Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Basic knowledge of open pit mining

F: | Au:佚名 | DA:2023-12-27 | 764 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Divided by section shape: whole section (1-5 a), unilateral groove (1-5 b)

6. open pit An area where open pit mining has taken place and is taking place, formed by steps and open pits.

Hillside open air: closed circle above. Sunken open air: closed circle below.

Constituent elements:

(1) Side wall: the overall surface around the open-pit mine, divided into: top wall, bottom wall (slope), end wall.

(2) working slope (working slope of respose).

(3) working slope and working slope Angle.

(4) Non-working slope surface and final slope Angle.

(5) Upper and lower final boundary line...... A closed curve where the surface of a non-working slope intersects the surface or the floor of an open pit at the end of mining.

(6) Final limit of open pit: the position defined by the final limit line at the upper and lower end.

Second, open pit mining process:

Perforation - blasting - mining - transport - discharge.

Process form: discontinuous process, continuous process, semi-continuous process.

These production links are closely coordinated with each other, so while constantly improving each production link, it is necessary to examine their links in order to improve the comprehensive production capacity of the all-open pit mine.

Third, the development process of open-pit mine project:

As mentioned earlier, the extraction of ore and rock from open pit mines is achieved from a certain process, and this work is generally referred to as open pit engineering.

Open pit mine engineering: according to the construction object, stripping engineering and mining engineering; According to the construction form, it can be divided into digging ditch works and covering works.

The development of mine engineering is carried out according to certain procedures.

For a step: Dig in and out of the trench opening section of the trench expansion.

For the upper and lower levels: trench digging and flank expansion are carried out at the same time, that is, the upper horizontal flank expansion is carried out at the same time as the lower horizontal trench digging, so:

The mine engineering depth continues to increase until the final mining depth.

The line of work at each level of production continues to advance outwards from the position of the initial ditch until the final boundary.

In the process of development, the open-pit mine gradually changes from small to large, from shallow to deep, and continuously extracts ore and strips rock until it is mined within the final boundary. The essential feature of the development process of open-pit mine engineering is gradual, that is, the mining work should continue to move in space, the step work line should continue to expand and advance, and the open-pit will expand further and further.

The characteristics of open-pit mining work are summarized: the production object is the natural ore rock, the mining site and production conditions continue to change, the old level continues to end the new level of production, forming the mining process from preparation to production and from production to new preparation of the cycle of movement law, so that digging, stripping, and mining between the three always maintain interdependence and mutual constraints.

Open pit mining plan

I. The significance of mining:

➤ It is a necessary means to ensure the continuous balanced production of mines

People need to have a plan in mind to do any job. From construction to mining, it usually takes more than a decade or decades, which requires a comprehensive plan, especially the characteristics of open-pit mine production: Production objects and working conditions often change (mine quantity, grade, occurrence conditions, surrounding rock characteristics, groundwater, climate, etc.) The work place is scattered and often moves, there are many production links, and the mining work needs its own preparation, with a cyclic movement law from preparation to production and from production to new preparation. Therefore, it is more necessary to develop a thorough excavation plan. Based on the comprehensive consideration of the cooperation of each process link in the open pit, the development of mining engineering in each period of the mine is made a comprehensive arrangement. In order to make more rational use of manpower, materials and equipment, balanced completion and over-completion of production tasks.

➤ It is an important link to implement the "sixteen character policy" and do a good job in mine management

Mining plan is the use of drawings and tables, indicating the specific time, space and quantity relationship of open-pit mine project development. The open-pit mining policy can be carried out concretely by drawing up plans. Therefore, it is an important document to design and guide the balanced production and comprehensive balance of open pit mine, and an important link to ensure the normal and sustainable production of mine and do a good job in mine management, and must be carefully prepared and implemented.

Division of extractive plans and tasks of each type of plan:

Extractive plans can be divided into two types:

➤ An annual open-pit mining schedule in design

It is an important document of mine design, is the embodiment of design decisions, its task is to determine the initial mine production capacity, balanced production stripping ratio to verify, and arrange the implementation and more accurately determine the open pit infrastructure time, infrastructure engineering amount, time to put into production, production deadline, design calculation year and the total amount of mining and stripping. Advance the position of the work line year by year, and calculate the equipment, personnel and materials required for each period and other mine facilities according to this plan.

