Basic knowledge of open pit mining

来源: | 作者:佚名 | 发布时间 :2023-12-27 | 644 次浏览: | Share:

Divided by section shape: whole section (1-5 a), unilateral groove (1-5 b)

6. open pit An area where open pit mining has taken place and is taking place, formed by steps and open pits.

Hillside open air: closed circle above. Sunken open air: closed circle below.

Constituent elements:

(1) Side wall: the overall surface around the open-pit mine, divided into: top wall, bottom wall (slope), end wall.

(2) working slope (working slope of respose).

(3) working slope and working slope Angle.

(4) Non-working slope surface and final slope Angle.

(5) Upper and lower final boundary line...... A closed curve where the surface of a non-working slope intersects the surface or the floor of an open pit at the end of mining.

(6) Final limit of open pit: the position defined by the final limit line at the upper and lower end.

Second, open pit mining process:

Perforation - blasting - mining - transport - discharge.

Process form: discontinuous process, continuous process, semi-continuous process.

These production links are closely coordinated with each other, so while constantly improving each production link, it is necessary to examine their links in order to improve the comprehensive production capacity of the all-open pit mine.

Third, the development process of open-pit mine project:

As mentioned earlier, the extraction of ore and rock from open pit mines is achieved from a certain process, and this work is generally referred to as open pit engineering.

Open pit mine engineering: according to the construction object, stripping engineering and mining engineering; According to the construction form, it can be divided into digging ditch works and covering works.

The development of mine engineering is carried out according to certain procedures.

For a step: Dig in and out of the trench opening section of the trench expansion.

For the upper and lower levels: trench digging and flank expansion are carried out at the same time, that is, the upper horizontal flank expansion is carried out at the same time as the lower horizontal trench digging, so:

The mine engineering depth continues to increase until the final mining depth.

The line of work at each level of production continues to advance outwards from the position of the initial ditch until the final boundary.

In the process of development, the open-pit mine gradually changes from small to large, from shallow to deep, and continuously extracts ore and strips rock until it is mined within the final boundary. The essential feature of the development process of open-pit mine engineering is gradual, that is, the mining work should continue to move in space, the step work line should continue to expand and advance, and the open-pit will expand further and further.

The characteristics of open-pit mining work are summarized: the production object is the natural ore rock, the mining site and production conditions continue to change, the old level continues to end the new level of production, forming the mining process from preparation to production and from production to new preparation of the cycle of movement law, so that digging, stripping, and mining between the three always maintain interdependence and mutual constraints.

Open pit mining plan

I. The significance of mining:

➤ It is a necessary means to ensure the continuous balanced production of mines

People need to have a plan in mind to do any job. From construction to mining, it usually takes more than a decade or decades, which requires a comprehensive plan, especially the characteristics of open-pit mine production: Production objects and working conditions often change (mine quantity, grade, occurrence conditions, surrounding rock characteristics, groundwater, climate, etc.) The work place is scattered and often moves, there are many production links, and the mining work needs its own preparation, with a cyclic movement law from preparation to production and from production to new preparation. Therefore, it is more necessary to develop a thorough excavation plan. Based on the comprehensive consideration of the cooperation of each process link in the open pit, the development of mining engineering in each period of the mine is made a comprehensive arrangement. In order to make more rational use of manpower, materials and equipment, balanced completion and over-completion of production tasks.

➤ It is an important link to implement the "sixteen character policy" and do a good job in mine management

Mining plan is the use of drawings and tables, indicating the specific time, space and quantity relationship of open-pit mine project development. The open-pit mining policy can be carried out concretely by drawing up plans. Therefore, it is an important document to design and guide the balanced production and comprehensive balance of open pit mine, and an important link to ensure the normal and sustainable production of mine and do a good job in mine management, and must be carefully prepared and implemented.

Division of extractive plans and tasks of each type of plan:

Extractive plans can be divided into two types:

➤ An annual open-pit mining schedule in design

It is an important document of mine design, is the embodiment of design decisions, its task is to determine the initial mine production capacity, balanced production stripping ratio to verify, and arrange the implementation and more accurately determine the open pit infrastructure time, infrastructure engineering amount, time to put into production, production deadline, design calculation year and the total amount of mining and stripping. Advance the position of the work line year by year, and calculate the equipment, personnel and materials required for each period and other mine facilities according to this plan.

