Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Mine hydrogeological types and prevention measures of groundwater influence on mining

来源: | 作者:佚名 | 发布时间 :2024-01-11 | 667 次浏览: | Share:

O Quotation

China is currently in a stage of rapid development, the demand for resources is large, the mining industry is developing rapidly, but there is a certain risk in the mining process, there are often some safety accidents, to the life safety of the corresponding staff has brought a threat, but also destroyed the ecological resources, must be prevented.

1 Division of mine hydrogeological types

1.1 Classification of mine water filling types

There are various bases for the division of mine hydrogeological types. If it is based on geological exploration types, it can be divided into the following 6 types: ① Karst type. When mining, the groundwater encountered by the corresponding mining personnel is mainly karst water, and the mines affected by karst water are called karst mines. ② Pore type. The pore type mine has remarkable characteristics. The interior of the mine is full of pores. After the water enters the mine voids, it becomes a pore type mine. ③ goaf water type. In the process of mining, if the mining is not carried out arbitrarily according to the law, the goaf water mine will be formed, which will have a more adverse impact on the subsequent mining work. ④ Terrestrial phenotype. If the infiltration of surface water occurs, it will certainly cause a series of effects on the mining work, and this kind of mine is called the geological mine. ⑤ Fissure type. If there are some cracks in the mined mine, the water continuously washes the mine, it will form a crack mine. ⑥ Mixed type. There are many kinds of water filling conditions in the mine, which will form a mixed mine.

1.2 Division of complexity of mine hydrogeological conditions

It can be divided into four types: ① simple type. Both geological and hydrological conditions are very simple and very low in complexity. The corresponding personnel can use very simple methods to explore, and when mining, the difficulty is very small. ② Medium type. For medium-sized mines, there is a certain complexity in hydrological conditions, there is goaf water in the mine, but the amount is very small, and the exploration work is relatively easy. When determining the scale range, it can be effectively determined. ③ Complex type. In complex mines, the geological structure is usually very complicated, and the mine is filled with more water, and the exploration work is difficult to carry out. When exploring the scale of the mine, it is difficult to accurately understand the scale. ④ Extremely complex type. There is a lot of goaf water in such mines, and the water content is very large. The mine of extremely complex type has certain risk, and may collapse.

2. Impact of groundwater on mining

2.1 Influence of groundwater on mine foundation

In the process of mining, it is necessary to fully consider the influence of groundwater on mine foundation and carry out corresponding research work. If there is no specific need, the designer should design the location of the infrastructure when designing the foundation of the mine project. It is usually chosen to be set above the water table. If there are some specific needs, when the necessary infrastructure is set under the water table, a series of waterproof measures must be taken, and the necessary anti-corrosion treatment of the infrastructure must be carried out to improve the stability of the safe operation of the mine to a certain extent. If you want to set up some infrastructure in the confined water layer, it is necessary to strictly manage and control the groundwater level, and methods can be adopted to reduce the water level, effectively avoid the occurrence of groundwater discharge phenomenon, so as to ensure the smooth progress of mining work.

2.2 Damage to mine soil layer caused by groundwater pressure

In a relatively stable natural environment, there is generally no dynamic pressure of groundwater, but due to the influence of some factors, such as artificial irrigation, frequent mineral exploitation, etc., the balance of groundwater pressure will be reduced. When the balance is disturbed, local groundwater can become too stressed. If there is silty soil layer inside the mine, there may be sand flow phenomenon, which will cause deformation, displacement, etc., and the possibility of safety accidents will be increased. Therefore, when mining, appropriate means should be adopted to minimize the pressure on groundwater. Some mines themselves have some unstable factors, when not mined, unstable factors are not shown, if after contact with the outside world, a variety of mining equipment continue to carry out a variety of operations, it may cause unstable factors, therefore, it is necessary to closely observe the change of indicators.

2.3 Groundwater changes affect mines

Due to the influence of human and natural factors, the groundwater level will undergo a series of changes, and these changes continue to accumulate, and after reaching a certain degree, it will have an adverse impact on the mine soil layer, that is, the change of groundwater affects the mine. There are two kinds of groundwater change: water level rise and fall: (1) water level rise. When there are some changes in temperature, increasing rainfall, irrigation work, etc., the water level will rise, thus making the salinization problem more serious, not only will cause certain harm to the mine, but also may occur geological disasters, such as collapse, which will pose a certain threat to the safety of the mine. ② The water level drops. The groundwater level may decrease under some influences, which will make the hardness of the mine soil layer increase continuously, thus destroying the geological conditions and deforming the foundation to a certain extent, which is not conducive to the progress of mining work.