  • ABB 3HAC031851-001 SMB Unit Technical Manual
  • Fuji NB1U56X-01 Programmable Controller Guide
  • Siemens 6AG1153-2BA02-7XB0 SIPLUS IM 153-2 Manual
  • Beckhoff EL6631 PROFINET Terminal Manual
  • Lenze E82EV302-4C Frequency Inverter Manual
  • Siemens 6SE7038-6EK84-1JC2 IGD8 Board Specifications
  • Pilz 774595 Safety Relay Specifications
  • Fanuc A20B-8200-0847 PLC Board Specification
  • Allen Bradley 1785-L60B/E PLC CPU Manual
  • PASABAN MC-2006 03 PLC Card Specifications
  • B&R X20CP1382 PLC Control Module X20 CPU
  • B&R X20DC2395 PLC Module Digital Output
  • AS-2P-70M-B Industrial PLC Communication Cable 70M
  • Siemens 6ES7136-6BA00-0CA0 PLC Module ET 200SP
  • Siemens 1FK7083-5AF71-1EB3 Servo Motor SIMOTICS S
  • WAGO 750 Series I/O Modules 750-842 750-530 750-430 750-602 750-514 750-600
  • Microchip TC9401CPD F/V Converter 100kHz 14DIP
  • Mitsubishi GT2310-VTBA GT2310-VTBD HMI Touch Screen 10.4 Inch
  • Siemens 3RT2036-1AN20 AC Contactor SIRIUS
  • Mitsubishi GT2708 HMI Touch Screen GT2708-VTBA VTBD STBA STBD
  • Siemens 6FC5110-0CB01-0AA0 CNC PLC CPU
  • ABB SINT4130C PCB Board
  • Omron NX1P2-1040DT PLC Controller
  • Fuji FRN3.7C1S-2J VFD
  • PLC-60/75 /E2UK Shielded Braided Cable
  • Omron CJ1W-NC434 Position Control Unit
  • Omron NX-AD2208 Analog Input Module
  • PASABAN MC-2006 03 PLC Card
  • Schneider 9038CR34 Pressure Switch
  • Pilz 240340 Safety Control Module
  • Mitsubishi A2NCPU Programmable Controller MELSEC
  • Mitsubishi Alpha XL Alarm Modem M20 Expansion
  • AutomationDirect D0-06DD2-D PLC DL06 Controller
  • Toshiba COMW01-21 PCB Control Board Turbine
  • Siemens 6FX1122-1AC02 Coupling Module SINUMERIK
  • Omron CVM1-CPU21-V2 CPU Unit Programmable
  • Beckhoff EL7041 Stepper Motor Terminal EtherCAT
  • B&R X20AI4622 Analog Input Module 4 Channels
  • OAT PMC25.2-003 Programmable Controller Module
  • Fanuc A16B-2200-0350 Graphic Board Series 16
  • Eaton Cutler Hammer 6-26-2 Contactor Contact Kit
  • Omron D4SL-NSK10-LK-K Safety Switch
  • Siemens C98043-A7001-L24 CUD1 Control Board
  • Mitsubishi A2NCPUR21-S1 PLC Module
  • National Instruments NI-9242 4-channel analog input module
  • BEMAC UST-202-D PLC Interface Board
  • Omron CJ1W-DA08C Analog Output Module
  • Mitsubishi QX521 CNC Interface Board
  • Schneider BMEP586040 High-Performance PLC Processor
  • Emerson 5X00875G01 Process Control PLC
  • Siemens SIMODRIVE 611 Power Module 6SN1145-1AA01-0AA0
  • Siemens 840C NC-CPU 486DX4 6FC5110-0BB04-0AA1
  • Mitsubishi GT2708 Series Operation Panel Touch HMI
  • Fanuc A04B-0103-C220 Programmable Controller Module
  • IFM CR2530 Programmable Controller for Mobile Automation
  • Omron FH-3050 Vision Controller i7-2715QE High Performance
  • National Instruments NI-9242 4-Ch Analog Input Module
  • B&R X20AI4632 Analog Input Module 4 Channels