  • Metso A413177 Digital Interface Control Module
  • METSO A413222 8-Channel Isolated Temperature Input Module
  • Metso A413313 Interface Control Module
  • METSO D100532 Control System Module
  • METSO A413310 8-Channel Digital Output Module
  • METSO A413659 Automation Control Module
  • Metso D100314 Process Control Interface Module
  • METSO A413665 8-Channel Analog Output Module
  • METSO A413654 Automation Control Module
  • Metso A413325 Interface Control Module
  • METSO A413110 8-Channel Analog Input Module
  • METSO A413144 Automation Control Module
  • Metso A413160 Digital Interface Control Module
  • METSO A413152 8-Channel Digital Input Module
  • METSO A413240A Automation Control Module
  • METSO A413146 Digital Interface Control Module
  • METSO A413150 Multi-Role Industrial Automation Module
  • METSO A413125 Automation Control / I/O Module
  • Metso A413111 Interface Control Module
  • METSO A413140 Automation Control Module
  • METSO 020A0082 Pneumatic Control Valve Component
  • METSO 02VA0093 Automation Control Module
  • METSO 02VA0153 Actuator Control Module
  • METSO 02VA0190 Automation Control Module
  • Metso 02VA0193 Pneumatic Control Valve Component
  • METSO 02VA0175 Valve Actuator Module
  • METSO D100308 Industrial Control Module
  • MOOG QAIO2/2-AV D137-001-011 Analog Input/Output Module
  • MOOG D136-002-002 Servo Drive or Control Module
  • MOOG D136-002-005 Servo Drive Control Module
  • MOOG D136E001-001 Servo Control Card Module
  • MOOG M128-010-A001B Servo Control Module Variant
  • MOOG G123-825-001 Servo Control Module
  • MOOG D136-001-008a Servo Control Card Module
  • MOOG M128-010 Servo Control Module
  • MOOG T161-902A-00-B4-2-2A Servo-Proportional Control Module
  • MOTOROLA 21255-1 Electronic Component Module
  • MOTOROLA 12967-1 / 13000C Component Assembly
  • MOTOROLA 01-W3914B Industrial Control Module
  • Motorola MVME2604-4351 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME162-513A VMEbus Embedded Computer Board
  • MOTOROLA MPC2004 Embedded PowerPC Processor
  • Motorola MVME6100 VMEbus Single Board Computer
  • MOTOROLA MVME162PA-344E VMEbus Embedded Computer Board
  • MOTOROLA RSG2PMC RSG2PMCF-NK2 PMC Expansion Module
  • Motorola APM-420A Analog Power Monitoring Module
  • MOTOROLA 0188679 0190530 Component Pair
  • Motorola 188987-008R 188987-008R001 Power Control Module
  • MOTOROLA DB1-1 DB1-FALCON Control Interface Module
  • MOTOROLA AET-3047 Antenna Module
  • Motorola MVME2604761 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME761-001 VMEbus Single Board Computer
  • MOTOROLA 84-W8865B01B Electronic System Module
  • Motorola MVIP301 Digital Telephony Interface Module
  • MOTOROLA 84-W8973B01A Industrial Control Module
  • MOTOROLA MVME2431 VMEbus Embedded Computer Board
  • MOTOROLA MVME172PA-652SE VMEbus Single Board Computer
  • Motorola MVME162-223 VMEbus Single Board Computer
  • MOTOROLA BOARD 466023 Electronic Circuit Board
  • Motorola MVME333-2 6-Channel Serial Communication Controller
  • MOTOROLA 01-W3324F Industrial Control Module
  • MOTOROLA MVME335 VMEbus Embedded Computer Board