3 Related preventive measures

3.1 Clarify the evaluation content of hydrogeological exploration

Through the above introduction, we know that the hydrogeological types of mines are very diverse, and groundwater will also have a greater impact on the actual mining engineering. Therefore, it is necessary to clarify the evaluation content of hydrogeological exploration. ① When the corresponding staff does not carry out the exploration work, it is necessary to fully view the relevant data of the exploration area, and carry out the actual exploration on the basis of understanding the basic situation. In the process of exploration, it is necessary to delineate key indicators, and then collect a large amount of data information. When selecting survey sites, the number should be as large as possible to avoid missing problems. (3) Hydrogeological exploration work should be completed at different times, such as dry period and wet period, and the exploration methods adopted should be different. There will be some changes in the natural environment, using a variety of methods, can be better hydrogeological exploration work. (4) The corresponding staff need to start from multiple aspects when evaluating hydrogeological exploration, so that more accurate and comprehensive data information can be obtained to prevent accidents.

3.2 Attach importance to the testing and research of water quality

China's mineral resources mining work after a long time is also in continuous development, almost reached the peak state, if you want to continue mining, you must develop in the deep direction. The hydrogeological types of mines show an increasing state, and the influence of groundwater is also gradually expanding. Therefore, it is necessary to improve the testing and research on the water quality, obtain research results, and constantly improve the quality of the test, so as to provide more preventive countermeasures. When water quality is sampled, groundwater is usually sampled twice a year, during periods of low and high water. According to the actual situation, the sampling times can be increased. When the water quality is fully understood, the number of samples can be appropriately reduced. The types of groundwater are also very many, according to different basis, can be divided into different. If based on aquifer, it can be divided into pore water, fissure water and karst water. Different types of groundwater have different hydrological properties. After a thorough study of water quality data information, it is possible to understand the changes in water level and volume. According to a series of analysis, it is known that the hydraulic properties will affect the formation stability of the mine to a certain extent, and may lead to the formation deformation.

3.3 Strengthen the investigation of potential security risks and increase capital investment

Improving the investigation of safety hazards can effectively prevent the occurrence of geological and hydrological accidents. Some dangerous areas, often occur some accidents, for these areas to focus on the investigation. It is necessary to fully study the basic situation of the mining area, and when the investigation is carried out, it can not leave dead corners and investigate thoroughly. The corresponding technical personnel can be assigned to carry out special monitoring work, the 24-hour duty system can be implemented, appropriate monitoring methods can be adopted to collect data, and the deformation of dangerous rock mass can be prepared every day. Second, we need to increase capital input. In the process of mining work, if some safety risks are found, measures should be taken immediately to avoid the risks, timely evacuation of the surrounding residents, and residents should be given some relocation subsidies to protect the rights and interests of residents. If a security incident has occurred, measures should be taken to deal with it. The corresponding departments should also improve the management of mining rights, ensure the smooth rectification work, improve the market mechanism, and ensure the order of the market.

3.4 Mechanism innovation

It is necessary to innovate the management mechanism in time, design a scientific and reasonable emergency management plan according to the actual situation, and set up a mining team with a high professional level. For some safety accidents that have occurred, we should prevent them in time. Around the mining area, tailings ponds are sometimes built, so it is necessary to do the monitoring and reinforcement of tailings dam body to effectively avoid dam break accidents, so as to ensure the balance of ecological environment to a certain extent. The corresponding management personnel must establish the concept of prevention, improve the duty of some dangerous areas, and always pay attention to the weather changes, if the rain weather occurs, it should be timely response measures, set up some safety buffer zone, effectively avoid disasters. Some geological and hydrological accidents often occur when mineral resources are exploited and used efficiently. Therefore, it is necessary to improve the prevention and control level, pay attention to the protection of the environment, and ensure the sustainable development of the ecological environment. In the development process of the mineral resources industry, gradually realize the value of resources, control the rapid economic growth to a certain extent, and carry out paid development of mineral resources, which can effectively prevent the occurrence of excessive mining, and also carry out certain macro-control of the market.


