Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Promote the high-quality development of renewable energy in the 14th Five-Year Plan

来源: | 作者:佚名 | 发布时间 :2024-01-09 | 534 次浏览: | Share:

The "14th Five-Year Plan" period is the first five years for China to start a new journey to comprehensively build a modern socialist country and march toward the second centennial goal, and it is also a difficult period for China to accelerate the green and low-carbon energy transformation and implement the nationally determined contribution to address climate change, and China's renewable energy has entered a new stage of development. 

Fully understand the new situation and requirements of the "14th Five-Year Plan" for the development of renewable energy

At present, a new round of global energy revolution and scientific and technological revolution is deeply evolving, and vigorously developing renewable energy has become a major strategic direction and concerted ambitious action for global energy transformation and climate change.  "14th Five-Year Plan" China's renewable energy development is facing a new situation, new requirements, is in a promising period of strategic opportunities.

Vigorously developing renewable energy is a major measure to further promote the energy revolution and ensure national energy security.  Among them, the installed capacity of hydropower, wind power, photovoltaic power generation and biomass power generation has ranked first in the world for many years, laying a solid foundation for the construction of a multi-wheel drive energy supply system of coal, oil, gas, nuclear, new energy and renewable energy to ensure safe and reliable energy supply. However, we must also clearly see that in the future, China's economy will be good for a long time, energy demand will continue to grow for a long period of time, under the constraints of China's carbon emission reduction, vigorously develop renewable energy has become the inevitable choice to accelerate the construction of clean low-carbon, safe and efficient energy system, based on domestic diversified supply to ensure security, and gradually achieve energy independence.

Vigorously developing renewable energy is an objective requirement for accelerating the construction of ecological civilization and realizing sustainable development.  In 2020, China's renewable energy generation will reach 2.2 trillion KWH, accounting for nearly 30% of the total electricity consumption in society, an increase of 9.5 percentage points over 2012, and make positive contributions to China's solemn commitment to achieve 15% of non-fossil energy consumption by 2020, promote energy structure adjustment and green low-carbon transformation. At the same time, it should be noted that China's energy production and consumption volume is large, and the proportion of renewable energy in China still lags behind that of major OECD developed countries. We must firmly implement the development concept of "clear waters and green mountains are gold hills and silver mountains", adhere to the synergies of reducing pollution and carbon emissions, and further leverage the ecological and environmental benefits of renewable energy and ecological governance. We will promote the coordinated development of renewable energy development and ecological progress and complement each other.

Vigorously developing renewable energy is a leading force in achieving the goal of peaking carbon neutrality and fulfilling the INDCs to address climate change.  The energy industry has a large scale, strong correlation and wide range of influence, and the carbon emissions from energy activities account for a high proportion of the total carbon emissions in the country. The energy field is a key field for achieving carbon peak and carbon neutrality. Renewable energy does not emit pollutants, nor does it emit greenhouse gases, is a natural green energy. In 2020, China's renewable energy development and utilization scale will reach 680 million tons of standard coal, equivalent to nearly 1 billion tons of alternative coal, and carbon reduction benefits are very significant. To achieve peak carbon neutrality, energy is the main battlefield, and renewable energy is both the vanguard and the main force. We must always maintain the unswerving strategic determination to give priority to development and vigorously develop renewable energy, accelerate the implementation of renewable energy alternative actions, accelerate the promotion of renewable energy to become the main body of incremental energy and electricity in China, and provide a strong guarantee for achieving the goal of carbon peak carbon neutrality and fulfilling the voluntary contribution commitment to address climate change.

Accurately grasp the new characteristics of the new stage of the development of renewable energy in the "14th Five-Year Plan"

During the "13th Five-Year Plan" period, China's renewable energy development and utilization scale ranks first in the world, the level of technology and equipment has been greatly improved, the industrial competitiveness has been continuously enhanced, and remarkable achievements have been made. "14th Five-Year Plan" period, China's renewable energy has stood at a new historical starting point, is accelerating into a new stage, showing new characteristics.

