in the soil system is long-term, hidden and irreversible, which often has a serious impact on the ecological environment of the surrounding area. Therefore, the ecological restoration of abandoned mines has important ecological significance. Mine ecological restoration is not only one of the important steps to alleviate desertification and soil erosion, but also one of the important means to tap its social and economic value through mine ecological restoration and transformation. At present, the selection of tourism development mode after ecological restoration has occupied more than half of the mine restoration cases, so considering economic factors has a high restoration value. In practice, the transformation of the abandoned site is mainly to add some humanistic landscape elements on the basis of its unique natural landscape and its own land resources, and at the same time, it is selected to transform into urban park, wetland park, ecological park, mine relic park and other tourist and leisure scenic spots. At present, the concept of ecological restoration at home and abroad mainly regards restoration as the state before destruction, requiring the restoration of forests, water bodies and farmland to the original state, and controlling the deposition of toxic and harmful substances and soil erosion. Ensure that the water table remains at its original level and the surface shape remains unchanged; Keep topsoil in place; Pay attention to the prevention and control of acidic substances and harmful and toxic substances; Prevent mine tailings from landslide and other secondary geological disasters.

1. Principles to be followed for mine ecological restoration

Mine ecological restoration is not only the restoration of damaged terrain, simple greening and so on. Mine ecological restoration is a systematic project, which is a complex project integrating damage investigation, design planning and construction. In order to achieve the result of restoring the damaged ecology, it is necessary to have a deep understanding of the connotation of the restoration goal. At the beginning of the planning, it is necessary to clarify the use of land use after restoration, the ecological structure and the ecological function that should be realized. Therefore, the goal setting of mine ecological restoration needs to comply with the following six principles: respect for nature, people-oriented; Adapt to local conditions and conform to the overall regional planning; Safe, efficient and sustainable use; Priority should be given to ecological and environmental benefits, and attention should be paid to economic benefits. Priority is given to restoring cultivated land, grassland and forest land; End treatment is combined with source and process control.

2. Strengthen the basic research of mine ecological restoration

The practice of mine ecological restoration for more than 40 years shows that the restoration theory lags far behind the practice, and many restoration cases fail due to lack of scientific restoration, which shows that there is a decoupling phenomenon between theory and practice. In order to repair the ecological environment damage caused by mining, many places have carried out spontaneous restoration and utilization of the damaged land and ecological environment. For densely populated areas with rapid economic development, mine ecological restoration is often promoted faster. However, the basic theory of this field and the principles of restoration technology still need to be deeply studied to support and promote the development of this field.

In the face of complex mining environmental damage problems, restoration methods and technologies need to be innovated, enriched and promoted, and the connotation of scientific restoration should be enriched from the scientific, different, advanced and economic aspects of technology, so as to balance the restoration benefits with funds and policy investment. Although there are many kinds of ecological restoration technologies, there are often some basic common technologies for ecological restoration, which is also the key to ecological restoration. Water is the source of life, soil is the basis of life, and plants are the root of life. Therefore, water, soil and plants are the three major elements of ecological restoration, and the restoration technology centering on these three major elements is the common core technology, namely, geomorphic remodeling, soil reconstruction and vegetation restoration. The interconnectedness of these three key technologies is shown in Figure 2.

