Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Construction of comprehensive treatment of mine solid waste in the era of big data

来源: | 作者:佚名 | 发布时间 :2023-12-21 | 806 次浏览: | Share:

In recent years, with the rapid development of China's economy, the environment has been greatly damaged, we should adhere to the principle of economic development can not be at the expense of the environment, pay attention to environmental issues. One of the more important issues is the treatment of solid waste, and the main source of solid waste is the waste rock and tailings discharged by the mining industry, that is, the solid waste of the mine. Mine solid waste belongs to industrial solid waste, mainly refers to all kinds of mines in the construction of shafts and alleys, mining process, open pit mining process produced by the stripping and waste rock, and washing and smelting process produced by the tailings or waste slag.

The amount of stripping waste produced by mining in China is amazing, and the mining stripping ratio of mining is large, such as the mining stripping ratio of metallurgical mines is (2~4); The ratio of mining and stripping in straight mines is mostly 1: (2~8), and the highest is 1: 14. The maximum mining and stripping ratio of gold mines can reach 1:(10~14). The annual discharge of waste rock from mines in China exceeds 600 million tons, and the annual stripping of waste rock from open-pit iron mines alone reaches 400 million tons. The total amount of waste stone in our country has reached tens of billions of tons, which is the first country in the name of waste stone discharge.

The harm caused by solid waste is also very huge, mainly in the following aspects:

One is to pollute the environment around the mine. The minerals in the mine contain a large number of unknown pollutants before being treated, and the waste naturally contains excessive pollutants (such as radioactive elements, heavy metal elements, etc.). In the process of mine solid waste stacking, on the one hand, these pollutants will penetrate into the ground and pollute the surrounding soil and water sources; On the other hand, it will also react with other substances on the surface, forming new pollution. It is understood that in the total area of the land destroyed by mines in China, about 59% are destroyed due to the gob formed by mining,20% are occupied by open pit waste piles,13% are occupied by tailings ponds,5% are occupied by underground waste rock piles, and 3% are in the collapse danger zone. Among them, tailings and waste rock piles accounted for 38% of the total.

The other is soil erosion. Serious soil pollution will make the surface of the mine can not continue to grow vegetation, resulting in the surrounding soil increasingly loose, when the rain washed will form soil erosion. The third is to bring security risks. Mine waste is piled up in a disorderly manner, and the soil has become loose due to damage, so there may be a collapse or landslide phenomenon at any time. In recent years, the resulting disasters have occurred from time to time, such as landslide, debris flow, tailings dam break, etc., which not only destroyed the ecological environment, but also posed a serious threat to people's lives and property safety. On December 20, 2015, a huge landslide occurred at the Hongao Yu mud collection site in Guangming New District of Shenzhen, Guangdong Province, killing 73 people. After investigation, it was found that the main cause of the accident was the serious over-storage and ultra-high overfill in the receiving field, which led to this tragedy. In addition, due to the environmental deterioration caused by the stacked mine solid waste, the later restoration cost will also be greatly increased.

The fourth is the serious waste of resources caused by the massive discharge of mine solid waste. Mine solid waste often contains a variety of metal elements, if long-term stacking and loss, not timely recovery and comprehensive utilization, not only pollute the environment, but also for the national mineral resources is a great waste. The utilization rate of mineral resources in China is very low, its total recovery rate is 20% lower than that of developed countries, the average recovery rate of ferrous metal mining such as iron and manganese is only 65%, and the comprehensive recovery rate of non-ferrous metal mining in China is only 60%~70%. Taking iron ore as an example, there are more than 30 kinds of associated components in Chinese resources, but only 20 kinds can be recovered at present. Therefore, a large amount of valuable metal elements and available non-metallic minerals are left in solid waste, resulting in annual mineral resource development losses of about 100 billion yuan. Especially the old tailings, due to the restriction of the conditions at that time, the loss to the valuable group of tailings is greater. In 1997, the amount of gold mined in China was 25.4 million tons, the total recovery rate of gold was 86.46%, and about 18-20 tons of gold was lost in the tailings.

These are the main hazards of mine solid waste, it is like a time bomb, once activated, will cause a devastating blow to the environment. And this "bomb" is far from as simple as it seems, and its ingredients are extremely complex, so the actual consequences are far more than those listed. There is therefore an urgent need for action.