Renewable energy will enter a new stage of high-quality development. During the "14th Five-Year Plan" period, under the multi-objective constraints of ensuring energy security, achieving green and low-carbon transformation, promoting ecological civilization construction, and coping with climate change, China's renewable energy will continue to maintain a rapid development trend. In particular, China's carbon dioxide emissions not only to peak before 2030, but also to achieve carbon neutrality after the carbon peak is far less than the time of developed countries, we must achieve the "first stand before breaking" of energy transformation in less than 10 years, China's renewable energy development is bound to further shift speed, to achieve accelerated replacement of fossil energy. We will move faster into a new stage of rapid development. At the same time, during the "14th Five-Year Plan" period, China's renewable energy should not only achieve continuous technological progress, continuous cost reduction, continuous improvement of efficiency, continuous enhancement of competitiveness, and comprehensive realization of subsidy-free parity and even low-price market-oriented development, but also accelerate the solution of key issues such as high proportion of consumption, key technology innovation, industrial chain and supply chain security, stability and reliability, and further improve quality and efficiency. We will move faster into a new stage of high-quality development.

Renewable energy will show new characteristics of large-scale, high proportion, marketization and high-quality development. First, large-scale development, on the basis of the leap-forward development of the "13th Five-Year Plan" period, the annual installed capacity of renewable energy power generation will be greatly increased during the "14th Five-Year Plan" period, the total installed capacity will be further expanded, and the main position of power generation installation will be accelerated. On the basis of maintaining a high utilization level in the "13th Five-Year Plan", the proportion of renewable energy in primary energy consumption during the "14th Five-Year Plan" period will continue to increase, and the proportion of energy and electricity consumption will exceed 50%, accelerating the growth of energy and electricity consumption. Third, market development, on the basis of the "13th Five-Year Plan" by policy-driven development, rely on subsidies to support development, the "14th Five-Year Plan" period of renewable energy development will further give full play to the decisive role of the market in resource allocation, better play the role of the government, accelerate the transformation to market-driven development, affordable and low-cost development, wind power and photovoltaic power generation will be fully rid of the dependence on financial subsidies, Achieve self-development and independent development. Fourth, high-quality development, during the "14th Five-Year Plan" period, renewable energy industry chain and supply chain innovation chain continued to consolidate and improve, renewable energy alternative actions were further implemented, new energy consumption and storage capacity significantly improved, the total renewable energy consumption responsibility weight and non-hydropower consumption responsibility weight reached 33% and 18%, respectively. A new power system with a gradually increasing proportion of new energy will be gradually built, and renewable energy will not only achieve large-scale development and construction, but also achieve a high level of consumption and utilization, and more effectively ensure the stable and reliable supply of electricity.

We will fully implement the new ideas and measures for the development of renewable energy in the 14th Five-Year Plan

During the "14th Five-Year Plan" period, renewable energy development opportunities are rare, the prospect is extremely broad, and the task is arduous.  We will implement actions to replace renewable energy, improve the consumption and storage capacity of renewable energy, consolidate and enhance the core competitiveness of the renewable energy industry, build a new power system with a gradually increasing proportion of new energy, strive to promote the large-scale, high-proportion, market-oriented and high-quality development of renewable energy, and effectively support the construction of a clean, low-carbon, safe and efficient energy system.

Optimize development with regional layout. Adhere to centralized and distributed development, onshore and offshore development, local consumption and export consumption, single-variety development and multi-variety complementary development, single scene and comprehensive scene development, power generation utilization and non-electricity utilization, optimize and promote the base and scale development of wind power and photovoltaic in the "three North" region, and comprehensively promote the comprehensive development of water and scenery in the southwest region. In the southern Middle East, we will focus on the local and nearby development of distributed wind power and photovoltaic power generation; in the eastern coastal region, we will actively promote the cluster development of offshore wind power; steadily promote the diversified development of biomass energy; actively promote the large-scale development of geothermal energy; and steadily advance the demonstration development of Marine energy. We will strive to build a new situation in which renewable energy sources complement each other, adapt to local conditions, and develop in diverse and integrated ways.

Major bases to support development. Give full play to the role of the large base "group army" and "main force" to effectively support the rapid development of renewable energy. We will accelerate the construction of seven new energy bases on land: the upper Yellow River, the Hexi Corridor, the Zigzagging Yellow River, the Northern Hebei Province, Songliao, Xinjiang and the Lower Yellow River, with scenic resources as the guide, trans-provincial and trans-regional power transmission channels as the support, and flexible power supply regulation, focusing on deserts, Gobi and desert areas. We will promote the construction of large hydropower bases in a scientific and orderly manner, and make coordinated progress in the development and construction of the two major hydropower bases in Sichuan, Yunnan, Guizhou, Guangxi, and southeast Tibet, relying on the regulation capacity of the hydropower bases in Southwest China and their export channels. We will optimize the layout of offshore wind power, carry out far-reaching offshore wind power planning, promote large-scale offshore development and far-reaching offshore demonstration development, and focus on building five offshore wind power base clusters in Shandong Peninsula, Yangtze River Delta, southern Fujian, eastern Guangdong and Beibu Gulf.

