Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"14th Five-Year Plan" new energy industry development has a long way to go

F: | Au:佚名 | DA:2024-01-09 | 651 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:



"14th Five-Year Plan" new energy development shows new features

On June 1, 2022, nine departments including the National Development and Reform Commission and the National Energy Administration jointly issued the "14th Five-Year Plan for Renewable Energy Development" (hereinafter referred to as the "Plan"). The plan proposes to develop and efficiently use renewable energy on a large scale, and accelerate the cultivation of new models and new forms of business. By 2025, the total consumption of renewable energy will reach about 1 billion tons of standard coal, accounting for about 18% of primary energy consumption. Annual renewable energy generation reached 3.3 trillion KWH, and wind and solar power generation (5.460, 0.07, 1.30%) doubled; The weight of total renewable energy power and non-hydropower consumption responsibility reached about 33% and 18% respectively, and the utilization rate was kept at a reasonable level. The scale of non-electric utilization of solar thermal energy, geothermal energy heating, biomass heating and biomass fuel has reached more than 60 million tons of standard coal. "Planning" for the first time in the form of joint issuance of nine departments, reflecting that the use of renewable energy to achieve "both large-scale development, but also a high level of consumption, more to ensure the stable and reliable supply of electricity", must rely on energy, finance, natural resources, ecological environment, housing, agriculture and rural departments between the coordination mechanism.

Under the background of "double carbon", the task of high-quality development of new energy is arduous, and new and higher requirements are put forward for detailed investigation of resources, land and sea use, meteorological services, ecological environment, finance and other aspects of finance and finance, and it is urgent to improve the land, finance and other support policies related to the development of renewable energy, and strengthen policy coordination.

"14th Five-Year Plan" period, the development of new energy will show new characteristics: first, large-scale development, on the basis of leapfrog development, further accelerate the increase in the proportion of installed power generation; Second, high-proportion development, from the incremental supplement of energy and electricity consumption to the incremental main body, the proportion of energy and electricity consumption increased rapidly; Third, market-oriented development, from subsidy-supported development to affordable and low-cost development, from policy-driven development to market-driven development; Fourth, high-quality development, both large-scale development, but also a high level of consumption, more to ensure the stable and reliable supply of electricity.

Renewable energy underpayment problem is expected to usher in "living water"

From 2021, newly approved onshore wind power projects and photovoltaic projects will be fully connected to the Internet at parity, and the state will no longer subsidize them. Since 2022, the newly approved offshore wind power project countries will no longer subsidize, and the total demand for wind power photovoltaic state subsidies will basically close. With the accumulation of time, the renewable energy subsidy gap continues to expand, and the issue of subsidies has become a chronic disease that hinders the high-quality development of the renewable energy industry. According to the rough calculation of the wind energy Committee of the China Renewable Energy Society, by the end of 2021, the total amount of arrears in subsidies is about 400 billion yuan.

Since 2022, the issue of renewable energy subsidies has repeatedly appeared in the policy documents of relevant state departments, and the problem of renewable energy subsidies arrears is expected to usher in a turnaround. The Announcement of the State Grid Co., Ltd. on the allocation of the first renewable energy Price Additional subsidy funds in the 2022 annual budget shows that the Ministry of Finance is expected to allocate about 33.9 billion yuan of the annual budget of the company's renewable energy price additional subsidy funds. Among them, wind power generation is about 10.5 billion yuan, solar power is about 26 billion yuan, and biomass power is about 3.35 billion yuan. In August 2022, the grid company led the establishment of two major settlement companies in order to unlock the "knot" of subsidy arrears. With the issuance of subsidies, renewable energy underpayment ushered in "living water", and the pressure on related "scenery" companies' accounts receivable will be eased.

In the future, as the problem of subsidy funding gap is gradually solved, the operating conditions of renewable energy power generation enterprises will be improved, the cash flow pressure will be alleviated, the long-term investment ability of enterprises will be enhanced, and the development of the industry will form a virtuous circle.