In 2005, the State Environmental Protection Administration, the Ministry of Land and Resources, the Ministry of Health issued the "Mining ecological environment protection and pollution prevention technology Policy", for the mine solid waste proposed to vigorously promote the comprehensive utilization of mineral processing solid waste technology, including: (1) tailings recycling and co-associated minerals and valuable elements recovery technology; ② The use of tailings processing production of building materials and products technology, such as cement additives, tailings brick, etc.; (3) Promote the technology of using tailings and waste rock as fillers to fill goaf or subsidence areas; (4) Using coal preparation slime to develop bio-organic fertilizer technology.

Let's talk about these aspects in detail:

1. Recycle useful metals from tailings. One of the products of separation operations in beneficiation, the part with the lowest content of useful target components is called tailings. Under the current technical and economic conditions, it is not appropriate to further improve sorting. However, with the development of production science and technology, the useful target components may also have the economic value of improving recycling. Tailings are not completely useless materials, often contain components that can be used for other purposes, and can be comprehensively utilized. Achieve no waste discharge. It is necessary to make full use of mineral resources and protect the ecological environment. The 11 tailings ponds of 7 large iron ore concentrators in a northeast region of China, with an annual discharge of 27 million tons of tailings, accumulated 770 million tons of tailings by May 2017, containing 8%~16% iron, and recovered iron concentrate (containing 54%~65% iron) and middle ore (containing 35%~40% iron) for cement plants as additives after the construction of the reconcentration workshop. The Nanyuan Iron Mine used the magnetic-gravity separation process to concentrate 5 million tons of tailings, and recovered 407,800 tons of iron concentrate with a grade of 56.71% and a recovery rate of 42.94%. Yongping Copper Mine daily treatment of 2000 tons of tailings, tailings by the combined process of heavy magnetic, heavy, floating and heavy separation step by step, the production of schetungstine concentrate 399.3 tons, sulfur concentrate 1584 tons, annual output value of 6.648 million yuan, annual profit of 1.728 million yuan; Dazhi Lvtongshan has recovered the tailings for many times. In the tailings after floating copper magnetic separation, iron concentrate is selected by the strong magnetic separation process and then the gold copper concentrate and iron concentrate with higher gold and silver content are selected by the re-grinding floating one weight one magnetic separation process. Gold copper concentrate 21.34g/t, silver 100g/t, copper 16.58g/t, the recovery rates were 64.81%, 18.16% and 53.66%, respectively. Some of the above successful cases we can learn from.

2. Use tailings to produce building materials

(1) Using tailings to make bricks. Iron tailings can be made into fire-free bricks, wall and floor decorative bricks. Maanshan Mine Research Institute has successfully made free brick by using iron ore tailings from Qidashan and Waitoushan. Jiangxi Copper Company Yinshan lead-zinc mine is used to produce autoclaved silicate brick because of its stable chemical composition of tailings. Dandong Institute of Building Materials used gold mine slag as the main raw material, adding some clay material with good plasticity, and made a new type of building decoration material - waste slag decorative brick by sintering. The use of copper and tungsten tailings to make bricks has also been successfully developed.

(2) The use of tailings to produce cement. Cement is made by two grinding and one firing process, and the strength of cement depends on the firing of clinker and the mineral composition in the clinker. Clinker is generally composed of tricalcium silicate, dicalcium silicate, tricalcium aluminate and tetracalcium ferroaluminate, among which tricalcium silicate and tricalcium aluminate play an important role in the early strength of cement. Dicalcium silicate, tetracalcium ferroaluminate and tricalcium silicate played an important role in the later strength. Tricalcium silicate is the main mineral in cement clinker (about 50%). Tailings are used to produce cement, which is to use some trace elements in tailings to affect the formation of clinker and mineral composition.

(3) The use of tailings to produce new glass materials. Using high iron and aluminum tailings as the main raw material, the surface glass made by melting is black, shiny and uniform, no bubbles, no defects. (4) The use of tailings to produce building glass-ceramics. Tailings glass-ceramics granite was made from Damiao Iron Mine tailings and waste rock. The compressive strength, flexion strength, gloss and acid-alkali resistance of the finished products reached or exceeded that of natural granite. Using copper tailings as the main raw material, the glass-ceramics of copper tailings with high strength, wear-resistance and corrosion resistance have been developed through industrial tests to replace marble, granite and ceramic tiles. In addition, the use of tungsten tailings to develop glass-ceramics. (5) Use tailings to produce other building materials. Using the tailings of Dagushan concentrator mixed with cement, lime and other raw materials, the aerated concrete is made with light weight and good moisture retention. In addition, iron tailings can be used as basic materials for roadbed in large quantities.