Demonstration projects will lead development. Adhere to innovation as the fundamental driving force for the development of renewable energy, and accelerate the cultivation of new technologies, new models and new forms of business for renewable energy. We will focus on promoting far-reaching offshore wind power, outdoor demonstration of photovoltaic power generation, new high-efficiency photovoltaic cells, geothermal power generation, medium and deep geothermal heating and other demonstrations to enhance the innovation and competitiveness of the renewable energy industry. Focusing on multiple integration, we will focus on the demonstration of photovoltaic sand control, photovoltaic corridors, far-reaching and affordable offshore wind power, offshore energy islands, deep integration of offshore wind power with offshore oil and gas, large-scale hydrogen production from renewable energy, bio-natural gas, biomass power generation, and clean biomass heating, and explore a new model of multi-variety complementary and multi-scenario comprehensive development of renewable energy. Focusing on the high proportion of consumption, we will focus on the implementation of small and medium-sized pumped storage, high-proportion new energy applications, green energy demonstration counties (parks), new energy micro-energy networks in villages and towns, and clean energy demonstration provinces, and take multiple measures to improve the level of consumption and utilization of renewable energy.

Implement development with action plans. Promote the deep integration of renewable energy development with ecological civilization construction, new urbanization, rural revitalization, new infrastructure, and new technologies, and constantly expand new areas and scenarios for renewable energy development. The implementation of thousands of villages to control the wind action, vigorously promote the decentralized development of wind power; Actively promote the upgrading of old wind farms in high-quality resource areas, and comprehensively improve the efficiency of wind power development and utilization; The implementation of rooftop photovoltaic development action, thousands of households Muguang action, "photovoltaic +" comprehensive utilization action, to promote the integration of photovoltaic power generation multi-scene development; We will actively investigate pumped storage resources, formulate and implement medium - and long-term plans for pumped storage, and improve the storage and regulation capacity of renewable energy. Expand the scale of non-electricity use of renewable energy, implement large-scale renewable energy heating activities in light of local conditions, and help the northern region clean heating; Focusing on rural revitalization, we will implement the rural power grid consolidation and upgrading project and rural energy station action, comprehensively improve the level of clean and electrified rural energy, and support the construction of ecologically livable and beautiful villages.

During the "14th Five-Year Plan" period, the National Energy Administration will strengthen policy supply, promote mechanism innovation, and create a good environment for the high-quality development of renewable energy. We will deepen the reform of delegating control over government services, intensify efforts to streamline administration and delegate power, improve oversight and management mechanisms, and improve government services. Improve the renewable energy consumption guarantee mechanism, strengthen weight guidance, strengthen evaluation and assessment, and promote all types of market players to share the responsibility for renewable energy consumption in a fair and reasonable way. We will improve the management mechanism for the development and construction of renewable energy, improve the fully guaranteed purchase system and price formation mechanism for renewable energy, and build a market system that fully reflects the ecological and environmental value of renewable energy and competes fairly with traditional energy sources. Improve the green electricity certificate system, do a good job of connecting with carbon trading, establish a green energy consumption evaluation, certification and identification system, and actively guide green energy consumption. Strengthen policy coordination, jointly with relevant departments, do a detailed survey of renewable energy resources, increase land, environmental, fiscal, financial and other support, and provide a comprehensive policy guarantee for the development of renewable energy.

It is of great significance, glorious mission and arduous task to vigorously develop renewable energy.  We will make new and greater contributions to the energy revolution and the comprehensive green and low-carbon transformation of economic and social development.