In May 2022, The General Office of the State Council forwarded the Implementation Plan of the National Development and Reform Commission and the National Energy Administration on Promoting the High-quality Development of New Energy in the New Era, focusing on the difficulties and blocking points of the development of new energy. Improve policy measures in seven aspects: innovating development and utilization models, building new power systems, deepening the reform of "discharge and management services", supporting and guiding the healthy development of industries, ensuring reasonable space demand, giving full play to the benefits of ecological and environmental protection, and improving fiscal and financial policies. Put forward fiscal and financial measures to support the development of new energy.

Distributed photovoltaic development prospects are broad, but still need to solve the phased problems

During the "14th Five-Year Plan" period, the "whole county promotion" and "big base" will largely determine the scale and competitive pattern of photovoltaic development, and countless enterprises will compete fiercely around these two key words. Under the background of "dual carbon", photovoltaic development prospects are broad.

On June 29, 2022, the "Action Plan for Industrial Energy Efficiency Improvement" jointly issued by the Ministry of Industry and Information Technology and other six departments proposed to support qualified industrial enterprises and industrial parks to build industrial green microgrids, accelerate the development and operation of integrated systems such as distributed photovoltaic, distributed wind power, efficient heat pump, waste heat and pressure utilization, and smart energy management and control, and promote the efficient and complementary use of multi-energy. Encourage the purchase of green electricity through the electricity market, and use renewable energy at a large scale and in a high proportion nearby. Promote the innovation and upgrading of smart photovoltaic and the application of industry characteristics, innovate the "photovoltaic +" model, and promote the diversified layout of photovoltaic power generation. In order to accelerate the development of rooftop distributed PV, the National Energy Administration issued the Notice on submitting the Pilot Program for the development of rooftop distributed PV in the whole county (city, district) in June 2021. On September 14 of the same year, the National Energy Administration officially issued the "Notice on the announcement of the whole county (city, district) roof distributed photovoltaic development pilot List", there are 676 whole counties (city, district) in the country, which is listed as the roof distributed photovoltaic development pilot. At present, Zhejiang, Jiangsu, Hainan, Shandong, Hebei, Jiangxi and other places have officially issued the entire county (city, district) roof distributed photovoltaic policies.

According to the "2022 China Distributed Photovoltaic Industry Development White Paper" released in November 2022, under the guidance of the "dual carbon" goal, China's distributed photovoltaic market will develop more strongly in 2022. From January to September 2022, China's new installed installed capacity of distributed PV was 35.3 GW, an increase of 115% compared with the same period in 2021. From the perspective of the development model, the "whole county promotion" has a far-reaching impact on the domestic distributed photovoltaic market in 2022, prompting more enterprises and funds to enter the field of distributed photovoltaic. From the perspective of market players, more and more central enterprises and state-owned enterprises have established energy investment companies, using existing resources and capital advantages to enter the national distributed photovoltaic market.

However, the whole county to promote the overall outbreak of distributed, not only bright prospects, in the industry to vigorously promote the development of distributed photovoltaic into the fast lane at the same time, the industry is still facing many difficulties, challenges and even hidden dangers. How to balance the game between the government and the market economy is still a problem, and the balance of the rights and interests of the government, users, investors, installers, equipment manufacturers, operation and maintenance providers, financing providers and millions of practitioners is still the biggest difficulty in policy implementation. To this end, the National Energy Administration put forward five principles: voluntary no coercion, pilot no approval, in place no offside, competition no monopoly, work no suspension. With the implementation of relevant policies and regulatory measures, distributed photovoltaic is expected to crack the phased problems and enter a new stage of high-quality development.