  • Pilz 773600 Input Module Safety Automation
  • Panasonic AFPX-C60P Programmable Controller PLC
  • Siemens 6ES7414-2XL07-0AB0 S7-400 CPU Manual
  • Cutler Hammer WM34V Interlock Kit Manual
  • Pilz 777587 Safety Relay Specifications
  • Omron CJ2H-CPU64-EIP CPU Module Manual
  • B&R X20AI1744-3 Analog Input Module Guide
  • Schneider LC1G185BEEA Contactor Specification
  • Sharp LM64P101 LCD Screen Specifications
  • B&R X20AT4222 Temperature Module Guide
  • Mitsubishi A2UCPU-S1 Controller Specifications
  • Stein Sohn E 083.1 Rack Module Technical Guide
  • Omron CK3W-AX1515N Motion Controller
  • Schneider TSXP572634M PLC Processor
  • Epson RAIOC-33 Programmable Controller
  • GRID T&D iRTUe-D1R1-W.125 I/O Module
  • Fanuc A20B-2002-0520 Control Board
  • B&R X20IF1030 Interface Module
  • Schneider ATV320U55N4B VFD
  • Omron NA5-9W001B-V1 HMI Touchscreen
  • Mitsubishi A2NCPU PLC CPU Unit
  • Omron CJ2M-CPU34 PLC CPU Unit
  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module
  • Omron CJ1W-ETN21 Ethernet Module PLC
  • Allen-Bradley 2711P-T15C4A7 PanelView Plus 1500 Guide
  • Pilz 777602 Safety Module XV1P Specifications
  • NI cFP-2220 and cFP Modules Technical Guide
  • Keyence XG-EC80 Camera Input Unit Overview
  • Dynatronix CRS9-10 DC Power Supply Manual
  • Omron G3PW-A220EC-S-FLK Power Controller Manual
  • EVO SP SYSTEM PLC Control Panel Overview
  • B&R X20IF10G3-1 Interface Module Specifications
  • NL8060BC21-11 Industrial LCD Screen Specification
  • SK-G9-FAN1-F6 Cooling Fan Technical Specifications
  • US Drives 3000-4220-4-4 PLC Add-on Module
  • Allen-Bradley 2002-NX70-HSC4 High-Speed Counter
  • Schneider TM258LF42DR PLC Controller
  • Harris 8800-00002-02 PLC Power Control Center
  • NLT NL8060BC21-11C 8.4 LCD Panel
  • ABB PLUTO S20 V2 CFS Safety PLC
  • Omron NS12-TS00B-V2 NS12-TS00B-ECV2 HMI
  • 7-29 10 00 A PLC Expansion Module
  • B&R X20DC2395 PLC Module
  • Omron NE1A-SCPU02 Network Controller
  • GE IC200UEX624-C VersaMax Micro PLC
  • Rexroth GIV50-11 Position Limit Switch Assembly
  • B&R X20SLX410 Safety Logic Module
  • Omron CJ1W-NC433 Position Control Unit
  • Inovance AM600-CPU1608TP PLC Controller
  • ABB Pluto S20 V2 CFS Safety PLC
  • Omron CJ1W-NC113 Position Control Unit
  • Grundig NEA02 AES 0 PLC I O Module
  • Fanuc A16B-2202-0432 Control PCB Board
  • Siemens 6SN1124-1AA00-0DA0 Simodrive LT Module
  • B&R X20AO2632 Analog Output Module Specifications
  • Georges Renault 6159187760 PLC Board Technical Guide
  • IDEC PLC FC6A-D32K3CEE MicroSmart Controller Manual
  • 6ES7226-6BA32-0XB0 Fail-Safe Digital Input Guide
  • Programmable Controller PLC EC20-4040BRA Specification
  • Grundig PLC NEA02 AES 0 I/O Card Specification
  • Seiki POS-M 10-22-01 Card Positioning Board Manual
  • Ormec Systems PMC960 Motion Controller CPU Guide