  • ABB 3BSE008062R1 PM633 Processor Module
  • ABB L110-24-1 Industrial Control Module
  • ABB IMDSO14 Digital Slave Output Module
  • ABB DSU10 Control Module
  • ABB DSQC627 3HAC020466-001 Advanced Power Supply Module
  • ABB DSQC354 Industrial I/O Module
  • ABB DSQC352 High Performance Input/Output Module
  • ABB 37911-4-0338125 Control Module
  • ABB DSPC172 CPU Module
  • ABB DSBB175 Industrial PLC Expansion Module
  • ABB CR-M4LS Industrial Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB BB510 (DC5256) Digital Control Module
  • ABB 61615-0-1200000 High-Precision Industrial Controller
  • ABB 3HNE 00313-1 TILLV.0317 Machine No. 64-25653
  • ABB 3HNA000512-001 Control Module
  • ABB 3HAC025466-001 Industrial Control Module
  • ABB 3HAB8101-8/08Y Industrial Control Module
  • ABB 3BHB003689 Multifunction Controller Module
  • ABB PXBHE65 206-00212 power module
  • ZUNKU 6203-2RS Deep Groove Ball Bearing
  • ZUNKU 6201-2RS Deep Groove Ball Bearing
  • ZYCOM IGLACS01281 Control Module
  • Zygo 8010-0105-02 ZMI-501 Displacement Measurement Interferometer
  • Zygo 1115-801-346 laser head cable
  • ZYGO HSSDC2 TO HSSDC2 CABLE 1115-800-055
  • ZYGO HSSDC TO HSSDC2 CABLE 1115-800-056
  • ZYGO ZMI 4104C Measurement Electronics Board
  • ZYGO ZMI-2002 8020-0211 Measurement Board
  • ZYGO 7702 8070-0102-35 Laser Head
  • ZYGO ZMI 7702 8070-0102-01X Laser Head
  • ZYGO ZMI-4004 4-Axis VME64x Measurement Board
  • ZYGO PC200 CS1115-801-346 Laser interferometer cable
  • ZYGO 8010-0105-01 ZMI Power Supply
  • ZYGO ZMI-2002 8020-0211-1-J Laser system measurement board card
  • ABB 35AE92 control card
  • ABB 200900-004 I/O Adapter PLC Board
  • Siemens 6ES7193-4CA40-0AA0 ET 200S Electronic Module
  • Siemens 6AV2124-2DC01-0AX0 Comfort Panel
  • Siemens 6ES7421-7DH00-0AB0 Digital Input Module
  • Siemens 6ES7350-2AH01-0AE0 Counter Module
  • Siemens 6ES7231-0HC22-0XA0 Analog Input Expansion Module
  • Siemens ET200SP 6ES7193-6PA00-0AA0 server module
  • Siemens 6ES7193-4JA00-0AA0 Terminal Module
  • Siemens 6AG1204-2BB10-4AA3 Ethernet Switch
  • SIEMENS 6GK1105-2AA10 SIMATIC NET series optical switching module (OSM ITP62)
  • Schneider Modicon Quantum 140CPU65260 Unity Processor
  • Schneider Modicon Quantum 140ACO02000 Analog Output Module
  • Schneider Modicon Quantum 140CPS11420 power module
  • Allen-Bradley 1747-CP3 SLC ™ Series of programming cables
  • Kollmorgen S33GNNA-RNNM-00 - Brushless Servo Motor
  • Kollmorgen 6sm56-s3000-g-s3-1325 - Servo Motor
  • Kollmorgen AKM52K-CCCN2-00 - Servo Motor
  • Kollmorgen PSR3-230/75-21-202 - Power Supply
  • Kollmorgen akm24d-anc2r-00 - Servo Motor
  • Kollmorgen AKM22E-ANCNR-00 - Servo Motor
  • Kollmorgen S60300-550 - Servo Drive
  • Kollmorgen B-204-B-21 - Servomotor
  • Kollmorgen AKM21E-BNBN1-00 - Servo Motor
  • Kollmorgen TT2953-1010-B - DC Servo Motor
  • Kollmorgen pa8500 - Servo Power Supply
  • Kollmorgen BDS4A-210J-0001-207C2 - Servo Drive
  • Kollmorgen TTRB1-4234-3064-AA - DC Servo Motor