3. Backfill the mined-out area with tailings. The tailing is fine and uniform in size. It has the advantages of convenient transportation, no processing and easy cementation when used as filling material in underground stope. The backfilling of tailings can greatly reduce the footprint. Conventional hydraulic filling (including high-concentration filling) uses graded coarse tailings. As a filler; The all-tailing paste filling technology developed in recent years has a remarkable effect on reducing or eliminating tailing pollution to the surface or underground environment. Waste rock is used as underground filling: one is direct backfill, the waste rock in the upper middle section is directly poured into the goaf in the lower middle section, most mines have adopted this backfill method; The other method is to lift the waste rock to the surface, carry out appropriate crushing processing, and mix the tailings and cement to backfill the goaf. This method is safe, but the processing cost is high. In Zhaoyuan Gold Mine and Jiaojia gold mine in Shandong province, China, the method of backfilling gob with mixed cement is adopted.

4. Other uses of tailings. There are some trace elements required by plants in the tailings, and the tailings can be directly processed as micro-fertilizer, or used as a soil amendment. For example, potassium, manganese, phosphorus, zinc, tin and other components in the tailings may often be micronutrient components of plants. The door tailing contains calcite, feldspar or alum salt, which can produce flocculant and collector of industrial sewage. Granodiorite tailing to produce flocculant or water glass is widely used in industry. In addition, the tailings can also be used as pesticides for agricultural production.

5. Start from the source, carry out comprehensive utilization of resources, and reduce the production of solid waste. Start from the source, carry out the comprehensive utilization of primary resources to reduce the production of solid waste, especially the production of fine tailings. It is an effective and economical method. Therefore, in the process design and production practice, in addition to improving the recovery rate of the main elements in the ore, it is also necessary to consider the comprehensive recovery of the associated metal elements and non-gold elements to avoid the tail project behind the main process. For the composite polymetallic ore whose comprehensive recovery technology is not mature, the resource reserve method can be adopted to be exploited when the conditions are mature to avoid the waste of resources.

In fact, the comprehensive treatment of mine solid waste can not be completed by enterprises on the one hand, but also requires efforts from all aspects. First, we must adhere to the principle of developing mineral resources under protection and protecting them during development, raise the people's awareness of resources and the environment, and integrate environmental protection into the whole process of resource development and utilization; The second is to incorporate the pollution prevention and control of mine solid waste into the overall planning of comprehensive remediation of mine ecological environment, guided by the principles of ecology and ecological economics, to coordinate resource development, comprehensive utilization of solid waste and pollution prevention, to economic and social development and environmental protection and construction of mining areas as objects, through unified planning and comprehensive construction, to achieve ecological construction, environmental construction and mining areas Coordinated development of economic construction; The third is to adapt to local conditions, according to the actual situation of each mine, adopt a reasonable way to comprehensively control the environmental pollution caused by solid waste, such as the reclamation and greening of solid waste dumps, the suppression of tailings pond dust, and the treatment of acid water discharged by solid waste. In a word, I believe that through the efforts of all parties the solid waste from mines can be well managed.

Over the years, especially in recent years, people have realized that tailings treatment and disposal technology is a worldwide problem, the whole tail overall utilization technology has made progress, no waste or less waste mining technology of mines continue to emerge, the use of tailings to make building materials production products are increasingly recognized by the society, become the bright spot of new productivity, the development of non-mineral mining industry is increasingly trapped around the mine solid waste generation The characteristics, combined with the market needs to develop new products, high value-added products are becoming the pursuit of the hot spot, the comprehensive utilization of solid waste in China has a certain technical basis, we should follow the focus of solid waste resources industrialization, select waste composite materials, tailings glass-ceramics, new lightweight building materials and useful minerals and metal extraction and other products technology, the establishment of batch Representative industrial demonstration projects with high technical starting point, significant comprehensive benefits and able to reach a certain scale, gradually form applicable and advanced complete sets of resource-based equipment and processes, and establish complete management methods and technical standards; According to the requirements of resource utilization, minimum quantification and harmless management, a management system for the overall utilization of mine tailings should be established to promote the industrialization of the overall utilization of mine solid waste. Mining enterprises should also further emancipate their minds, establish a solid waste management and operation mechanism that is in line with the market economy, raise funds in many ways, realize enterprise management, take the road of industrialization, and strive to practice the "three represents", develop our country's mining economy and improve our mining environment.