  • ABB 1TGE120010R1300 Industrial Control Module
  • ABB 216BM61b HESG448267R1021 Advanced Process Control Module
  • ABB BDD110 HNLP205879R1 Digital I/O Module
  • ABB IEMPU02 Power Supply Module
  • ABB G3FE HENF452697R1 High performance control module
  • ABB G3FD HENF452692R1 High-Performance Industrial Control Module
  • ABB B5EC HENF105077R1 Electronic Motor Protection Relay
  • ABB G3EFa HENF450295R2 Industrial Automation Module
  • ABB B5EEd HENF105082R4 Electronic Motor Protection Relay
  • ABB O3EId HENF452777R3 Digital Output Module
  • ABB NWX511a-2/R HESG112548R12 Industrial Automation Module
  • ABB E3ES Power communication module
  • ABB O3EX HENF315845R2 Industrial Control Module
  • ABB O3EHa HENF315087R2 Digital Output Module
  • ABB E3ED High-Performance Industrial Controller
  • ABB O3EGb HENF315118R2 Digital Output Module
  • ABB O3ED Digital Input Module
  • ABB O3ES HENF445789R1 Digital Input Module
  • ABB G3ESa HENF318736R1 control module
  • ABB 8025-235 Industrial Control Module
  • ABB 216NG61A HESG441633R1 HESG216875/K main control board
  • ABB SCYC51020 58052582G programmable Logic Controller
  • ABB RED670 Line differential protection
  • ABB PP825A 3BSE042240R3 Touch Screen Panel
  • ABB SCYC51020 58052582/G pulse trigger board
  • ALSTOM COP232.2 VME A32/D32.029.232 446 Controller Unit
  • ABB AO2000 LS25 Laser analyzers
  • ABB LM80 Laser level transmitter
  • ABB PM803F 3BDH000530R1 Base Unit 16 MB
  • ABB SD822 3BSC610038R1 Power Supply Device
  • ABB PCD235B1101 3BHE032025R1101 Industrial Control Module
  • ABB AZ20/112112221112E/STD Control Module
  • ABB UAD142A01 3BHE012551R0001 Industrial Control Module
  • ABB 5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 main control board
  • ABB FET3251C0P184C0H2 High-Performance Power Module
  • ABB CAI04 Ability ™ Symphony ® Plus Hardware Selector
  • ABB R474A11XE HAFAABAAABE1BCA1XE output hybrid module
  • ABB REF542PLUS 1VCR007346 Compact Digital Bay Control
  • ABB REF542PLUS 1VCF752000 Feeder Terminal Panel
  • ABB PPD113B03-26-100100 3BHE023584R2625 output hybrid module
  • ABB 3BHE022293R0101 PCD232A Communication Interface Unit
  • ABB CI857K01 3BSE018144R1 Module Controller
  • ABB 3ASC25H216A DATX132 Industrial Controller
  • ABB LWN2660-6 High-Voltage Industrial Controller
  • ABB 1MRK00008-KB Control Module
  • ABB SC540 3BSE006096R1 Submodule Carrier
  • ABB REF615C_C HCFFAEAGANB2BAN1XC feeder protection and measurement and control device
  • ABB S-073N 3BHB009884R0021 multi-function servo driver
  • ABB SK827005 SK827100-AS 480V 60HZ coil
  • GE 029.381208 module
  • ABB REF615E_E HBFHAEAGNCA1BNN1XE Module
  • ABB TP830 3BSE018114R1 Baseplate Module
  • ABB TK803V018 3BSC950130R1 Cable Assembly
  • ABB DSRF197 3BSE019297R1 Controller Module
  • ABB DSAO120A 3BSE018293R1 Advanced Analog Output Board
  • ABB DSDP170 57160001-ADF Pulse Counting Module
  • ABB DSBC176 3BSE019216R1 Bus Extender Board
  • ABB DSDO115A 3BSE018298R1 Digital Output Module
  • ABB PM865K01 3BSE031151R1 Processor Unit HI
  • ABB 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 auxiliary DC power supply unit
  • ABB TP853 3BSE018126R1 Power Supply Module
  • ABB REM545AG228AAAA High Precision Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB REM615C_D HCMJAEADAND2BNN1CD Motor protection and control
  • ABB TP857 3BSE030192R1 DCS System
  • ABB PP865A 3BSE042236R2 Touch Panel