  • ABB 3HAC031851-001 SMB Unit Technical Manual
  • Fuji NB1U56X-01 Programmable Controller Guide
  • Siemens 6AG1153-2BA02-7XB0 SIPLUS IM 153-2 Manual
  • Beckhoff EL6631 PROFINET Terminal Manual
  • Lenze E82EV302-4C Frequency Inverter Manual
  • Siemens 6SE7038-6EK84-1JC2 IGD8 Board Specifications
  • Pilz 774595 Safety Relay Specifications
  • Fanuc A20B-8200-0847 PLC Board Specification
  • Allen Bradley 1785-L60B/E PLC CPU Manual
  • PASABAN MC-2006 03 PLC Card Specifications
  • B&R X20CP1382 PLC Control Module X20 CPU
  • B&R X20DC2395 PLC Module Digital Output
  • AS-2P-70M-B Industrial PLC Communication Cable 70M
  • Siemens 6ES7136-6BA00-0CA0 PLC Module ET 200SP
  • Siemens 1FK7083-5AF71-1EB3 Servo Motor SIMOTICS S
  • WAGO 750 Series I/O Modules 750-842 750-530 750-430 750-602 750-514 750-600
  • Microchip TC9401CPD F/V Converter 100kHz 14DIP
  • Mitsubishi GT2310-VTBA GT2310-VTBD HMI Touch Screen 10.4 Inch
  • Siemens 3RT2036-1AN20 AC Contactor SIRIUS
  • Mitsubishi GT2708 HMI Touch Screen GT2708-VTBA VTBD STBA STBD
  • Siemens 6FC5110-0CB01-0AA0 CNC PLC CPU
  • ABB SINT4130C PCB Board
  • Omron NX1P2-1040DT PLC Controller
  • Fuji FRN3.7C1S-2J VFD
  • PLC-60/75 /E2UK Shielded Braided Cable
  • Omron CJ1W-NC434 Position Control Unit
  • Omron NX-AD2208 Analog Input Module
  • PASABAN MC-2006 03 PLC Card
  • Schneider 9038CR34 Pressure Switch
  • Pilz 240340 Safety Control Module
  • Mitsubishi A2NCPU Programmable Controller MELSEC
  • Mitsubishi Alpha XL Alarm Modem M20 Expansion
  • AutomationDirect D0-06DD2-D PLC DL06 Controller
  • Toshiba COMW01-21 PCB Control Board Turbine
  • Siemens 6FX1122-1AC02 Coupling Module SINUMERIK
  • Omron CVM1-CPU21-V2 CPU Unit Programmable
  • Beckhoff EL7041 Stepper Motor Terminal EtherCAT
  • B&R X20AI4622 Analog Input Module 4 Channels
  • OAT PMC25.2-003 Programmable Controller Module
  • Fanuc A16B-2200-0350 Graphic Board Series 16
  • Eaton Cutler Hammer 6-26-2 Contactor Contact Kit
  • Omron D4SL-NSK10-LK-K Safety Switch
  • Siemens C98043-A7001-L24 CUD1 Control Board
  • Mitsubishi A2NCPUR21-S1 PLC Module
  • National Instruments NI-9242 4-channel analog input module
  • BEMAC UST-202-D PLC Interface Board
  • Omron CJ1W-DA08C Analog Output Module
  • Mitsubishi QX521 CNC Interface Board
  • Schneider BMEP586040 High-Performance PLC Processor
  • Emerson 5X00875G01 Process Control PLC
  • Siemens SIMODRIVE 611 Power Module 6SN1145-1AA01-0AA0
  • Siemens 840C NC-CPU 486DX4 6FC5110-0BB04-0AA1
  • Mitsubishi GT2708 Series Operation Panel Touch HMI
  • Fanuc A04B-0103-C220 Programmable Controller Module
  • IFM CR2530 Programmable Controller for Mobile Automation
  • Omron FH-3050 Vision Controller i7-2715QE High Performance
  • National Instruments NI-9242 4-Ch Analog Input Module
  • B&R X20AI4632 Analog Input Module 4 Channels
  • Pilz 773600 Input Module Safety Automation
  • Panasonic AFPX-C60P Programmable Controller PLC
  • Siemens 6ES7414-2XL07-0AB0 S7-400 CPU Manual
  • Cutler Hammer WM34V Interlock Kit Manual
  • Pilz 777587 Safety Relay Specifications
  • Omron CJ2H-CPU64-EIP CPU Module Manual
  • B&R X20AI1744-3 Analog Input Module Guide
  • Schneider LC1G185BEEA Contactor Specification
  • Sharp LM64P101 LCD Screen Specifications
  • B&R X20AT4222 Temperature Module Guide
  • Mitsubishi A2UCPU-S1 Controller Specifications
  • Stein Sohn E 083.1 Rack Module Technical Guide
  • Omron CK3W-AX1515N Motion Controller
  • Schneider TSXP572634M PLC Processor
  • Epson RAIOC-33 Programmable Controller
  • GRID T&D iRTUe-D1R1-W.125 I/O Module
  • Fanuc A20B-2002-0520 Control Board
  • B&R X20IF1030 Interface Module
  • Schneider ATV320U55N4B VFD
  • Omron NA5-9W001B-V1 HMI Touchscreen
  • Mitsubishi A2NCPU PLC CPU Unit
  • Omron CJ2M-CPU34 PLC CPU Unit
  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module
  • Omron CJ1W-ETN21 Ethernet Module PLC
  • Allen-Bradley 2711P-T15C4A7 PanelView Plus 1500 Guide
  • Pilz 777602 Safety Module XV1P Specifications
  • NI cFP-2220 and cFP Modules Technical Guide
  • Keyence XG-EC80 Camera Input Unit Overview
  • Dynatronix CRS9-10 DC Power Supply Manual
  • Omron G3PW-A220EC-S-FLK Power Controller Manual
  • EVO SP SYSTEM PLC Control Panel Overview
  • B&R X20IF10G3-1 Interface Module Specifications
  • NL8060BC21-11 Industrial LCD Screen Specification
  • SK-G9-FAN1-F6 Cooling Fan Technical Specifications
  • US Drives 3000-4220-4-4 PLC Add-on Module
  • Allen-Bradley 2002-NX70-HSC4 High-Speed Counter
  • Schneider TM258LF42DR PLC Controller
  • Harris 8800-00002-02 PLC Power Control Center
  • NLT NL8060BC21-11C 8.4 LCD Panel
  • ABB PLUTO S20 V2 CFS Safety PLC
  • Omron NS12-TS00B-V2 NS12-TS00B-ECV2 HMI
  • 7-29 10 00 A PLC Expansion Module
  • B&R X20DC2395 PLC Module
  • Omron NE1A-SCPU02 Network Controller
  • GE IC200UEX624-C VersaMax Micro PLC
  • Rexroth GIV50-11 Position Limit Switch Assembly
  • B&R X20SLX410 Safety Logic Module
  • Omron CJ1W-NC433 Position Control Unit
  • Inovance AM600-CPU1608TP PLC Controller
  • ABB Pluto S20 V2 CFS Safety PLC
  • Omron CJ1W-NC113 Position Control Unit
  • Grundig NEA02 AES 0 PLC I O Module
  • Fanuc A16B-2202-0432 Control PCB Board
  • Siemens 6SN1124-1AA00-0DA0 Simodrive LT Module
  • B&R X20AO2632 Analog Output Module Specifications
  • Georges Renault 6159187760 PLC Board Technical Guide
  • IDEC PLC FC6A-D32K3CEE MicroSmart Controller Manual
  • 6ES7226-6BA32-0XB0 Fail-Safe Digital Input Guide
  • Programmable Controller PLC EC20-4040BRA Specification
  • Grundig PLC NEA02 AES 0 I/O Card Specification
  • Seiki POS-M 10-22-01 Card Positioning Board Manual
  • Ormec Systems PMC960 Motion Controller CPU Guide