  • Westinghouse 5X00583G01 Control Module
  • WESTINGHOUSE 5X00497G01 PLC Module
  • WESTINGHOUSE 1C31233G01 Ovation Module
  • WESTINGHOUSE 4D33900G19 Industrial Control Module
  • Westinghouse 5X00225G01 Controller Base Rack for Industrial Automation
  • WESTINGHOUSE 5A26304G02 Ovation I/O Module
  • WESTINGHOUSE 5X00070G01 Ovation Module
  • Westinghouse 5X00605G01 Control Module
  • WESTINGHOUSE 5X00241G02 Ovation System Communication Module
  • WESTINGHOUSE 5X00226G03 Ovation Module
  • Westinghouse ZX345Q Control System
  • WESTINGHOUSE ST24B3 Temperature Transmitter
  • WESTINGHOUSE AID-1 Industrial Keyboard
  • Westinghouse 5X00241G01 Control Module
  • WESTINGHOUSE 5X00226G02 Ovation Controller Base Module
  • WESTINGHOUSE 5X00119G01 Ovation Module
  • Westinghouse 5X00105G14 Control Module
  • WESTINGHOUSE 5X00105G01 Ovation System Base Module
  • WESTINGHOUSE 5X00058G01 Ovation Controller
  • Westinghouse 5A26391H24 Control Module
  • WESTINGHOUSE 4D33942G01 Ovation I/O Communication Module
  • WESTINGHOUSE 3A99158G01 Ovation I/O Module
  • WESTINGHOUSE 3A99200G01 Control Module
  • WESTINGHOUSE 3A99132G02 Ovation System Power Module
  • WESTINGHOUSE 3A99132G01 Ovation Interface Module
  • WESTINGHOUSE 1X00416H01 Control Module
  • WESTINGHOUSE 1X00024H01 Ovation System Interface Module
  • WESTINGHOUSE 1C31227G02 Ovation I/O Module
  • Westinghouse 1C31194G03 Control Module
  • WESTINGHOUSE 1C31194G02 Ovation Controller Module
  • WESTINGHOUSE 1C31194G01 Ovation Controller Module
  • WESTINGHOUSE 1C31189G01 Control I O Module
  • WESTINGHOUSE 1C31179G02 Ovation Processor Module
  • WESTINGHOUSE 1C31164G02 Ovation Relay Output Module
  • Westinghouse 1C31161G02 RTD Input Module
  • WESTINGHOUSE 1C31150G01 Ovation DCS I/O Controller Module
  • WESTINGHOUSE 1C31113G02 Ovation Analog Input Module
  • WESTINGHOUSE 1C31129G03 Control Module
  • WESTINGHOUSE 1C31122G01 Process Controller | Ovation DCS Control Module
  • WESTINGHOUSE 1C31113G02 Ovation Analog Input Module
  • WESTINGHOUSE 1B30023H02 Control Module
  • WESTINGHOUSE 1B30035H01 Turbine Control System Module
  • WIDAP UFW30.156 6K8J175W0823 Power Resistor Technical Profile
  • WINGREEN IPB PCB V2.0_A01 03ZSTL6-00-201-RS Industrial Power Board
  • WINGREEN CANopen_ADAPTER V5.0_A01 03ZSTI-00-501-RS Module
  • WINGREEN PUIM V2.0 034STM4-00-200-RS Power Interface Module
  • WINGREEN DUDT_DETECTION_V2.0_A01 03ZSTJ0-00-201-RS Detection Control Board
  • WINGREEN LAIB V3.0_A00 034STN1-00-300-RS Embedded Industrial Motherboard
  • WINGREEN FAN_DETECTION V1.0_A05 03ZSTJ3-00-105Fan Monitoring Module
  • WINGREEN LAIB V3.0_A00 034STN1-01-300-RS Interface Board
  • WINGREEN ATKB_V5.0_A01 03ZSTI4-00-501 Industrial Control Keyboard Module
  • WINGREEN ATKB_V5.0_A01 03ZSTI4-01-501 Industrial Motherboard | Embedded Control Board
  • WINGREEN FPB_V3.0_A01 03ZSTJ1-00-301-RS Fieldbus Processor
  • WINGREEN DSPB_V4.0_A02 03ZSTI7-00-402-RS Digital Processing Board
  • WOHNER 31110 Cylindrical Fuse Holder
  • WOODHEAD APPLICOM PCI4000 PCI Communication Card Industrial DeviceNet CAN Bus Interface
  • Woodward 8440-1706 Industrial Control System Module
  • Woodward 8440-2052 H Synchronizer Load Share Module
  • Baldor KPD-TS12C-30E 12.1" Color TFT Touch Screen Ethernet HMI
  • Baldor KPD-TS10C-30E 10" Color TFT Touch Screen Operator Interface with Serial and Ethernet Interfaces
  • Baldor KPD-TS05C-30E 5.6" Color TFT Touch Screen with Serial and Ethernet Interface