  • Micro Innovation GF1-10TVD-100 Micro Panel
  • Micro Innovation XN-B3T-SBC 16-Fold DO Base Module
  • MICRO INNOVATION AG WINBLOC CAN-3AI/1AO-UI 85 51 224192
  • KMK Micro Innovation GS2-90EMD-000 Micro Panel
  • Micro Innovation MC2-430-10TVB-1-10 PanelView Terminal 24VDC
  • Micro Innovation XNE-8DO-24VDC-0.5A-P I/O Module 8550100795
  • MICRO INNOVATION GF1-10TVB-100 Touch Panel
  • MICRO INNOVATION AG WINBLOC CAN-4AI/UI Analog Input Module
  • MICRO INNOVATION AG WINBLOC CAN-32DO/0.5A-P-2x16 Output Module
  • MICRO INNOVATION AG CAN-32DI/P-2X16 8551224182 Input Module
  • MICRO INNOVATION MK2-230/232-57 Circuit Board 85 28 200000
  • MICRO INNOVATION CAN-BRIDGE 8551224177 CAN Bridge
  • Micro Innovation MC2-430-10TVB-1-10 Panel 24VDC
  • MICRO INNOVATION MC2-432-57CQB-1-10 HMI Panel
  • MICRO INNOVATION AG CAN-BRIDGE 85 51 224177 CAN Bridge
  • MICRO INNOVATION CAN-4AI/UI Analog Input Module
  • MICRO INNOVATION CAN-32DI/P-2X16 Input Module
  • SIGMATEK MDD111 09-404-111 Drive Module
  • SIGMATEK DVI021 Display Interface Module
  • SIGMATEK 00-450-024 C-IPC Processor
  • SIGMATEK MDD-111 MDD111 Drive Module
  • SIGMATEK ICA011 20-102-011 Interface Module
  • SIGMATEK 01-250-010-D NC4Kompakt Control Module
  • SIGMATEK CRIF081 12-751-081 Interface Module
  • SIGMATEK S1026-8AF61-R4E-Z57 Drive Module
  • SIGMATEK 9305.081.02 9227.082.00 Control Module
  • Sigma Tek 5000B-36 Attitude Indicator
  • SIGMATEK CEZ201 12-051-201-O Counter Module
  • SIGMATEK DPS001 Power Supply Module
  • SIGMATEK 994 395 01z Via Interface Module
  • SIGMATEK PC411-K 01-310-411-K Industrial PC
  • SIGMATEK 9816.324.00 Demag NC4 Keyboard
  • SIGMATEK ET261 90010C-71 Operator Terminal
  • SIGMATEK DDI 164 05-006-164 Input Module
  • SIGMATEK CCP 082 C-DIAS Processor Module
  • SIGMATEK CEZ201 12-051-201-O PLC Module
  • SIGMATEK MDD 1111 06178867 Drive Module
  • SIGMATEK S1 073-6AC61-RE-Y08-Z Drive Module
  • SIGMATEK MDD 111 Drive Module MDD111
  • SIGMATEK CSDI161 Safety Module 12-891-161
  • SIGMATEK C-IPC Processor 01-450-024
  • SIGMATEK DIAS DAM122 Analog Mixing Module
  • Sigma Tek 5000B-36 Attitude Gyro Indicator
  • SIGMATEK TMS012 Motherboard Module 05-250-012-T
  • SIGMATEK CCP-531 PLC Module
  • SIGMATEK DIAS DNC4 I/O Module 05-250-011
  • SIGMATEK AI088 Analog Input Module
  • SIGMATEK CEZ201 Counter Module
  • SIGMATEK CIC011 Industrial Computer Module
  • SIGMATEK MDM021 Motor Drive Module
  • SIGMATEK DTO163 Digital Output Module
  • SIGMA-TEK 5000B-36 Attitude Gyro
  • SIGMATEK DM161 Digital Input Module
  • SIGMATEK CCP-531 PLC Control Panel
  • SIGMATEK HZS773 Touch Terminal Operator Panel
  • SIGMATEK MDP101 3 KVA 45-65Hz Driver
  • SIGMATEK ETV1251 Touch Panel 12-230-1251
  • SIGMATEK CIO021 Safety Module 12-013-021
  • Sigma Tek 4000H-5 Directional Gyro
  • SIGMATEK TAE531 I/O Module 01-240-531
  • SIGMATEK DAI081 Input Module 05-009-081
  • SIGMATEK DCP640 Drive Control Module