  • Motorola MVME147SRF VMEbus Single Board Computer
  • MOTOROLA MVME705B VMEbus Single Board Computer
  • MOTOROLA MVME712A/AM VMEbus Embedded Computer Board
  • MOTOROLA MVME715P VMEbus Single Board Computer
  • Motorola MVME172-533 VMEbus Single Board Computer
  • Motorola TMCP700 W33378F Control Processor Module
  • MOTOROLA MVME188A VMEbus Embedded Computer Board
  • Motorola MVME712/M VME Transition Module
  • Motorola 30-W2960B01A Industrial Processor Control Module
  • MOTOROLA FAB 0340-1049 Electronic Module
  • Motorola MVME162-210 VME Single Board Computer
  • Motorola MVME300 VMEbus GPIB IEEE-488 Interface Controller
  • MOTOROLA CPCI-6020TM CompactPCI Processor Board
  • Motorola MVME162-522A VMEbus Single Board Computer
  • MOTOROLA MVME162-512A VMEbus Single Board Computer
  • MOTOROLA MVME162-522A 01-W3960B/61C VMEbus Single Board Computer
  • MOTOROLA MVME162-220 VMEbus Embedded Computer Board
  • Motorola MVME162-13 VMEbus Single Board Computer
  • MOTOROLA MVME162-10 VMEbus Single Board Computer
  • RELIANCE 57C330C AutoMax Network Interface Module
  • RELIANCE 6MDBN-012102 Drive System Module
  • RELIANCE 0-60067-1 Industrial Drive Control Module
  • Reliance Electric 0-60067-A AutoMax Communication Module
  • RELIANCE S0-60065 System Control Module
  • RELIANCE S-D4006-F Industrial Drive Control Module
  • Reliance Electric S-D4011-E Shark I/O Analog Input Module
  • RELIANCE S-D4009-D Drive Control Module
  • RELIANCE S-D4043 Drive Control Module
  • Reliance DSA-MTR60D Digital Servo Motor Interface Module
  • RELIANCE 0-60063-2 Industrial Drive Control Module
  • RELIANCE S-D4041 Industrial Control Module
  • Reliance Electric SR3000 2SR40700 Power Module
  • RELIANCE VZ7000 UVZ701E Variable Frequency Drive Module
  • RELIANCE VZ3000G UVZC3455G Drive System Module
  • Reliance Electric S-D4039 Remote I/O Head Module
  • RELIANCE 0-57210-31 Industrial Drive Control Module
  • RELIANCE 0-56942-1-CA Control System Module
  • Reliance Electric 0-57100 AutoMax Power Supply Module
  • RELIANCE 0-54341-21 Industrial Control Module
  • RELIANCE 0-52712 800756-21B Drive Interface Board
  • KEBA PS242 - Power Supply Module
  • KEBA BL460A - Bus Coupling Module
  • KEBA K2-400 OF457/A Operating Panel
  • KEBA T200-M0A-Z20S7 Panel PC
  • KEBA K2-700 AMT9535 Touch Screen Panel
  • KEBA T20e-r00-Am0-C Handheld Terminal
  • KEBA OP350-LD/J-600 Operating Panel
  • KEBA 3HAC028357-001 DSQC 679 IRC5 Teach Pendant
  • KEBA E-32-KIGIN Digital Input Card
  • KEBA FP005 Front Panel
  • KEBA BT081 2064A-0 Module
  • KEBA FP-005-LC / FP-004-LC Front Panel
  • KEBA SI232 Serial Interface
  • KEBA T70-M00-AA0-LE KeTop Teach Pendant
  • KEBA KEMRO-BUS-8 Bus Module
  • KEBA IT-10095 Interface Terminal
  • KEBA RFG-150AWT Power Supply Unit
  • KEBA C55-200-BU0-W Control Unit
  • KEBA Tt100-MV1 Temperature Module
  • KEBA E-HSI-RS232 D1714C / D1714B Interface Module
  • KEBA E-HSI-CL D1713D Interface Module
  • KEBA D1321F-1 Input Module
  • KEBA E-32-D Digital Input Card
  • KEBA C5 DM570 Digital Module
  • KEBA XE020 71088 Module
  • KEBA E-16-DIGOUT Digital Output Card