  • Baldor KPD-TS05C-30 5.6 Inch Color TFT Touch Screen Serial Interface
  • Baldor KPD-TS05M-10 5.6" Monochrome Touch Screen Serial Interface HMI
  • Baldor KPD-TS03M-10 Monochrome Touch Screen Operator Interface
  • Baldor KPD-KG420-30 4x20 Graphic Display with 12 Function Keys - Serial Interface
  • Baldor KPD-KG420-20 4x20 Character Graphic Display Serial Interface
  • WOODWARD EASYGEN-3200-5 8440-1992 A Genset Controller
  • WOODWARD PEAK200-HVAC 8200-1501 C Version | Industrial Building Automation Controller
  • Woodward 8440-2052 easyGEN-3200 Genset Control Power Management
  • Woodward 8237-1246 + 5437-1119 Control System Module
  • WOODWARD SPM-D11 8440-1703 Overspeed Protection System Module
  • WOODWARD 8237-1369 Governor Control Module
  • Woodward 8237-1600 Digital Control Module
  • WOODWARD BUM60-1224-54-B-001-VC-A0-0093-0013-G003-0000 3522-1004 Industrial Control Module
  • WOODWARD 8200-1302 Genset Controller
  • Woodward 8901-457 Speed Control Module
  • WOODWARD 5501-465 Control Module
  • Woodward 5448-890 SPM-D10 Digital Control Module
  • WOODWARD 5437-1067A Turbine Governor Actuator
  • Woodward 8440-1666 B Digital Control Module
  • WOODWARD 8440-1706 A SPM-D11 Synchronous Phase Modulator Module
  • WOODWARD 5466-425 Programmable Automation Controller (PAC)
  • WOODWARD 5466-318- Industrial Gas Turbine Control Module
  • WOODWARD 5453-277 Digital Control Module
  • WOODWARD 5453-203 Digital Governor Control Module
  • WOODWARD 9907-1106 Pressure Converter
  • WOODWARD 5233-2089 Professional Industrial Control System Module
  • WOODWARD 9907-147 Power outage tripping overspeed protection system
  • WOODWARD 8237-1600 Digital Speed Control System
  • WOODWARD 8402-319 8402-119 microprocessor speed controller
  • Woodward 8237-1006 Digital Governor
  • WOODWARD 5501-471 Communication Module
  • WOODWARD 5466-258 Input/Output Module
  • WOODWARD 5501-467 Multi Protocol Communication Gateway and I/O Expansion Module
  • WOODWARD 5501-470 Digital microprocessor controller module
  • WOODWARD 9907-1200 Digital Governor
  • WOODWARD 8444-1067 High Performance Digital Microprocessor Controller Module
  • WOODWARD 8446-1019 Integrated Gas Engine Electronic Control System
  • WOODWARD 9907-162 Digital Engine Governor
  • WOODWARD 5466-316 Simulation Combination Module
  • WOODWARD 5464-414 Digital Speaker Sensor Module
  • XANTREX XFR40-70 DC power supply
  • XP POWER F8B6A4A6A6 power module
  • XP POWER F8B6D4A3G3 power supply
  • XYCOM XVME-674 VMEbus Single Slot CPU/Processor Module
  • XYCOM XVME-957 Circuit Board
  • XYCOM XVME-976 PC board computer
  • XYCOM XVME-530 8-Channel Isolated Analog Output Module
  • XYCOM Proto XVME-085 Bus Module
  • YAMAHA RCX40 4-AXIS ROBOT CONTROLLER
  • YAMATAKE EST0240Z05WBX00 touch screen display
  • YAMATAKE HD-CAOBS00 flowmeter
  • HIMA X-COM 01 Communication Module
  • HIMA HIMax X-AO 16 01 Analog Output Module
  • HIMA X-AI3251 Analog Input Module
  • HIMA X-DO3251 Digital Output Module
  • HIMA X-DI3202 Digital Input Module
  • HIMA X-DI6451 Digital Input Module
  • YASKAWA USAHEM-02-TE53 AC servo motor
  • Yaskawa JZNC-XPP02B Teaching Programmer
  • YASKAWA CACR-SR07BE12M servo drive
  • YASKAWA JAMSC-B2732V Advanced Drive Controller
  • YASKAWA JGSM-06 Controller
  • YASKAWA PCCF-H64MS 64MB Industrial Memory Module
  • YASKAWA CACR-02-TE1K servo driver
  • YASKAWA JAPMC-IQ2303 Controller Module
  • YASKAWA DDSCR-R84H Controller
  • YASKAWA JANCD-XTU01B circuit board