  • ABB SCYC51020 58052582H Industrial Automation Control Module
  • ABB SCYC51090 58053899E Control Module
  • ABB CB801 3BSE042245R1 Profibus DP Slave Expansion Module
  • ABB 5SHY4045L0001 3BHB018162R0001 IGCT Module
  • ABB 5SHY6545L0001 AC10272001R0101 5SXE10-0181 High-Power IGCT Module
  • ABB RMU811 Module Termination Unit
  • ABB TVOC-2-240 1SFA664001R1001 Industrial Control Module
  • ABB LDSTA-01 63940143B Input/Output (I/O) Module
  • ABB GJR5252300R3101 07AC91H Analog Input/Output Module
  • ABB GJR5252300R3101 07AC91F Industrial Control Module
  • ABB TB711F 3BDH000365R0001 Industrial Control Module
  • ABB TU715F 3BDH000378R0001 I/O Terminal Unit (ITU)
  • ABB DC732F 3BDH000375R0001 Industrial Controller
  • ABB TTH300 Head-mount temperature transmitter
  • ABB UNS3670A-Z V2 HIEE205011R0002 Industrial Automation Module
  • ABB RC527 3BSE008154R1 Redundant System Control Module
  • ABB 5SHY5055L0002 3BHE019719R0101 GVC736BE101 Industrial Control Module
  • ABB PM866 3BSE050200R1 AC800M series PLC core controller
  • ABB UFC718AE01 HIEE300936R0001 Main Circuit Interface Board
  • ABB DSAI130A 3BSE018292R1 Industrial I/O Module Controller
  • ABB 07KT98 GJR5253100R0278 Advanced Controller Module
  • ABB PFTL101B-5.0kN 3BSE004191R1 Power Conversion Module
  • ABB 5SHX1445H0002 3BHL000387P0101 IGCT Module
  • ABB 3HNM07686-1 3HNM07485-1/07 Controller Module
  • ABB DSCS131 57310001-LM DS Communication Board
  • ABB DSBC172 57310001-KD BUS REPEATER
  • ABB DSRF180A 57310255-AV Digital Remote I/O Module
  • ABB DSTC175 57310001-KN Precision Control Module
  • ABB DSSB140 48980001-P Battery Unit Industrial Control Module
  • ABB UAC389AE02 HIEE300888R0002 PCB Board
  • ABB PFTL101B 20KN 3BSE004203R1 DCS Module
  • ABB UFC718AE101 HIEE300936R0101 PCB Circuit Board
  • ABB UNS2880b-P,V2 3BHE014967R0002 Control Board
  • ABB UNS0887A-P 3BHE008128R0001 Communication Module
  • ABB UNS2882A-P,V1 3BHE003855R0001 EGC Board
  • ABB UNS2882A 3BHE003855R0001 Interface Board
  • ABB UNS4881b,V4 3BHE009949R0004 Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F 216EA62 Redundant system modules
  • ABB 216DB61 HESG324063R100/J Controller Module
  • ABB PFSK142 3BSE006505R1 Control board
  • ABB DSAI133A 3BSE018290R1 Analog Input Module
  • ABB PFTL201C-10KN 3BSE007913R0010 Load Cells
  • ABB CI858-1 3BSE018137R1 Industrial Module
  • ABB 5SHY35L4520 5SXE10-0181 AC10272001R0101 Controller
  • ABB TU847 3BSE022462R1 Module Termination Unit
  • ABB 6231BP10910 PLC Analog Output Module
  • ABB 07BR61R1 GJV3074376R1 Distributed I / O Coupler
  • ABB DI93A HESG440355R3 Digital Input Module
  • ABB IC660BBA104 6231BP10910 Industrial Control Module
  • ABB TP858 3BSE018138R1 Module Controller
  • ABB PFEA111-65 3BSE050090R65 Tension Electronics Module
  • ABB DSMB-02C 3AFE64666606 Power Supply Board
  • ABB MC91 HESG440588R4 HESG112714/B Wireless Router Modules
  • ABB PPD113-B03-23-111615 Excitation system controller
  • ABB AB91-1 HESG437479R1 HESG437899 Graphics Expansion Module
  • ABB IT94-3 HESG440310R2 HESG112699/B controller
  • ABB NF93A-2 HESG440280R2 HESG323662R1/HESG216665/K Module Controller
  • ABB IW93-2 HESG440356R1 HESG216678/B I/O module
  • ABB PM861K01 3BSE018105R1 Processor Module
  • ABB RB520 Dummy Module For Submodule Slot
  • ABB SR511 3BSE000863R1 SR511 Regulator 24V/5V
  • ABB DSDP140B 57160001-ACX Counter Board