  • Kollmorgen MH-827-A-43 - Servo Motor
  • Kollmorgen AKM24D-ACBNR-OO - Servo Motor
  • Kollmorgen 00-01207-002 - Servo Disk DC Motor
  • Kollmorgen AKM21C-ANBNAB-00 - Servo Motor
  • Kollmorgen PSR3-208/50-01-003 - Power Supply
  • Kollmorgen 6SM56-S3000 - Servo Motor
  • Kollmorgen DBL3H00130-B3M-000-S40 - Servo Motor
  • Kollmorgen 6SN37L-4000 - Servo Motor
  • Kollmorgen AKM65K-ACCNR-00 - Servo motor
  • Kollmorgen 6SM56-L3000-G - Servo Motor
  • Kollmorgen AKMH43H-CCCNRE5K - Servo Motor
  • Kollmorgen PSR4/52858300 - Power Supply
  • Kollmorgen KBM-79H03-E03 - Direct Drive Rotary Motor
  • Kollmorgen AKM33E-ANCNDA00 - Servo Motor
  • Kollmorgen U9M4/9FA4T/M23 - ServoDisc DC Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • Kollmorgen AKM43L-ACD2CA00 - Servo Motor
  • Kollmorgen AKM54K-CCCN2-00 - Servo Motor
  • Kollmorgen M-605-B-B1-B3 - Servo Motor
  • Kollmorgen AKD-P00606-NBAN-0000 - Rotary Drive
  • Kollmorgen 6SM-37M-6.000 - Servo Motor
  • Kollmorgen A.F.031.5 - Sercos Interface Board
  • Kollmorgen 918974 5054 - Servo PWM
  • Kollmorgen U12M4 - ServoDisc DC Motor
  • Kollmorgen AKD-B00606-NBAN-0000 - Servo Drive
  • Kollmorgen MV65WKS-CE310/22PB - Servo Drive
  • Kollmorgen 65WKS-CE310/22PB - Servo Drive
  • Kollmorgen EM10-27 - Module
  • Kollmorgen S64001 - Servo Drive
  • Kollmorgen CR03200-000000 - Servo Drive
  • Kollmorgen 6SM57M-3000+G - Servo Motor
  • Kollmorgen BDS4 - Servo Drive
  • Kollmorgen AKD-P00306-NBEC-000 - Servo Drive
  • Kollmorgen AKD-B01206-NBAN-0000 - Servo Drive
  • Kollmorgen STP-57D301 - Stepper Motor
  • Kollmorgen 6SM37L-4.000 - Servo Motor
  • Kollmorgen 44-10193-001 - Circuit Board
  • Kollmorgen PRDR9SP24SHA-12 - Board
  • Kollmorgen PRD-AMPE25EA-00 - Servo Drive
  • Kollmorgen DBL3N00130-0R2-000-S40 - Servo Motor
  • Kollmorgen S406BA-SE - Servo Drive
  • Kollmorgen AKD-P00607-NBEI-0000 - Servo Drive
  • Kollmorgen AKD-P01207-NBEC-0000 - Servo Drive
  • Kollmorgen CR03550 - Servo Drive
  • Kollmorgen VSA24-0012/1804J-20-042E - Servo Drive
  • Kollmorgen N2-AKM23D-B2C-10L-5B-4-MF1-FT1E-C0 - Actuator
  • Kollmorgen 04S-M60/12-PB - Servo Drive
  • Kollmorgen H33NLHP-LNW-NS50 - Stepper Motor
  • Kollmorgen A-78771 - Interlock Board
  • Kollmorgen AKM43E-SSSSS-06 - Servo Motor
  • Kollmorgen AKD-P00607-NBEC-0000 - Servo Drive
  • Kollmorgen E21NCHT-LNN-NS-00 - Stepper Motor
  • Kollmorgen cr10704 - Servo Drive
  • Kollmorgen d101a-93-1215-001 - Motor
  • Kollmorgen BDS4A-203J-0001-EB202B21P - Servo Drive
  • Kollmorgen MCSS23-6432-002 - Connector
  • Kollmorgen AKD-P01207-NACC-D065 - Servo Drive
  • Kollmorgen CK-S200-IP-AC-TB - I/O Adapter and Connector
  • Kollmorgen CR10260 - Servo Drive
  • Kollmorgen EC3-AKM42G-C2R-70-04A-200-MP2-FC2-C0 - Actuator
  • Kollmorgen BDS5A-206-01010-205B2-030 - Servo Drive
  • Kollmorgen s2350-vts - Servo Drive
  • Kollmorgen AKM24D-ANC2DB-00 - Servo Motor
  • Kollmorgen E31NCHT-LNN-NS-01 - Stepper Motor
  • Kollmorgen PRD-0051AMPF-Y0 - Servo Board