  • SIGMATEK DCP643 Slides Module A6-29
  • SIGMATEK SCP011 Safety Module 20-890-011
  • SIGMATEK DDM 164-D Slides Module
  • SIGMATEK C-IPC Processor 146267
  • SIGMATEK ET3200 Display Screen
  • SIGMATEK CEZ221 C-DIAS Mixing Module
  • SIGMATEK SDD120-2 DIAS Servo Drive
  • SIGMATEK DIP011 05-058-011 Module
  • Sigmatek DEC181 I/O Module
  • SIGMATEK DCP640 DIAS Central Unit
  • SIGMATEK 00-450-024 C-IPC Industrial Computer
  • SIGMATEK AKM32C-ANCNR-B0 Servomotor
  • SIGMATEK DVI021 DIAS Power Module
  • SIGMATEK CTS051 12-053-051 Control Module
  • SIGMATEK CTS022 Control Module
  • Sigmatek 01-250-010-D NC4Kompakt V2.1 Module
  • SIGMATEK Control Keyboard 01-285-042 Interface
  • SIGMATEK TO081 20-007-081 Digital Output Module
  • Sigmatek AKM73Q-ANCNGBB0 7.07kW Servo Motor
  • Sigmatek DIP012 Demag 07024165 Processor Module
  • SIGMATEK PC 411 Injection Molding Controller
  • SIGMATEK CEZ201 12-051-201-O Processor Module
  • SIGMATEK VI021 20-003-021 Digital Input Module
  • SIGMATEK Computer C-IPC 144904 Industrial PC
  • SIGMATEK 9307.083.01 9305.081.02 Industrial Module
  • SIGMATEK AI075 Analog Input Module
  • SIGMATEK HGT834-W Teaching Pendant
  • Sigmatek CDI161 Digital Input Module
  • SIGMATEK HGT834 Teaching Pendant
  • SIGMATEK CEZ201 12-051-201-O Module
  • SIGMATEK Demag 9617.067.03 9708.244.00 Module
  • SIGMATEK SCP010 Safety CPU Module
  • SIGMATEK N100 20-011-100 Module
  • SIGMATEK CNC 031 Positioning Output Module
  • Sigmatek 01-355-016 Control Module
  • Sigmatek MDM021 Digital Mixed Module
  • Sigmatek DAI411 05-020-411 Analog Module
  • Attitude Gyro 1U367-232-2 Aircraft Instrument
  • Sigma-Tek 5000B-36 Attitude Gyro 23-501-06-16
  • Sigmatek HGT834-W Injection Molding Teach Pendant
  • Sigma Tek 5000EG Attitude Gyro 1U670-003-12
  • Sigmatek HGT834-W Teach Pendant
  • Sigmatek DEE011 05-068-011 Module
  • Sigmatek DIAS DCP643 Central Processing Unit
  • Sigmatek MDD111-1 DIAS Drive Axis Module
  • Sigmatek DKL042 05-024-042 Terminal Module
  • Sigmatek DM822 Control Module
  • Sigmatek CDM167 12-008-167-O Module
  • Sigmatek TAE151 Touch Display Unit
  • Sigmatek DCC041 SLIDES Module 05-700-041-D
  • Sigmatek AKM65M-ANC2GBB0 PM Servo Motor
  • Sigmatek ETT221 01-230-221 Operator Terminal
  • Sigmatek SLIDES DAM 124 Analog Module
  • Sigmatek AKM31C-ANCNGBB0 Servo Motor
  • Mannesmann Demag Sigmatek CP626 Central Unit
  • SIGMATEK 0332.554.03 Board 371071000154
  • SIGMATEK 12-250-021 Base Plate Back Panel CM5V020
  • SIGMATEK DM162 S-DIAS Digital Mix Module
  • DEMAG ERGOTECH 061 381 66 Sigmatek 9842.243.02 Circuit Board
  • SIGMATEK CP313-1 PLC Module
  • Sigmatek ETV0551-2 VARAN Touch Terminal
  • Sigmatek SDM 081 FS S-Dias Safety Module
  • DEMAG 05-250-023 Ergotech Motherboard with Sigmatek TMS012
  • Sigmatek CM5V020 12-250-023-K Wiring Base
  • Sigma Tek 5000B-37 Attitude Gyro Indicator
  • Sigmatek SDD120-2 DIAS Drive